SlideShare a Scribd company logo
© 2018 iZenBridge | Public
Webinar
on
Agile and PMBOK®
Guide Sixth Edition
© 2018 iZenBridge | Public
About Me
➢ Founder of iZenBridge (PMI REP) & Discuss Agile
➢ PMP® Certified Since 2006
➢ Teaching Project Management from six years
➢ Teaching Agile for six years
© 2018 iZenBridge | Public
Session Goal
Provide overview
of Agile coverage
in PMBOK®
Guide Sixth
Edition
© 2018 iZenBridge | Public
Session Structure
Activity Duration
Introduction 5 Min
Session Content 40 Min
Q & As 10 Min
Keep posting your questions , I will address
them towards the end.
© 2018 iZenBridge | Public
Who are here ?
© 2018 iZenBridge | Public
What is Agile?
Predictive Life Cycle
Planning
Executing
Adaptive Life Cycle
© 2018 iZenBridge | Public
Agile and Predictive
Predictive Life Cycle
Adaptive Life Cycle
© 2018 iZenBridge | Public
1. Project Integration Management
Includes the processes and activities to identify, define,
combine, unify, and coordinate the various processes and
project management activities within the Project
Management Process Groups.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Integration Management
Progressive Planning
by Team
Detailed Planning
By Project Manager
Over
Participative Decision
Making
Project Manager
Decision Making
Responding to
Change
Following the Plan
Monitoring by
Incremental Delivery
Variance Analysis
Self Organizing Team Detailed Instructions
Value Delivery Scope Delivery
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
2. Project Scope Management
Includes the processes required to ensure the
project includes all the work required, and only
the work required, to complete the project
successfully.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Scope Management
Progressive
Elaboration
Detailed ScopingOver
Continuous Discovery
of Scope
Early Baseline
Establish Process
to Change
Following the Plan
Disaggregation of
Value
Decomposition of Work
Frequent Validation Late Validation
Value Delivery
(Backlog)
Scope Delivery
(Specification)
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
3. Project Schedule Management
Includes the processes required to manage the timely
completion of the project.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Schedule Management
Responding to Change Following PlanOver
Measure Deliverables
Measure Task
Completions
Planning is regular
Activity (Iterative)
Planning may be Phase
(Predictive)
On Demand
Scheduling
Predictive Scheduling
Pull Scheduling Push Scheduling
Planning is looked as
Intent
Planning is looked as
Commitment
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
4. Project Cost Management
Includes the processes involved in planning, estimating,
budgeting, financing, funding, managing, and controlling
costs so the project can be completed within the approved
budget.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Cost Management
Lightweight Estimation
Detailed Cost
Calculations
Over
Adjustable high-level
forecast
Stringent Detailed
Forecast
Short Term
Detailing
Long Term Detailing
Adhering to Value Adhering to Constraints
Budget for Value Goals Budget for Scope of
Work
Accept Changes Control Changes
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
5. Project Quality Management
Includes the processes for incorporating the organization’s
quality policy regarding planning, managing, and
controlling project and product quality requirements, in
order to meet stakeholders’ expectations.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Quality Management
Frequent Quality and
Review
Towards the EndOver
Recurring
retrospectives
Phase End Lesson
Learned
Facilitate Frequent
Delivery
Big Batch Size
Early Detection of Non
compliance
Late Detection
Less Work in Progress More work in Progress
Quality mean Frequent
Delivery
Quality mean Quality
Reports
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
6. Project Resource Management
Includes the processes to identify, acquire, and manage the
resources needed for the successful completion of the
project.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Resource Management
Individual and
Interaction
Process and ToolsOver
Team Structure to
promote collaboration
Team Structure for
Clear Work Division
Self Organizing
Team
Manager Organized
Team
Generalized Specialist
(T Shaped)
Specialist Skills
Flexible Work
Assignment Clear work assignment
Individual and Shared
Accountability
Individual
Accountability
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
7. Project Communications Management
Includes the processes required to ensure timely and
appropriate planning, collection, creation, distribution,
storage, retrieval, management, control, monitoring, and
ultimate disposition of project information
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Communications Management
Realtime
communication
Planned
Communication
Over
Stress of Face to Face
Communication
Documented
Communication
Informal
Communication
Formal Communication
Information Radiators
based communication
Report Based
Communication
Meetings and
Workshops Project Status Reports
Communication using
deliverables
Communication using
Status Reports
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
8. Project Risk Management
Includes the processes of conducting risk management
planning, identification, analysis, response planning,
response implementation, and monitoring risk on a project.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Risk Management
Organic Risk
Management
Risk ManagementOver
Frequent Review of
Deliverable
Late Review
Frequent
Retrospective
Risk Management
Meeting
Realtime Risk
Management
Planned Risk
Management
Frequent
Reprioritization of Work
Risk Response
Planning
Expecting Unknowns Planning Unknowns
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
9. Project Procurement Management
Includes the processes necessary to purchase or acquire
products, services, or results needed from outside the
project team.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Procurement Management
Customer Collaboration Contract NegotiationOver
Shared Risk
Procurement Model
Vendor Risk
Procurement Model
Master Services
Agreement (MSA)
SOW Based
Agreement
Agreement on
Delivering Value
Agreement on Scope
Flexible Change
Management Changed Management
Monitoring based on
Deliverables
Monitoring based on
reports
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
10. Project Stakeholder Management
Includes the processes required to identify the people,
groups, or organizations that could impact or be impacted
by the project, to analyze stakeholder expectations and
their impact on the project, and to develop appropriate
management strategies for effectively engaging
stakeholders in project decisions and execution.
- PMBOK® Guide Sixth Edition
© 2018 iZenBridge | Public
Project Stakeholder Management
Engagement ManagementOver
Team having regular
interaction
Team going though
layers of Management
Face to Face
Interaction
Document based
Interaction
Joint Problem Solving
Selling idea to
stakeholders
Aggressive
Transparency
Sharing Summary
Reports
Attending Project
Meetings Checking Reports
Over
Over
Over
Over
Over
© 2018 iZenBridge | Public
© 2018 iZenBridge | Public
Is Agile only for software ?
© 2018 iZenBridge | Public
Future Learning
www.izenbridge.com – Agile Principles and Mindset
© 2018 iZenBridge | Public
Upcoming Online Sessions
Session Dates
Disciplined Agile Delivery (Hybrid Agile)
– CDA Certification
21-22 February 2018
Team Kanban Practitioner (TKP) 28 Feb - 1 Mar 2018
© 2018 iZenBridge | Public
Certification in Agile Based Approach ?
Certified Scrum Master
(CSM) from Scrum Alliance
PMI Agile Certified
Practitioner (PMI-ACP)®
© 2018 iZenBridge | Public
Questions?

