UNDERSTANDING YOUR
PROJECT BEFORE YOU START
——————————
RESEARCH & DISCOVERY PHASE
James Tryon, Creative Director 

WP Valet
“MEET & GREET”
INTERNAL MEETING AFTER
“MEET & GREET”
• Review notes in an internal
meeting with your team.
• Review Client Questionnaire
• Review Client’s Site
• Review Client’s Creative
Brief/RFP (if they have one)
• Review Competitors
• Basic Brand Analysis
• If we determine we’re a
good fit, our team will
recommend next steps to
client.
CLIENT QUESTIONNAIRE LINKS
• Logos

http://easilyamusedinc.com/wp-content/uploads/2012/10/
easilyamused-questionnaire-branding.doc
• General

http://easilyamusedinc.com/wp-content/uploads/2012/10/
easilyamusedquestionnaire.doc
• *The above links are old. Please review and update your own.
NEXT STEPS…
RESEARCH & DISCOVERY

DOCUMENTING
• R&D can be as small as 1/2 day of Discovery and 1/2 day of
document writing. (1 day)
• R&D can span weeks, depending on the complexity of the
project.
• R&D is invaluable in project planning & organizing.
HOWTO DO 

RESEARCH & DISCOVERY
CLIENT QUESTIONNAIRE
• Can be given to clients right after the “Meet & Greet”.
• Before Research & Discovery starts, a client may be asked to
fill this out.
• It gives us a chance to really hear their feelings, and then we
can make sure we address their concerns.
• Valuable for re-branding or new projects.
WHAT’S INCLUDED 

IN AN AUDIT?
• Analysis of client’s site & audience.
• Vision, scope, and planning to achieve specific goals.
• Detailed list of requirements & tasks.
• Site maps, estimates on tasks, client’s budget & timeline.
• Recommendations for improving ROI.
• UX/UI direction for how things should be set up.
TEAMWORK
We work as teammates with our clients. 



This includes:

- Daily stand-up meetings.

- Open communication.

-Transparent reporting.
We define full scope and vision of the project together.
We works in an Agile fashion to make sure our clients’
needs are addressed & most important features are
constantly prioritized.
RESEARCH & DISCOVERY
MEETING
WHATTO COVER INYOUR
MEETING…
• Identify Items that Need
Internal Research
• Goal Planning
• DefineTarget Audience
• Write Users Stories
• Competitor Analysis
• Information Architecture
• Project Audit
• Content Strategy - Basic
OPENTHE FLOODGATES
The sky’s the limit in this meeting and is used to spark
creativity and get everyone involved in the project motivated.
Do a group brain-dump.Anything and everything that you
could ever want, we just write it down.Then we sort all of
them into 3 piles.
1) Needed
2) Nice to have
3) Cool but not really needed now.
WHO’SYOURTARGET
AUDIENCE AND WHY
Personas
•late 50’s blue collar worker
with limited computer use
•Tired single Mother very
busy and very tired
•car accident victim looking
for pain relief
Facts
• in pain so kinda agitated
• it might hurt to use the
mouse
• older demographic
Thoughts
• need large buttons to help
with clicking
• very direct messaging to limit
on confusion
•Too much text / cluster could
be overwhelming
USER STORIES
USER STORY EXAMPLE
“As a <role>, I want <goal/desire> so that <benefit>”
“As a customer representative, I want to search for my customers
by their first and last name to find the customer faster.”
QUESTIONSTO ASK
These are excellent questions to ask during your 

Research & Discovery Meeting.
MEETING QUESTIONS
#1: Problem Statement
What problem do you want to solve?
                                         
#2: Stakeholders
Who do you answer to? Who is involved in this project?
                                                 
#3: Users
Who are you users?
#4: Risks
What risks are we afraid of? 

