At the end of this presentation, you will be able to:
•Define completion
•Factors influencing completion design.
•List and define the different types of completion
•Describe surface control equipments
•Define subsea completion
Introduction to Well Completions
Agenda
• After exploratory drilling confirms the presence of an oil or natural gas
reservoir, the hydrocarbons are brought to the surface.
• Once the design well depth is reached, the formation is tested and
evaluated to determine whether the well is to be completed for
production, or plugged and abandoned.
• This decision is taken based on the information available on reservoir
characteristics.
• To complete the well production, casing is installed and cemented, and
the drilling rig is dismantled and moved to the next site.
• A service rig is brought in to perforate the production casing and run
production tubing along with down hole equipments.
• The installation of surface safety equipments takes place and
production begins.
30’’ CASING
20’’ CASING
13 3/8’’ CASING
7’’ LINER
RESERVOIR
SEA BED
PLATFORM
Production casing (9 5/8)
Downhole Equipment
Safety Equipment
Completion Process
Completion
It’s a link between drilling the borehole and
the production phase.
Well completion creates a dependable pathway
to the surface for the hydrocarbons.
Once the well is drilled, it has to be made ready
for the safe and efficient production of oil.
The term ‘completion’ describes the assembly of
Down hole tubulars and other safety equipments
that is required to enable the safe and efficient
production of oil or gas from the well after it has
been drilled.
Completion Process
What is Completion?
Completion
FACTORS INFLUENCING COMPLETIONS DESIGN.
• Purpose of the well
• The environment
• Drilling
• The reservoir
• Production
• Completion techniques
Purpose of the well
• Exploration wells: To obtain preliminary data on a reservoir, nature and
characteristics of the fluids on the reservoir, pay zone characteristics (pressure,
temperature, permeability and productivity)
• Appraisal or confirmation: Refine or complete the data from exploration and
determine the off-wellbore characteristics (permeability, reservoir boundaries,
existence of faults/discontinuity)
• Developmental well: This stage brings the wells on the production stream.
Assess well conditions and effectiveness of completions and obtain further info
on the well.
– Production- productivity
– Injection- Optimize reservoir pressure
– Observation-monitor variations in reservoir parameters
Parameters related to the Environment
• Constrains related to country/site/location of well
i.e land or offshore.
• Environmental restrictions involve:
– Difficulty in obtaining supplies
– Available space
– Available utilities
– Safety rules and regulations
– Certain operations that may or may not be possible
 Meteorological and oceanographic conditions must also be taken into
consideration where applicable.
Parameters related to the Drilling
• Types of rigs
(drilling/completions)
• Well profile-
horizontal/directional
• Drilling and casing program
• Drilling in the pay zone(s) and
drilling fluids- formation
damage and fluid
contamination.
• Cementing the production
casing
Parameters related to the Reservoir
• Reservoir pressure and its changes-
need for injection wells?
• Interface between fluids and their
changes- water encroachment
• Number of levels to be produced
• Rock characteristics and fluid types
• Production profile and the number of
wells required.
Parameters related to the Production
• Safety- compliance with various regulations
• Flowing well or artificial lift- a wells flow capability depends on
natural changes in bottom hole pressure versus cumulative
production.
• Operating conditions- space availability, operating fluids-
erosion/corrosion
• Anticipated measurement, maintenance or work over operations-
maintenance and repair operations to ensure the well reaches its
lifetime
Other factors
• Parameters related to completion
techniques: general configuration, pay zone to bore hole
connection, treatment of the formation, equipment installed,
artificial lift
• Synthesis-How completion is designed-
completions should be designed to optimize
productivity/injectivity performance, make sure the well produces
reliably and safely, optimize the implemantation of atrificial lift,
optimize equipment lifetime and make it easy o change all or some
of the equipment in the future without much difficulty.

More Related Content

What's hot

Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
Elsayed Amer
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
Kamel Elsayed
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
SARWAR SALAM
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
Elsayed Amer
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Reza Mostafavi Tabatabaei
 
Well control and blowout preventer
Well control  and blowout preventerWell control  and blowout preventer
Well control and blowout preventer
Shamim Akram
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
Sand control
Sand controlSand control
Sand control
AnindiaMisra
 
4th Presentation
4th Presentation4th Presentation
4th Presentation
Barun
 
Well Control
Well ControlWell Control
Well Control
AAPG SU SC
 
Wellheads Training .pdf
Wellheads Training .pdfWellheads Training .pdf
Wellheads Training .pdf
MUHAMMADakram840755
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
M.T.H Group
 
Packers GFK
Packers GFKPackers GFK
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
Amir Rafati
 
