This document provides an introduction to computers and the Windows operating system. It defines basic computer components like the monitor, system unit, keyboard, and mouse. It describes the Windows desktop interface including the taskbar, icons, start button and start menu. It explains how to start and shut down a computer properly. It covers using and customizing the mouse, opening and closing programs, using menu bars and toolbars, and cutting, copying and pasting text. The document is intended as an introductory guide for new computer users to learn basic computer and Windows concepts.
What is a computer?
What is an operating system?
The Windows Screen
Starting and shutting down your computer
The mouse according to Windows
Opening and closing programs
Menu bars and Tool Bars
Cut/Copy and Paste
Further study
What is a computer?
What is an operating system?
The Windows Screen
Starting and shutting down your computer
The mouse according to Windows
Opening and closing programs
Menu bars and Tool Bars
Cut/Copy and Paste
Further study
I have given the explanation simply in a way that any one can understand on how to approach to a computer and to obtain it's basic skills on using windows 7 platform.
I have given the explanation simply in a way that any one can understand on how to approach to a computer and to obtain it's basic skills on using windows 7 platform.
New to computers? Our presentation will help you get oriented to your PC - learn about key mouse functions, the components of your desktop, and the features of program windows.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...UiPathCommunity
💥 Speed, accuracy, and scaling – discover the superpowers of GenAI in action with UiPath Document Understanding and Communications Mining™:
See how to accelerate model training and optimize model performance with active learning
Learn about the latest enhancements to out-of-the-box document processing – with little to no training required
Get an exclusive demo of the new family of UiPath LLMs – GenAI models specialized for processing different types of documents and messages
This is a hands-on session specifically designed for automation developers and AI enthusiasts seeking to enhance their knowledge in leveraging the latest intelligent document processing capabilities offered by UiPath.
Speakers:
👨🏫 Andras Palfi, Senior Product Manager, UiPath
👩🏫 Lenka Dulovicova, Product Program Manager, UiPath
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
PHP Frameworks: I want to break free (IPC Berlin 2024)Ralf Eggert
In this presentation, we examine the challenges and limitations of relying too heavily on PHP frameworks in web development. We discuss the history of PHP and its frameworks to understand how this dependence has evolved. The focus will be on providing concrete tips and strategies to reduce reliance on these frameworks, based on real-world examples and practical considerations. The goal is to equip developers with the skills and knowledge to create more flexible and future-proof web applications. We'll explore the importance of maintaining autonomy in a rapidly changing tech landscape and how to make informed decisions in PHP development.
This talk is aimed at encouraging a more independent approach to using PHP frameworks, moving towards a more flexible and future-proof approach to PHP development.
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
"Impact of front-end architecture on development cost", Viktor TurskyiFwdays
I have heard many times that architecture is not important for the front-end. Also, many times I have seen how developers implement features on the front-end just following the standard rules for a framework and think that this is enough to successfully launch the project, and then the project fails. How to prevent this and what approach to choose? I have launched dozens of complex projects and during the talk we will analyze which approaches have worked for me and which have not.
Search and Society: Reimagining Information Access for Radical FuturesBhaskar Mitra
The field of Information retrieval (IR) is currently undergoing a transformative shift, at least partly due to the emerging applications of generative AI to information access. In this talk, we will deliberate on the sociotechnical implications of generative AI for information access. We will argue that there is both a critical necessity and an exciting opportunity for the IR community to re-center our research agendas on societal needs while dismantling the artificial separation between the work on fairness, accountability, transparency, and ethics in IR and the rest of IR research. Instead of adopting a reactionary strategy of trying to mitigate potential social harms from emerging technologies, the community should aim to proactively set the research agenda for the kinds of systems we should build inspired by diverse explicitly stated sociotechnical imaginaries. The sociotechnical imaginaries that underpin the design and development of information access technologies needs to be explicitly articulated, and we need to develop theories of change in context of these diverse perspectives. Our guiding future imaginaries must be informed by other academic fields, such as democratic theory and critical theory, and should be co-developed with social science scholars, legal scholars, civil rights and social justice activists, and artists, among others.
UiPath Test Automation using UiPath Test Suite series, part 3DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 3. In this session, we will cover desktop automation along with UI automation.
