► Total 16 years experience in Construction Industry:
1998 to till date - 10 years in UAE and 6 years in INDIA
► Professional Qualification: Diploma in Civil Engineering.
(From Department of Technical Education, Bangalore, INDIA)
► Certified Cost Engineer (CCE)
(Diploma from 3FOLD Education Center, Dubai)
► Chief Quantity Surveyor with M/s GHANTOOT TRANSPORT AND
GENERAL CONTRACTING Est. , Abu dhabi , U.A.E. (ISO 9001,14001&18001 Certified)
from May 2004 to till date.
► Work Experience with Authorities : Abudhabi Municipality, Urban Development
committee Abudhabi, ALDAR, ADDC, Etisalat and ADSSC. Department of Transport
Abudhabi, ALDAR, MUSANADA
■PROFESSIONAL EXPERIENCE
1. Working as Chief Quantity Surveyor for Gantoot Transport and General Contracting Est.
ABU DHABI – UAE (ISO – 9001, 14001&18001Certified)
PROJECT - 1: Al Shamkha Project – Third Area, Bridge interchange.
(May2004 to May 2005)
• CLIENT: Abu Dhabi Municipality, UAE.
• CONSULTANT: M/s High - Point Rendel.
Pages 1 of 7
• COST: 45,000,000 Dhs.
• SCOPE: This Project contains one Main Bridge of Superstructure – 2 span continuous insitu
Post – Tensioned Concrete Box Girder, Span 53. 15 m. Total 12 km (4 lanes) road with
Reinforced soil wall structure.
PROJECT - 2: Interchange at Al Falah Area, Bridge interchange.
(May 2005 to April 2006)
• CLIENT: Abu Dhabi Municipality, UAE.
• CONSULTANT: M/s Frederic R. Harris Inc.
• COST: 63,000,000 Dhs.
• SCOPE : It consists one main Bridge of Superstructure - 2 Span , continuous CAST -
INSITU POST-TENSIONED CONCRETE BOX GIRDER 2 X 44.783 ( 89.57 M ), Three
Protection Culverts for Gas Pipe Line , with 346 Pile's of avg. Depth 9.70 M, Including
20,000 sm Reinforced Earth Soil Wall Structure. Ducts & Relocation for various Existing
services and it consist 8 km Road.
PROJECT - 3: Construction of Internal Roads in Al-Shamkha Area
(April 2006 to June2006)
• CLIENT: Abu Dhabi Municipality, UAE.
• CONSULTANT: Hyder Consulting Middle East Limited
• COST: 145,000,000 Dhs.
• SCOPE. This Project contains Approach roads to Villas, Service reservation,
Utility protection & future ducts, road marking & signs, guardrail, storm
water, Irrigation works, Street lighting & Electrical works. Ducts & Relocation
for various Existing Services.
PROJECT - 4: Construction of Internal Roads in Khalifa City – A,
(June 2006 to 12-07-2008)
• CLIENT: Abu Dhabi Municipality, UAE.
• CONSULTANT: M/s Frederic R. Harris Inc...
• COST: 185,000,000 Dhs.
• SCOPE. This Project contains Approach roads to Villas, Service reservation, Utility
protection & future ducts, road marking & signs, guardrail, storm water,
Irrigation works, Street lighting & Electrical works. Ducts & Relocation for
various Existing Services.
PROJECT - 5: Public Housing Project at Al Wathba – 20 villas
(July 2007 to December 2007)
• CLIENT: Development Committee for Management of Residential and Service Facilities in
The Emirate of Abudhabi.
• CONSULTANT: M/s Dorsch Cosult.
• COST: 25,000,000 Dhs.
• SCOPE. This Project contains Approach roads to Villas, Service reservation, Utility
protection & future ducts, road marking & signs, guardrail, storm water,
Pages 2 of 7
Irrigation works, Street lighting & Electrical works. Ducts & Relocation for
various Existing Services.
PROJECT – 6 : Widening of Air Port Road From IP-40 to IP-49
(October 2008 to 04-12-2009)
• CLIENT: Abudhabi Municipality
• CONSULTANT: M/s Ital Cosult.
• COST: 175,940,000 Dhs.
