SlideShare a Scribd company logo
Bhagyam_PCP_Overview
RJ Operations
2013
2
PCP (Progressive Cavity Pump)
PCP: A Progressive cavity pump is a type of positive displacement pump
and is also known as a progressing cavity pump, eccentric screw
pump or cavity pump.
PC Pumping Systems typically consist of the following components:
 Surface Equipment
Drive head assembly
VFD (Variable Frequency Drive)
Down hole gauge Panel (Geophysical Research Company)
BOP (Blow Out Preventer), Flow Tee – Kombi Tree
 Down hole equipment
Stator (Stationary with tubing)
Rotor (Internal & Rotary with drive rods)
3
PCP System Configuration
Down hole Equipment
Belts &
Sheaves
Surface Drive
Electric Motor
Polished Rod
Sucker Rods
Surface Equipment
PC Pump Stator
PC Pump Rotor
No-Turn Tool
Tagbar
Sucker Rods
w/ Couplings
3
Flow Tee
4
General Features
Rotor :
Is a high strength steel component externally
machined as a helix of “n” lobes and coated
with chrome or an alternative hard material.
Only moving part.
Stator :
Generally made with elastomer (or rubber)
with and internal shape as an helix of “n+1”
lobes. This rubber body is bonded to the
interior of a steel tube. Stationary piece.
5
Polish Rod and Clamp arrangement
 The entire series of Polish
rod, Sucker rod and Rotor is
suspended in the downhole
through the Polish rod clamp.
6
PCP Drive head assembly
Belts and Sheaves
 The drive head assembly comprises of a
Prime mover, Transmission system .
 Prime mover is the driver, which in this
case is the FLP(flameproof) Electric
motor of 75HP.
 Transmission system which transfers the
power from the Prime mover to the
Polished rod, which in this case is the
Belt and sheaves.
7
The basic functions of a surface PC drive are:
 Suspend the rod string and carry the axial loads
 Deliver the torque required at the polished rod
 Rotate the polished rod at the required speed in a safe manner
 Provide for safe release of the stored energy during shut-downs
 Prevent produced fluids from escaping the system
To achieve these functions, drives typically comprise the following
components:
 Thrust Bearing
 Transmission System (Fixed Gear or Sheaves & Belts)
 Braking Mechanism (or recoil control system)
 Stuffing Box
8
Christmas Tree
 The PCP Christmas tree assembly
comprises of Master valve, BOP, kill
wing valve and Drive head on top.
 At the bottom we have tubing
hanger which has got chemical
injection connection and down hole
gauge cable running up to the
downhole.
 The wing XSV is installed for the
slam shut of the flow arm in case of
trip scenario.
9
VFD & GRC Panel
 VFD panel is an Electrical panel
which houses the VFD(Variable
frequency drive) which is an
electrical system used to vary the
frequency of the input(to the panel)
current.
 It is important to control the RPM of
the motor as per well behavior for
which VFD is deployed.
 The LCD screen display’s the
parameters related to Motor i.e.
frequency, current, avg voltage etc.
 The Down hole gauge (GRC) panel
is installed to monitor the well
downhole parameters like Pump
intake/discharge temperature &
Pressure locally.
10
Downhole Gauge Tool
 The purpose of downhole gauge is to monitor the PIP(pump intake
press), PDP(pump discharge press) and downhole temperature’s
respectively.
 It is important to closely monitor the PIP, PDP which gives a fair pump
operation idea to operated optimally.
11
PCP Rotor & Stator
 The polished rod is coupled
through a series of sucker rod
to the Rotor of the pump.
 The Rotor is an externally
machined rod with helical
lobes and is the only moving
part downhole.
 The Stator is generally made
up of Elastomer and has got
internal helical lobes. It is
stationary part of the pump.
 When rotor turns a series of
sealed cavities forms and
progress from suction to
discharge resulting in non
pulsating +ve displacement
flow
Rotor
12
No Turn Tool (NTT)
 NTT- To avoid backing-off the
tubing string when the system
is operating and for easy
release in opposite direction
when the system stops and
back-spins.
13
Tag Bar
It is the integral part of stator required as a reference to facilitate the
installation and space out of rotor and sucker rod string.
14
PCP Rotor & Stator
 BWP-15, Well-13 well
completion drawing
15
Stator Elastomer Types
Elastomer
Family
Elastomer code for
stator labeling (ISO
compliance)
Old
Name
New Commercial Name
and approved
("nickname") General Description and Application
