CURRICULUM VITAE
BACHIRCHAKAR
Personal Information
Birth Date: 7 December 1979
Gender: Male
Nationality: Lebanon
Visa Status: Residency Visa
Residence Location: Abu Dhabi, United Arab Emirates
Marital Status: Married
Driving License: United Arab Emirates
OBJECTIVE:
Seeking to join a professional and leading organization that will present me with the
opportunity and challenge to optimize my interpersonal and organization capabilities.
EDUCATION:
 1992 – 1996: Bourj Hammoud 3rd official school – Sin el fil
(Lebanese School)
 1996 – 1999: Technical Official School – Dekwaneh
(BT3 in Topographic sciences) / LEBANON
 2000 – 2003: International technical college C.I.T – Dawra
(Diploma in topographic sciences) / LEBANON
 2004 – 2006: Superior Industrial Technical Institute I.T.I.S – Dekwaneh
(Bachelor degree in topographic sciences) / LEBANON
Professional Experience:
Jan 2015 – Present: CAD Engineer
MACE Contractor LLC.
Abu Dhabi, United Arab Emirates
Company Industry: Construction
PROJECT: Replacement Of Existing Old Mains And Distribution Water
Networks (Shaabiyat Al Maqam) AL AIN City. (CONTRACT No. A-10915.1).
Direct Contract With AADC (Al Ain Distribution Company)
Main tasks:
• Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic, Typical
& Structural Details) according to AADC Standards.
• Liaising closely with the Chief Surveyor to fulfill all site requirements
(Obstructions, Crossing utilities, etc...) according to site condition.
• Be fully aware of the Contract requirements, B.O.Q & Specifications.
• Reporting to project manager.
March 2013 – Jan 2015: CAD Engineer
MACE Contractor LTD.
Abu Dhabi, United Arab Emirates
Company Industry: Construction
PROJECT: Long Term Agreement for Execution of Water Connections,
Network Relocations & Improvements in Central Region AUH (Contract No.
D-102600) – Direct Contract with ADDC (Abu Dhabi Distribution Company)
Main tasks:
• Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic, Typical
& Structural Details) according to ADDC Standards.
• Liaising closely with the Chief Surveyor to fulfill all site requirements
(Obstructions, Crossing utilities, etc...) according to site condition.
• Be fully aware of the Contract requirements, B.O.Q & Specifications.
• Reporting to project manager.
April 2011 -Feb 2014: CAD Engineer
MACE Contractor LTD.
Abu Dhabi, United Arab Emirates
Company Industry: Construction
PROJECT: Upgrading And Relocating the Potable Water And Sewerage
Network falling under Contract “AL RAS AL AKHDAR AND BAYNOONAH
STREET UPGRADING AND TRAFFIC IMPROVEMENT CONTRACT No.
148/10” as per the new Road Geometry.
Construction of New Water Pipe lines of several Diameters (DN800, DN600,
DN400, DN300 & DN200 D.I. (Ductile Iron), with all related fittings as per the
Approved Shop drawings, using Open Cut method or NDM method (Non
Disruptive Method) as per site condition.
Construction a Multiple of Future GRP DUCTS concrete encased for future
use.
Constructions for new proposed Sewerage manholes and pipe lines (GRP &
uPVC) using Open Cut method or NDM method (Non Disruptive Method)
Main tasks:
• Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic,
Typical & Structural Details) according to ADDC & ADSSC Standards.
• Liaising closely with the Chief Surveyor to fulfill all site requirements
(Obstructions, Crossing utilities, etc...) according to site condition.
• Be fully aware of the Contract requirements, B.O.Q & Specifications.
• Reporting to project manager.
December 2007 - April
2011:
CAD Engineer
MACE Contractor LTD.
Abu Dhabi, United Arab Emirates
Company Industry: Construction
PROJECT: Upgrading And Relocating the Potable Water And Sewerage
Network falling under Contract “UPGRADING OF AL SALAM STREET
AND ABU DHABI CITY RING ROAD CONTRACT No. 1" as per the new
Road Geometry.
