Introduction to ASME code
(ASME IX)
Eng. Mohamed Farouk Bayomi
QC/QA Engineer
CWI /API 570 /ASNT Level II
Mohamed Farouk ((CWI /API 570 /ASNT Level II))0
Page
ASME 2014
ASME IX
Welding ,Brazing
and Fusing
Mohamed Farouk ((CWI /API 570 /ASNT Level II))1
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))2
Part 4
How to produce PQR According to ASME IX ??
Page
ASME 2014
ASME IX
Mohamed Farouk ((CWI /API 570 /ASNT Level II))3
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))4
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))5
Required WPS for fabrication
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))6
Page
ASME 2014
• Example : SMAW Process
To produce PQR according to ASME Section IX , there are some important
steps :
1- Look at all essential variables (factors) for your welding Process.
2- Add also non essential variables to PQR format after checking your
construction code like (ASME B31.3, B31.8 ,ASME Section VIII Div.1 ).
3- Put also non essential variables and start filling out PQR format. Add joint
design and company name ,etc.
4- Choose a qualified welder .
5- Let the welder starts the welding process, and record all variables like
(welding speed, heat input , I, V, …etc.)
6- After welding process done , check it visual if Ok.. Start mechanical tests
(Tension, Bending, Hardness if required).
7- After get the results and passed ,add all results to your PQR format.
8- Review it all again, if Ok.. Sign it with date and keep it to produce
required WPS that will be used during fabrication.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))7
Page
ASME 2014
• Example : SMAW Process step by step
Step 1
1- Look at all essential variables (factors) for your welding Process.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))8
Page
ASME 2014
• Example : SMAW Process
step 2
2- Add also remaining essential variables to PQR format after checking your
construction code like (ASME B31.3, B31.8 ,ASME Section VIII Div.1 ).
For example; ASME B31.3 for piping construction have some rules for
Preheating and PWHT should be add to PQR as ESSENTIAL .
See next slides for ASME B31.3 (Construction code)
Mohamed Farouk ((CWI /API 570 /ASNT Level II))9
Page
ASME 2014
Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))10
Page
ASME 2014
Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))11
Page
ASME 2014
Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))12
Page
ASME 2014
Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))13
Page
ASME 2014
• Example : SMAW Process
step 3
3- Put also non essential variables and start filling out PQR format. Add
joint design and company name ,etc.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))14
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))15
Page
ASME 2014
• Example : SMAW Process
step 4
4- Choose a qualified welder to qualify
this procedure.
Note : this is not to qualify a welder or to test
his ability.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))16
Page
ASME 2014
• Example : SMAW Process
step 5
5- Let the welder starts the welding process, and record all variables like
(welding speed, heat input, welding parameters, …etc.)
Mohamed Farouk ((CWI /API 570 /ASNT Level II))17
Page
ASME 2014
• Example : SMAW Process
step 6
6- After welding process done , check it visual(free of spatters, burn-
through, Cracks, surface pores, undercut, weld color, etc. ) if Ok.. Start
mechanical tests (Tension, Bending, Hardness if required).
How are we choosing type of test and number of tests?
We will see that in next slide >>
Mohamed Farouk ((CWI /API 570 /ASNT Level II))18
Page
ASME 2014
step 6
Mechanical tests
The tension test and bending tests shall be as per Section IX
QW 451.1 , It depend on thickness of test coupon welded.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))19
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))20
step 6
Tension test
The required number of tension specimen are always two,
unless your coupon exceeds 1’’ ,then you are divide it onto
multiple pieces. (see QW 151.1 (C)and (D))
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))21
step 6
Tension test
QW 152 Tension Test Procedure
The tension test specimen shall be ruptured under tensile
load. The tensile strength shall be computed by dividing the
ultimate total load by the least cross sectional area of the
specimen as calculated from actual measurements made
before the load is applied.
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))22
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))23
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))24
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))25
Page
ASME 2014
step 6
Bending Test
The bending test shall be as per Section IX QW 451.1 , It
depend on thickness of test coupon welded.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))26
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))27
step 6
Bending Test
The bending test shall be one of the
following:
Face bend, root bend, and side bend.
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))28
Page
ASME 2014
step 7
7- After get the results and passed ,add all results to your PQR format.
And attach your test result reports to your PQR.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))29
Page
ASME 2014
Mohamed Farouk ((CWI /API 570 /ASNT Level II))30
All that is left is to fill out the bottom of the back of the PQR. This
will be easy, just a few housekeeping items to complete.
Page
ASME 2014
step 8
8- Review it all again, if Ok.. Sign it with date and keep it to produce
required WPS that will be used during fabrication.
Mohamed Farouk ((CWI /API 570 /ASNT Level II))31

More Related Content

What's hot

ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfPKNanavati
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wireImran Jamil
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)Mohamed Farouk
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix Nuri Cesur
 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdfVENKATESAN S
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
 
Wis5 welding consumables 18
Wis5 welding consumables 18Wis5 welding consumables 18
Wis5 welding consumables 18Thang Do Minh
 