Water
Resistance at
Low Temp
(<50C)
Water
Resistance at
Elevated Temp
(>50C)
H2S
Resistance **
Solids
Resistance
CO2
Resistance **
Aromatics
Resistance **
Max Fluid
Temp.
(°C) *
118 Buna Soft MN-118 (Soft)
Excellent wear and mechanical properties. Lower
hardness compared to regular medium Nitrile.
Recommended in heavy oil, high sand cut, foreign
debris concentrations (ex. Iron Pyrite).
Fair Poor Fair Excellent Poor Poor 60
116
Buna
(59O)
MN-116
Very good wear and mechanical properties.
Recommended for heavy oil, coal bed methane
dewatering and water source wells.
Very good Good Fair Very good Fair Fair 80
309
HN
(68A1)
HN-309
Good wear and mechanical properties. Good
resistance to aromatics. Recommended for medium
crudes, many light oils and nonaggressive chemicals.
Good Fair Good Good Fair Very good 80
306 NBRA HN-306 (NBRA)
Good wear and mechanical properties. Good
resistance to aromatics. Recommended for medium
crudes, many light oils and nonaggressive chemicals.
Good Fair Good Good Good Very good 100
310 NBRHP HN-310 (NBRHP)
Excellent wear and mechanical properties. Good
resistance to aromatics. Recommended for medium
crudes, many light oils and nonaggressive chemicals.
Good Good Good Very good Good Very good 100
312 100C HN-312 (Hi-Per)
Good wear and mechanical properties. Excellent
resistance to aromatics, gas and explosive
decompression. Recommended for light oil, many
chemicals and applications with high GOR's. Higher
stiffness facilitates higher capacity pressure ratings on
applied pump models
Excellent Excellent Good Fair Excellent Excellent 100
501 HNBR HNBR-501
Higher temperature capability than standard nitriles.
Excellent resistance to water and H2S. Recommended
for medium crudes, elevated temperature coalbed
methane dewatering and wells with significant H2S.
Excellent Excellent Excellent Very good Good Good 140
503 N/A HNBR-503 (LS)
Higher temperature capability than standard nitriles.
Excellent resistance to water, good resistance to H2S
and very good resistance to aromatics Recommended
for medium crudes, many light oils, coalbed methane
dewatering when at elevated temperatures.
Excellent Excellent Very good Very good Good Very good 140
Notes: Excellent
* Fluid Temperature rating is for elastomer only. Limitations may occur due to bonding system depending on Fluid Composition. Very good
** Limitations may occur at extreme levels under specific operating conditions. Good
Fair
Please contact the WFT PCP Technical Tupport Team for specific recommendations regarding the best elastomer choice for your application Poor
Medium
Ntirile
High
Nitrile
HNBR
Elastomers for Progressing Cavity Pumps
15
16
Advantages & Applications of a PC Pumping System
Advantages
 Pump high volumes (800+ m3/day)
 Lift capacities of up to 2000 meters
 Pump a range of Oil Gravity’s from 5 to 35 API.
 Pump 100 % H2O
 Pump high density & viscosity fluids.
 Pump high concentrations of slurries. (70%)
 No valves to clog or gas lock
Applications
 Sand-laden heavy crude oil and bitumen
 High-water cuts
 Various oil gravities with limits on H2S, CO2 and aromatics
 Dewatering gas wells, such as coal bed methane projects
 All well types including horizontal, slant, directional and vertical
 Offshore platforms (compatible with foot print restriction)
16
17
PCP Safety system
The PCP protection:
 Gas Detector (HI-alarm) : 20%
 Gas Detector (HI HI-Trip) : 40%
 High current : 65 - 70A
 Low current : 29A
 High discharge pressure : 1000psi
 Low intake pressure : 205 psi
 High rod speed : 475 rpm
 Low rod speed : 80 rpm
 High frequency clamp : 33 Hz
 Low frequency clamp : 10 Hz
 High Tubing head pressure : 31.5 bar
18
Operating Parameters
Cause Effect Time Value Cause Effect Value
Low Currect Alarm 10 min 29 Amp
Low Freq
Clamp clamp 10 Hz
Trip After 10 min 29 Amp
High current Alarm 0.1 min 65 – 70 Amp
High Freq
clamp clamp 33 Hz
Trip After 0.1 min 65 – 70 Amp
Low Intake Pr. Alarm NA
Trip NA
High
Discharge Pr. Alarm 0.0 min 1000 Psi
Trip After 0.0 min 1000 Psi
High Rod Speed Alarm 0.0 min 475 rpm
Trip After 0.0 min 475 rpm
Low Rod Speed Alarm 1.0 min 80 rpm
Trip After 1.0 min 80 rpm
19
PCP Well DCS Graphic page
20
Vendors / Suppliers
 1. Drive head assembly : Grenco
 2. PCP stator / Rotor : Cameron
 3. Christmas tree : Cameron
 4. Packers : Halliburton
 5. Variable Frequency Drives(VFD): Unico
 6. Down hole data : Geophysical Research company (GRC)
21

