This document transmittal is requesting approval for an interview schedule with an Instrument QC Inspector, Mr. Muhammad Talha Kaleem, for Package 3 of the Wasit Gas Program SRU & Utilities Project. The Company Representative, Ahmed A. Awaji, has approved the request without comments. The Southern Area Projects Inspection Division also approved the inspector without comments, reserving the right to reevaluate the approval if performance falls below expectations, and noting the approval is for Package 3 only.
• Coordinating with Construction Supervisor project plan drawing review (having AFC drawing officially approved documentation.)
• Represent Company during weekly meeting concerning schedule plan activity and project plan on all tools and equipment needed for construction.
• Assigned to Review all Subcontractor Technical Documentation Circulation prior approval to all concerned lead official.
• Ensures instrument equipment works are compliant with project specifications, company procedures, method statements and quality assurance and controls documentation (strictly implementing the ISO 9000).
• Supervision and monitoring the flow of inspection on-site and calibration prior to meet the project deadline.
• Monitors all subcontractor activity priors for deadline start of Instrumentation Workload
• Coordinating with Construction Supervisor project plan drawing review (having AFC drawing officially approved documentation.)
• Represent Company during weekly meeting concerning schedule plan activity and project plan on all tools and equipment needed for construction.
• Assigned to Review all Subcontractor Technical Documentation Circulation prior approval to all concerned lead official.
• Ensures instrument equipment works are compliant with project specifications, company procedures, method statements and quality assurance and controls documentation (strictly implementing the ISO 9000).
• Supervision and monitoring the flow of inspection on-site and calibration prior to meet the project deadline.
• Monitors all subcontractor activity priors for deadline start of Instrumentation Workload
Mechanical Inspector - API 653 - KSA - CV.pdfssuser931ac3
17 years experience in mechanical inspection in different sectors including Oil & Gas Plants, Oil Refineries, Power & Desalination plants, Pipeline Projects, Construction industries.
I worked as API 653 inspector for storage tanks during new construction of tanks according to applicable standards (API 650 & API 620) and in-service inspection of tanks under scope of API 653 Standards.
Conduct pre-inspection meetings in order to understand and establish the quality and inspection requirements as per the applicable codes, standards, specifications and project requirements.
Reviewing of quality plans / ITPs, Process Maps, Work Instructions and inspection documents.
Execute work in accordance with strict compliance of agreed inspection and test plan and to carry out quality inspections accordingly to ensure the integrity and compliance of the item with the requirements of international codes, standards, specifications and customers project specification requirements.
Provide Third party inspection (TPI) services to construction companies, EPC contractors and to various clients in the Oil & Gas and Energy Sector.
Perform QA/QC activities according to related standards and codes.
Conduct on-stream inspection for equipment condition monitoring.
Conducts periodic inspections accordance with pre-established programs and procedures.
Supervises and coordinates NDT crews and Selects appropriate NDT techniques required for condition evaluation and interpret their results to applicable codes.
Review of material certificates as per ASME Sec II and ASTM & inspect stock materials delivered to assurance its compliance.
Witnessing of hydro test, pneumatic test Vacuum box test.
Shop and site inspection involving stage and final inspection, detect, identify, and report non-conformances during the course of the fabrication process.
Inspection of Painting and coating.
In-service inspection of Boilers, Pressure Vessels, Tanks, piping, etc.
FAT for Valves.
Structure Inspection during new construction.
Data gathering for Aramco RBI Projects.
Experienced to work with Large Refineries, Petrochemical Plants, Power Plants, and Cement Plant, at different positions in order to excel my carrier apply Engineering tools for the advancement of Process plants.
To work in an organization which provides me a career growth and to utilize my Engineering skills which will enable be to culminate into a rewarding career.
1. WASIT PROJECTS DEPARTMENT
WASIT SRU & UTILITIES PROJECT
WASIT SAPMT SITE OFFICE SRU BLDG. ROOM # 07
SAUDI ARABIA
DOCUMENT TRANSMITTAL
8-May-14
Contract No. 6600026171(IK)
TO: Kee Nam (Kenney) Cho
Contractor Representative
SK Engineering & Construction Co Ltd
Wasit Site Office
FROM:
TEL. NO.:
FAX NO. :
Mr. Ahmed A. Al-Awaji,
Company Representative (IK)
679 - 7200
679-7286
SRU TRANSMITTAL NO.: WPD-WUC-T-0262-14
SK TRANSMITTAL
NO.:
SK/IK-US-T-S4240/2014
is transmitted herewith
Documents EDiskettes Drawings
EDisapproval EApproval
Information 0Review 8, Comments
Title:
Pkg#3
Request for Interview Schedule to Instrument QC Inspector (Mr. Muhammad Talha Kaleem) - SKEC-
Comments:
COMPANY has approved without comments.
