SlideShare a Scribd company logo
VENDOR EVALUATION
Under Guidence of:
Mr. Tirth D Patel
Assistant Prof.
Civil Engineering Dept.
UVPCE
Prepared By:
Rudra Desai 16014111004
Mikul Patel 16014111018
Vismay Shah 16014111028
1
Content of
Presentation
• Types of Purchase
• Method of Purchase
• Vendor Evaluation
• Data Collection
• Data Analysis
• Conclusion
2
INTRODUCTION
› Vendor evaluation is a term used in business and refers to the process of
evaluating and approving potential Vendors by quantitative assessment.
› The purpose of Vendor evaluation is to ensure a portfolio of best in class
Vendors is available for use. Vendor evaluation is also a process applied to
current Vendors in order to measure and monitor their performance for the
purposes of reducing costs, mitigating risk and driving continuous
improvement.
3
PRINCIPLES OF PURCHASE
Right
Quality
Rigth Quantity
Rigth
Time
Rigth
Price
Rigth
Place
4
TYPES OF PURCHASING
1.Centralized Purchasing
› Under centralised purchasing purchases are made at one central point for the whole
organisation and material is issued to respective departments or jobs as and when
needed. Centralised purchasing is suitable in cases where the organisation runs one
plant. It will bring about economies of purchasing and buying in small lots will be
avoided.
› It ensures consistent buying policies in future and purchasing powers are
concentrated in the hands of one person, the in charge of purchasing department.
› The most important benefit which can be drawn from centralised buying is that it
keeps the inventories in control and checks the wasteful investment in materials and
equipment etc. thereby ensuring overall economy in purchasing. 5
Continue…
› It also ensures bulk buying which ensures favourable prices. The staff requirements
under this type are limited and specialists in buying may be appointed. Centralised
purchasing is further helpful to the vendors since their selling costs are reduced as
they can easily co-ordinate and supply goods to a single buyer instead of large
number of buyers.
6
TYPES OF PURCHASING
1.Decentralized Purchasing
› Decentralised purchasing is just the reverse of centralised purchasing. This is
suitable in organisations running more than one plant. Under this type each plant has
its own purchasing agents. In other words, every department makes its own
purchases. This is also called localized purchasing.
› Decentralised purchasing is quite flexible and can be quickly adjusted in accordance
with the requirements of a particular plant. More attention can be paid by the
departmental head on buying problems as he will be carrying limited number of
activities in his department and he can be held responsible for the purchase of
goods and the overall performance of the plant.
7
Continue…
› The serious drawback which emerges from this type is the lack of uniformity in
purchasing procedure in the organisation. At the same time uniformity in prices
cannot be ensured and moreover every departmental head may not possess the
calibre of an expert buyer.
8
PURCHASE PARAMETERS
Purchase
Parameters
SWOT
Analysis
Right
Materi
al Right
Qualit
y
Right
Quantit
y EOQ
Right
Attitud
e
Right
Price
Right
Time
Right
Transportat
ion
Right
Contract
s
Right
Source
Right
Place of
Delivery
9
METHODS OF PURCHASING
10
• Hand to mouth purchasing
• Forward purchasing
• Speculative purchasing
• Hedging
• Reciprocal purchasing
• Concentrated purchasing
• Diversified purchasing
• Tender buying.
EVALUATING SUPPPIER PERFORMANCE
1.Categorical System
› In this method, the buyer chooses attributes that are most important to its particular
situation. The buyer assigns either a preferred (+), unsatisfactory (-), or neutral (O)
rating for each of the selected attributes to every vendor.
› Then the ratings are totalled for each vendor. For example, ratings resulting in
scores of two preferred (++), one unsatisfactory (-), and one neutral (O) would total
one positive (+). A comparison of total scores reveals the highest rated vendor. The
representatives of the involved divisions agree upon the ratings (Hillman, 1993).
› Categorical supplier measurement is the easiest method to implement but suffers
from subjectivity.
11
› It does not provide a detailed insight into the supplier’s true performance because
the attributes being measured are weighted equally. Also, because the
representatives of the involved divisions assign the ratings, this method relies on an
individual’s perception about performance and not on quantitative data.
2. Weighted Point Method
› In the weighted-point method, the relevant attributes are chosen and each are
assigned a weight depending on the importance to the overall performance. The firm
reaches a consensus on weight assignments to prevent or minimize subjectivity.
› The weight for each performance category is then multiplied by the performance