More Related Content

Similar to Webinar on Agile and PMBOK® Guide Sixth Edition

2_Project Scope Management
2_Project Scope Management2_Project Scope Management
2_Project Scope Management
Hisham Haridy MBA, PMP®, RMP®, SP®
 
Pmp pmbok6 -2018 (1)
Pmp   pmbok6 -2018 (1)Pmp   pmbok6 -2018 (1)
Pmp pmbok6 -2018 (1)
sai12234
 
Webinar on Business Analysis in Project Context - PMI PBA
Webinar on Business Analysis in Project Context - PMI PBAWebinar on Business Analysis in Project Context - PMI PBA
Webinar on Business Analysis in Project Context - PMI PBA
iZenBridge Consultancy Pvt. Ltd.
 
Pmi acp training in hyderabad
Pmi acp training in hyderabadPmi acp training in hyderabad
Pmi acp training in hyderabad
prathyusha1234
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
prathyusha1234
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
prathyusha1234
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
prathyusha1234
 
Pmp training in Bangalore
Pmp training in BangalorePmp training in Bangalore
Pmp training in Bangalore
likithach1
 
Pmi acp training in hyderabad
Pmi acp training in hyderabadPmi acp training in hyderabad
Pmi acp training in hyderabad
prathyusha1234
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
prathyusha1234
 
Pmp training in Bangalore
Pmp training in BangalorePmp training in Bangalore
Pmp training in Bangalore
likithach1
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
prathyusha1234
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
prathyusha1234
 
Pmi acp training in hyderabad
Pmi acp training in hyderabadPmi acp training in hyderabad
Pmi acp training in hyderabad
prathyusha1234
 
Pmp training in kolkata
Pmp training in kolkataPmp training in kolkata
Pmp training in kolkata
TejaspathiLV
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018
sai12234
 
