THE
FEATURES
OF
VERTIGO
VERTICAL
AXIS WIND
TURBINE
SYSTEM’S
KNOW-
HOW
Wind turbines next generation
(Slow Rotation Generator) vertical axis wind turbine
Low start up operating wind speed
The wind mill already produces current at this wind
speed.
THEUNIQUEFEATURESOFVERTIGOSRG
♦ Specially designed winding
The system makes use of specially designed
windings instead of the traditional iron-core
coil technology.
Specially designed windings.
♦ The wind turbine is very compatible, as it can
work both off-grid and on-grid.
♦ The wind turbine is very silent
♦ The operating rev is very low, only 25-30rpm
One of the most important unique
features of the Wind turbine is the
Low Start up wind speed (0.5m/s)
GUA GLOBAL
♦ It produces far more energy than any other vertical
wind turbines out there, at the same wind speed!
INTERNATIONAL PATENT
Data of Patent
Owner: GT Global Technology
US-34236 FL Sarasota, Washington BLVD 677
Registration no: PO900009171784
THEUNIQUEFEATURESOFVERTIGOSRG
INTERNATIONAL PATENT
We are renewable energy specialists & consultants
providing green energy technology solutions. Offering
residential, business, institutional and governmental
customers an easy way to purchase cleaner competitively
priced electricity producing products, as well as, the
opportunity to offset their carbon footprint.
Pursuant to the planning process, includes the following
solutions:
♦ The design of the rotor and it’s mathematical formula
♦ Generator with slow rotation
♦ Safety and control
International patented Technology
THEUNIQUEFEATURESOFVERTIGOSRG
♦ The system uses specially designed fans
♦ The device still continues working properly
even at 25m/s, stormy winds and resistant to160km/h
(44.44 m/s) high winds without damaging it!
♦ Our systems can work at any location, where
the minimal wind speed is available, but it is of
importance, that in the case of custom or serial
orders, we take into consideration the particular
local environmental characteristics. Thus we are
really able to install our solutions suitable at
different locations and local wind conditions.
As a result of the different requirements of Volts
and Ampers in different locations, the required
inverter might be different as well! As a result of
this, considering also the above factors, we
can guarantee to provide our customers with
the most efficient solutions.
The wind turbine is resistant to high sormy winds
Resistant to high stormy winds
On-gridInstallation
Installation
THEUNIQUEFEATURESOFVERTIGOSRG
Installation Gallery
UNIQUEFEATURESOFVERTIGOSRG COMPATIBILITY
♦
♦
♦ The system can work as a Hybrid, as it can work in compatibility with solar panels incorporated into
the system to increase efficiency, and reduce energy wastage. The solar panel can be integrated, so that
none of the energy generated by the wind turbine at very low speeds is lost.
♦ The wind turbine is very compatible, as it can work both off grid and on.
grid.
It also can work as a mobile wind turbine, as the wind turbines can be
fixed in a mobile-container-mode, and can easily be moved from place to
place
The wind turbine is very silent, making it very convenient to
be used for residential and commercial purposes.
♦ The wind turbine requires less maintenance
THEUNIQUEFEATURESOFVERTIGOSRG
 We calculate the height requirement of the supporting beam also upon local circumstances to further improve the
annual operating hours.
 It is important to highlight that our solution was developed to work in synergy with several inverters produced for regular wind
turbines in the market. Some of the types we incorporate into our systems are: Power one, Aurora, SMA, Fronius, etc.
 The maximal efficiency of VertiGo measured until now is 43%. According to our knowledge there’s no vertical wind
turbine solution with this performance ever made or operated. Products of other manufacturers typically provide the half or
one-third of the data provided in their materials.
 We always provide the output performance, measuring it after the inverter output, which can only really indicate the real
amount of energy that can be used.
 We optimize our solution to the real wind conditions of the place of installation, deciding and advising prior to any
installation, as well as the exact type of inverter most suitable. As a result of this, a traditional "out of the box" type product can
only be properly made upon predecided wind conditions. Improving customer satisfaction, as the machine will produce the
possible maximum amount of current, guaranteeing the shortest return on investment!
 It produces far more energy than any other Vertical axis wind turbines in the market, guaranteeing a shorter return on investment!
 It is extremely quiet, even at high wind speeds, and can run day and night for 30 years!