score that is assigned to it. Finally, these products are totalled to determine a final
rating for each supplier. 12
› Firms often use the weighted point system because it is highly reliable and its
implementation costs are moderate. In addition, it combines qualitative and
quantitative performance factors into a common system.
› Because users can change the weights assigned to each performance category, or
change the performance categories themselves depending on the strategic priorities
of the firm, the system is flexible.
› The weighted-point method overcomes the subjectivity of the categorical system,
but it has some drawbacks. It requires the buyer to specify the value of one
performance measure relative to another, which is often difficult in practice.
13
3. Cost – Based System
› Using the cost-based system, a buyer is able to quantify the additional costs incurred
if a supplier fails to perform as expected. The total cost of doing business with the
supplier can be calculated by the supplier performance index (SPI).
› This index is calculated for each item or commodity provided by the supplier and has
a base value of 1.
› It is represented by the following formula: SPI = (Purchase Price + Non-performance
Cost) / (Purchase Price).
› As derived from the equation, the closer SPI is to 1, the better the supplier. Non-costs
should include qualitative factors.
14
Data Collection
› The Data collection is done for the cement, any three vendors are selected
for the Data collected. Most commonly known factor are quality, delivery,
price and services. Each factor is assigned a weight which varies from
vendor to vendor, depending upon the buyer’s judgment about the
importance of the factor.
15
List of Vendors Selected
V
E
N
D
O
R
S
LIST
S1 – Nirmax Cement
Ambica Traders
S2 – J.K Laxmi Cement
Umiya Traders
S3 – Wonder Cement
Mahalaxmi Traders 16
The rejection of the material are less because the data is collected in summer season, hence in the winter season there are more chances of
getting more bags of cement rejected.
Supplier Inspection Analysis Price Analysis Price Analysis
Lots Received Lots Accepted Basic Price (Rs.
Per Bag)
Discount (%) Transport Deliveries
missed (%)
S1
Nirmax
1000 990 243 3 0 10
S2 J.K
Laxmi
1000 993 252 0 0 6
S3
Wonder
1000 985 245 2 0 2
Quality factor (%) = 40
Price Factor (%) = 35
Delivery factor (%) = 25
17
DATA ANALYSIS
18
1. QUALITY RATING
Quality rating is measured in terms of percentage of lots accepted.
QUALITY RATING = Proportion of lots accepted x Quality factor weight in percentage.
100
Supplier No. of lots
received
Lots accepted Proportion % of lots
accepted
Factor Weight Quality Rating
1 2 3 4 5 6 = (4 x 5)/100
S1 –
Nirmax
1000 990 99 40 39.6
S2 – JK
Laxmi
1000 993 99.3 40 39.72
S3 –
Wonder
1000 985 98.5 40 39.4
19
2. PRICE RATING
Price performance is measured in terms of percentage of lowest price to the price paid
PRICE RATING = Lowest price x Price factor weight in percentage
Price paid
Supplier Unit Price
(Rs.)
Discount
(%)
Basic
Price
(Rs.)
Transport
ation
charges
Net
Price
Lowest
price
7 AS % OF 6 Factor
Weight
Price rating
1 2 3 4 5 6 7 8=7/6 9 10=8*9/100
S1 –
Nirmax
243 3 235.71 0 235.7 235.7 100 35 35
S2 – JK
Laxmi
252 0 252 0 252 235.7 93.73 35 32.73
S3 –
Wonder
245 2 240.1 0 240.1 235.7 98.2125 35 34.37
20
3. DELIVERY RATING
Delivery performance is measured in terms of proportion of the performance promises fulfilled.
Delivery rating= Proportion of commitments kept up x Services factor weight percentage
Supplier % Deliveries
missed
Proportion of promises kept Factor Weight Delivery Rating
1 2 3 4 5=(3*4)/100
S1 – Nirmax 10 90 25 22.5
S2 – JK Laxmi 6 94 25 23.5
S3 – Wonder 2 98 25 24.5
21
4. COMPOSITE RATING
Composite rating is the aggregate of quality rating, price rating and delivery rating.
COMPOSITE RATING
Supplier Individual Rating Composite rating
Quality rating Price rating Delivery rating
S1 – Nirmax 39.6 35 22.5 97.1
S2 – JK Laxmi 39.72 32.73 23.5 95.95
S3 – Wonder 39.4 34.75 24.5 98.27
22
S3
Acceptance and the non-acceptance norms are then
fixed which are applied to the composite rating. The
acceptance norms generally vary from vendor to
vendor, depending upon their needs.
Category Range
A 91-100
B 81-90
C 71-80
D 61-70
E 51-60
is preferred because it has a highest
rating.
23
CONCLUSION
In concluding part, we come to know that
by proper Vendor Evaluation we could
select the Best and Appropriate vendor
for the particular material. It prevents us
to become subjective towards one criteria
of selection.
24
REFERENCES
1. Material Management Text and Case BY
A.K.CHITALE & R.C. GUPTA
2. Empire Skylark
3. http://www.yourarticlelibrary.com/material-
management/types-of-material-purchasing-in-
an-organisation-centralised-and-
decentralised/26123/
4. https://scm.ncsu.edu/scm-
articles/article/performance-measurements-
and-metrics-an-analysis-of-supplier-evaluation
25
Thank you very much
for your time
26