PMP Certifiation
PMP CertifiationPMP Certifiation
PMP Certifiation
priyankaravilla
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018
sai12234
 
pmi agile certified practitioner course
pmi agile certified practitioner coursepmi agile certified practitioner course
pmi agile certified practitioner course
krishna1132
 
PMP Certification Hyderabad
PMP Certification HyderabadPMP Certification Hyderabad
PMP Certification Hyderabad
shivajbb
 

Similar to Webinar on Agile and PMBOK® Guide Sixth Edition (20)

2_Project Scope Management
2_Project Scope Management2_Project Scope Management
2_Project Scope Management
 
Pmp pmbok6 -2018 (1)
Pmp   pmbok6 -2018 (1)Pmp   pmbok6 -2018 (1)
Pmp pmbok6 -2018 (1)
 
Webinar on Business Analysis in Project Context - PMI PBA
Webinar on Business Analysis in Project Context - PMI PBAWebinar on Business Analysis in Project Context - PMI PBA
Webinar on Business Analysis in Project Context - PMI PBA
 
Pmi acp training in hyderabad
Pmi acp training in hyderabadPmi acp training in hyderabad
Pmi acp training in hyderabad
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
 
Pmp training in Bangalore
Pmp training in BangalorePmp training in Bangalore
Pmp training in Bangalore
 
Pmi acp training in hyderabad
Pmi acp training in hyderabadPmi acp training in hyderabad
Pmi acp training in hyderabad
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
 
Pmp training in Bangalore
Pmp training in BangalorePmp training in Bangalore
Pmp training in Bangalore
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
 
Pmi acp training
Pmi acp trainingPmi acp training
Pmi acp training
 
Pmi acp training in hyderabad
Pmi acp training in hyderabadPmi acp training in hyderabad
Pmi acp training in hyderabad
 
Pmp training in kolkata
Pmp training in kolkataPmp training in kolkata
Pmp training in kolkata
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018
 
PMP Certifiation
PMP CertifiationPMP Certifiation
PMP Certifiation
 
Pmp pmbok6 -2018
Pmp   pmbok6 -2018Pmp   pmbok6 -2018
Pmp pmbok6 -2018
 
pmi agile certified practitioner course
pmi agile certified practitioner coursepmi agile certified practitioner course
pmi agile certified practitioner course
 
PMP Certification Hyderabad
PMP Certification HyderabadPMP Certification Hyderabad
PMP Certification Hyderabad
 

More from Saket Bansal

Improving Collaboration by Awareness of Mind Games
Improving Collaboration by Awareness of  Mind GamesImproving Collaboration by Awareness of  Mind Games
Improving Collaboration by Awareness of Mind Games
Saket Bansal
 
Emotional Intelligence: From Theory to Practice
Emotional Intelligence: From Theory to PracticeEmotional Intelligence: From Theory to Practice
Emotional Intelligence: From Theory to Practice
Saket Bansal
 
Webinar on Leader As Coach
Webinar on Leader As Coach Webinar on Leader As Coach
Webinar on Leader As Coach
Saket Bansal
 
Workshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) NoidaWorkshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) Noida
Saket Bansal
 
Webinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridgeWebinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridge
Saket Bansal
 
Webinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridgeWebinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridge
Saket Bansal
 
Webinar on Agile Metrics
Webinar on Agile Metrics Webinar on Agile Metrics
Webinar on Agile Metrics
Saket Bansal
 
Lean India Summit : From Productivity to Profitability
Lean India Summit : From Productivity to Profitability Lean India Summit : From Productivity to Profitability
Lean India Summit : From Productivity to Profitability
Saket Bansal
 
Webinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridgeWebinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridge
Saket Bansal
 
PMP : Precedence Diagram Method : Relationship Types | iZenBridge
PMP : Precedence Diagram Method : Relationship Types | iZenBridgePMP : Precedence Diagram Method : Relationship Types | iZenBridge
PMP : Precedence Diagram Method : Relationship Types | iZenBridge
Saket Bansal
 
Agile NCR : Starting your business in a lean way
Agile NCR : Starting your business in a lean wayAgile NCR : Starting your business in a lean way
Agile NCR : Starting your business in a lean way
Saket Bansal
 
Webinar on Agile Estimation : iZenBridge
Webinar on Agile Estimation : iZenBridgeWebinar on Agile Estimation : iZenBridge
Webinar on Agile Estimation : iZenBridge
Saket Bansal
 
