What Managers Do Managerial Activities Make decisions Allocate resources Direct activities of others to attain goals Managers (or  administrators ) Individuals who achieve goals through other people.
Where Managers Work Organization A consciously coordinated social unit, composed of two or more people, that functions on a relatively continuous basis to achieve a common goal or set of goals.
Management Functions Management Functions Planning Organizing Leading Controlling
Management Functions (cont’d) Planning A process that includes defining goals, establishing strategy, and developing different ways to coordinate activities.
Management Functions (cont’d) Organizing Determining what tasks are to be done, who is to do them, how the tasks are to be grouped, who reports to whom, and where decisions are to be made.
Management Functions (cont’d) Leading A function that includes giving vision, motivating employees, directing others, selecting the most effective communication channels, and resolving conflicts.
Management Functions (cont’d) Controlling Monitoring activities to ensure they are being accomplished as planned and correcting any significant deviations.
What Is Planning? Planning A primary functional managerial activity that involves: Defining the organization’s goals Establishing an overall strategy for achieving those goals Developing a comprehensive set of plans to integrate and coordinate organizational work. Types of planning Informal:   not written down, short-term focus; specific to an organizational unit. Formal:   written, specific, and long-term focus, involves  shared goals for the organization.
Why Do Managers Plan? Purposes of Planning Provides direction Reduces uncertainty Minimizes waste and redundancy Sets the standards for controlling
Planning and Performance The Relationship Between Planning And Performance Formal planning is associated with: Higher profits and returns of assets. Positive financial results. The quality of planning and implementation affects performance more than the extent of planning. The external environment can reduce the impact of planning on performance, Formal planning must be used for several years before planning begins to affect performance.
How Do Managers Plan? Elements of Planning Goals (also Objectives) Desired outcomes for individuals, groups, or entire organizations Provide direction and evaluation performance criteria Plans Documents that outline how goals are to be accomplished Describe how resources are to be allocated and establish activity schedules
Types of Goals Financial Goals Are related to the expected internal financial performance of the organization. Strategic Goals Are related to the performance of the firm relative to factors in its external environment (e.g., competitors). Stated Goals versus Real Goals Broadly-worded official statements of the organization (intended for public consumption) that may be irrelevant to its real goals (what actually goes on in the organization).
Types of Plans Exhibit 1.1
Traditional Objective Setting Exhibit 7.4
Planning in the Hierarchy of Organizations Exhibit 7.7
Managers Versus Leaders Managers Are appointed to their position. Can influence people only to the extent of the formal authority of their position. Do not necessarily have the skills and capabilities to be leaders. Leaders Are appointed or emerge from within a work group. Can influence other people and have managerial authority. Do not necessarily have the skills and capabilities to be managers. Leadership is the process of influencing a group toward the achievement of goals.
The Managerial Grid Managerial Grid Appraises leadership styles using two dimensions: Concern for people Concern for production Places managerial styles in five categories: Impoverished management Task management Middle-of-the-road management Country club management Team management
The Managerial Grid Exhibit 17.3 Source:   Reprinted by permission of  Harvard Business Review . An exhibit from “Breakthrough in Organization Development” by Robert R. Blake, Jane S. Mouton, Louis B. Barnes, and Larry E. Greiner, November–December 1964, p. 136. Copyright © 1964 by the President and Fellows of Harvard College. All rights reserved.
Cutting-Edge Approaches to Leadership Transactional Leadership Leaders who guide or motivate their followers in the direction of established goals by clarifying role and task requirements. Transformational Leadership Leaders who inspire followers to transcend their own self-interests for the good of the organization by clarifying role and task requirements. Leaders who also are capable of having a profound and extraordinary effect on their followers.
Cutting Edge Approaches to Leadership (cont’d) Charismatic Leadership An enthusiastic, self-confident leader whose personality and actions influence people to behave in certain ways. Characteristics of charismatic leaders: Have a vision. Are able to articulate the vision. Are willing to take risks to achieve the vision. Are sensitive to the environment and follower needs. Exhibit behaviors that are out of the ordinary.