More Related Content

What's hot

ppt of vendor management
ppt of vendor management ppt of vendor management
ppt of vendor management
rohit12692
 
Purchasing ~Sourcing
Purchasing ~SourcingPurchasing ~Sourcing
Purchasing ~Sourcing
Anand Subramaniam
 
Metrics For Vendor Management V4
Metrics For Vendor Management V4Metrics For Vendor Management V4
Metrics For Vendor Management V4
karasi001
 
Benchmarking in supply chain
Benchmarking  in supply chainBenchmarking  in supply chain
Benchmarking in supply chain
Tushar Tale
 
Srm Presentation
Srm PresentationSrm Presentation
Srm Presentation
Muhammed Akgun
 
The biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent themThe biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent them
Ali Zeeshan
 
Smarter Supplier Management – Improving Supplier Performance Through Better C...
Smarter Supplier Management – Improving Supplier Performance Through Better C...Smarter Supplier Management – Improving Supplier Performance Through Better C...
Smarter Supplier Management – Improving Supplier Performance Through Better C...
SAP Ariba
 
Vendor Performance Management
Vendor Performance ManagementVendor Performance Management
Vendor Performance Management
Gerald Ford
 
Vendor evalu.nikhil 12mt07ind017
Vendor evalu.nikhil 12mt07ind017Vendor evalu.nikhil 12mt07ind017
Vendor evalu.nikhil 12mt07ind017
Akash Maurya
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selection
Ankit
 
Vendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation SlidesVendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation Slides
SlideTeam
 
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Optimus BT
 
7 step strategic sourcing
7 step strategic sourcing7 step strategic sourcing
7 step strategic sourcing
Nimisis
 
Vendor management
Vendor managementVendor management
Vendor management
Linda Bartlett
 
Strategic Procurement
Strategic ProcurementStrategic Procurement
Strategic Procurement
Syed Ali Roshaan Raza
 
Vendor selection process
Vendor selection processVendor selection process
Vendor selection process
Mili Juneja
 
Vendor management
Vendor managementVendor management
Vendor management
Niraj Patel
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTSWAPAN KUMAR ROY
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATION
Zamri Yahya
 

What's hot (20)

ppt of vendor management
ppt of vendor management ppt of vendor management
ppt of vendor management
 
