This document discusses well completion, which involves all post-drilling operations necessary for hydrocarbon production. It describes how completion planning must consider reservoir characteristics, fluid properties, and production forecasts to optimize equipment selection and well design. The document outlines different types of completions, including open hole, cased hole, tubingless, packerless, single string, selective, and multiple string configurations. Factors that influence completion design are also summarized such as reservoir pressure, permeability, fluid chemistry, temperature, and long-term production.