Cutting Edge Approaches to Leadership (cont’d) Visionary Leadership A leader who creates and articulates a realistic, credible, and attractive vision of the future that improves upon the present situation. Visionary leaders have the ability to: Explain the vision to others. Express the vision not just verbally but through behavior. Extend or apply the vision to different leadership contexts.
Cutting Edge Approaches to Leadership (cont’d) Team Leadership Characteristics Having patience to share information Being able to trust others and to give up authority Understanding when to intervene Team Leader’s Job Managing the team’s external boundary Facilitating the team process Coaching, facilitating, handling disciplinary problems, reviewing team and individual performance, training, and communication
Cutting Edge Approaches to Leadership (cont’d) Team Leadership Roles Liaison with external constituencies Troubleshooter Conflict manager Coach
Specific Team Leadership Roles Exhibit 1.2
Beyond Charismatic Leadership  Level 5 Leaders Possess a fifth dimension—a paradoxical blend of personal humility and professional will—in addition to the four basic leadership qualities of individual capability, team skills, managerial competence, and the ability to stimulate others to high performance. Channel their ego needs away from themselves and into the goal of building a great company .
Contemporary Planning Techniques Scenario A consistent view of what the future is likely to be. Scenario Planning An attempt not try to predict the future but to reduce uncertainty by playing out potential situations under different specified conditions . Contingency Planning Developing scenarios that allow managers determine in advance what their actions should be should a considered event actually occur.
ORGANIZING Organizing The process of arranging people and other resources to work together to accomplish a goal. Organization structure The system of tasks, workflows, reporting relationships, and communication channels that link together diverse individuals and groups.
Organizing viewed in relationship with the other management functions.
What are the major types of organization structures? Functional structures People with similar skills and performing similar tasks are grouped together into formal work units. Members work in their functional areas of expertise. Are not limited to businesses. Work well for small organizations producing few products or services.
What are the new developments in organization structures? Network structures A central core that is linked through networks of relationships with outside contractors and suppliers of essential services. Own only core components and use strategic alliances or outsourcing to provide other components.
What are the major types of organization structures? Divisional structures Group together people who work on the same product or process, serve similar customers, and/or are located in the same area or geographical region. Common in complex organizations. Avoid problems associated with functional structures.
The boundary less organization eliminates internal and external barriers.
What organizing trends are changing the workplace? Contemporary organizing trends include: Shorter chains of command. Less unity of command. Wider spans of control. More delegation and empowerment. Decentralization with centralization. Reduced use of staff.
What organizing trends are changing the workplace? Shorter chains of command The line of authority that vertically links all persons with successively higher levels of management . Organizing trend: Organizations are being “streamlined” by cutting unnecessary levels of management. Flatter structures are viewed as a competitive advantage.
What organizing trends are changing the workplace? Less unity of command Each person in an organization should report to one and only one supervisor. Organizing trend: Organizations are using more cross-functional teams, task forces, and horizontal structures. Organizations are becoming more customer conscious. Employees often find themselves working for more than one boss.
What organizing trends are changing the workplace? Wider spans of control The number of persons directly reporting to a manager. Organizing trend: Many organizations are shifting to wider spans of control as levels of management are eliminated. Managers have responsibility for a larger number of subordinates who operate with less direct supervision.
Spans of control in “flat” versus “tall” structures.
What organizing trends are changing the workplace? More delegation and empowerment Delegation is the process of entrusting work to others by giving them the right to make decisions and take action. The manager assigns responsibility, grants authority to act, and creates accountability. Authority should be commensurate with responsibility.
What organizing trends are changing the workplace? Guidelines for effective delegation: Carefully choose the person to whom you delegate. Define the responsibility; make the assignment clear. Agree on performance objectives and standards. Agree on a performance timetable. Give authority; allow the other person to act independently. Show trust in the other person. Provide performance support. Give performance feedback Recognize and reinforce progress. Help when things go wrong. Don’t forget your accountability for performance results.
What organizing trends are changing the workplace? More delegation and empowerment (cont.) A common management failure is unwillingness to delegate. Delegation leads to empowerment. Organizing trend: Managers are delegating more and finding more ways to empower people at all levels.