Purchasing ~Sourcing
Purchasing ~SourcingPurchasing ~Sourcing
Purchasing ~Sourcing
 
Metrics For Vendor Management V4
Metrics For Vendor Management V4Metrics For Vendor Management V4
Metrics For Vendor Management V4
 
Benchmarking in supply chain
Benchmarking  in supply chainBenchmarking  in supply chain
Benchmarking in supply chain
 
Srm Presentation
Srm PresentationSrm Presentation
Srm Presentation
 
The biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent themThe biggest problems caused by suppliers and how to prevent them
The biggest problems caused by suppliers and how to prevent them
 
Smarter Supplier Management – Improving Supplier Performance Through Better C...
Smarter Supplier Management – Improving Supplier Performance Through Better C...Smarter Supplier Management – Improving Supplier Performance Through Better C...
Smarter Supplier Management – Improving Supplier Performance Through Better C...
 
Vendor Performance Management
Vendor Performance ManagementVendor Performance Management
Vendor Performance Management
 
Developing a Supplier Scorecard - Term Paper
Developing a Supplier Scorecard - Term PaperDeveloping a Supplier Scorecard - Term Paper
Developing a Supplier Scorecard - Term Paper
 
Vendor evalu.nikhil 12mt07ind017
Vendor evalu.nikhil 12mt07ind017Vendor evalu.nikhil 12mt07ind017
Vendor evalu.nikhil 12mt07ind017
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selection
 
Vendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation SlidesVendor Management PowerPoint Presentation Slides
Vendor Management PowerPoint Presentation Slides
 
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
 
7 step strategic sourcing
7 step strategic sourcing7 step strategic sourcing
7 step strategic sourcing
 
Vendor management
Vendor managementVendor management
Vendor management
 
Strategic Procurement
Strategic ProcurementStrategic Procurement
Strategic Procurement
 
Vendor selection process
Vendor selection processVendor selection process
Vendor selection process
 
Vendor management
Vendor managementVendor management
Vendor management
 
VENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENTVENDOR PROCESS DEVELOPMENT
VENDOR PROCESS DEVELOPMENT
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATION
 

Similar to VENDOR EVALUATION - RESOURCE MANAGEMENT

Foodhall purchase dept
Foodhall purchase deptFoodhall purchase dept
Foodhall purchase dept
Sneha Nair
 
Vendor development
Vendor developmentVendor development
Vendor developmentPadmadhar PD
 
Manjunat h material management
Manjunat h material managementManjunat h material management
Manjunat h material managementManjunath Halkeri
 
Purchasing and Supplier Selection.pptx
Purchasing and Supplier Selection.pptxPurchasing and Supplier Selection.pptx
Purchasing and Supplier Selection.pptx
RidaZaman1
 
bp case study
bp case study bp case study
bp case study
etizaz
 
A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...
Vishnu Kumar
 
YASH Quality Management Technical White Paper
YASH Quality Management Technical White PaperYASH Quality Management Technical White Paper
YASH Quality Management Technical White Paper
YASH Technologies
 
Sourcing Strategy Development
Sourcing Strategy DevelopmentSourcing Strategy Development
Sourcing Strategy DevelopmentJason D Barr
 
A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...
Sachin Mathews
 
Unit 1 notes
Unit 1 notesUnit 1 notes
Unit 1 notes
Balamurugan Karnan
 
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
FaHaD .H. NooR
 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnet
nimbalkarpranit
 
Procurement kpi's and strategic sourcing
Procurement kpi's  and strategic sourcingProcurement kpi's  and strategic sourcing
Procurement kpi's and strategic sourcing
Paco Rodríguez de Molina
 
Operations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleOperations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) Cycle
IRJET Journal
 
Purchase management
Purchase managementPurchase management
operations management(vendor selection and rating)
operations  management(vendor selection and rating)operations  management(vendor selection and rating)
operations management(vendor selection and rating)
POOJA UDAYAN
 
Procurement contract management
Procurement  contract managementProcurement  contract management
Procurement contract managementUtomo Prawiro
 
31185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-631185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-6
sneha dwivedi
 