What is worst case scenario?
MEETING QUESTIONS
#5: Assumptions
Examples:
1. Client will provide high quality videos in a timely fashion.
2. Client will provide high quality photos in a timely fashion.
3. Client will provide descriptions for products.
4. Client will provide feedback on layout designs in a timely

fashion.
#5: List of Features NOT to be developed
if you're used a gateway, make sure the client knows you
are not creating it.
NOW IT’STIMETO WRITE!
WHAT’S IN A PROJECT AUDIT?
• Page outlining any new features sections not on current site
• list any possible or key plugins
• Page for extra Ideas
• List of possible templates needed for theme
• Explanation of how Project Management will be handled.
SECTIONS OF

YOUR AUDIT
• list of Overall Goals
• list any Client Feedback
• Problems with Current site
• Define target Audience
• Current Navigations
• New Site Map (this evolves
as we uncover needed
functionality)
• Question everything
• Review every page
• Review every section
PROJECT AUDIT PER PAGE/SECTION
• list page title and url
• Goals of the page
• Current feature list
• New Feature list
• Current Problems
• Solution per section and/or
page
• Feedback from client
• Wish list/backlog/Nice to
Haves
• Design feedback
• Other Notes - Any random
ideas per page and section
• ClientTo Do’s per page and
sections
LIST OFTEMPLATES NEEDED
Home
Locations
◦ archive
◦ category
◦ tag
◦ Show single
Events
◦ archive
◦ category
◦ tag
◦ single event
• blog
◦ archive
◦ category
◦ tag
◦ single post
• Team directory
• 404
• Single page
• search results
DISCUSS POSSIBLE CONTENT
STRATEGIES
How and when to use tags and categories, along with a
starter list of rules when making new category and tag.
- What Custom PostTypes does the project need
- WhatTaxonomies does the project need
- What Parent Categories to start with.
- Along with setting a game plan for growth.
PHASE #2
Things currently out of scope.
OVERALL RECAPTHOUGHTS
And AllThe OtherThings
Trello
RESOURCES CREATED
• Brain dumps
• Sorted feature list
• Define Goals / user stories
• Create user stories
• Define target Audience
• Site map
• Basic wire frames(paper)
• Lots of sketching
• Stockholder Interviews
• Talk about inspiration
• Basic guides for colors
• Basic guides for layout
• Assigned ClientTasks
• Start content gathering
• Compile assists
• Tickets
THANKYOU ;C )
james@thewpvalet.com

http://thewpvalet.com
@jamestryon

More Related Content

What's hot

Making ourselves redundant: Delivering impact by building design capabilities...
Making ourselves redundant: Delivering impact by building design capabilities...Making ourselves redundant: Delivering impact by building design capabilities...
Making ourselves redundant: Delivering impact by building design capabilities...Service Experience Camp
 
Cracking the Product Manager Interview
Cracking the Product Manager InterviewCracking the Product Manager Interview
Cracking the Product Manager InterviewGayle McDowell
 
Inventory of Changes
Inventory of ChangesInventory of Changes
Inventory of ChangesJim Burnett
 
GHC slides for dare to disrupt the numbers
GHC slides for dare to disrupt the numbersGHC slides for dare to disrupt the numbers
GHC slides for dare to disrupt the numbersAliza Carpio
 
Design thinking lean startup and agile pradeep
Design thinking lean startup and agile pradeepDesign thinking lean startup and agile pradeep
Design thinking lean startup and agile pradeepPradeep Patel, PMP®
 
UXPA 2021: Starting From Scratch: Creating a UX Practice
UXPA 2021: Starting From Scratch: Creating a UX PracticeUXPA 2021: Starting From Scratch: Creating a UX Practice
UXPA 2021: Starting From Scratch: Creating a UX PracticeUXPA International
 
Adversarial to Harmonious: Building the Developer/UX Connection
Adversarial to Harmonious: Building the Developer/UX ConnectionAdversarial to Harmonious: Building the Developer/UX Connection
Adversarial to Harmonious: Building the Developer/UX ConnectionUXPA International
 
Discussing Design: The Art of Critique
Discussing Design: The Art of CritiqueDiscussing Design: The Art of Critique
Discussing Design: The Art of CritiqueAaron Irizarry
 
I Have No Idea What I'm Doing, and That's Okay!
I Have No Idea What I'm Doing, and That's Okay! I Have No Idea What I'm Doing, and That's Okay!
I Have No Idea What I'm Doing, and That's Okay! Laura McGuigan
 