More Related Content

What's hot

introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
Dr. Arzu Javadova
 
Tubing string
Tubing stringTubing string
Tubing string
Elsayed Amer
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
Ogbarode Napoleon Ogbon
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
Elsayed Amer
 
Artificial Lift Methods
Artificial Lift MethodsArtificial Lift Methods
Artificial Lift Methods
Sarwar Alam Ansari
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
Amir Rafati
 
Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)
Rakesh Kumar
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
mmody4
 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
Kamal Abdurahman
 
Well Workover
Well Workover Well Workover
Well Workover
Christian Akhilome
 
Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting
Bailey LeRoux
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
Elsayed Amer
 
13 artificial-lift
13 artificial-lift13 artificial-lift
13 artificial-lift
juanca0106
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
Bogura Polytechnic Inistitute
 
Packers GFK
Packers GFKPackers GFK
Artificial Lift Selection Criterion
Artificial Lift Selection CriterionArtificial Lift Selection Criterion
Artificial Lift Selection Criterion
Balaji Chennakrishnan
 
Well intervention
Well interventionWell intervention
Well intervention
Touseef Rehman
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
Elsayed Amer
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
Elsayed Amer
 
Drilling operations
Drilling operationsDrilling operations
Drilling operations
Andi Anriansyah
 

What's hot (20)

introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Tubing string
Tubing stringTubing string
Tubing string
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
Artificial Lift Methods
Artificial Lift MethodsArtificial Lift Methods
Artificial Lift Methods
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)Sucker Rod Pump (SRP)
Sucker Rod Pump (SRP)
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Open Hole Completion Design
Open Hole Completion DesignOpen Hole Completion Design
Open Hole Completion Design
 
Well Workover
Well Workover Well Workover
Well Workover
 
Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting
 
Completion equipment packer part #1
Completion equipment packer part #1Completion equipment packer part #1
Completion equipment packer part #1
 
13 artificial-lift
13 artificial-lift13 artificial-lift
13 artificial-lift
 
Well completion and testing
Well completion and testingWell completion and testing
Well completion and testing
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Artificial Lift Selection Criterion
Artificial Lift Selection CriterionArtificial Lift Selection Criterion
Artificial Lift Selection Criterion
 
Well intervention
Well interventionWell intervention
Well intervention
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Drilling operations
Drilling operationsDrilling operations
Drilling operations
 