Topics covered:
UI automation Introduction,
UI automation Sample
Desktop automation flow
Pradeep Chinnala, Senior Consultant Automation Developer @WonderBotz and UiPath MVP
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
2. Agenda
What is a computer?
What is an operating system?
The Windows Screen
Starting and shutting down yourcomputer
The mouse according to Windows
Opening and closing programs
Menu bars and Tool Bars
Cut/Copy and Paste
Furtherstudy
3. What is a Computer
Screen (Monitor)
Box (System Unit)
motherboard
hard drive
floppy drive
CD-ROM/DVD
Keyboard
mouse
Peripherals
6. Starting yourcomputer
Before starting your computer make sure you do
not have a diskette in your A drive
To start your computer just turn on the power
switch or power bar (the computer will take a few
minutes to go through its initialization procedure
and you will eventually see your desktop and
icons)
If this does not happen check that your monitor
(i.e. screen ) is on.
7. Starting yourcomputer, cont.
If computer was shutdown improperly, you
may see a screen saying Windows would like
to check your files for errors.
It may then say it has found an error and ask if
it should fix the error. You will probably want
to tell it to fix the error and skip the undo disk
and next time try to do a proper shutdown
8. Shutting down yourcomputer
Windows is very finicky about being shut down
properly (do not just shut the power off)
Move your cursor to start button and click
Click on the radio button beside Shut down
Click on OK button
WAIT (Windows will go through an elaborate
process of making sure all programs are shut
down. You will then see a Windows screen and
eventually a black screen with the words “It’s
now safe to turn off your computer”)
9. Shutting down yourcomputer,
cont.
You may now turn off the power button/bar.
In some cases when Windows cannot finish
it’s shutdown sequence, your may have to
shut down by restarting or shutting off the
power before Windows is ready.
10. Restarting your computer
Sometimes your computer will start doing
funny things or your mouse will stop working
Try ALT + CTL + DELETE
If you see a program is not responding, you
can try to highlight that program and press the
“End Task” button.
If nothing happens try ALT + CTL + DELETE
again. This will restart your computer
11. Restarting your computer, cont.
If your mouse is working you can click on Start
button, click on Shutdown but click on the
radio button beside Restart and your computer
will restart
Useful if your modem stops functioning.
12. Mouse
Pointing device that moves pointer or cursor
Point and click (tip of the arrow is the point)
Left and right buttons
Start programs - 1 click vs 2 clicks
Highlight text (click and drag)
Practice makes perfect
14. Scrolling pages
Mouse
Clickon up and down arrows
or
Clickon top of and below that darkerbox without
touching the box
or
Clickand drag the darkerbox
Keyboard (make sure cursoris on page by
clicking on empty space)
Use arrow keys
Use page up, page down, home and end
15. Opening Programs
If on desktop as icon, double click on icon.
If does not open press “Enter” key.
Click on “Start” button, Move cursor up to
“Programs”. After menu on the right appears
move cursor over to menu and up or down
to required program. Click on program
If program has been minimized and appears
on task bar, click on square representing
program.
17. Closing programs
Click on the X icon in the top right hand corner
of the window
or
Put your cursor on File in menu bar and click,
then move cursor down the drop-down menu to
the bottom to word “Quit” or “Exit” or “Close”.
Click on the word
or
Hold down the Alt key and press F4.
20. Using Menu Bars
All Windows programs have a menu bar and
everything you can do with that program will be
available from one of the drop-down menus
Place tip of the cursor on the word in Menu bar
and click. Move cursor down drop-down menu
to action you want to perform and click.
If item has an arrow pointing to the right move
cursor to the right to see the submenu.
21. Menu items common to most
Windows programs
File (includes New file, open file, save and print
functions)
Edit (includes Find and Cut, Copy and Paste)
View (allows you to change the look of screen
by adding and subtracting bars like tool bar)
Tools (most programs but program specific)
Window (allows you arrange windows and
choose between different files)
Help used to give help in program’s functions
and gives version no. for troubleshooting
purposes
22. Cut/Copy and Paste
Place your cursor at the beginning of the text you
would like to cut or copy, click with left-hand
button keeping the button down.