Deconstructing the Design Sprint
Deconstructing the Design SprintDeconstructing the Design Sprint
Deconstructing the Design SprintJohnny1337
 
A New Toolbox: Artifact Providence 2013
A New Toolbox: Artifact Providence 2013A New Toolbox: Artifact Providence 2013
A New Toolbox: Artifact Providence 2013Kevin Sharon
 
Team alignment map beta
Team alignment map betaTeam alignment map beta
Team alignment map betaGhani Kolli
 
Designing a Recruiting Strategy for Hiring Designers
Designing a Recruiting Strategy for Hiring DesignersDesigning a Recruiting Strategy for Hiring Designers
Designing a Recruiting Strategy for Hiring DesignersChris Avore
 
Designers Are From Mars, Engineers Are From Venus
Designers Are From Mars, Engineers Are From VenusDesigners Are From Mars, Engineers Are From Venus
Designers Are From Mars, Engineers Are From VenusMotivate Design
 
Building a UX team
Building a UX teamBuilding a UX team
Building a UX teamNorthernUX
 
Introduction to Product strategy (Google Launchpad)
Introduction to Product strategy (Google Launchpad)Introduction to Product strategy (Google Launchpad)
Introduction to Product strategy (Google Launchpad)Dhyana Scarano
 
MURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/Meeting
MURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/MeetingMURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/Meeting
MURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/MeetingMURAL
 
Lean UX in the Enterprise: A Government Case Study
Lean UX in the Enterprise: A Government Case StudyLean UX in the Enterprise: A Government Case Study
Lean UX in the Enterprise: A Government Case Studyuxpin
 

What's hot (20)

Lean Service Clinic / Andreas Conradi
Lean Service Clinic / Andreas ConradiLean Service Clinic / Andreas Conradi
Lean Service Clinic / Andreas Conradi
 
Making ourselves redundant: Delivering impact by building design capabilities...
Making ourselves redundant: Delivering impact by building design capabilities...Making ourselves redundant: Delivering impact by building design capabilities...
Making ourselves redundant: Delivering impact by building design capabilities...
 
Cracking the Product Manager Interview
Cracking the Product Manager InterviewCracking the Product Manager Interview
Cracking the Product Manager Interview
 
Intro to Product Design
Intro to Product DesignIntro to Product Design
Intro to Product Design
 
Inventory of Changes
Inventory of ChangesInventory of Changes
Inventory of Changes
 
GHC slides for dare to disrupt the numbers
GHC slides for dare to disrupt the numbersGHC slides for dare to disrupt the numbers
GHC slides for dare to disrupt the numbers
 
Design thinking lean startup and agile pradeep
Design thinking lean startup and agile pradeepDesign thinking lean startup and agile pradeep
Design thinking lean startup and agile pradeep
 
UXPA 2021: Starting From Scratch: Creating a UX Practice
UXPA 2021: Starting From Scratch: Creating a UX PracticeUXPA 2021: Starting From Scratch: Creating a UX Practice
UXPA 2021: Starting From Scratch: Creating a UX Practice
 
Adversarial to Harmonious: Building the Developer/UX Connection
Adversarial to Harmonious: Building the Developer/UX ConnectionAdversarial to Harmonious: Building the Developer/UX Connection
Adversarial to Harmonious: Building the Developer/UX Connection
 
Discussing Design: The Art of Critique
Discussing Design: The Art of CritiqueDiscussing Design: The Art of Critique
Discussing Design: The Art of Critique
 
I Have No Idea What I'm Doing, and That's Okay!
I Have No Idea What I'm Doing, and That's Okay! I Have No Idea What I'm Doing, and That's Okay!
I Have No Idea What I'm Doing, and That's Okay!
 