Construction of New Water Pipe lines of several Diameters (DN1200, DN900,
DN800, DN600, DN400, DN300 & DN200 D.I. (Ductile Iron), with all related
fittings as per the Approved Shop drawings, using Open Cut method or NDM
method (Non Disruptive Method) as per site condition.
Constructions for new proposed Sewerage manholes And pipe lines (GRP)
Dia. 1200mm & 1400mm, using Open Cut/NDM method as per site condition.
Main tasks:
• Managing the Design Department.
• Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic and
Typical Details) according to ADDC & ADSSC Standards.
• Liaising closely with the Chief Surveyor to fulfill all site requirements
(Obstructions, Crossing utilities, etc...) according to site condition.
• Be fully aware of the Contract requirements, B.O.Q & specifications.
• Reporting to project manager.
December 2006 -
December 2007:
Mapping / GIS Eng.
MACE Contractor LTD.
Abu Dhabi, United Arab Emirates
Landscaping Division:
Operation and maintenance for landscape, irrigation, storm water and
associated infrastructure / Abu Dhabi City Quadrant-3 and Surrounding
Islands. Contract No. “PGD-O&M-103”.
Main tasks:
• Report to contract manager.
• Liaise closely with the QA/QC and Survey Engineer.
• Supervise day to day site activities of survey teams.
• Preparation of Method Statements and survey reports.
• Be responsible for the integrity and quality of Mapping/GIS works.
• Review, monitor and report on progress.
• Be fully aware of the Contract requirements.
• Ensure that work is executed in accordance with the specification.
• Ensure timely submissions for approval as required by the contract.
July 2002 - November
2006:
GIS and Auto-Cad Coordinator:
OFFICE OF WATER FOR BEIRUT AND MOUNT LEBANON.
Lebanon - Beirut, Beirut, Lebanon
Company Industry: Government Sector
Office of water for Beirut and mount Lebanon is a governmental institute its
task is to provide water services (potable water) to Beirut district and
suburban.
Main tasks:
• Updating vector maps & data on the GIS system as per the new projects
delivered.
• Providing the location of failure networks on GIS system (leak pipes, broken
and damaged pipes, etc …)
• Preparing and plotting maps on GIS system.
• Reporting to Technical manager.
• Liaising closely with the Survey Engineer.
October 2001 - October
2002:
Land surveyor
Directorate of Geographic Affairs (D.A.G.) / Ministry of defense.
Lebanon - Baabda, Lebanon
Company Industry: Government Sector
Job Role: Engineering
The directorate of geographic affairs is responsible for all the geographic
works especially:
• Triangulation to the fifth order
• Measurement of general elevations
• Aerial photography
• Photographic transformation
• Compilation and printing of the unified map, scale 1:20,000, for all the
Lebanese territory.
• Correction, completion, and printing of the unified map, scale 1:50,000, for
all the Lebanese territory.
• Provide the surveying services department with maps compiled through
photographic transformation at scales varying between 1:500 and 1:5,000 for
all non-surveyed areas.
• Compile maps with elevation contours at different scales according to the
requests of the different technical departments at the ministries and the
independent institution at their request and funding. Such compilations are
used for irrigation, reforestation, roads, electricity, rural and urban planning
and tunnel excavation studies.
EXPECTATION: I like to perform with people to have skills & more experiences in organization.
Ready for a teamwork and under pressure.
COMPUTER & SKILLS:
Good experience in:
- Word
- Excel
- Auto-Cad + GIS
- MS Project
- GPS Info
- Internet Info
LANGUAGES :
Language Spoken Written Reading
Arabic Excellent Excellent Excellent
French Very Good Very Good Very Good
English Very Good Very Good Very Good
HOBBIES:
Sports
Music
Public relations
Internet
References are available upon request.