High Efficiency
UNIQUEFEATURESOFVERTIGOSRG
Comparison of a 50KW Vertigo SRG with a traditional VAWT
Average Wind
Speed(m/s)
1 2 3 4 5 6 7 8 9 10
Production (kWh) 0 6044 20500 48530 94783 163812 260084 388243 552756 552756
Annual Energy Production
THEUNIQUEFEATURESOFVERTIGOSRG
Performance comparison of a 50kW VertiGo wind turbine at different wind speeds
 Verti-GO SRG 5 KW
 Verti-GO SRG 10 KW
 Verti-GO SRG 12.5 KW
 Verti-GO SRG 20 KW
 Verti-GO SRG 27.5 KW
 Verti-GO SRG 50 KW
Windspeed (m/s) 1 2 3 4 5 6 7 8 9 10
50KW Traditional Vawt
output power (w)
0 0 0 3220 6290 10870 17260 25770 36690 50330
50KW VertiGO SRG
Output power (w)
0 690 2340 5540 10820 18700 29690 44320 63100 63100
List of VertiGo SRG Product types
High efficiency
THEUNIQUEFEATURESOFVERTIGOSRG
General Data Table
General data
Productname Verigo SRG
5KW
VetigoSRG
10KW
Vertigo SRG
12.5 KW
Vertigo SRG
20KW
Vertigo SRG
27.5 KW
Vertigo SRG
50KW
Rated power (KW)
5.1 9 12.5 20 27.5 50
Rated wind speed (m/s) 8.3 8.3 8.3 8.3 8.3 8.3
Start up wind speed (m/s) 0.5 0.5 0.5 0.5 0.5 0.5
Wind Speed deceleration
(m/s)
9 9 9 9 9 9
Survival wind speed
44.44 44.44 44.44 44.44 44.44 44.44
Amount of blades (pcs)
6 6 6 6 6 6
Blade material Fiberglass
epoxy/ stainless
steel
Fiberglass
epoxy/ stainless
steel
Fiberglass
epoxy/ stainless
steel
Fiberglass
epoxy/ stainless
steel
Fiberglass
epoxy/ stainless
steel
Fiberglass
epoxy/ stainless
steel
Rotor diameter (m) 3.8 5.6 8 10 7.5 10
Windmill weight (kg) 953 1162 1483 1839 2255 4575
12mtower weight (kg) 1162 1162 1162 1162 1745 2324
THEUNIQUEFEATURESOFVERTIGOSRG
Technical Data
Other installation
materials:
● Mechanical and
electrical installation
materials, fittings,
accessories aids,
groundings.
● Device unit(s)
inverter connector.
● Design, which is
optional or as
provided on request
Productname Verigo SRG
5KW
VetigoSRG
10KW
Vertigo SRG
12.5 KW
Vertigo SRG
20KW
Vertigo SRG
27.5 KW
Vertigo SRG
50KW
Minimumtower height(m)
6 6 6 6 6 6
Materialoftower
Steel Steel Steel Steel Steel Steel
6mtower weight(kg)
1000 1000 1000 1000 1000 1000
Generatorrotation(rpm)
0-60 0-60 0-60 0-60 0-60 0-60
Generatoroutputphases
1 to 3 1 to 3 1 to 3 1 to 3 1 to 3 1 to 3
Generatorprotectionlevel
Marine proof Marine proof Marine proof Marine proof Marine proof Marine proof
Invertertype Power one,
Aurora, SMA,
Fronius, etc
Power one,
Aurora, SMA,
Fronius, etc
Power one,
Aurora, SMA,
Fronius, etc
Power one,
Aurora, SMA,
Fronius, etc
Power one,
Aurora, SMA,
Fronius, etc
Power one,
Aurora, SMA,
Fronius, etc
Power ofinverter(kw)
5 10 12.5 20 27.5 50
Ratedinverteroutput
voltage(v) 110/230 110/230 110/230 110/230 110/230 110/230
Protectionbox:electronic
break(Ohmbreak)
Varistor,black-outkey
(m/s)
44.44< 44.44< 44.44< 44.44< 44.44< 44.44<
UNIQUEFEATURESOFVERTIGOSRG III. THE ELECTRONICS
Implementation Schedule:
• Estimating the demand.
• Measurements on site.
• Selection of the product.
• Order placement.
• Fulfilling the 60% down-payment.
• Planning of construction (if needed) which can differ by country.
• Installation.
• Payment of the remaining amount (40%).
• Handing over.
Other relevant confidential information:
• NASA had previously taken measurements of the VertiGO product with
impressive results due to its uniqueness and power production, leaving a very
good recommendation.
• The US NAVY are currently also intending to use the VertiGO product.
• Numerous VertiGo products are also intended to be used by the Kazakstan state
For more information and enquiries, contact us at info@guaglobal.com
Tel: +36 30 9872 375
For more information, inquiries and business opportunities
kindly contact us as at gua-rep@guaglobal.com or
info@guaglobal.com Tel:+36 30 9872 375
Thank you for your kind attention!