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingabhi10apr
 
ASME_impact-testing-requirements.pdf
ASME_impact-testing-requirements.pdfASME_impact-testing-requirements.pdf
ASME_impact-testing-requirements.pdfTiborKemny
 
Asme b31.3 process_piping
Asme b31.3 process_pipingAsme b31.3 process_piping
Asme b31.3 process_pipingdinusim
 
RT Acceptance criteria
RT Acceptance criteriaRT Acceptance criteria
RT Acceptance criteriaAnand Kishor
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects Saqib Rasool
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 sJithu John
 
ASME ISO IBR.pdf
ASME ISO IBR.pdfASME ISO IBR.pdf
ASME ISO IBR.pdfmithilesh73
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0Mohammad Mahrous
 

What's hot (20)

ASME SEC IX PPT.pdf
ASME SEC IX PPT.pdfASME SEC IX PPT.pdf
ASME SEC IX PPT.pdf
 
Selection of filler wire
Selection of filler wireSelection of filler wire
Selection of filler wire
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdf
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
 
Wis5 welding consumables 18
Wis5 welding consumables 18Wis5 welding consumables 18
Wis5 welding consumables 18
 
Saes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) pipingSaes w-011-welding on plot ( process ) piping
Saes w-011-welding on plot ( process ) piping
 
ASME_impact-testing-requirements.pdf
ASME_impact-testing-requirements.pdfASME_impact-testing-requirements.pdf
ASME_impact-testing-requirements.pdf
 
QC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdfQC Welding Inspector Interview Question & Answers.pdf
QC Welding Inspector Interview Question & Answers.pdf
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
 
Asme b31.3 process_piping
Asme b31.3 process_pipingAsme b31.3 process_piping
Asme b31.3 process_piping
 
ASME Codes.pdf
ASME Codes.pdfASME Codes.pdf
ASME Codes.pdf
 
RT Acceptance criteria
RT Acceptance criteriaRT Acceptance criteria
RT Acceptance criteria
 
criteria of weld defects
criteria of weld defects criteria of weld defects
criteria of weld defects
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 
ASME ISO IBR.pdf
ASME ISO IBR.pdfASME ISO IBR.pdf
ASME ISO IBR.pdf
 
Asme viii Div. 1 presentation rev.0
Asme viii Div. 1  presentation   rev.0Asme viii Div. 1  presentation   rev.0
Asme viii Div. 1 presentation rev.0
 
Pwht1
Pwht1Pwht1
Pwht1
 

Similar to How to produce PQR

Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...DixitJoshi5
 
Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Dinh Truong Van
 
CV of Adeel Omer
CV of Adeel OmerCV of Adeel Omer
CV of Adeel OmerAdeel Omer
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Gaurav Singh Rajput
 
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfINSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfTeddy Setiady
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013leo040490
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testingRamamoorthy Madhan
 
Mechanical Inspector - API 653 - KSA - CV.pdf
Mechanical Inspector - API 653 - KSA - CV.pdfMechanical Inspector - API 653 - KSA - CV.pdf
Mechanical Inspector - API 653 - KSA - CV.pdfssuser931ac3
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QATariq mohd
 
Guide to prepare_the_wpqr_-_asme_code
Guide to prepare_the_wpqr_-_asme_codeGuide to prepare_the_wpqr_-_asme_code
Guide to prepare_the_wpqr_-_asme_codemayank0738
 

Similar to How to produce PQR (20)

Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
 
Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014
 
Satip nde-ut-01
Satip nde-ut-01Satip nde-ut-01
Satip nde-ut-01
 
CV of Adeel Omer
CV of Adeel OmerCV of Adeel Omer
CV of Adeel Omer
 
S2011-6.pdf
S2011-6.pdfS2011-6.pdf
S2011-6.pdf
 
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1Inspection of Pressure Vessels as per ASME Sec VIII Division -1
Inspection of Pressure Vessels as per ASME Sec VIII Division -1
 
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdfINSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
INSPECTION OF PRESSURE VESSELS TO ASME Section VIII Div. 1.pdf
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
CV TWO
CV TWOCV TWO
CV TWO
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 
Intro
IntroIntro
Intro
 
CV
CVCV
CV
 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testing
 
Asme section ix new
Asme section ix newAsme section ix new
Asme section ix new
 
Mechanical Inspector - API 653 - KSA - CV.pdf
Mechanical Inspector - API 653 - KSA - CV.pdfMechanical Inspector - API 653 - KSA - CV.pdf
Mechanical Inspector - API 653 - KSA - CV.pdf
 
RESUME.pdf
RESUME.pdfRESUME.pdf
RESUME.pdf
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QA
 
Guide to prepare_the_wpqr_-_asme_code
Guide to prepare_the_wpqr_-_asme_codeGuide to prepare_the_wpqr_-_asme_code
Guide to prepare_the_wpqr_-_asme_code
 