Introduction of Project Management
Introduction of Project ManagementIntroduction of Project Management
Introduction of Project Management
Saket Bansal
 
Lean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridgeLean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridge
Saket Bansal
 
Plan Risk Responses : PMP : Project Risk Management
Plan Risk Responses : PMP : Project Risk ManagementPlan Risk Responses : PMP : Project Risk Management
Plan Risk Responses : PMP : Project Risk Management
Saket Bansal
 
Risk Analysis : PMP- Project Risk Management
Risk Analysis : PMP- Project Risk ManagementRisk Analysis : PMP- Project Risk Management
Risk Analysis : PMP- Project Risk Management
Saket Bansal
 
iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...
iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...
iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...
Saket Bansal
 
Agile Beyond Rituals | Presented at Agile Noida
Agile Beyond Rituals | Presented at Agile Noida Agile Beyond Rituals | Presented at Agile Noida
Agile Beyond Rituals | Presented at Agile Noida
Saket Bansal
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar
Saket Bansal
 
Agile Metric | Velocity | PMI ACP | IZenBridge
Agile Metric | Velocity | PMI ACP | IZenBridgeAgile Metric | Velocity | PMI ACP | IZenBridge
Agile Metric | Velocity | PMI ACP | IZenBridge
Saket Bansal
 

More from Saket Bansal (20)

Improving Collaboration by Awareness of Mind Games
Improving Collaboration by Awareness of  Mind GamesImproving Collaboration by Awareness of  Mind Games
Improving Collaboration by Awareness of Mind Games
 
Emotional Intelligence: From Theory to Practice
Emotional Intelligence: From Theory to PracticeEmotional Intelligence: From Theory to Practice
Emotional Intelligence: From Theory to Practice
 
Webinar on Leader As Coach
Webinar on Leader As Coach Webinar on Leader As Coach
Webinar on Leader As Coach
 
Workshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) NoidaWorkshop on Test Driven Development (TDD) Noida
Workshop on Test Driven Development (TDD) Noida
 
Webinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridgeWebinar On Collect Requirement - iZenBridge
Webinar On Collect Requirement - iZenBridge
 
Webinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridgeWebinar on Requirement Prioritization Process - iZenBridge
Webinar on Requirement Prioritization Process - iZenBridge
 
Webinar on Agile Metrics
Webinar on Agile Metrics Webinar on Agile Metrics
Webinar on Agile Metrics
 
Lean India Summit : From Productivity to Profitability
Lean India Summit : From Productivity to Profitability Lean India Summit : From Productivity to Profitability
Lean India Summit : From Productivity to Profitability
 
Webinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridgeWebinar On Scaled Agile Framework (SAFe) | iZenBridge
Webinar On Scaled Agile Framework (SAFe) | iZenBridge
 
PMP : Precedence Diagram Method : Relationship Types | iZenBridge
PMP : Precedence Diagram Method : Relationship Types | iZenBridgePMP : Precedence Diagram Method : Relationship Types | iZenBridge
PMP : Precedence Diagram Method : Relationship Types | iZenBridge
 
Agile NCR : Starting your business in a lean way
Agile NCR : Starting your business in a lean wayAgile NCR : Starting your business in a lean way
Agile NCR : Starting your business in a lean way
 
Webinar on Agile Estimation : iZenBridge
Webinar on Agile Estimation : iZenBridgeWebinar on Agile Estimation : iZenBridge
Webinar on Agile Estimation : iZenBridge
 
Introduction of Project Management
Introduction of Project ManagementIntroduction of Project Management
Introduction of Project Management
 
Lean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridgeLean , Pull System & Kanban |iZenBridge
Lean , Pull System & Kanban |iZenBridge
 
Plan Risk Responses : PMP : Project Risk Management
Plan Risk Responses : PMP : Project Risk ManagementPlan Risk Responses : PMP : Project Risk Management
Plan Risk Responses : PMP : Project Risk Management
 
Risk Analysis : PMP- Project Risk Management
Risk Analysis : PMP- Project Risk ManagementRisk Analysis : PMP- Project Risk Management
Risk Analysis : PMP- Project Risk Management
 
iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...
iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...
iZenBridge's PMP® Math Series: Project Selection : PV , NPV, IRR, BCR and Pay...
 