Abu Dhabi, United Arab Emirates
Email Address: ch_bachir@hotmail.com
Mobile Number: +971 - 50 - 412 7239
Alternative Mobile Number: +971 - 55 – 233 2492

BACHIR CHAKAR CV (7-4-2015)

  • 1.
    CURRICULUM VITAE BACHIRCHAKAR Personal Information BirthDate: 7 December 1979 Gender: Male Nationality: Lebanon Visa Status: Residency Visa Residence Location: Abu Dhabi, United Arab Emirates Marital Status: Married Driving License: United Arab Emirates OBJECTIVE: Seeking to join a professional and leading organization that will present me with the opportunity and challenge to optimize my interpersonal and organization capabilities. EDUCATION:  1992 – 1996: Bourj Hammoud 3rd official school – Sin el fil (Lebanese School)  1996 – 1999: Technical Official School – Dekwaneh (BT3 in Topographic sciences) / LEBANON  2000 – 2003: International technical college C.I.T – Dawra (Diploma in topographic sciences) / LEBANON  2004 – 2006: Superior Industrial Technical Institute I.T.I.S – Dekwaneh (Bachelor degree in topographic sciences) / LEBANON
  • 2.
    Professional Experience: Jan 2015– Present: CAD Engineer MACE Contractor LLC. Abu Dhabi, United Arab Emirates Company Industry: Construction PROJECT: Replacement Of Existing Old Mains And Distribution Water Networks (Shaabiyat Al Maqam) AL AIN City. (CONTRACT No. A-10915.1). Direct Contract With AADC (Al Ain Distribution Company) Main tasks: • Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic, Typical & Structural Details) according to AADC Standards. • Liaising closely with the Chief Surveyor to fulfill all site requirements (Obstructions, Crossing utilities, etc...) according to site condition. • Be fully aware of the Contract requirements, B.O.Q & Specifications. • Reporting to project manager. March 2013 – Jan 2015: CAD Engineer MACE Contractor LTD. Abu Dhabi, United Arab Emirates Company Industry: Construction PROJECT: Long Term Agreement for Execution of Water Connections, Network Relocations & Improvements in Central Region AUH (Contract No. D-102600) – Direct Contract with ADDC (Abu Dhabi Distribution Company) Main tasks: • Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic, Typical & Structural Details) according to ADDC Standards. • Liaising closely with the Chief Surveyor to fulfill all site requirements (Obstructions, Crossing utilities, etc...) according to site condition. • Be fully aware of the Contract requirements, B.O.Q & Specifications. • Reporting to project manager. April 2011 -Feb 2014: CAD Engineer MACE Contractor LTD. Abu Dhabi, United Arab Emirates Company Industry: Construction PROJECT: Upgrading And Relocating the Potable Water And Sewerage Network falling under Contract “AL RAS AL AKHDAR AND BAYNOONAH
  • 3.
    STREET UPGRADING ANDTRAFFIC IMPROVEMENT CONTRACT No. 148/10” as per the new Road Geometry. Construction of New Water Pipe lines of several Diameters (DN800, DN600, DN400, DN300 & DN200 D.I. (Ductile Iron), with all related fittings as per the Approved Shop drawings, using Open Cut method or NDM method (Non Disruptive Method) as per site condition. Construction a Multiple of Future GRP DUCTS concrete encased for future use. Constructions for new proposed Sewerage manholes and pipe lines (GRP & uPVC) using Open Cut method or NDM method (Non Disruptive Method) Main tasks: • Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic, Typical & Structural Details) according to ADDC & ADSSC Standards. • Liaising closely with the Chief Surveyor to fulfill all site requirements (Obstructions, Crossing utilities, etc...) according to site condition. • Be fully aware of the Contract requirements, B.O.Q & Specifications. • Reporting to project manager. December 2007 - April 2011: CAD Engineer MACE Contractor LTD. Abu Dhabi, United Arab Emirates Company Industry: Construction PROJECT: Upgrading And Relocating the Potable Water And Sewerage Network falling under Contract “UPGRADING OF AL SALAM STREET AND ABU DHABI CITY RING ROAD CONTRACT No. 1" as per the new Road Geometry. Construction of New Water Pipe lines of several Diameters (DN1200, DN900, DN800, DN600, DN400, DN300 & DN200 D.I. (Ductile Iron), with all related fittings as per the Approved Shop drawings, using Open Cut method or NDM method (Non Disruptive Method) as per site condition. Constructions for new proposed Sewerage manholes And pipe lines (GRP) Dia. 1200mm & 1400mm, using Open Cut/NDM method as per site condition. Main tasks: • Managing the Design Department. • Producing SHOP / AS BUILT drawings. (Layout & Profile, Schematic and Typical Details) according to ADDC & ADSSC Standards. • Liaising closely with the Chief Surveyor to fulfill all site requirements (Obstructions, Crossing utilities, etc...) according to site condition. • Be fully aware of the Contract requirements, B.O.Q & specifications. • Reporting to project manager.