Viewers also liked

Rotating right resp presentation web-show
Rotating right resp presentation web-showRotating right resp presentation web-show
Rotating right resp presentation web-showRjwing
 
price list + editorial calendar 2015
price list + editorial calendar 2015price list + editorial calendar 2015
price list + editorial calendar 2015Denis Demyanikov
 
Pricelist inner
Pricelist innerPricelist inner
Pricelist inner
pravinkalemca
 
IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)
Ivan Isaev
 
article1433749720_Fozao et al
article1433749720_Fozao et alarticle1433749720_Fozao et al
article1433749720_Fozao et allionel mbanda
 
Smart Oilfield Data Mining Final Project-Rod Pump Failure Prediction
Smart Oilfield Data Mining Final Project-Rod Pump Failure PredictionSmart Oilfield Data Mining Final Project-Rod Pump Failure Prediction
Smart Oilfield Data Mining Final Project-Rod Pump Failure Prediction
Jeffrey Daniels
 
Subsurface Pumps, pumpsandpipesmdhc
Subsurface Pumps, pumpsandpipesmdhcSubsurface Pumps, pumpsandpipesmdhc
Subsurface Pumps, pumpsandpipesmdhctmhsweb
 
Artificial Lift Screening and Selection
Artificial Lift Screening and SelectionArtificial Lift Screening and Selection
Artificial Lift Screening and Selection
Andres Martingano
 
Sucker rod pumping short course!!! ~downhole diagnostic
Sucker rod pumping short course!!!   ~downhole diagnosticSucker rod pumping short course!!!   ~downhole diagnostic
Sucker rod pumping short course!!! ~downhole diagnostic
enLightNme888
 
Forever Living Products distributor price list 2014-2015
Forever Living Products distributor price list 2014-2015Forever Living Products distributor price list 2014-2015
Forever Living Products distributor price list 2014-2015
Katalin Hidvegi
 
capitulo-2-bombeo-mecanico
capitulo-2-bombeo-mecanicocapitulo-2-bombeo-mecanico
capitulo-2-bombeo-mecanico
Arturo Montiel
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well
Ramez Abdalla, M.Sc
 
Oil Industry Powerpoint Template
Oil Industry Powerpoint TemplateOil Industry Powerpoint Template
Oil Industry Powerpoint Template
PowerPoint Team
 
Oil 101: Introduction to Oil and Gas - Upstream
Oil 101:  Introduction to Oil and Gas - UpstreamOil 101:  Introduction to Oil and Gas - Upstream
Oil 101: Introduction to Oil and Gas - Upstream
EKT Interactive
 
Introduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream DownstreamIntroduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream Downstream
Ir. Puput Risanto, IPM, PMP, PMI-RMP, ASEAN Eng
 
Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1
Fidan Aliyeva
 

Viewers also liked (19)

Rotating right resp presentation web-show
Rotating right resp presentation web-showRotating right resp presentation web-show
Rotating right resp presentation web-show
 
price list + editorial calendar 2015
price list + editorial calendar 2015price list + editorial calendar 2015
price list + editorial calendar 2015
 
Pricelist inner
Pricelist innerPricelist inner
Pricelist inner
 
IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)IRZ oilfield equipment (ESP)
IRZ oilfield equipment (ESP)
 
article1433749720_Fozao et al
article1433749720_Fozao et alarticle1433749720_Fozao et al
article1433749720_Fozao et al
 
Utkarsh Bhargava - Thesis
Utkarsh Bhargava - ThesisUtkarsh Bhargava - Thesis
Utkarsh Bhargava - Thesis
 
Smart Oilfield Data Mining Final Project-Rod Pump Failure Prediction
Smart Oilfield Data Mining Final Project-Rod Pump Failure PredictionSmart Oilfield Data Mining Final Project-Rod Pump Failure Prediction
Smart Oilfield Data Mining Final Project-Rod Pump Failure Prediction
 
Subsurface Pumps, pumpsandpipesmdhc
Subsurface Pumps, pumpsandpipesmdhcSubsurface Pumps, pumpsandpipesmdhc
Subsurface Pumps, pumpsandpipesmdhc
 