Deconstructing the Design Sprint
Deconstructing the Design SprintDeconstructing the Design Sprint
Deconstructing the Design Sprint
 
A New Toolbox: Artifact Providence 2013
A New Toolbox: Artifact Providence 2013A New Toolbox: Artifact Providence 2013
A New Toolbox: Artifact Providence 2013
 
Team alignment map beta
Team alignment map betaTeam alignment map beta
Team alignment map beta
 
Designing a Recruiting Strategy for Hiring Designers
Designing a Recruiting Strategy for Hiring DesignersDesigning a Recruiting Strategy for Hiring Designers
Designing a Recruiting Strategy for Hiring Designers
 
Designers Are From Mars, Engineers Are From Venus
Designers Are From Mars, Engineers Are From VenusDesigners Are From Mars, Engineers Are From Venus
Designers Are From Mars, Engineers Are From Venus
 
Building a UX team
Building a UX teamBuilding a UX team
Building a UX team
 
Introduction to Product strategy (Google Launchpad)
Introduction to Product strategy (Google Launchpad)Introduction to Product strategy (Google Launchpad)
Introduction to Product strategy (Google Launchpad)
 
MURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/Meeting
MURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/MeetingMURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/Meeting
MURAL Webinar: How Design Sprints Can Be Reformatted For Any Workshop/Meeting
 
Lean UX in the Enterprise: A Government Case Study
Lean UX in the Enterprise: A Government Case StudyLean UX in the Enterprise: A Government Case Study
Lean UX in the Enterprise: A Government Case Study
 

Viewers also liked

Technical Discovery: ... in a nutshell
Technical Discovery: ...  in a nutshellTechnical Discovery: ...  in a nutshell
Technical Discovery: ... in a nutshellVasileios Fasoulas
 
City and County Discovery Phase Results Summary
City and County Discovery Phase Results SummaryCity and County Discovery Phase Results Summary
City and County Discovery Phase Results Summarytogethernjersey
 
Discover phase showcase template
Discover phase showcase templateDiscover phase showcase template
Discover phase showcase templateYianni Achele
 
WordPress media library - Going Outside the Instructionsmedia library
WordPress media library - Going Outside the Instructionsmedia libraryWordPress media library - Going Outside the Instructionsmedia library
WordPress media library - Going Outside the Instructionsmedia libraryEasily Amused, Inc. & The WP Valet
 
How a project is born. Intro to Discovery Phase
How a project is born. Intro to Discovery Phase How a project is born. Intro to Discovery Phase
How a project is born. Intro to Discovery Phase Kate Semizhon
 
Crafting the Discovery Phase: Starting Design Projects Right
Crafting the Discovery Phase: Starting Design Projects RightCrafting the Discovery Phase: Starting Design Projects Right
Crafting the Discovery Phase: Starting Design Projects RightDan Brown
 
How to Lead a Discovery Meeting
How to Lead a Discovery MeetingHow to Lead a Discovery Meeting
How to Lead a Discovery MeetingSalesScripter
 
How to Stream to Facebook Live Like a Pro
How to Stream to Facebook Live Like a ProHow to Stream to Facebook Live Like a Pro
How to Stream to Facebook Live Like a ProLeslie Samuel
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheLeslie Samuel
 

Viewers also liked (12)

Best Practices in Theme Development - WordCamp Orlando 2012
Best Practices in Theme Development - WordCamp Orlando 2012Best Practices in Theme Development - WordCamp Orlando 2012
Best Practices in Theme Development - WordCamp Orlando 2012
 
Technical Discovery: ... in a nutshell
Technical Discovery: ...  in a nutshellTechnical Discovery: ...  in a nutshell
Technical Discovery: ... in a nutshell
 
What's New in WordPress 3.6 - BarCamp Orlando 2013
What's New in WordPress 3.6 - BarCamp Orlando 2013What's New in WordPress 3.6 - BarCamp Orlando 2013
What's New in WordPress 3.6 - BarCamp Orlando 2013
 
City and County Discovery Phase Results Summary
City and County Discovery Phase Results SummaryCity and County Discovery Phase Results Summary
City and County Discovery Phase Results Summary
 
Discover phase showcase template
Discover phase showcase templateDiscover phase showcase template
Discover phase showcase template
 
WordPress media library - Going Outside the Instructionsmedia library
WordPress media library - Going Outside the Instructionsmedia libraryWordPress media library - Going Outside the Instructionsmedia library
WordPress media library - Going Outside the Instructionsmedia library
 
How a project is born. Intro to Discovery Phase
How a project is born. Intro to Discovery Phase How a project is born. Intro to Discovery Phase
How a project is born. Intro to Discovery Phase
 
