SAUDI ARAMCO
CONSULTING SERVICES DEPARTMENT
ME&CCD/MEU
Procedure Review Sheet
CSD/ME&CCD/MEU
Log # MS- 13535
EMAS (Larsen & Toubro)
13/7/2017
REVIEW STATUS
Date
REVIEW STATUS DEFINITIONS:
Status
1
Contractor / Vendor
6600035803 (OOK) / BI No. 10-01902B.I. / Contract no.
P.O. Number
Procedure Type
PQR
Note: Fabrication of Jacket Legs, Deck Column, Piles, Crane Pedestal Column, Primary & Secondary Bracings
The following WPS's were all previously approved by Saudi Aramco CSD at Status 2, however, it is noted that L &
T have revised these WPS's and the following are approved for the given application. All previous approvals for the
following WPS's shall be discarded in favour of this approval.
L & T shall note that a CSD Status 1 or 2 is approved and does not require re-submission UNLESS for a technical
reason changes have to be made to the WPS.
LT-MFY-HASBAH-II-STR-04 Rev B LT-MFY-HASBAH-II-STR-43 Rev B
LT-MFY-HASBAH-II-STR-05 Rev B LT-MFY-HASBAH-II-STR-106 Rev B
LT-MFY-HASBAH-II-STR-10 Rev B LT-MFY-HASBAH-II-STR-77 Rev B
LT-MFY-HASBAH-II-STR-11 Rev B LT-MFY-HASBAH-II-STR-80 Rev B
LT-MFY-HASBAH-II-STR-12 Rev B LT-MFY-HASBAH-II-STR-103 Rev B
LT-MFY-HASBAH-II-STR-13 Rev B LT-MFY-HASBAH-II-STR-104 Rev B
LT-MFY-HASBAH-II-STR-36 Rev B LT-MFY-HASBAH-II-STR-105 Rev B
LT-MFY-HASBAH-II-STR-38 Rev B
LT-MFY-HASBAH-II-STR-39 Rev B
See BelowLine Cl. / Grp #
1 - APPROVED
2 - APPROVED AS NOTED. FABRICATION MAY PROCEED
3 - APPROVED AS NOTED, FABRICATION MAY PROCEED,
SUBMIT CORRECTED COPY
4 - NOT APPROVED; CORRECT AND RESUBMIT
5 - REVIEW NOT REQUIRED
RETURN TO:
Saad Al-Wahaib, Project Engineer
Fadhili Gas Program, Rm. 18, Floor 9, Petrofac House,
Tower 2, Al-Khan Road, Shajah, UAE
LTHE-EMAS/SA/HASBAH-II/OOK/D/C/09667
Incoming references:
Previous log reference: CSD/ME&CCD/MEU Log #
n/a
Equipment No. or
Design Code:
PQR No./Rev.
B31.1
B31.3
B31.4
B31.8
Sec.8 D1
Sec.8 D2
API 620
API 650
API RP2A
SMAW
GTAW
GMAW
FCAW
SAW
ESW
Welding Process(es)
Qualification Code
Sour
PWHT
Impacts
MDMT
P No. Gr. P No. Gr.
Filler Metal
Welding Procedure Specifications (WPS)
THE REFERENCED PROCEDURE(S) HAS BEEN REVIEWED AND EVALUATED IN CONJUNCTION WITH SUPPORTING DOCUMENTATION. UTILIZATION OF THIS PROCEDURE INDICATES THAT THE
MANUFACTURER OR CONTRACTOR CERTIFIES THAT THE STATEMENTS AND DATA IN THIS DOCUMENTATION ARE CORRECT. HE ASSERTS THE TEST WELDS WERE PREPARED, WELDED,
TESTED, AND MET THE REQUIREMENTS AS INDICATED AND IN ACCORDANCE WITH THE APPLICABLE CODE AND SAUDI ARAMCO STANDARDS AND SPECIFICATIONS
To
Service Conditions
WPS / Rev. As Listed
Transfer Mode
NA
Hrdn.
ASME Sec IX
API 1104
AWS D1.1
By
:
Malcolm Setchfield
wps
wps