What organizing trends are changing the workplace? Reduced use of staff Specialized staff  People who perform a technical service or provide special problem-solving expertise to other parts of the organization. Personal staff People working in “assistant-to” positions that provide special support to higher-level managers.
Recruitment Process of locating, identifying, and attracting capable candidates Can be for current or future needs Critical activity for some corporations.  What sources do we use for recruitment
Job Performance, Selection Criteria, and Predictors
Big Five Personality Characteristics
Types of Selection Interviews
What Is Control? Control The process of monitoring activities to ensure that they are being accomplished as planned and of correcting any significant deviations. The Purpose of Control To ensure that activities are completed in ways that lead to accomplishment of organizational goals.
Why Is Control Important? As the final link in management functions: Planning Controls let managers know whether their goals and plans are on target and what future actions to take. Empowering employees Control systems provide managers with information and feedback on employee performance. Protecting the workplace Controls enhance physical security and help minimize  workplace disruptions.
The Planning–Controlling Link Exhibit 1.3
The Control Process The Process of Control Measuring actual performance. Comparing actual performance against a standard. Taking action to correct deviations or inadequate standards.
The Control Process Exhibit 1.4
Taking Managerial Action Courses of Action “ Doing nothing” Only if deviation is judged to be insignificant. Correcting actual (current) performance Immediate corrective action to correct the problem at once. Basic corrective action to locate and to correct the source of the deviation. Corrective Actions Change strategy, structure, compensation scheme, or training programs; redesign jobs; or fire employees
Taking Managerial Action (cont’d) Courses of Action (cont’d) Revising the standard Examining the standard to ascertain whether or not the standard is realistic, fair, and achievable. Upholding the validity of the standard. Resetting goals that were initially set too low or too high.
Controlling for Organizational Performance What Is Performance? The end result of an activity What Is Organizational  Performance? The accumulated end results of all of the organization’s work processes and activities Designing strategies, work processes, and work activities. Coordinating the work of employees
Understanding Groups Group Two or more interacting and interdependent individuals who come together to achieve particular goals. Formal groups Work groups defined by the organization’s structure that have designated work assignments and tasks. Appropriate behaviors are defined by and directed toward organizational goals. Informal groups Groups that are independently formed to meet the social needs of their members.
Stages in Group Development Forming Members join and begin the process of defining the group’s purpose, structure, and leadership . Storming Intragroup conflict occurs as individuals resist control by the group and disagree over leadership. Norming Close relationships develop as the group becomes cohesive and establishes its norms for acceptable behavior . Performing A fully functional group structure allows the group to focus on performing the task at hand . Adjourning The group prepares to disband and is no longer concerned with high levels of performance.
Stages of Group Development Exhibit 1.5
Group Structure: Group Size Small groups Complete tasks faster than larger groups. Make more effective use of facts . Large groups Solve problems better than small groups. Are good for getting diverse input. Are more effective in fact-finding. Social Loafing The tendency for individuals to expend less effort when working collectively than when work individually.
Group Structure (cont’d) Group Cohesiveness The degree to which members are attracted to a group and share the group’s goals. Highly cohesive groups are more effective and productive than less cohesive groups when their goals aligned with organizational goals.
The Relationship Between Cohesiveness and Productivity Exhibit 1.6
Techniques for Making More Creative Group Decisions Exhibit 1.7
Advantages of Using Teams Teams outperform individuals. Teams provide a way to better use employee talents. Teams are more flexible and responsive. Teams can be quickly  assembled, deployed,  refocused, and disbanded .
What Is a Team? Work Team A group whose members work intensely on a specific common goal using their positive synergy, individual and mutual accountability, and complementary skills . Types of Teams Problem-solving teams Self-managed work teams Cross-functional teams Virtual teams
Types of Teams Problem-solving Teams Employees from the same department and functional area who are involved in efforts to improve work activities or to solve specific problems Self-managed Work Teams A formal group of employees who operate without a manager and responsible for a complete work process or segment.