Crafting the Discovery Phase: Starting Design Projects Right
Crafting the Discovery Phase: Starting Design Projects RightCrafting the Discovery Phase: Starting Design Projects Right
Crafting the Discovery Phase: Starting Design Projects Right
 
How to Lead a Discovery Meeting
How to Lead a Discovery MeetingHow to Lead a Discovery Meeting
How to Lead a Discovery Meeting
 
Building a Website The Easy Way With Wordpress
Building a Website The Easy Way With WordpressBuilding a Website The Easy Way With Wordpress
Building a Website The Easy Way With Wordpress
 
How to Stream to Facebook Live Like a Pro
How to Stream to Facebook Live Like a ProHow to Stream to Facebook Live Like a Pro
How to Stream to Facebook Live Like a Pro
 
How to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your NicheHow to Become a Thought Leader in Your Niche
How to Become a Thought Leader in Your Niche
 

Similar to Understanding Your Project Before You Start

D4d talkingtoclients
D4d talkingtoclientsD4d talkingtoclients
D4d talkingtoclientsDani Nordin
 
Nov. 15, 2011 dani nordin talking to clients about drupal projects
Nov. 15, 2011 dani nordin talking to clients about drupal projectsNov. 15, 2011 dani nordin talking to clients about drupal projects
Nov. 15, 2011 dani nordin talking to clients about drupal projectsO'Reilly Media
 
User Stories from Scenarios
User Stories from ScenariosUser Stories from Scenarios
User Stories from ScenariosRavikanth-BA
 
Improve Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsImprove Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsElizabeth Steiner
 
UX in Action: IBM Watson
UX in Action: IBM WatsonUX in Action: IBM Watson
UX in Action: IBM WatsonUserTesting
 
Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...berhanu taye
 
Behavior Driven Development
Behavior Driven DevelopmentBehavior Driven Development
Behavior Driven DevelopmentNETUserGroupBern
 
Things to Budget for When Planning a Drupal Implementation
Things to Budget for When Planning a Drupal ImplementationThings to Budget for When Planning a Drupal Implementation
Things to Budget for When Planning a Drupal ImplementationDani Nordin
 
Discovery 101
Discovery 101Discovery 101
Discovery 101creed
 
12 Rules for Building Your Product Management Playbook
12 Rules for Building Your Product Management Playbook12 Rules for Building Your Product Management Playbook
12 Rules for Building Your Product Management PlaybookJeremy Horn
 
Software Product Engineering
Software Product EngineeringSoftware Product Engineering
Software Product EngineeringSagittarius
 
Scoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an AgencyScoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an AgencyJohn Giaconia
 
Scoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an AgencyScoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an AgencyKara Hansen
 
15 tips for bullet proof requirements analysis on SharePoint projects
15 tips for bullet proof requirements analysis on SharePoint projects15 tips for bullet proof requirements analysis on SharePoint projects
15 tips for bullet proof requirements analysis on SharePoint projectsDocFluix, LLC
 
How to make change happen in your organisation by talking your devs language
How to make change happen in your organisation by talking your devs languageHow to make change happen in your organisation by talking your devs language
How to make change happen in your organisation by talking your devs languageBuiltvisible
 
Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...
Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...
Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...Dakiry
 
Untangling spring week2
Untangling spring week2Untangling spring week2
Untangling spring week2Derek Jacoby
 
How to take the stress out of writing case studies
How to take the stress out of writing case studiesHow to take the stress out of writing case studies
How to take the stress out of writing case studiesDesignHammer
 

Similar to Understanding Your Project Before You Start (20)

D4d talkingtoclients
D4d talkingtoclientsD4d talkingtoclients
D4d talkingtoclients
 
Nov. 15, 2011 dani nordin talking to clients about drupal projects
Nov. 15, 2011 dani nordin talking to clients about drupal projectsNov. 15, 2011 dani nordin talking to clients about drupal projects
Nov. 15, 2011 dani nordin talking to clients about drupal projects
 
User Stories from Scenarios
User Stories from ScenariosUser Stories from Scenarios
User Stories from Scenarios
 
How to do b tech be projects or any academic projects
How to do b tech be projects or any academic projectsHow to do b tech be projects or any academic projects
How to do b tech be projects or any academic projects
 
Improve Product Design with High Quality Requirements
Improve Product Design with High Quality RequirementsImprove Product Design with High Quality Requirements
Improve Product Design with High Quality Requirements
 
UX in Action: IBM Watson
UX in Action: IBM WatsonUX in Action: IBM Watson
UX in Action: IBM Watson
 
Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...Project management.docx communictionLecture notes Training for Trainers in Ge...
Project management.docx communictionLecture notes Training for Trainers in Ge...
 