Agile Beyond Rituals | Presented at Agile Noida
Agile Beyond Rituals | Presented at Agile Noida Agile Beyond Rituals | Presented at Agile Noida
Agile Beyond Rituals | Presented at Agile Noida
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar
 
Agile Metric | Velocity | PMI ACP | IZenBridge
Agile Metric | Velocity | PMI ACP | IZenBridgeAgile Metric | Velocity | PMI ACP | IZenBridge
Agile Metric | Velocity | PMI ACP | IZenBridge
 

Recently uploaded

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
Madan Karki
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
gaafergoudaay7aga
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
ramrag33
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
Nada Hikmah
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 

Recently uploaded (20)

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Seminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptxSeminar on Distillation study-mafia.pptx
Seminar on Distillation study-mafia.pptx
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
integral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdfintegral complex analysis chapter 06 .pdf
integral complex analysis chapter 06 .pdf
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Data Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptxData Control Language.pptx Data Control Language.pptx
Data Control Language.pptx Data Control Language.pptx
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Curve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods RegressionCurve Fitting in Numerical Methods Regression
Curve Fitting in Numerical Methods Regression
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 

Webinar on Agile and PMBOK® Guide Sixth Edition

  • 1. © 2018 iZenBridge | Public Webinar on Agile and PMBOK® Guide Sixth Edition
  • 2. © 2018 iZenBridge | Public About Me ➢ Founder of iZenBridge (PMI REP) & Discuss Agile ➢ PMP® Certified Since 2006 ➢ Teaching Project Management from six years ➢ Teaching Agile for six years
  • 3. © 2018 iZenBridge | Public Session Goal Provide overview of Agile coverage in PMBOK® Guide Sixth Edition
  • 4. © 2018 iZenBridge | Public Session Structure Activity Duration Introduction 5 Min Session Content 40 Min Q & As 10 Min Keep posting your questions , I will address them towards the end.
  • 5. © 2018 iZenBridge | Public Who are here ?
  • 6. © 2018 iZenBridge | Public What is Agile? Predictive Life Cycle Planning Executing Adaptive Life Cycle
  • 7. © 2018 iZenBridge | Public Agile and Predictive Predictive Life Cycle Adaptive Life Cycle
  • 8. © 2018 iZenBridge | Public 1. Project Integration Management Includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups. - PMBOK® Guide Sixth Edition
  • 9. © 2018 iZenBridge | Public Project Integration Management Progressive Planning by Team Detailed Planning By Project Manager Over Participative Decision Making Project Manager Decision Making Responding to Change Following the Plan Monitoring by Incremental Delivery Variance Analysis Self Organizing Team Detailed Instructions Value Delivery Scope Delivery Over Over Over Over Over
  • 10. © 2018 iZenBridge | Public 2. Project Scope Management Includes the processes required to ensure the project includes all the work required, and only the work required, to complete the project successfully. - PMBOK® Guide Sixth Edition
  • 11. © 2018 iZenBridge | Public Project Scope Management Progressive Elaboration Detailed ScopingOver Continuous Discovery of Scope Early Baseline Establish Process to Change Following the Plan Disaggregation of Value Decomposition of Work Frequent Validation Late Validation Value Delivery (Backlog) Scope Delivery (Specification) Over Over Over Over Over
  • 12. © 2018 iZenBridge | Public 3. Project Schedule Management Includes the processes required to manage the timely completion of the project. - PMBOK® Guide Sixth Edition
  • 13. © 2018 iZenBridge | Public Project Schedule Management Responding to Change Following PlanOver Measure Deliverables Measure Task Completions Planning is regular Activity (Iterative) Planning may be Phase (Predictive) On Demand Scheduling Predictive Scheduling Pull Scheduling Push Scheduling Planning is looked as Intent Planning is looked as Commitment Over Over Over Over Over
  • 14. © 2018 iZenBridge | Public 4. Project Cost Management Includes the processes involved in planning, estimating, budgeting, financing, funding, managing, and controlling costs so the project can be completed within the approved budget. - PMBOK® Guide Sixth Edition
  • 15. © 2018 iZenBridge | Public Project Cost Management Lightweight Estimation Detailed Cost Calculations Over Adjustable high-level forecast Stringent Detailed Forecast Short Term Detailing Long Term Detailing Adhering to Value Adhering to Constraints Budget for Value Goals Budget for Scope of Work Accept Changes Control Changes Over Over Over Over Over