Types of Teams (cont’d) Cross-functional Teams A hybrid grouping of individuals who are experts in various specialties and who work together on various tasks. Virtual Teams Teams that use computer technology to link physically dispersed members in order to achieve a common goal.
Examples of Formal Groups Command Groups Groups that are determined by the organization chart and composed of individuals who report directly to a given manager. Task Groups Groups composed of individuals brought together to complete a specific job task; their existence is often temporary because once the task is completed, the group disbands.
Examples of Formal Groups (cont’d) Cross-functional Teams Groups that bring together the knowledge and skills of individuals from various work areas or groups whose members have been trained to do each others’ jobs. Self-managed Teams Groups that are essentially independent and in addition to their own tasks, take on traditional responsibilities such as hiring, planning and scheduling, and performance evaluations .
Characteristics of Effective Teams Exhibit 1.8
Characteristics of Effective Teams Have a clear understanding of their goals. Have competent members with relevant technical and interpersonal skills. Exhibit high mutual trust in the character and integrity of their  members. Are unified in their commitment to team goals. Have good communication systems. Possess effective negotiating skills Have appropriate leadership Have both internally and externally supportive environments
Job satisfaction A general attitude toward one’s job, the difference between the amount of reward workers receive and the amount they believe they should receive.

What Managers Do

  • 1.
    What Managers DoManagerial Activities Make decisions Allocate resources Direct activities of others to attain goals Managers (or administrators ) Individuals who achieve goals through other people.
  • 2.
    Where Managers WorkOrganization A consciously coordinated social unit, composed of two or more people, that functions on a relatively continuous basis to achieve a common goal or set of goals.
  • 3.
    Management Functions ManagementFunctions Planning Organizing Leading Controlling
  • 4.
    Management Functions (cont’d)Planning A process that includes defining goals, establishing strategy, and developing different ways to coordinate activities.
  • 5.
    Management Functions (cont’d)Organizing Determining what tasks are to be done, who is to do them, how the tasks are to be grouped, who reports to whom, and where decisions are to be made.
  • 6.
    Management Functions (cont’d)Leading A function that includes giving vision, motivating employees, directing others, selecting the most effective communication channels, and resolving conflicts.
  • 7.
    Management Functions (cont’d)Controlling Monitoring activities to ensure they are being accomplished as planned and correcting any significant deviations.
  • 8.
    What Is Planning?Planning A primary functional managerial activity that involves: Defining the organization’s goals Establishing an overall strategy for achieving those goals Developing a comprehensive set of plans to integrate and coordinate organizational work. Types of planning Informal: not written down, short-term focus; specific to an organizational unit. Formal: written, specific, and long-term focus, involves shared goals for the organization.
  • 9.
    Why Do ManagersPlan? Purposes of Planning Provides direction Reduces uncertainty Minimizes waste and redundancy Sets the standards for controlling
  • 10.
    Planning and PerformanceThe Relationship Between Planning And Performance Formal planning is associated with: Higher profits and returns of assets. Positive financial results. The quality of planning and implementation affects performance more than the extent of planning. The external environment can reduce the impact of planning on performance, Formal planning must be used for several years before planning begins to affect performance.
  • 11.
    How Do ManagersPlan? Elements of Planning Goals (also Objectives) Desired outcomes for individuals, groups, or entire organizations Provide direction and evaluation performance criteria Plans Documents that outline how goals are to be accomplished Describe how resources are to be allocated and establish activity schedules
  • 12.
    Types of GoalsFinancial Goals Are related to the expected internal financial performance of the organization. Strategic Goals Are related to the performance of the firm relative to factors in its external environment (e.g., competitors). Stated Goals versus Real Goals Broadly-worded official statements of the organization (intended for public consumption) that may be irrelevant to its real goals (what actually goes on in the organization).
  • 13.
    Types of PlansExhibit 1.1
  • 14.
  • 15.
    Planning in theHierarchy of Organizations Exhibit 7.7
  • 16.