Behavior Driven Development
Behavior Driven DevelopmentBehavior Driven Development
Behavior Driven Development
 
Things to Budget for When Planning a Drupal Implementation
Things to Budget for When Planning a Drupal ImplementationThings to Budget for When Planning a Drupal Implementation
Things to Budget for When Planning a Drupal Implementation
 
Discovery 101
Discovery 101Discovery 101
Discovery 101
 
12 Rules for Building Your Product Management Playbook
12 Rules for Building Your Product Management Playbook12 Rules for Building Your Product Management Playbook
12 Rules for Building Your Product Management Playbook
 
Software Product Engineering
Software Product EngineeringSoftware Product Engineering
Software Product Engineering
 
Scoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an AgencyScoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an Agency
 
Scoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an AgencyScoping and Estimating WordPress Projects as an Agency
Scoping and Estimating WordPress Projects as an Agency
 
15 tips for bullet proof requirements analysis on SharePoint projects
15 tips for bullet proof requirements analysis on SharePoint projects15 tips for bullet proof requirements analysis on SharePoint projects
15 tips for bullet proof requirements analysis on SharePoint projects
 
How to make change happen in your organisation by talking your devs language
How to make change happen in your organisation by talking your devs languageHow to make change happen in your organisation by talking your devs language
How to make change happen in your organisation by talking your devs language
 
Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...
Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...
Романа Косцик “New project begins. Jump in and keep calm. Everything will be ...
 
Untangling spring week2
Untangling spring week2Untangling spring week2
Untangling spring week2
 
Role of a Web design and development company in India
Role of a Web design and development company in India Role of a Web design and development company in India
Role of a Web design and development company in India
 
How to take the stress out of writing case studies
How to take the stress out of writing case studiesHow to take the stress out of writing case studies
How to take the stress out of writing case studies
 

Recently uploaded

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Recently uploaded (20)

Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Understanding Your Project Before You Start

  • 1. UNDERSTANDING YOUR PROJECT BEFORE YOU START —————————— RESEARCH & DISCOVERY PHASE James Tryon, Creative Director 
 WP Valet
  • 2.
  • 4. INTERNAL MEETING AFTER “MEET & GREET” • Review notes in an internal meeting with your team. • Review Client Questionnaire • Review Client’s Site • Review Client’s Creative Brief/RFP (if they have one) • Review Competitors • Basic Brand Analysis • If we determine we’re a good fit, our team will recommend next steps to client.
  • 5. CLIENT QUESTIONNAIRE LINKS • Logos
 http://easilyamusedinc.com/wp-content/uploads/2012/10/ easilyamused-questionnaire-branding.doc • General
 http://easilyamusedinc.com/wp-content/uploads/2012/10/ easilyamusedquestionnaire.doc • *The above links are old. Please review and update your own.
  • 7. RESEARCH & DISCOVERY
 DOCUMENTING • R&D can be as small as 1/2 day of Discovery and 1/2 day of document writing. (1 day) • R&D can span weeks, depending on the complexity of the project. • R&D is invaluable in project planning & organizing.
  • 8. HOWTO DO 
 RESEARCH & DISCOVERY
  • 9. CLIENT QUESTIONNAIRE • Can be given to clients right after the “Meet & Greet”. • Before Research & Discovery starts, a client may be asked to fill this out. • It gives us a chance to really hear their feelings, and then we can make sure we address their concerns. • Valuable for re-branding or new projects.
  • 10. WHAT’S INCLUDED 
 IN AN AUDIT? • Analysis of client’s site & audience. • Vision, scope, and planning to achieve specific goals. • Detailed list of requirements & tasks. • Site maps, estimates on tasks, client’s budget & timeline. • Recommendations for improving ROI. • UX/UI direction for how things should be set up.
  • 11. TEAMWORK We work as teammates with our clients. 
 