  • 16. © 2018 iZenBridge | Public 5. Project Quality Management Includes the processes for incorporating the organization’s quality policy regarding planning, managing, and controlling project and product quality requirements, in order to meet stakeholders’ expectations. - PMBOK® Guide Sixth Edition
  • 17. © 2018 iZenBridge | Public Project Quality Management Frequent Quality and Review Towards the EndOver Recurring retrospectives Phase End Lesson Learned Facilitate Frequent Delivery Big Batch Size Early Detection of Non compliance Late Detection Less Work in Progress More work in Progress Quality mean Frequent Delivery Quality mean Quality Reports Over Over Over Over Over
  • 18. © 2018 iZenBridge | Public 6. Project Resource Management Includes the processes to identify, acquire, and manage the resources needed for the successful completion of the project. - PMBOK® Guide Sixth Edition
  • 19. © 2018 iZenBridge | Public Project Resource Management Individual and Interaction Process and ToolsOver Team Structure to promote collaboration Team Structure for Clear Work Division Self Organizing Team Manager Organized Team Generalized Specialist (T Shaped) Specialist Skills Flexible Work Assignment Clear work assignment Individual and Shared Accountability Individual Accountability Over Over Over Over Over
  • 20. © 2018 iZenBridge | Public 7. Project Communications Management Includes the processes required to ensure timely and appropriate planning, collection, creation, distribution, storage, retrieval, management, control, monitoring, and ultimate disposition of project information - PMBOK® Guide Sixth Edition
  • 21. © 2018 iZenBridge | Public Project Communications Management Realtime communication Planned Communication Over Stress of Face to Face Communication Documented Communication Informal Communication Formal Communication Information Radiators based communication Report Based Communication Meetings and Workshops Project Status Reports Communication using deliverables Communication using Status Reports Over Over Over Over Over
  • 22. © 2018 iZenBridge | Public 8. Project Risk Management Includes the processes of conducting risk management planning, identification, analysis, response planning, response implementation, and monitoring risk on a project. - PMBOK® Guide Sixth Edition
  • 23. © 2018 iZenBridge | Public Project Risk Management Organic Risk Management Risk ManagementOver Frequent Review of Deliverable Late Review Frequent Retrospective Risk Management Meeting Realtime Risk Management Planned Risk Management Frequent Reprioritization of Work Risk Response Planning Expecting Unknowns Planning Unknowns Over Over Over Over Over
  • 24. © 2018 iZenBridge | Public 9. Project Procurement Management Includes the processes necessary to purchase or acquire products, services, or results needed from outside the project team. - PMBOK® Guide Sixth Edition
  • 25. © 2018 iZenBridge | Public Project Procurement Management Customer Collaboration Contract NegotiationOver Shared Risk Procurement Model Vendor Risk Procurement Model Master Services Agreement (MSA) SOW Based Agreement Agreement on Delivering Value Agreement on Scope Flexible Change Management Changed Management Monitoring based on Deliverables Monitoring based on reports Over Over Over Over Over
  • 26. © 2018 iZenBridge | Public 10. Project Stakeholder Management Includes the processes required to identify the people, groups, or organizations that could impact or be impacted by the project, to analyze stakeholder expectations and their impact on the project, and to develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution. - PMBOK® Guide Sixth Edition
  • 27. © 2018 iZenBridge | Public Project Stakeholder Management Engagement ManagementOver Team having regular interaction Team going though layers of Management Face to Face Interaction Document based Interaction Joint Problem Solving Selling idea to stakeholders Aggressive Transparency Sharing Summary Reports Attending Project Meetings Checking Reports Over Over Over Over Over
  • 28. © 2018 iZenBridge | Public
  • 29. © 2018 iZenBridge | Public Is Agile only for software ?
  • 30. © 2018 iZenBridge | Public Future Learning www.izenbridge.com – Agile Principles and Mindset
  • 31. © 2018 iZenBridge | Public Upcoming Online Sessions Session Dates Disciplined Agile Delivery (Hybrid Agile) – CDA Certification 21-22 February 2018 Team Kanban Practitioner (TKP) 28 Feb - 1 Mar 2018
  • 32. © 2018 iZenBridge | Public Certification in Agile Based Approach ? Certified Scrum Master (CSM) from Scrum Alliance PMI Agile Certified Practitioner (PMI-ACP)®
  • 33. © 2018 iZenBridge | Public Questions?