guaglobal.com

  • 1.
    THE FEATURES OF VERTIGO VERTICAL AXIS WIND TURBINE SYSTEM’S KNOW- HOW Wind turbinesnext generation (Slow Rotation Generator) vertical axis wind turbine
  • 2.
    Low start upoperating wind speed The wind mill already produces current at this wind speed. THEUNIQUEFEATURESOFVERTIGOSRG ♦ Specially designed winding The system makes use of specially designed windings instead of the traditional iron-core coil technology. Specially designed windings. ♦ The wind turbine is very compatible, as it can work both off-grid and on-grid. ♦ The wind turbine is very silent ♦ The operating rev is very low, only 25-30rpm One of the most important unique features of the Wind turbine is the Low Start up wind speed (0.5m/s) GUA GLOBAL ♦ It produces far more energy than any other vertical wind turbines out there, at the same wind speed!
  • 3.
    INTERNATIONAL PATENT Data ofPatent Owner: GT Global Technology US-34236 FL Sarasota, Washington BLVD 677 Registration no: PO900009171784 THEUNIQUEFEATURESOFVERTIGOSRG INTERNATIONAL PATENT We are renewable energy specialists & consultants providing green energy technology solutions. Offering residential, business, institutional and governmental customers an easy way to purchase cleaner competitively priced electricity producing products, as well as, the opportunity to offset their carbon footprint. Pursuant to the planning process, includes the following solutions: ♦ The design of the rotor and it’s mathematical formula ♦ Generator with slow rotation ♦ Safety and control International patented Technology
  • 4.
    THEUNIQUEFEATURESOFVERTIGOSRG ♦ The systemuses specially designed fans ♦ The device still continues working properly even at 25m/s, stormy winds and resistant to160km/h (44.44 m/s) high winds without damaging it! ♦ Our systems can work at any location, where the minimal wind speed is available, but it is of importance, that in the case of custom or serial orders, we take into consideration the particular local environmental characteristics. Thus we are really able to install our solutions suitable at different locations and local wind conditions. As a result of the different requirements of Volts and Ampers in different locations, the required inverter might be different as well! As a result of this, considering also the above factors, we can guarantee to provide our customers with the most efficient solutions. The wind turbine is resistant to high sormy winds Resistant to high stormy winds
  • 5.
  • 6.
    UNIQUEFEATURESOFVERTIGOSRG COMPATIBILITY ♦ ♦ ♦ Thesystem can work as a Hybrid, as it can work in compatibility with solar panels incorporated into the system to increase efficiency, and reduce energy wastage. The solar panel can be integrated, so that none of the energy generated by the wind turbine at very low speeds is lost. ♦ The wind turbine is very compatible, as it can work both off grid and on. grid. It also can work as a mobile wind turbine, as the wind turbines can be fixed in a mobile-container-mode, and can easily be moved from place to place The wind turbine is very silent, making it very convenient to be used for residential and commercial purposes. ♦ The wind turbine requires less maintenance
  • 7.
    THEUNIQUEFEATURESOFVERTIGOSRG  We calculatethe height requirement of the supporting beam also upon local circumstances to further improve the annual operating hours.  It is important to highlight that our solution was developed to work in synergy with several inverters produced for regular wind turbines in the market. Some of the types we incorporate into our systems are: Power one, Aurora, SMA, Fronius, etc.  The maximal efficiency of VertiGo measured until now is 43%. According to our knowledge there’s no vertical wind turbine solution with this performance ever made or operated. Products of other manufacturers typically provide the half or one-third of the data provided in their materials.  We always provide the output performance, measuring it after the inverter output, which can only really indicate the real amount of energy that can be used.  We optimize our solution to the real wind conditions of the place of installation, deciding and advising prior to any installation, as well as the exact type of inverter most suitable. As a result of this, a traditional "out of the box" type product can only be properly made upon predecided wind conditions. Improving customer satisfaction, as the machine will produce the possible maximum amount of current, guaranteeing the shortest return on investment!  It produces far more energy than any other Vertical axis wind turbines in the market, guaranteeing a shorter return on investment!  It is extremely quiet, even at high wind speeds, and can run day and night for 30 years! High Efficiency
  • 8.
    UNIQUEFEATURESOFVERTIGOSRG Comparison of a50KW Vertigo SRG with a traditional VAWT Average Wind Speed(m/s) 1 2 3 4 5 6 7 8 9 10 Production (kWh) 0 6044 20500 48530 94783 163812 260084 388243 552756 552756 Annual Energy Production
  • 9.