Artificial Lift Screening and Selection
Artificial Lift Screening and SelectionArtificial Lift Screening and Selection
Artificial Lift Screening and Selection
 
Sucker rod pumping short course!!! ~downhole diagnostic
Sucker rod pumping short course!!!   ~downhole diagnosticSucker rod pumping short course!!!   ~downhole diagnostic
Sucker rod pumping short course!!! ~downhole diagnostic
 
Forever Living Products distributor price list 2014-2015
Forever Living Products distributor price list 2014-2015Forever Living Products distributor price list 2014-2015
Forever Living Products distributor price list 2014-2015
 
capitulo-2-bombeo-mecanico
capitulo-2-bombeo-mecanicocapitulo-2-bombeo-mecanico
capitulo-2-bombeo-mecanico
 
GE O&G overview 2013
GE O&G overview 2013GE O&G overview 2013
GE O&G overview 2013
 
Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well Managing Downhole Failures in a Rod Pumped Well
Managing Downhole Failures in a Rod Pumped Well
 
Oil Industry Powerpoint Template
Oil Industry Powerpoint TemplateOil Industry Powerpoint Template
Oil Industry Powerpoint Template
 
Oil 101: Introduction to Oil and Gas - Upstream
Oil 101:  Introduction to Oil and Gas - UpstreamOil 101:  Introduction to Oil and Gas - Upstream
Oil 101: Introduction to Oil and Gas - Upstream
 
Oil and gas industry overview
Oil and gas industry overviewOil and gas industry overview
Oil and gas industry overview
 
Introduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream DownstreamIntroduction to Oil and Gas Industry - Upstream Midstream Downstream
Introduction to Oil and Gas Industry - Upstream Midstream Downstream
 
Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1Introduction into Oil and Gas Industry. OIL: Part 1
Introduction into Oil and Gas Industry. OIL: Part 1
 

Similar to WELL HEAD pcp overview1234

Artificial Lift Products from Evolution Oil Tools
Artificial Lift Products from Evolution Oil ToolsArtificial Lift Products from Evolution Oil Tools
Artificial Lift Products from Evolution Oil Tools
Geoffrey Brennan
 
UNiD Catalogue
UNiD CatalogueUNiD Catalogue
CKD Presentation
CKD PresentationCKD Presentation
CKD Presentation
Italpneumatica1
 
Jet cleaning machine-PressureJet
Jet cleaning machine-PressureJetJet cleaning machine-PressureJet
Jet cleaning machine-PressureJet
Human Resources PressureJet
 
Segmento Automotivo - CKD Corp.pdf
Segmento Automotivo - CKD Corp.pdfSegmento Automotivo - CKD Corp.pdf
Segmento Automotivo - CKD Corp.pdf
Júlio Gengo
 
High pressure cleaning pump-PressureJet
 High pressure cleaning pump-PressureJet High pressure cleaning pump-PressureJet
High pressure cleaning pump-PressureJet
Human Resources PressureJet
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração Hermetic
Vibropac
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview
Shaukat Ali
 
High pressure jet cleaner-PressureJet
High pressure jet cleaner-PressureJetHigh pressure jet cleaner-PressureJet
High pressure jet cleaner-PressureJet
Human Resources PressureJet
 
Steam Condensate Return Stations
Steam Condensate Return StationsSteam Condensate Return Stations
Steam Condensate Return Stations
Mountain States Engineering and Controls
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
admin_PJSPL
 
High pressure water jet cleaner-PressureJet
High pressure water jet cleaner-PressureJetHigh pressure water jet cleaner-PressureJet
High pressure water jet cleaner-PressureJet
Human Resources PressureJet
 
High Pressure Water Jet cleaner 14 lpm 140 bar
High Pressure Water Jet cleaner 14 lpm 140 barHigh Pressure Water Jet cleaner 14 lpm 140 bar
High Pressure Water Jet cleaner 14 lpm 140 bar
admin_PJSPL
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
admin_PJSPL
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
admin_PJSPL
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
admin_PJSPL
 