Tubing string
Tubing stringTubing string
Tubing string
Elsayed Amer
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
Elsayed Amer
 
Kick t1
Kick t1Kick t1
Kick t1
Seham Jalal
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...tmhsweb
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
Elsayed Amer
 
Packers & bridge plugs
Packers & bridge plugsPackers & bridge plugs

What's hot (20)

Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 
Coiled Tubing Conveyed Perforations
Coiled Tubing Conveyed PerforationsCoiled Tubing Conveyed Perforations
Coiled Tubing Conveyed Perforations
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Side sliding door ssd
Side sliding door ssdSide sliding door ssd
Side sliding door ssd
 
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
 
Well control and blowout preventer
Well control  and blowout preventerWell control  and blowout preventer
Well control and blowout preventer
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Sand control
Sand controlSand control
Sand control
 
4th Presentation
4th Presentation4th Presentation
4th Presentation
 
Well Control
Well ControlWell Control
Well Control
 
Wellheads Training .pdf
Wellheads Training .pdfWellheads Training .pdf
Wellheads Training .pdf
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Wellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACEWellhead equipment Introduction Based on API 6a & NACE
Wellhead equipment Introduction Based on API 6a & NACE
 
Tubing string
Tubing stringTubing string
Tubing string
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Kick t1
Kick t1Kick t1
Kick t1
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
Installation procedures of wellhead
Installation procedures of wellheadInstallation procedures of wellhead
Installation procedures of wellhead
 
Packers & bridge plugs
Packers & bridge plugsPackers & bridge plugs
Packers & bridge plugs
 

Similar to Well completion d.pptx

vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
AndresRios87791
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
Nouh Almandhari
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Arez Luqman
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC SupervisorPranesh Kumar
 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validation
jpegd
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
TemitopeBello6
 
Oil & Gas Production theory cocnepts.ppt
Oil & Gas Production theory cocnepts.pptOil & Gas Production theory cocnepts.ppt
Oil & Gas Production theory cocnepts.ppt
jainjainik6096
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
Akshaya Mishra
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015naiyar yazdani
 
Well completion
Well completionWell completion
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
velMurugan260
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
Sigve Hamilton Aspelund
 

Similar to Well completion d.pptx (20)

Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
vdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.pptvdocuments.mx_well-completion-petronas.ppt
vdocuments.mx_well-completion-petronas.ppt
 
Drill stem test
Drill stem testDrill stem test
Drill stem test
 
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)  Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
 
A Sattar CWI Engrs
A Sattar CWI EngrsA Sattar CWI Engrs
A Sattar CWI Engrs
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
A Sattar CV-II
A Sattar CV-IIA Sattar CV-II
A Sattar CV-II
 
CV of AKRAM (2)
CV of AKRAM (2)CV of AKRAM (2)
CV of AKRAM (2)
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validation
 
overview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptxoverview of DRILLING OPERATION.pptx
overview of DRILLING OPERATION.pptx
 
Oil & Gas Production theory cocnepts.ppt
Oil & Gas Production theory cocnepts.pptOil & Gas Production theory cocnepts.ppt
Oil & Gas Production theory cocnepts.ppt
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Well completion
Well completionWell completion
Well completion
 
Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
Petroleum drilling fundamentals
Petroleum drilling fundamentalsPetroleum drilling fundamentals
Petroleum drilling fundamentals
 

More from AihamAltayeh1

Microsoft Word Basics2.ppt
Microsoft Word Basics2.pptMicrosoft Word Basics2.ppt
Microsoft Word Basics2.ppt
AihamAltayeh1
 
powerpoint.pptx
powerpoint.pptxpowerpoint.pptx
powerpoint.pptx
AihamAltayeh1
 
WBM & OBM Drilling Fluids.pptx
WBM & OBM Drilling Fluids.pptxWBM & OBM Drilling Fluids.pptx
WBM & OBM Drilling Fluids.pptx
AihamAltayeh1
 
pump units.ppt
pump units.pptpump units.ppt
pump units.ppt
AihamAltayeh1
 
ESP_PRESENTATION_pptx.pptx
ESP_PRESENTATION_pptx.pptxESP_PRESENTATION_pptx.pptx
ESP_PRESENTATION_pptx.pptx
AihamAltayeh1
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdf
AihamAltayeh1
 

More from AihamAltayeh1 (6)