    THEUNIQUEFEATURESOFVERTIGOSRG Performance comparison ofa 50kW VertiGo wind turbine at different wind speeds  Verti-GO SRG 5 KW  Verti-GO SRG 10 KW  Verti-GO SRG 12.5 KW  Verti-GO SRG 20 KW  Verti-GO SRG 27.5 KW  Verti-GO SRG 50 KW Windspeed (m/s) 1 2 3 4 5 6 7 8 9 10 50KW Traditional Vawt output power (w) 0 0 0 3220 6290 10870 17260 25770 36690 50330 50KW VertiGO SRG Output power (w) 0 690 2340 5540 10820 18700 29690 44320 63100 63100 List of VertiGo SRG Product types High efficiency
  • 10.
    THEUNIQUEFEATURESOFVERTIGOSRG General Data Table Generaldata Productname Verigo SRG 5KW VetigoSRG 10KW Vertigo SRG 12.5 KW Vertigo SRG 20KW Vertigo SRG 27.5 KW Vertigo SRG 50KW Rated power (KW) 5.1 9 12.5 20 27.5 50 Rated wind speed (m/s) 8.3 8.3 8.3 8.3 8.3 8.3 Start up wind speed (m/s) 0.5 0.5 0.5 0.5 0.5 0.5 Wind Speed deceleration (m/s) 9 9 9 9 9 9 Survival wind speed 44.44 44.44 44.44 44.44 44.44 44.44 Amount of blades (pcs) 6 6 6 6 6 6 Blade material Fiberglass epoxy/ stainless steel Fiberglass epoxy/ stainless steel Fiberglass epoxy/ stainless steel Fiberglass epoxy/ stainless steel Fiberglass epoxy/ stainless steel Fiberglass epoxy/ stainless steel Rotor diameter (m) 3.8 5.6 8 10 7.5 10 Windmill weight (kg) 953 1162 1483 1839 2255 4575 12mtower weight (kg) 1162 1162 1162 1162 1745 2324
  • 11.
    THEUNIQUEFEATURESOFVERTIGOSRG Technical Data Other installation materials: ●Mechanical and electrical installation materials, fittings, accessories aids, groundings. ● Device unit(s) inverter connector. ● Design, which is optional or as provided on request Productname Verigo SRG 5KW VetigoSRG 10KW Vertigo SRG 12.5 KW Vertigo SRG 20KW Vertigo SRG 27.5 KW Vertigo SRG 50KW Minimumtower height(m) 6 6 6 6 6 6 Materialoftower Steel Steel Steel Steel Steel Steel 6mtower weight(kg) 1000 1000 1000 1000 1000 1000 Generatorrotation(rpm) 0-60 0-60 0-60 0-60 0-60 0-60 Generatoroutputphases 1 to 3 1 to 3 1 to 3 1 to 3 1 to 3 1 to 3 Generatorprotectionlevel Marine proof Marine proof Marine proof Marine proof Marine proof Marine proof Invertertype Power one, Aurora, SMA, Fronius, etc Power one, Aurora, SMA, Fronius, etc Power one, Aurora, SMA, Fronius, etc Power one, Aurora, SMA, Fronius, etc Power one, Aurora, SMA, Fronius, etc Power one, Aurora, SMA, Fronius, etc Power ofinverter(kw) 5 10 12.5 20 27.5 50 Ratedinverteroutput voltage(v) 110/230 110/230 110/230 110/230 110/230 110/230 Protectionbox:electronic break(Ohmbreak) Varistor,black-outkey (m/s) 44.44< 44.44< 44.44< 44.44< 44.44< 44.44<
  • 12.
    UNIQUEFEATURESOFVERTIGOSRG III. THEELECTRONICS Implementation Schedule: • Estimating the demand. • Measurements on site. • Selection of the product. • Order placement. • Fulfilling the 60% down-payment. • Planning of construction (if needed) which can differ by country. • Installation. • Payment of the remaining amount (40%). • Handing over. Other relevant confidential information: • NASA had previously taken measurements of the VertiGO product with impressive results due to its uniqueness and power production, leaving a very good recommendation. • The US NAVY are currently also intending to use the VertiGO product. • Numerous VertiGo products are also intended to be used by the Kazakstan state For more information and enquiries, contact us at info@guaglobal.com Tel: +36 30 9872 375
  • 13.
    For more information,inquiries and business opportunities kindly contact us as at gua-rep@guaglobal.com or info@guaglobal.com Tel:+36 30 9872 375 Thank you for your kind attention!