Similar to VENDOR EVALUATION - RESOURCE MANAGEMENT (20)

Foodhall purchase dept
Foodhall purchase deptFoodhall purchase dept
Foodhall purchase dept
 
Vendor development
Vendor developmentVendor development
Vendor development
 
Manjunat h material management
Manjunat h material managementManjunat h material management
Manjunat h material management
 
Purchasing and Supplier Selection.pptx
Purchasing and Supplier Selection.pptxPurchasing and Supplier Selection.pptx
Purchasing and Supplier Selection.pptx
 
bp case study
bp case study bp case study
bp case study
 
A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...A simple overview to retail direct & in direct purchases spend analysis in 7 ...
A simple overview to retail direct & in direct purchases spend analysis in 7 ...
 
YASH Quality Management Technical White Paper
YASH Quality Management Technical White PaperYASH Quality Management Technical White Paper
YASH Quality Management Technical White Paper
 
Sourcing Strategy Development
Sourcing Strategy DevelopmentSourcing Strategy Development
Sourcing Strategy Development
 
ISC Brochure
ISC BrochureISC Brochure
ISC Brochure
 
Total cost of ownership1
Total cost of ownership1Total cost of ownership1
Total cost of ownership1
 
A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...A holistic framework of supplier selection and performance evaluation for an ...
A holistic framework of supplier selection and performance evaluation for an ...
 
Unit 1 notes
Unit 1 notesUnit 1 notes
Unit 1 notes
 
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
Purchasing mangement - Puchasing Process - Make Or Buy Decisions - Supplier S...
 
Material Management And Human Resources Managemnet
Material Management And Human Resources ManagemnetMaterial Management And Human Resources Managemnet
Material Management And Human Resources Managemnet
 
Procurement kpi's and strategic sourcing
Procurement kpi's  and strategic sourcingProcurement kpi's  and strategic sourcing
Procurement kpi's and strategic sourcing
 
Operations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) CycleOperations in Source to Pay (S2P) Cycle
Operations in Source to Pay (S2P) Cycle
 
Purchase management
Purchase managementPurchase management
Purchase management
 
operations management(vendor selection and rating)
operations  management(vendor selection and rating)operations  management(vendor selection and rating)
operations management(vendor selection and rating)
 
Procurement contract management
Procurement  contract managementProcurement  contract management
Procurement contract management
 
31185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-631185020 purchasing-and-vendor-management-lecture-6
31185020 purchasing-and-vendor-management-lecture-6
 

Recently uploaded

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 

Recently uploaded (20)

Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 

VENDOR EVALUATION - RESOURCE MANAGEMENT

  • 1. VENDOR EVALUATION Under Guidence of: Mr. Tirth D Patel Assistant Prof. Civil Engineering Dept. UVPCE Prepared By: Rudra Desai 16014111004 Mikul Patel 16014111018 Vismay Shah 16014111028 1
  • 2. Content of Presentation • Types of Purchase • Method of Purchase • Vendor Evaluation • Data Collection • Data Analysis • Conclusion 2
  • 3. INTRODUCTION › Vendor evaluation is a term used in business and refers to the process of evaluating and approving potential Vendors by quantitative assessment. › The purpose of Vendor evaluation is to ensure a portfolio of best in class Vendors is available for use. Vendor evaluation is also a process applied to current Vendors in order to measure and monitor their performance for the purposes of reducing costs, mitigating risk and driving continuous improvement. 3
  • 4. PRINCIPLES OF PURCHASE Right Quality Rigth Quantity Rigth Time Rigth Price Rigth Place 4
  • 5. TYPES OF PURCHASING 1.Centralized Purchasing › Under centralised purchasing purchases are made at one central point for the whole organisation and material is issued to respective departments or jobs as and when needed. Centralised purchasing is suitable in cases where the organisation runs one plant. It will bring about economies of purchasing and buying in small lots will be avoided. › It ensures consistent buying policies in future and purchasing powers are concentrated in the hands of one person, the in charge of purchasing department. › The most important benefit which can be drawn from centralised buying is that it keeps the inventories in control and checks the wasteful investment in materials and equipment etc. thereby ensuring overall economy in purchasing. 5
  • 6. Continue… › It also ensures bulk buying which ensures favourable prices. The staff requirements under this type are limited and specialists in buying may be appointed. Centralised purchasing is further helpful to the vendors since their selling costs are reduced as they can easily co-ordinate and supply goods to a single buyer instead of large number of buyers. 6
  • 7. TYPES OF PURCHASING 1.Decentralized Purchasing › Decentralised purchasing is just the reverse of centralised purchasing. This is suitable in organisations running more than one plant. Under this type each plant has its own purchasing agents. In other words, every department makes its own purchases. This is also called localized purchasing. › Decentralised purchasing is quite flexible and can be quickly adjusted in accordance with the requirements of a particular plant. More attention can be paid by the departmental head on buying problems as he will be carrying limited number of activities in his department and he can be held responsible for the purchase of goods and the overall performance of the plant. 7
  • 8. Continue… › The serious drawback which emerges from this type is the lack of uniformity in purchasing procedure in the organisation. At the same time uniformity in prices cannot be ensured and moreover every departmental head may not possess the calibre of an expert buyer. 8
  • 9. PURCHASE PARAMETERS Purchase Parameters SWOT Analysis Right Materi al Right Qualit y Right Quantit y EOQ Right Attitud e Right Price Right Time Right Transportat ion Right Contract s Right Source Right Place of Delivery 9
  • 10. METHODS OF PURCHASING 10 • Hand to mouth purchasing • Forward purchasing • Speculative purchasing • Hedging • Reciprocal purchasing • Concentrated purchasing • Diversified purchasing • Tender buying.
  • 11. EVALUATING SUPPPIER PERFORMANCE 1.Categorical System › In this method, the buyer chooses attributes that are most important to its particular situation. The buyer assigns either a preferred (+), unsatisfactory (-), or neutral (O) rating for each of the selected attributes to every vendor. › Then the ratings are totalled for each vendor. For example, ratings resulting in scores of two preferred (++), one unsatisfactory (-), and one neutral (O) would total one positive (+). A comparison of total scores reveals the highest rated vendor. The representatives of the involved divisions agree upon the ratings (Hillman, 1993). › Categorical supplier measurement is the easiest method to implement but suffers from subjectivity. 11
  • 12. › It does not provide a detailed insight into the supplier’s true performance because the attributes being measured are weighted equally. Also, because the representatives of the involved divisions assign the ratings, this method relies on an individual’s perception about performance and not on quantitative data. 2. Weighted Point Method › In the weighted-point method, the relevant attributes are chosen and each are assigned a weight depending on the importance to the overall performance. The firm reaches a consensus on weight assignments to prevent or minimize subjectivity. › The weight for each performance category is then multiplied by the performance score that is assigned to it. Finally, these products are totalled to determine a final rating for each supplier. 12