Move the cursor to right to highlight the section or
words you want to copy (move cursor down to get
whole paragraph or page)
When the text you wanted to copy or move is
highlighted, let go of the mouse button
If you highlight too much text, do not let go of the
button but adjust the cursor until you have the
right amount of text. If you let go, start over by
clicking anywhere that is not a link and start over.
23. Cut/Copy and Paste, cont.
Move cursor to Edit in Menu bar and move
down the drop down menu until you reach
“Cut” or “Copy” and click (“Cut” will remove
the text and “Copy” will leave it where it is)
Move the cursor to the area of the document
or file where you would like to put the text and
click making sure the blinking cursor is where
you want the text to be
Move cursor to Edit in Menu bar and move
down drop down menu until you reach Paste
and click
24. Using Tool Bars
Icons which represent frequently used actions
Place tip of cursor in middle of icon and click
Opening files, printing, and saving files are
common in tool bars
If you do not know what an icon signifies,
move cursor over the icon and wait for a
couple of seconds and a brief description will
appear.
If do not need tool bar (all actions available
from Menu bar) can get rid of tool bar by
clicking on “View” in Menu bar
Let’s begin our study of Windows 7 with some definitions. These definitions apply to all computer systems ,so they are worthwhile to understand.
The operating system is a software application that controls the activities of the computer. Behind the scenes ,it accepts input from devices, such as the keyboard and mouse, and directs output to the monitor and speakers. It keeps track of your files and folders on storage devices, such as disk drives and flash drives. It provides security for your computer system. It communicates with the other software applications you have on your computer and enables them to work together.
The desktop is the screen that displays once you have turned on the computer and responded to prompts for your user name and password. This is your workspace. It is where you manage tasks on the computer. Your software opens on the desktop. You manipulate your files and folders on the desktop.
The taskbar provides you with access to the software applications, enables you to move between the applications, and gives you access to system resources. It is a horizontal bar that appears at the bottom of the screen.
A window is a space on the desktop representing a program, system resource, or data. Multiple windows can be open at one time, working independently as well as together. For instance, if you write a report on the latest sales for your company, you will open a spreadsheet and copy the net profit directly from the spreadsheet into the report document. Windows can be moved around the desktop, minimized to take up less space, and maximized to fill the desktop.
Icons are small pictures that represent programs, files, folders, or other things on the desktop. Objects with the same characteristics, like file folders, have the same icon. Software icons are unique so that you can quickly find the software application.
Don’t worry if the desktop you see in your office or at school is different than the one you have at home. Computers have unique configurations of installed programs and files. Windows 7 enables you to create a desktop environment with which you are comfortable by adding or removing icons that fit your needs.
The Start menu, accessed with a click on the Start button, lists the programs, folders and utility applications that are available on your computer. The Start menu is divided into panes, with similar items grouped on a pane. The left pane displays a list of programs that you commonly access on the computer. This gets you going quickly if you need one of these applications. If you use Microsoft Word consistently, it will appear on this list. Programs that you don’t use as frequently are accessed when you point to All Programs on the left pane.
The right pane accesses your system folders, such as Documents, Pictures and Music. You open and adjust your system settings from this pane, using the Control Panel. You also log off, shut down, and get help using the right pane of the Start menu.
Below the left pane, the Search box enables you to type keywords to complete searches for files or folders on your computer. Searching will be covered in a later slide in this presentation.
Just as you can rearrange the items on your desk, you can customize your desktop to make it uniquely suited to your tastes. The screen saver, a series of moving pictures that appears when your computer has been idle for a period of time, along with background and window color, are selected from the Personalization window. Right-click on an empty portion of the desktop and select Personalize to open this window.
The Desktop Backgrounds include built-in categories or you may select a personal picture from a folder on your computer. Many people enjoy placing family photos or pet photos on the background of their desktop. Likewise the screen saver, which provides privacy for your open files on the computer when you are away from your desk, is changed with built-in screen savers. The color of the borders of your windows is another change that you can make to your desktop. You can mix your own colors and change the intensity of the colors as desired. Different themes are built-in, downloaded from online theme libraries, or created by you. These change the desktop background, window color, sounds and screen saver all at one time.