More Related Content

What's hot

Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
Jithu John
 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginners
MOHAMMAD ATIF ALI
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
Mohamed Farouk
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
Jithu John
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbookram111eg
 
asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
Siamak Rafizadeh
 
radiographic-interpretation.pdf
radiographic-interpretation.pdfradiographic-interpretation.pdf
radiographic-interpretation.pdf
VENKATESAN S
 
API 653 - Material preparado.ppt
API 653 - Material preparado.pptAPI 653 - Material preparado.ppt
API 653 - Material preparado.ppt
ClaudiaPatriciaMagaa1
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
Praj Industries Ltd.
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
hesham ismail
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
Sayed Salah Elsawey
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1
Tiago Pereira
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
Karthik Banari
 
RT Acceptance criteria
RT Acceptance criteriaRT Acceptance criteria
RT Acceptance criteria
Anand Kishor
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
PKNanavati
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
Saqib Rasool
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
Sharad Naik
 

What's hot (20)

Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
 
Piping welding notes for beginners
Piping welding notes for beginnersPiping welding notes for beginners
Piping welding notes for beginners
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
 
radiographic-interpretation.pdf
radiographic-interpretation.pdfradiographic-interpretation.pdf
radiographic-interpretation.pdf
 
API 653 - Material preparado.ppt
API 653 - Material preparado.pptAPI 653 - Material preparado.ppt
API 653 - Material preparado.ppt
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
 
Presentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptxPresentation API 570 -510-653.pptx
Presentation API 570 -510-653.pptx
 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
RT Acceptance criteria
RT Acceptance criteriaRT Acceptance criteria
RT Acceptance criteria
 
ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
236135365 heat-treatment-manual
236135365 heat-treatment-manual236135365 heat-treatment-manual
236135365 heat-treatment-manual
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
 
495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx495265750-Hydro-Test-Procedure.docx
495265750-Hydro-Test-Procedure.docx
 
Presentation on SECVIII
Presentation on SECVIIIPresentation on SECVIII
Presentation on SECVIII
 

Similar to wps

761 27 may_2014
761 27 may_2014761 27 may_2014
761 27 may_2014
amconnect
 
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDFVP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
ssuser30385d
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)Mohd Zaini Baharum
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
Tonni Bruce
 
Satip nde-ut-01
Satip nde-ut-01Satip nde-ut-01
Satip nde-ut-01
Jagan Durga
 
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationNSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
surajkumar844960
 
testing formats
testing formatstesting formats
testing formats
Abhishek Shukla
 
- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...yang lu
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
AmitKunduDVC
 
Technical specifications package a vol 1
Technical specifications package a vol 1Technical specifications package a vol 1
Technical specifications package a vol 1
PRABIR DATTA
 
03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf
AnonymousbIe9JSMphs
 
HPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxHPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptx
sohamsohamalways
 

Similar to wps (20)

761 27 may_2014
761 27 may_2014761 27 may_2014
761 27 may_2014
 
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDFVP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
 
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
( Itp ag pipe) rapid p006 a scs qac itp 3200 0007
 
Inspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas PlanInspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas Plan
 
Inspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas PlanInspector Approval Wasit Gas Plan
Inspector Approval Wasit Gas Plan
 
Satip nde-ut-01
Satip nde-ut-01Satip nde-ut-01
Satip nde-ut-01
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationNSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 
5. Afghanistan US Army Approval
5. Afghanistan US Army Approval5. Afghanistan US Army Approval
5. Afghanistan US Army Approval
 
testing formats
testing formatstesting formats
testing formats
 
- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...- The preliminary investgation report for the oil gas process equipment co,lt...
- The preliminary investgation report for the oil gas process equipment co,lt...
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
 
Technical specifications package a vol 1
Technical specifications package a vol 1Technical specifications package a vol 1
Technical specifications package a vol 1
 
Report
ReportReport
Report
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 
03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf03c-eil-mr-3002-dd1059.pdf
03c-eil-mr-3002-dd1059.pdf
 
HPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptxHPCL Shapoorji Environment Impact AssessmentA.pptx
HPCL Shapoorji Environment Impact AssessmentA.pptx
 

Recently uploaded

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 

Recently uploaded (20)

Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 

wps

  • 1. SAUDI ARAMCO CONSULTING SERVICES DEPARTMENT ME&CCD/MEU Procedure Review Sheet CSD/ME&CCD/MEU Log # MS- 13535 EMAS (Larsen & Toubro) 13/7/2017 REVIEW STATUS Date REVIEW STATUS DEFINITIONS: Status 1 Contractor / Vendor 6600035803 (OOK) / BI No. 10-01902B.I. / Contract no. P.O. Number Procedure Type PQR Note: Fabrication of Jacket Legs, Deck Column, Piles, Crane Pedestal Column, Primary & Secondary Bracings The following WPS's were all previously approved by Saudi Aramco CSD at Status 2, however, it is noted that L & T have revised these WPS's and the following are approved for the given application. All previous approvals for the following WPS's shall be discarded in favour of this approval. L & T shall note that a CSD Status 1 or 2 is approved and does not require re-submission UNLESS for a technical reason changes have to be made to the WPS. LT-MFY-HASBAH-II-STR-04 Rev B LT-MFY-HASBAH-II-STR-43 Rev B LT-MFY-HASBAH-II-STR-05 Rev B LT-MFY-HASBAH-II-STR-106 Rev B LT-MFY-HASBAH-II-STR-10 Rev B LT-MFY-HASBAH-II-STR-77 Rev B LT-MFY-HASBAH-II-STR-11 Rev B LT-MFY-HASBAH-II-STR-80 Rev B LT-MFY-HASBAH-II-STR-12 Rev B LT-MFY-HASBAH-II-STR-103 Rev B LT-MFY-HASBAH-II-STR-13 Rev B LT-MFY-HASBAH-II-STR-104 Rev B LT-MFY-HASBAH-II-STR-36 Rev B LT-MFY-HASBAH-II-STR-105 Rev B LT-MFY-HASBAH-II-STR-38 Rev B LT-MFY-HASBAH-II-STR-39 Rev B See BelowLine Cl. / Grp # 1 - APPROVED 2 - APPROVED AS NOTED. FABRICATION MAY PROCEED 3 - APPROVED AS NOTED, FABRICATION MAY PROCEED, SUBMIT CORRECTED COPY 4 - NOT APPROVED; CORRECT AND RESUBMIT 5 - REVIEW NOT REQUIRED RETURN TO: Saad Al-Wahaib, Project Engineer Fadhili Gas Program, Rm. 18, Floor 9, Petrofac House, Tower 2, Al-Khan Road, Shajah, UAE LTHE-EMAS/SA/HASBAH-II/OOK/D/C/09667 Incoming references: Previous log reference: CSD/ME&CCD/MEU Log # n/a Equipment No. or Design Code: PQR No./Rev. B31.1 B31.3 B31.4 B31.8 Sec.8 D1 Sec.8 D2 API 620 API 650 API RP2A SMAW GTAW GMAW FCAW SAW ESW Welding Process(es) Qualification Code Sour PWHT Impacts MDMT P No. Gr. P No. Gr. Filler Metal Welding Procedure Specifications (WPS) THE REFERENCED PROCEDURE(S) HAS BEEN REVIEWED AND EVALUATED IN CONJUNCTION WITH SUPPORTING DOCUMENTATION. UTILIZATION OF THIS PROCEDURE INDICATES THAT THE MANUFACTURER OR CONTRACTOR CERTIFIES THAT THE STATEMENTS AND DATA IN THIS DOCUMENTATION ARE CORRECT. HE ASSERTS THE TEST WELDS WERE PREPARED, WELDED, TESTED, AND MET THE REQUIREMENTS AS INDICATED AND IN ACCORDANCE WITH THE APPLICABLE CODE AND SAUDI ARAMCO STANDARDS AND SPECIFICATIONS To Service Conditions WPS / Rev. As Listed Transfer Mode NA Hrdn. ASME Sec IX API 1104 AWS D1.1 By : Malcolm Setchfield