  • 4.
    December 2006 - December2007: Mapping / GIS Eng. MACE Contractor LTD. Abu Dhabi, United Arab Emirates Landscaping Division: Operation and maintenance for landscape, irrigation, storm water and associated infrastructure / Abu Dhabi City Quadrant-3 and Surrounding Islands. Contract No. “PGD-O&M-103”. Main tasks: • Report to contract manager. • Liaise closely with the QA/QC and Survey Engineer. • Supervise day to day site activities of survey teams. • Preparation of Method Statements and survey reports. • Be responsible for the integrity and quality of Mapping/GIS works. • Review, monitor and report on progress. • Be fully aware of the Contract requirements. • Ensure that work is executed in accordance with the specification. • Ensure timely submissions for approval as required by the contract. July 2002 - November 2006: GIS and Auto-Cad Coordinator: OFFICE OF WATER FOR BEIRUT AND MOUNT LEBANON. Lebanon - Beirut, Beirut, Lebanon Company Industry: Government Sector Office of water for Beirut and mount Lebanon is a governmental institute its task is to provide water services (potable water) to Beirut district and suburban. Main tasks: • Updating vector maps & data on the GIS system as per the new projects delivered. • Providing the location of failure networks on GIS system (leak pipes, broken and damaged pipes, etc …) • Preparing and plotting maps on GIS system. • Reporting to Technical manager. • Liaising closely with the Survey Engineer. October 2001 - October 2002: Land surveyor Directorate of Geographic Affairs (D.A.G.) / Ministry of defense.
  • 5.
    Lebanon - Baabda,Lebanon Company Industry: Government Sector Job Role: Engineering The directorate of geographic affairs is responsible for all the geographic works especially: • Triangulation to the fifth order • Measurement of general elevations • Aerial photography • Photographic transformation • Compilation and printing of the unified map, scale 1:20,000, for all the Lebanese territory. • Correction, completion, and printing of the unified map, scale 1:50,000, for all the Lebanese territory. • Provide the surveying services department with maps compiled through photographic transformation at scales varying between 1:500 and 1:5,000 for all non-surveyed areas. • Compile maps with elevation contours at different scales according to the requests of the different technical departments at the ministries and the independent institution at their request and funding. Such compilations are used for irrigation, reforestation, roads, electricity, rural and urban planning and tunnel excavation studies. EXPECTATION: I like to perform with people to have skills & more experiences in organization. Ready for a teamwork and under pressure. COMPUTER & SKILLS: Good experience in: - Word - Excel - Auto-Cad + GIS - MS Project - GPS Info - Internet Info LANGUAGES : Language Spoken Written Reading Arabic Excellent Excellent Excellent French Very Good Very Good Very Good English Very Good Very Good Very Good
  • 6.
    HOBBIES: Sports Music Public relations Internet References areavailable upon request. Abu Dhabi, United Arab Emirates Email Address: ch_bachir@hotmail.com Mobile Number: +971 - 50 - 412 7239 Alternative Mobile Number: +971 - 55 – 233 2492