 This includes:
 - Daily stand-up meetings.
 - Open communication.
 -Transparent reporting. We define full scope and vision of the project together. We works in an Agile fashion to make sure our clients’ needs are addressed & most important features are constantly prioritized.
  • 13. WHATTO COVER INYOUR MEETING… • Identify Items that Need Internal Research • Goal Planning • DefineTarget Audience • Write Users Stories • Competitor Analysis • Information Architecture • Project Audit • Content Strategy - Basic
  • 14. OPENTHE FLOODGATES The sky’s the limit in this meeting and is used to spark creativity and get everyone involved in the project motivated. Do a group brain-dump.Anything and everything that you could ever want, we just write it down.Then we sort all of them into 3 piles. 1) Needed 2) Nice to have 3) Cool but not really needed now.
  • 15. WHO’SYOURTARGET AUDIENCE AND WHY Personas •late 50’s blue collar worker with limited computer use •Tired single Mother very busy and very tired •car accident victim looking for pain relief Facts • in pain so kinda agitated • it might hurt to use the mouse • older demographic Thoughts • need large buttons to help with clicking • very direct messaging to limit on confusion •Too much text / cluster could be overwhelming
  • 17. USER STORY EXAMPLE “As a <role>, I want <goal/desire> so that <benefit>” “As a customer representative, I want to search for my customers by their first and last name to find the customer faster.”
  • 18. QUESTIONSTO ASK These are excellent questions to ask during your 
 Research & Discovery Meeting.
  • 19. MEETING QUESTIONS #1: Problem Statement What problem do you want to solve?                                           #2: Stakeholders Who do you answer to? Who is involved in this project?                                                   #3: Users Who are you users? #4: Risks What risks are we afraid of? 
 What is worst case scenario?
  • 20. MEETING QUESTIONS #5: Assumptions Examples: 1. Client will provide high quality videos in a timely fashion. 2. Client will provide high quality photos in a timely fashion. 3. Client will provide descriptions for products. 4. Client will provide feedback on layout designs in a timely
 fashion. #5: List of Features NOT to be developed if you're used a gateway, make sure the client knows you are not creating it.
  • 22. WHAT’S IN A PROJECT AUDIT? • Page outlining any new features sections not on current site • list any possible or key plugins • Page for extra Ideas • List of possible templates needed for theme • Explanation of how Project Management will be handled.
  • 23. SECTIONS OF
 YOUR AUDIT • list of Overall Goals • list any Client Feedback • Problems with Current site • Define target Audience • Current Navigations • New Site Map (this evolves as we uncover needed functionality) • Question everything • Review every page • Review every section
  • 24. PROJECT AUDIT PER PAGE/SECTION • list page title and url • Goals of the page • Current feature list • New Feature list • Current Problems • Solution per section and/or page • Feedback from client • Wish list/backlog/Nice to Haves • Design feedback • Other Notes - Any random ideas per page and section • ClientTo Do’s per page and sections
  • 25. LIST OFTEMPLATES NEEDED Home Locations ◦ archive ◦ category ◦ tag ◦ Show single Events ◦ archive ◦ category ◦ tag ◦ single event • blog ◦ archive ◦ category ◦ tag ◦ single post • Team directory • 404 • Single page • search results
  • 26. DISCUSS POSSIBLE CONTENT STRATEGIES How and when to use tags and categories, along with a starter list of rules when making new category and tag. - What Custom PostTypes does the project need - WhatTaxonomies does the project need - What Parent Categories to start with. - Along with setting a game plan for growth.
  • 27. PHASE #2 Things currently out of scope.
  • 30. RESOURCES CREATED • Brain dumps • Sorted feature list • Define Goals / user stories • Create user stories • Define target Audience • Site map • Basic wire frames(paper) • Lots of sketching • Stockholder Interviews • Talk about inspiration • Basic guides for colors • Basic guides for layout • Assigned ClientTasks • Start content gathering • Compile assists • Tickets