    Managers Versus LeadersManagers Are appointed to their position. Can influence people only to the extent of the formal authority of their position. Do not necessarily have the skills and capabilities to be leaders. Leaders Are appointed or emerge from within a work group. Can influence other people and have managerial authority. Do not necessarily have the skills and capabilities to be managers. Leadership is the process of influencing a group toward the achievement of goals.
  • 17.
    The Managerial GridManagerial Grid Appraises leadership styles using two dimensions: Concern for people Concern for production Places managerial styles in five categories: Impoverished management Task management Middle-of-the-road management Country club management Team management
  • 18.
    The Managerial GridExhibit 17.3 Source: Reprinted by permission of Harvard Business Review . An exhibit from “Breakthrough in Organization Development” by Robert R. Blake, Jane S. Mouton, Louis B. Barnes, and Larry E. Greiner, November–December 1964, p. 136. Copyright © 1964 by the President and Fellows of Harvard College. All rights reserved.
  • 19.
    Cutting-Edge Approaches toLeadership Transactional Leadership Leaders who guide or motivate their followers in the direction of established goals by clarifying role and task requirements. Transformational Leadership Leaders who inspire followers to transcend their own self-interests for the good of the organization by clarifying role and task requirements. Leaders who also are capable of having a profound and extraordinary effect on their followers.
  • 20.
    Cutting Edge Approachesto Leadership (cont’d) Charismatic Leadership An enthusiastic, self-confident leader whose personality and actions influence people to behave in certain ways. Characteristics of charismatic leaders: Have a vision. Are able to articulate the vision. Are willing to take risks to achieve the vision. Are sensitive to the environment and follower needs. Exhibit behaviors that are out of the ordinary.
  • 21.
    Cutting Edge Approachesto Leadership (cont’d) Visionary Leadership A leader who creates and articulates a realistic, credible, and attractive vision of the future that improves upon the present situation. Visionary leaders have the ability to: Explain the vision to others. Express the vision not just verbally but through behavior. Extend or apply the vision to different leadership contexts.
  • 22.
    Cutting Edge Approachesto Leadership (cont’d) Team Leadership Characteristics Having patience to share information Being able to trust others and to give up authority Understanding when to intervene Team Leader’s Job Managing the team’s external boundary Facilitating the team process Coaching, facilitating, handling disciplinary problems, reviewing team and individual performance, training, and communication
  • 23.
    Cutting Edge Approachesto Leadership (cont’d) Team Leadership Roles Liaison with external constituencies Troubleshooter Conflict manager Coach
  • 24.
    Specific Team LeadershipRoles Exhibit 1.2
  • 25.
    Beyond Charismatic Leadership Level 5 Leaders Possess a fifth dimension—a paradoxical blend of personal humility and professional will—in addition to the four basic leadership qualities of individual capability, team skills, managerial competence, and the ability to stimulate others to high performance. Channel their ego needs away from themselves and into the goal of building a great company .
  • 26.
    Contemporary Planning TechniquesScenario A consistent view of what the future is likely to be. Scenario Planning An attempt not try to predict the future but to reduce uncertainty by playing out potential situations under different specified conditions . Contingency Planning Developing scenarios that allow managers determine in advance what their actions should be should a considered event actually occur.
  • 27.
    ORGANIZING Organizing Theprocess of arranging people and other resources to work together to accomplish a goal. Organization structure The system of tasks, workflows, reporting relationships, and communication channels that link together diverse individuals and groups.
  • 28.
    Organizing viewed inrelationship with the other management functions.
  • 29.
    What are themajor types of organization structures? Functional structures People with similar skills and performing similar tasks are grouped together into formal work units. Members work in their functional areas of expertise. Are not limited to businesses. Work well for small organizations producing few products or services.
  • 30.
    What are thenew developments in organization structures? Network structures A central core that is linked through networks of relationships with outside contractors and suppliers of essential services. Own only core components and use strategic alliances or outsourcing to provide other components.
  • 31.
    What are themajor types of organization structures? Divisional structures Group together people who work on the same product or process, serve similar customers, and/or are located in the same area or geographical region. Common in complex organizations. Avoid problems associated with functional structures.