Manual book honda cbr 250 r preview
Manual book honda cbr 250 r previewManual book honda cbr 250 r preview
Manual book honda cbr 250 r preview
nur cholis
 
Pjs1415 new
Pjs1415 newPjs1415 new
Pjs1415 new
admin_PJSPL
 

Similar to WELL HEAD pcp overview1234 (20)

Artificial Lift Products from Evolution Oil Tools
Artificial Lift Products from Evolution Oil ToolsArtificial Lift Products from Evolution Oil Tools
Artificial Lift Products from Evolution Oil Tools
 
UNiD Catalogue
UNiD CatalogueUNiD Catalogue
UNiD Catalogue
 
CKD Presentation
CKD PresentationCKD Presentation
CKD Presentation
 
Jet cleaning machine-PressureJet
Jet cleaning machine-PressureJetJet cleaning machine-PressureJet
Jet cleaning machine-PressureJet
 
Segmento Automotivo - CKD Corp.pdf
Segmento Automotivo - CKD Corp.pdfSegmento Automotivo - CKD Corp.pdf
Segmento Automotivo - CKD Corp.pdf
 
High pressure cleaning pump-PressureJet
 High pressure cleaning pump-PressureJet High pressure cleaning pump-PressureJet
High pressure cleaning pump-PressureJet
 
OTS_Pumps-Compressors
OTS_Pumps-CompressorsOTS_Pumps-Compressors
OTS_Pumps-Compressors
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração Hermetic
 
Catalogue n° HD-E-00
Catalogue n° HD-E-00Catalogue n° HD-E-00
Catalogue n° HD-E-00
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview
 
High pressure jet cleaner-PressureJet
High pressure jet cleaner-PressureJetHigh pressure jet cleaner-PressureJet
High pressure jet cleaner-PressureJet
 
Steam Condensate Return Stations
Steam Condensate Return StationsSteam Condensate Return Stations
Steam Condensate Return Stations
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
 
High pressure water jet cleaner-PressureJet
High pressure water jet cleaner-PressureJetHigh pressure water jet cleaner-PressureJet
High pressure water jet cleaner-PressureJet
 
High Pressure Water Jet cleaner 14 lpm 140 bar
High Pressure Water Jet cleaner 14 lpm 140 barHigh Pressure Water Jet cleaner 14 lpm 140 bar
High Pressure Water Jet cleaner 14 lpm 140 bar
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
 
High pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 barHigh pressure jet cleaner 14 lpm 140 bar
High pressure jet cleaner 14 lpm 140 bar
 
Manual book honda cbr 250 r preview
Manual book honda cbr 250 r previewManual book honda cbr 250 r preview
Manual book honda cbr 250 r preview
 
Pjs1415 new
Pjs1415 newPjs1415 new
Pjs1415 new
 

Recently uploaded

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 

Recently uploaded (20)

weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 

WELL HEAD pcp overview1234

  • 2. 2 PCP (Progressive Cavity Pump) PCP: A Progressive cavity pump is a type of positive displacement pump and is also known as a progressing cavity pump, eccentric screw pump or cavity pump. PC Pumping Systems typically consist of the following components:  Surface Equipment Drive head assembly VFD (Variable Frequency Drive) Down hole gauge Panel (Geophysical Research Company) BOP (Blow Out Preventer), Flow Tee – Kombi Tree  Down hole equipment Stator (Stationary with tubing) Rotor (Internal & Rotary with drive rods)
  • 3. 3 PCP System Configuration Down hole Equipment Belts & Sheaves Surface Drive Electric Motor Polished Rod Sucker Rods Surface Equipment PC Pump Stator PC Pump Rotor No-Turn Tool Tagbar Sucker Rods w/ Couplings 3 Flow Tee
  • 4. 4 General Features Rotor : Is a high strength steel component externally machined as a helix of “n” lobes and coated with chrome or an alternative hard material. Only moving part. Stator : Generally made with elastomer (or rubber) with and internal shape as an helix of “n+1” lobes. This rubber body is bonded to the interior of a steel tube. Stationary piece.
  • 5. 5 Polish Rod and Clamp arrangement  The entire series of Polish rod, Sucker rod and Rotor is suspended in the downhole through the Polish rod clamp.
  • 6. 6 PCP Drive head assembly Belts and Sheaves  The drive head assembly comprises of a Prime mover, Transmission system .  Prime mover is the driver, which in this case is the FLP(flameproof) Electric motor of 75HP.  Transmission system which transfers the power from the Prime mover to the Polished rod, which in this case is the Belt and sheaves.
  • 7. 7 The basic functions of a surface PC drive are:  Suspend the rod string and carry the axial loads  Deliver the torque required at the polished rod  Rotate the polished rod at the required speed in a safe manner  Provide for safe release of the stored energy during shut-downs  Prevent produced fluids from escaping the system To achieve these functions, drives typically comprise the following components:  Thrust Bearing  Transmission System (Fixed Gear or Sheaves & Belts)  Braking Mechanism (or recoil control system)  Stuffing Box
  • 8. 8 Christmas Tree  The PCP Christmas tree assembly comprises of Master valve, BOP, kill wing valve and Drive head on top.  At the bottom we have tubing hanger which has got chemical injection connection and down hole gauge cable running up to the downhole.  The wing XSV is installed for the slam shut of the flow arm in case of trip scenario.
  • 9. 9 VFD & GRC Panel  VFD panel is an Electrical panel which houses the VFD(Variable frequency drive) which is an electrical system used to vary the frequency of the input(to the panel) current.  It is important to control the RPM of the motor as per well behavior for which VFD is deployed.  The LCD screen display’s the parameters related to Motor i.e. frequency, current, avg voltage etc.  The Down hole gauge (GRC) panel is installed to monitor the well downhole parameters like Pump intake/discharge temperature & Pressure locally.
  • 10. 10 Downhole Gauge Tool  The purpose of downhole gauge is to monitor the PIP(pump intake press), PDP(pump discharge press) and downhole temperature’s respectively.  It is important to closely monitor the PIP, PDP which gives a fair pump operation idea to operated optimally.
  • 11. 11 PCP Rotor & Stator  The polished rod is coupled through a series of sucker rod to the Rotor of the pump.  The Rotor is an externally machined rod with helical lobes and is the only moving part downhole.  The Stator is generally made up of Elastomer and has got internal helical lobes. It is stationary part of the pump.  When rotor turns a series of sealed cavities forms and progress from suction to discharge resulting in non pulsating +ve displacement flow Rotor
  • 12. 12 No Turn Tool (NTT)  NTT- To avoid backing-off the tubing string when the system is operating and for easy release in opposite direction when the system stops and back-spins.
  • 13. 13 Tag Bar It is the integral part of stator required as a reference to facilitate the installation and space out of rotor and sucker rod string.
  • 14. 14 PCP Rotor & Stator  BWP-15, Well-13 well completion drawing