Microsoft Word Basics2.ppt
Microsoft Word Basics2.pptMicrosoft Word Basics2.ppt
Microsoft Word Basics2.ppt
 
powerpoint.pptx
powerpoint.pptxpowerpoint.pptx
powerpoint.pptx
 
WBM & OBM Drilling Fluids.pptx
WBM & OBM Drilling Fluids.pptxWBM & OBM Drilling Fluids.pptx
WBM & OBM Drilling Fluids.pptx
 
pump units.ppt
pump units.pptpump units.ppt
pump units.ppt
 
ESP_PRESENTATION_pptx.pptx
ESP_PRESENTATION_pptx.pptxESP_PRESENTATION_pptx.pptx
ESP_PRESENTATION_pptx.pptx
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdf
 

Recently uploaded

Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
rosedainty
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
Steve Thomason
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
Balvir Singh
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 

Recently uploaded (20)

Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
The Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve ThomasonThe Art Pastor's Guide to Sabbath | Steve Thomason
The Art Pastor's Guide to Sabbath | Steve Thomason
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
Operation Blue Star - Saka Neela Tara
Operation Blue Star   -  Saka Neela TaraOperation Blue Star   -  Saka Neela Tara
Operation Blue Star - Saka Neela Tara
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 

Well completion d.pptx

  • 1. At the end of this presentation, you will be able to: •Define completion •Factors influencing completion design. •List and define the different types of completion •Describe surface control equipments •Define subsea completion Introduction to Well Completions Agenda
  • 2. • After exploratory drilling confirms the presence of an oil or natural gas reservoir, the hydrocarbons are brought to the surface. • Once the design well depth is reached, the formation is tested and evaluated to determine whether the well is to be completed for production, or plugged and abandoned. • This decision is taken based on the information available on reservoir characteristics. • To complete the well production, casing is installed and cemented, and the drilling rig is dismantled and moved to the next site. • A service rig is brought in to perforate the production casing and run production tubing along with down hole equipments. • The installation of surface safety equipments takes place and production begins. 30’’ CASING 20’’ CASING 13 3/8’’ CASING 7’’ LINER RESERVOIR SEA BED PLATFORM Production casing (9 5/8) Downhole Equipment Safety Equipment Completion Process Completion
  • 3. It’s a link between drilling the borehole and the production phase. Well completion creates a dependable pathway to the surface for the hydrocarbons. Once the well is drilled, it has to be made ready for the safe and efficient production of oil. The term ‘completion’ describes the assembly of Down hole tubulars and other safety equipments that is required to enable the safe and efficient production of oil or gas from the well after it has been drilled. Completion Process What is Completion? Completion
  • 4. FACTORS INFLUENCING COMPLETIONS DESIGN. • Purpose of the well • The environment • Drilling • The reservoir • Production • Completion techniques
  • 5. Purpose of the well • Exploration wells: To obtain preliminary data on a reservoir, nature and characteristics of the fluids on the reservoir, pay zone characteristics (pressure, temperature, permeability and productivity) • Appraisal or confirmation: Refine or complete the data from exploration and determine the off-wellbore characteristics (permeability, reservoir boundaries, existence of faults/discontinuity) • Developmental well: This stage brings the wells on the production stream. Assess well conditions and effectiveness of completions and obtain further info on the well. – Production- productivity – Injection- Optimize reservoir pressure – Observation-monitor variations in reservoir parameters
  • 6. Parameters related to the Environment • Constrains related to country/site/location of well i.e land or offshore. • Environmental restrictions involve: – Difficulty in obtaining supplies – Available space – Available utilities – Safety rules and regulations – Certain operations that may or may not be possible  Meteorological and oceanographic conditions must also be taken into consideration where applicable.
  • 7. Parameters related to the Drilling • Types of rigs (drilling/completions) • Well profile- horizontal/directional • Drilling and casing program • Drilling in the pay zone(s) and drilling fluids- formation damage and fluid contamination. • Cementing the production casing
  • 8. Parameters related to the Reservoir • Reservoir pressure and its changes- need for injection wells? • Interface between fluids and their changes- water encroachment • Number of levels to be produced • Rock characteristics and fluid types • Production profile and the number of wells required.
  • 9. Parameters related to the Production • Safety- compliance with various regulations • Flowing well or artificial lift- a wells flow capability depends on natural changes in bottom hole pressure versus cumulative production. • Operating conditions- space availability, operating fluids- erosion/corrosion • Anticipated measurement, maintenance or work over operations- maintenance and repair operations to ensure the well reaches its lifetime
  • 10. Other factors • Parameters related to completion techniques: general configuration, pay zone to bore hole connection, treatment of the formation, equipment installed, artificial lift • Synthesis-How completion is designed- completions should be designed to optimize productivity/injectivity performance, make sure the well produces reliably and safely, optimize the implemantation of atrificial lift, optimize equipment lifetime and make it easy o change all or some of the equipment in the future without much difficulty.