Recently uploaded

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 

How to produce PQR

  • 1. Page ASME 2014 Introduction to ASME code (ASME IX) Eng. Mohamed Farouk Bayomi QC/QA Engineer CWI /API 570 /ASNT Level II Mohamed Farouk ((CWI /API 570 /ASNT Level II))0
  • 2. Page ASME 2014 ASME IX Welding ,Brazing and Fusing Mohamed Farouk ((CWI /API 570 /ASNT Level II))1
  • 3. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))2 Part 4 How to produce PQR According to ASME IX ??
  • 4. Page ASME 2014 ASME IX Mohamed Farouk ((CWI /API 570 /ASNT Level II))3
  • 5. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))4
  • 6. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))5 Required WPS for fabrication
  • 7. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))6
  • 8. Page ASME 2014 • Example : SMAW Process To produce PQR according to ASME Section IX , there are some important steps : 1- Look at all essential variables (factors) for your welding Process. 2- Add also non essential variables to PQR format after checking your construction code like (ASME B31.3, B31.8 ,ASME Section VIII Div.1 ). 3- Put also non essential variables and start filling out PQR format. Add joint design and company name ,etc. 4- Choose a qualified welder . 5- Let the welder starts the welding process, and record all variables like (welding speed, heat input , I, V, …etc.) 6- After welding process done , check it visual if Ok.. Start mechanical tests (Tension, Bending, Hardness if required). 7- After get the results and passed ,add all results to your PQR format. 8- Review it all again, if Ok.. Sign it with date and keep it to produce required WPS that will be used during fabrication. Mohamed Farouk ((CWI /API 570 /ASNT Level II))7
  • 9. Page ASME 2014 • Example : SMAW Process step by step Step 1 1- Look at all essential variables (factors) for your welding Process. Mohamed Farouk ((CWI /API 570 /ASNT Level II))8
  • 10. Page ASME 2014 • Example : SMAW Process step 2 2- Add also remaining essential variables to PQR format after checking your construction code like (ASME B31.3, B31.8 ,ASME Section VIII Div.1 ). For example; ASME B31.3 for piping construction have some rules for Preheating and PWHT should be add to PQR as ESSENTIAL . See next slides for ASME B31.3 (Construction code) Mohamed Farouk ((CWI /API 570 /ASNT Level II))9
  • 11. Page ASME 2014 Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))10
  • 12. Page ASME 2014 Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))11
  • 13. Page ASME 2014 Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))12
  • 14. Page ASME 2014 Eng. Mohamed Farouk Bayomi ((QC/QA Engineer))13
  • 15. Page ASME 2014 • Example : SMAW Process step 3 3- Put also non essential variables and start filling out PQR format. Add joint design and company name ,etc. Mohamed Farouk ((CWI /API 570 /ASNT Level II))14
  • 16. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))15
  • 17. Page ASME 2014 • Example : SMAW Process step 4 4- Choose a qualified welder to qualify this procedure. Note : this is not to qualify a welder or to test his ability. Mohamed Farouk ((CWI /API 570 /ASNT Level II))16
  • 18. Page ASME 2014 • Example : SMAW Process step 5 5- Let the welder starts the welding process, and record all variables like (welding speed, heat input, welding parameters, …etc.) Mohamed Farouk ((CWI /API 570 /ASNT Level II))17
  • 19. Page ASME 2014 • Example : SMAW Process step 6 6- After welding process done , check it visual(free of spatters, burn- through, Cracks, surface pores, undercut, weld color, etc. ) if Ok.. Start mechanical tests (Tension, Bending, Hardness if required). How are we choosing type of test and number of tests? We will see that in next slide >> Mohamed Farouk ((CWI /API 570 /ASNT Level II))18
  • 20. Page ASME 2014 step 6 Mechanical tests The tension test and bending tests shall be as per Section IX QW 451.1 , It depend on thickness of test coupon welded. Mohamed Farouk ((CWI /API 570 /ASNT Level II))19
  • 21. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))20 step 6 Tension test The required number of tension specimen are always two, unless your coupon exceeds 1’’ ,then you are divide it onto multiple pieces. (see QW 151.1 (C)and (D))
  • 22. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))21 step 6 Tension test QW 152 Tension Test Procedure The tension test specimen shall be ruptured under tensile load. The tensile strength shall be computed by dividing the ultimate total load by the least cross sectional area of the specimen as calculated from actual measurements made before the load is applied.
  • 23. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))22
  • 24. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))23
  • 25. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))24
  • 26. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))25
  • 27. Page ASME 2014 step 6 Bending Test The bending test shall be as per Section IX QW 451.1 , It depend on thickness of test coupon welded. Mohamed Farouk ((CWI /API 570 /ASNT Level II))26
  • 28. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))27 step 6 Bending Test The bending test shall be one of the following: Face bend, root bend, and side bend.
  • 29. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))28
  • 30. Page ASME 2014 step 7 7- After get the results and passed ,add all results to your PQR format. And attach your test result reports to your PQR. Mohamed Farouk ((CWI /API 570 /ASNT Level II))29
  • 31. Page ASME 2014 Mohamed Farouk ((CWI /API 570 /ASNT Level II))30 All that is left is to fill out the bottom of the back of the PQR. This will be easy, just a few housekeeping items to complete.
  • 32. Page ASME 2014 step 8 8- Review it all again, if Ok.. Sign it with date and keep it to produce required WPS that will be used during fabrication. Mohamed Farouk ((CWI /API 570 /ASNT Level II))31