  • 32.
    The boundary lessorganization eliminates internal and external barriers.
  • 33.
    What organizing trendsare changing the workplace? Contemporary organizing trends include: Shorter chains of command. Less unity of command. Wider spans of control. More delegation and empowerment. Decentralization with centralization. Reduced use of staff.
  • 34.
    What organizing trendsare changing the workplace? Shorter chains of command The line of authority that vertically links all persons with successively higher levels of management . Organizing trend: Organizations are being “streamlined” by cutting unnecessary levels of management. Flatter structures are viewed as a competitive advantage.
  • 35.
    What organizing trendsare changing the workplace? Less unity of command Each person in an organization should report to one and only one supervisor. Organizing trend: Organizations are using more cross-functional teams, task forces, and horizontal structures. Organizations are becoming more customer conscious. Employees often find themselves working for more than one boss.
  • 36.
    What organizing trendsare changing the workplace? Wider spans of control The number of persons directly reporting to a manager. Organizing trend: Many organizations are shifting to wider spans of control as levels of management are eliminated. Managers have responsibility for a larger number of subordinates who operate with less direct supervision.
  • 37.
    Spans of controlin “flat” versus “tall” structures.
  • 38.
    What organizing trendsare changing the workplace? More delegation and empowerment Delegation is the process of entrusting work to others by giving them the right to make decisions and take action. The manager assigns responsibility, grants authority to act, and creates accountability. Authority should be commensurate with responsibility.
  • 39.
    What organizing trendsare changing the workplace? Guidelines for effective delegation: Carefully choose the person to whom you delegate. Define the responsibility; make the assignment clear. Agree on performance objectives and standards. Agree on a performance timetable. Give authority; allow the other person to act independently. Show trust in the other person. Provide performance support. Give performance feedback Recognize and reinforce progress. Help when things go wrong. Don’t forget your accountability for performance results.
  • 40.
    What organizing trendsare changing the workplace? More delegation and empowerment (cont.) A common management failure is unwillingness to delegate. Delegation leads to empowerment. Organizing trend: Managers are delegating more and finding more ways to empower people at all levels.
  • 41.
    What organizing trendsare changing the workplace? Reduced use of staff Specialized staff People who perform a technical service or provide special problem-solving expertise to other parts of the organization. Personal staff People working in “assistant-to” positions that provide special support to higher-level managers.
  • 42.
    Recruitment Process oflocating, identifying, and attracting capable candidates Can be for current or future needs Critical activity for some corporations. What sources do we use for recruitment
  • 43.
    Job Performance, SelectionCriteria, and Predictors
  • 44.
    Big Five PersonalityCharacteristics
  • 45.
  • 46.
    What Is Control?Control The process of monitoring activities to ensure that they are being accomplished as planned and of correcting any significant deviations. The Purpose of Control To ensure that activities are completed in ways that lead to accomplishment of organizational goals.
  • 47.
    Why Is ControlImportant? As the final link in management functions: Planning Controls let managers know whether their goals and plans are on target and what future actions to take. Empowering employees Control systems provide managers with information and feedback on employee performance. Protecting the workplace Controls enhance physical security and help minimize workplace disruptions.
  • 48.
  • 49.
    The Control ProcessThe Process of Control Measuring actual performance. Comparing actual performance against a standard. Taking action to correct deviations or inadequate standards.
  • 50.
  • 51.
    Taking Managerial ActionCourses of Action “ Doing nothing” Only if deviation is judged to be insignificant. Correcting actual (current) performance Immediate corrective action to correct the problem at once. Basic corrective action to locate and to correct the source of the deviation. Corrective Actions Change strategy, structure, compensation scheme, or training programs; redesign jobs; or fire employees
  • 52.
    Taking Managerial Action(cont’d) Courses of Action (cont’d) Revising the standard Examining the standard to ascertain whether or not the standard is realistic, fair, and achievable. Upholding the validity of the standard. Resetting goals that were initially set too low or too high.
  • 53.