20 4.05. 1 2
SKEC
WASIT PKG#3 .
WASIT PKG # 3 PROJECT
Dept Act. int, Dept Act int.
PD HSE
CD OC
PM Admin
SM Schedule
CM Material
MPCM Civil
PCM Arch
...r
PPD Mech
PPM HVAC
MFEM Piping
FEM STUSTR
Sub—con Elec/Inst
Contract Paint
H/0
C: C over Only ca.:.1intil 3pages
ashy
ORIGINATOR:
Ahmed .Awa
NMS IHT
Or
NOTE:
RECEIVED BY: DATE:
Attachments:
Response Required: / N
DUE
DATE:
cc:
Note: COMPANY's review, revision, certification, acceptance or approval of documents in this correspondence shall not have the effect of
amending, modifying or limiting, in any way the CONTRACTOR's obligations stipulated in Contract No.6600026172(00K) or
6600026171(IK). Deviation to project standards, procedures, specifications...etc. shall be raised independently as a waiver request and
agreed according to contractual terms.
2. INSPECTION DEPARTMENT
SOUTHERN AREA PROJECTS INSPECTION DIVISION
WASIT PROJECTS INSPECTION SECTION
Room 03, PKG-3 SAPMT office building, WASIT
Tel: 679-7200; Fax: TBA
DOCUMENT REVIEW RESPONSE
Response No.: WPIS-SRU-799-14
SUBMITTING ARAMCO ORGANIZATION
Representative
r.)NAME:
DEPARTMENT:
ADDRESS:
TELEPHONE:
Ahmed A. Awaji, Company
SAPM 0 MAY 20V
SAPMT
679-7200
Project Description Wasit GAS program, SRU Utilities Project (WUC)
BI/JO 10-00914-0004 Main Contractor: SK Engrg. Const.
Reference
Your Transmittal: WPD/WUC/PID/T-0148-14 Ref. No. SK/IK-US-T-S4240-14
Submitted Document INSTRUMENT QC INSPECTOR (Mr MUHAMMAD TALHA KALEEM)
REVIEW STATUS REVIEW DEFINITIONS
1 — Approved without comments 7 — Reviewed with comments
2 — Approved with comments 8 — Partially reviewed with comments
3 — Approved with JC Cards attached 9 — Review not required
4 — Partial approval
5 — Not approved
6 — Reviewed, no comments
COMMENTS
Status-1-Approved without comments.
Note:-
• PID reserves the right to re-evaluate and revoke
expected level.
• Approval is for Pkg-3 Only.
this approval if his performance falls below the
Name of Signatory : Mohiddine Akkad-Salam
Supervisor
Date: 05/08/2014
Initial by: kif n Project File : SRU-799
3. engineeringengineering construction
WASIT GAS PROGRAM, SRU UTILITIES PROJECT (WUC)
TRANSMITTAL
To,
Mr, Ahmed A. AL-Awaji DATE : 07 / Apr / 2014
Company Representative (1K) TR. NO. : SK/IK-US-T-S4240/2014
Saudi Aramco CONTRACT NO. : 6600026171 (1K)
Saudi Aramco Oil Company 31311 REFERENCE : -
Dhahran, Saudi Arabia
THE FOLLOWING •DRAWINGS inSPECIFICATION IIPROCEDURE
• DATA SHEETS •CALCULATION IIIMATERIAL REQUITION
• TBE •VENDOR DOCUMENT sOTHERS
ARE TRANSMITTED sAPPROVAL •REVIEW •INFORMATION
, INRECORD •QUOTATION •CONSTRUCTION
THIS IS sORIGINAL •REVISION •FINAL
DRAWINGS OR DOCUMENT NO. SIZE REV. NO. NO. OF COPIES DESCRIPTION OR TITLE
QCISKPCM-US-T-073712014 A4 A 3 Request for Interview Schedule to Instrument QC Inspector.
(Mr, Muhammad Talha Kaleem) SKEC-Direct Team-Pkg #3.
ae
Iklk
Signed :
Kwang Nam (Cavin) Youn / Site Manager
NOTE :
• RECEIPT NOT REQUIRED
RECEIPT REQUIRED (PLEASE ACKNOWLEDGE THE RECEIPT OF THE DUPLICATE AND RETURN BY FAX)
THE ABOVE DOCUMENT RECEIVED WITH ELECTRONIC COPY IN CD BY
SIGNATURE TITLE DATE