  • 13. › Firms often use the weighted point system because it is highly reliable and its implementation costs are moderate. In addition, it combines qualitative and quantitative performance factors into a common system. › Because users can change the weights assigned to each performance category, or change the performance categories themselves depending on the strategic priorities of the firm, the system is flexible. › The weighted-point method overcomes the subjectivity of the categorical system, but it has some drawbacks. It requires the buyer to specify the value of one performance measure relative to another, which is often difficult in practice. 13
  • 14. 3. Cost – Based System › Using the cost-based system, a buyer is able to quantify the additional costs incurred if a supplier fails to perform as expected. The total cost of doing business with the supplier can be calculated by the supplier performance index (SPI). › This index is calculated for each item or commodity provided by the supplier and has a base value of 1. › It is represented by the following formula: SPI = (Purchase Price + Non-performance Cost) / (Purchase Price). › As derived from the equation, the closer SPI is to 1, the better the supplier. Non-costs should include qualitative factors. 14
  • 15. Data Collection › The Data collection is done for the cement, any three vendors are selected for the Data collected. Most commonly known factor are quality, delivery, price and services. Each factor is assigned a weight which varies from vendor to vendor, depending upon the buyer’s judgment about the importance of the factor. 15
  • 16. List of Vendors Selected V E N D O R S LIST S1 – Nirmax Cement Ambica Traders S2 – J.K Laxmi Cement Umiya Traders S3 – Wonder Cement Mahalaxmi Traders 16
  • 17. The rejection of the material are less because the data is collected in summer season, hence in the winter season there are more chances of getting more bags of cement rejected. Supplier Inspection Analysis Price Analysis Price Analysis Lots Received Lots Accepted Basic Price (Rs. Per Bag) Discount (%) Transport Deliveries missed (%) S1 Nirmax 1000 990 243 3 0 10 S2 J.K Laxmi 1000 993 252 0 0 6 S3 Wonder 1000 985 245 2 0 2 Quality factor (%) = 40 Price Factor (%) = 35 Delivery factor (%) = 25 17
  • 19. 1. QUALITY RATING Quality rating is measured in terms of percentage of lots accepted. QUALITY RATING = Proportion of lots accepted x Quality factor weight in percentage. 100 Supplier No. of lots received Lots accepted Proportion % of lots accepted Factor Weight Quality Rating 1 2 3 4 5 6 = (4 x 5)/100 S1 – Nirmax 1000 990 99 40 39.6 S2 – JK Laxmi 1000 993 99.3 40 39.72 S3 – Wonder 1000 985 98.5 40 39.4 19
  • 20. 2. PRICE RATING Price performance is measured in terms of percentage of lowest price to the price paid PRICE RATING = Lowest price x Price factor weight in percentage Price paid Supplier Unit Price (Rs.) Discount (%) Basic Price (Rs.) Transport ation charges Net Price Lowest price 7 AS % OF 6 Factor Weight Price rating 1 2 3 4 5 6 7 8=7/6 9 10=8*9/100 S1 – Nirmax 243 3 235.71 0 235.7 235.7 100 35 35 S2 – JK Laxmi 252 0 252 0 252 235.7 93.73 35 32.73 S3 – Wonder 245 2 240.1 0 240.1 235.7 98.2125 35 34.37 20
  • 21. 3. DELIVERY RATING Delivery performance is measured in terms of proportion of the performance promises fulfilled. Delivery rating= Proportion of commitments kept up x Services factor weight percentage Supplier % Deliveries missed Proportion of promises kept Factor Weight Delivery Rating 1 2 3 4 5=(3*4)/100 S1 – Nirmax 10 90 25 22.5 S2 – JK Laxmi 6 94 25 23.5 S3 – Wonder 2 98 25 24.5 21
  • 22. 4. COMPOSITE RATING Composite rating is the aggregate of quality rating, price rating and delivery rating. COMPOSITE RATING Supplier Individual Rating Composite rating Quality rating Price rating Delivery rating S1 – Nirmax 39.6 35 22.5 97.1 S2 – JK Laxmi 39.72 32.73 23.5 95.95 S3 – Wonder 39.4 34.75 24.5 98.27 22
  • 23. S3 Acceptance and the non-acceptance norms are then fixed which are applied to the composite rating. The acceptance norms generally vary from vendor to vendor, depending upon their needs. Category Range A 91-100 B 81-90 C 71-80 D 61-70 E 51-60 is preferred because it has a highest rating. 23
  • 24. CONCLUSION In concluding part, we come to know that by proper Vendor Evaluation we could select the Best and Appropriate vendor for the particular material. It prevents us to become subjective towards one criteria of selection. 24
  • 25. REFERENCES 1. Material Management Text and Case BY A.K.CHITALE & R.C. GUPTA 2. Empire Skylark 3. http://www.yourarticlelibrary.com/material- management/types-of-material-purchasing-in- an-organisation-centralised-and- decentralised/26123/ 4. https://scm.ncsu.edu/scm- articles/article/performance-measurements- and-metrics-an-analysis-of-supplier-evaluation 25
  • 26. Thank you very much for your time 26