    Controlling for OrganizationalPerformance What Is Performance? The end result of an activity What Is Organizational Performance? The accumulated end results of all of the organization’s work processes and activities Designing strategies, work processes, and work activities. Coordinating the work of employees
  • 54.
    Understanding Groups GroupTwo or more interacting and interdependent individuals who come together to achieve particular goals. Formal groups Work groups defined by the organization’s structure that have designated work assignments and tasks. Appropriate behaviors are defined by and directed toward organizational goals. Informal groups Groups that are independently formed to meet the social needs of their members.
  • 55.
    Stages in GroupDevelopment Forming Members join and begin the process of defining the group’s purpose, structure, and leadership . Storming Intragroup conflict occurs as individuals resist control by the group and disagree over leadership. Norming Close relationships develop as the group becomes cohesive and establishes its norms for acceptable behavior . Performing A fully functional group structure allows the group to focus on performing the task at hand . Adjourning The group prepares to disband and is no longer concerned with high levels of performance.
  • 56.
    Stages of GroupDevelopment Exhibit 1.5
  • 57.
    Group Structure: GroupSize Small groups Complete tasks faster than larger groups. Make more effective use of facts . Large groups Solve problems better than small groups. Are good for getting diverse input. Are more effective in fact-finding. Social Loafing The tendency for individuals to expend less effort when working collectively than when work individually.
  • 58.
    Group Structure (cont’d)Group Cohesiveness The degree to which members are attracted to a group and share the group’s goals. Highly cohesive groups are more effective and productive than less cohesive groups when their goals aligned with organizational goals.
  • 59.
    The Relationship BetweenCohesiveness and Productivity Exhibit 1.6
  • 60.
    Techniques for MakingMore Creative Group Decisions Exhibit 1.7
  • 61.
    Advantages of UsingTeams Teams outperform individuals. Teams provide a way to better use employee talents. Teams are more flexible and responsive. Teams can be quickly assembled, deployed, refocused, and disbanded .
  • 62.
    What Is aTeam? Work Team A group whose members work intensely on a specific common goal using their positive synergy, individual and mutual accountability, and complementary skills . Types of Teams Problem-solving teams Self-managed work teams Cross-functional teams Virtual teams
  • 63.
    Types of TeamsProblem-solving Teams Employees from the same department and functional area who are involved in efforts to improve work activities or to solve specific problems Self-managed Work Teams A formal group of employees who operate without a manager and responsible for a complete work process or segment.
  • 64.
    Types of Teams(cont’d) Cross-functional Teams A hybrid grouping of individuals who are experts in various specialties and who work together on various tasks. Virtual Teams Teams that use computer technology to link physically dispersed members in order to achieve a common goal.
  • 65.
    Examples of FormalGroups Command Groups Groups that are determined by the organization chart and composed of individuals who report directly to a given manager. Task Groups Groups composed of individuals brought together to complete a specific job task; their existence is often temporary because once the task is completed, the group disbands.
  • 66.
    Examples of FormalGroups (cont’d) Cross-functional Teams Groups that bring together the knowledge and skills of individuals from various work areas or groups whose members have been trained to do each others’ jobs. Self-managed Teams Groups that are essentially independent and in addition to their own tasks, take on traditional responsibilities such as hiring, planning and scheduling, and performance evaluations .
  • 67.
  • 68.
    Characteristics of EffectiveTeams Have a clear understanding of their goals. Have competent members with relevant technical and interpersonal skills. Exhibit high mutual trust in the character and integrity of their members. Are unified in their commitment to team goals. Have good communication systems. Possess effective negotiating skills Have appropriate leadership Have both internally and externally supportive environments
  • 69.
    Job satisfaction Ageneral attitude toward one’s job, the difference between the amount of reward workers receive and the amount they believe they should receive.

Editor's Notes

  • #43 7 Once managers know their staffing needs, they can begin to look for capable people to fill those needs. The process to do this is called recruitment. It is a process that locates, identifies, and attracts capable candidates for the work. For many organizations, this has become a critical activity. As the business demands change, so do the skills required. And there are some skill sets that are in high demand which means organizations have to have a good plan to locate the people with the unique skills.