  • 15. 15 Stator Elastomer Types Elastomer Family Elastomer code for stator labeling (ISO compliance) Old Name New Commercial Name and approved ("nickname") General Description and Application Water Resistance at Low Temp (<50C) Water Resistance at Elevated Temp (>50C) H2S Resistance ** Solids Resistance CO2 Resistance ** Aromatics Resistance ** Max Fluid Temp. (°C) * 118 Buna Soft MN-118 (Soft) Excellent wear and mechanical properties. Lower hardness compared to regular medium Nitrile. Recommended in heavy oil, high sand cut, foreign debris concentrations (ex. Iron Pyrite). Fair Poor Fair Excellent Poor Poor 60 116 Buna (59O) MN-116 Very good wear and mechanical properties. Recommended for heavy oil, coal bed methane dewatering and water source wells. Very good Good Fair Very good Fair Fair 80 309 HN (68A1) HN-309 Good wear and mechanical properties. Good resistance to aromatics. Recommended for medium crudes, many light oils and nonaggressive chemicals. Good Fair Good Good Fair Very good 80 306 NBRA HN-306 (NBRA) Good wear and mechanical properties. Good resistance to aromatics. Recommended for medium crudes, many light oils and nonaggressive chemicals. Good Fair Good Good Good Very good 100 310 NBRHP HN-310 (NBRHP) Excellent wear and mechanical properties. Good resistance to aromatics. Recommended for medium crudes, many light oils and nonaggressive chemicals. Good Good Good Very good Good Very good 100 312 100C HN-312 (Hi-Per) Good wear and mechanical properties. Excellent resistance to aromatics, gas and explosive decompression. Recommended for light oil, many chemicals and applications with high GOR's. Higher stiffness facilitates higher capacity pressure ratings on applied pump models Excellent Excellent Good Fair Excellent Excellent 100 501 HNBR HNBR-501 Higher temperature capability than standard nitriles. Excellent resistance to water and H2S. Recommended for medium crudes, elevated temperature coalbed methane dewatering and wells with significant H2S. Excellent Excellent Excellent Very good Good Good 140 503 N/A HNBR-503 (LS) Higher temperature capability than standard nitriles. Excellent resistance to water, good resistance to H2S and very good resistance to aromatics Recommended for medium crudes, many light oils, coalbed methane dewatering when at elevated temperatures. Excellent Excellent Very good Very good Good Very good 140 Notes: Excellent * Fluid Temperature rating is for elastomer only. Limitations may occur due to bonding system depending on Fluid Composition. Very good ** Limitations may occur at extreme levels under specific operating conditions. Good Fair Please contact the WFT PCP Technical Tupport Team for specific recommendations regarding the best elastomer choice for your application Poor Medium Ntirile High Nitrile HNBR Elastomers for Progressing Cavity Pumps 15
  • 16. 16 Advantages & Applications of a PC Pumping System Advantages  Pump high volumes (800+ m3/day)  Lift capacities of up to 2000 meters  Pump a range of Oil Gravity’s from 5 to 35 API.  Pump 100 % H2O  Pump high density & viscosity fluids.  Pump high concentrations of slurries. (70%)  No valves to clog or gas lock Applications  Sand-laden heavy crude oil and bitumen  High-water cuts  Various oil gravities with limits on H2S, CO2 and aromatics  Dewatering gas wells, such as coal bed methane projects  All well types including horizontal, slant, directional and vertical  Offshore platforms (compatible with foot print restriction) 16
  • 17. 17 PCP Safety system The PCP protection:  Gas Detector (HI-alarm) : 20%  Gas Detector (HI HI-Trip) : 40%  High current : 65 - 70A  Low current : 29A  High discharge pressure : 1000psi  Low intake pressure : 205 psi  High rod speed : 475 rpm  Low rod speed : 80 rpm  High frequency clamp : 33 Hz  Low frequency clamp : 10 Hz  High Tubing head pressure : 31.5 bar
  • 18. 18 Operating Parameters Cause Effect Time Value Cause Effect Value Low Currect Alarm 10 min 29 Amp Low Freq Clamp clamp 10 Hz Trip After 10 min 29 Amp High current Alarm 0.1 min 65 – 70 Amp High Freq clamp clamp 33 Hz Trip After 0.1 min 65 – 70 Amp Low Intake Pr. Alarm NA Trip NA High Discharge Pr. Alarm 0.0 min 1000 Psi Trip After 0.0 min 1000 Psi High Rod Speed Alarm 0.0 min 475 rpm Trip After 0.0 min 475 rpm Low Rod Speed Alarm 1.0 min 80 rpm Trip After 1.0 min 80 rpm
  • 19. 19 PCP Well DCS Graphic page
  • 20. 20 Vendors / Suppliers  1. Drive head assembly : Grenco  2. PCP stator / Rotor : Cameron  3. Christmas tree : Cameron  4. Packers : Halliburton  5. Variable Frequency Drives(VFD): Unico  6. Down hole data : Geophysical Research company (GRC)
  • 21. 21