SCOPE. This Project contains 1 lane both Widening of both side of roads , Service reservation, Utility
protection & future ducts, road marking & signs, guardrail, storm water, Irrigation works, Street
lighting & Electrical works. Ducts & Relocation for various Existing Services
PROJECT – 7 : ROADS FOR THE NEW INDUSTRIAL AREA SOUTH OF
CHANNEL IN MUSSAFF AREA (ICAD) CONTRACT -992
(June 2008 to Dece-2009)
• CLIENT: Abudhabi Municipality
• CONSULTANT: M/s Cansult Mounsell
• COST: 267,800,000 Dhs.
SCOPE : Construction of Six Lanes Divided Roads of Approximately 7 km in Length, Construction of Roundabout
and two ramps, Construction of two utility bridges to Protect the Existing Gas and Oil Pipelines, Provision of new
Lighting Network, Relocation and Protection of Existing Water Lines , Replacement of O.H Power Lines With
Underground Cables, Provision of Contingency Ducts , Road Furniture , Storm Water System.
PROJECT – 8 : MAINTENANCE AND REHABILITATION WORK FOR
ABUDHABI STRATEGIC ROADS ZONE-1 , ABUDHABI REGION
CONTRACT. No : 47-2009
(Dece-2009 to Oct 2011)
• CLIENT: Department of Transport
• CONSULTANT: M/s Cansult Mounsell
• COST: 316,941,561.46 Dhs.
FINAL PAYMENT & MEASUREMENTS
PROJECT – 9 : Construction of Internal Roads in Mussafah East & West
Contract No : 228
(12/11/2007 to 31/10/209)
• CLIENT: Abudhabi Municipality
• CONSULTANT: M/s Altorath Engineering Consultants.
• COST : 116,073,552.39
PROJECT – 10: Roads & Infrastructure for Abu Dhabi International Shooting Club.
Contract No : 2000
(08-04-2006 to 30-04-2008)
• CLIENT: Abudhabi Municipality
• CONSULTANT: M/s W.S. Atkins & Partners Overseas
• COST : 93,590,693.00
Pages 3 of 7
•
PROJECT – 11: Roads for Mohammed Bin Zayed City 4th
Stage East
Contract No : 953/4-1
(14-03-2007 to 06-10-2008)
• CLIENT: Abudhabi Municipality
• CONSULTANT: M/s Cansult
• COST : 210,719,629.35
PROJECT – 12: Construction and Maintenance of separate roads in western region
Contract No : 225
(23-07-2005 to 22-07-2007)
• CLIENT: Abudhabi Municipality
• CONSULTANT: M/s Samer Group L.L.C
• COST : 79,999,000.00
•
PROJECT – 13: Paving Road Between Araada and Al Burair Police Station in western region
Contract No : 23/2006
(09-05-2006 to 09/01/2008)
• CLIENT: Abudhabi Municipality
• CONSULTANT: M/s Gibb Limited.
• COST : 38,500,000.00
PROJECT – 14: AL FALAH COMMUNITY DEVELOPMENT Infrastructure Works Package-
A(Village 2 & 3)
Contract No : A290101/2009/C/034A
(01-05-2010 to 31-03-2013)
• CLIENT: M/S ALDAR
• PROJECT MANAGEMENT: M/S FLUOR
• CONSULTANT: M/s Hyder, Ital , Halcrow and MWH
COST CONSULTANT: M/s RLB Dubai
COST : 668,158,000 AED
PROJECT – 15 : TRAFFIC ALLEVIATION PROJECT/DALMA MALL ACCESS
Contract No: DOT/DC/MR/108/12
(14-08-2013 to till date)
• CLIENT: M/S Department of Transport
• CONSULTANT: M/s PARSONS
COST: 77,000,000AED
PROJECT – 16 : IMPROVEMENT OF MAFRAQ TO AL GHWAIFAT SECTION-4B, AL
MAFRAQ TO HIMEEM INTERCHANGE
Contract No: PD/CA/BPS/AG/R9/P47-2014/14/010
(01-03-2014 to till date)
• CLIENT: M/S DEPARTMENT OF TRANSPORT ABUDHABI
• EMPOLYER : M/s MUSANADA
• CONSULTANT: M/s DORSH GROUPPE
Pages 4 of 7
COST: 1,115,207,0000AED
SCOPE : Construction of Eight Lanes Divided Roads of Approximately 27 km in Length, including 3 major Bridge
Interchanges, Construction of Roundabout and two ramps, Construction of two utility bridges to Protect the Existing
Gas and Oil Pipelines, Provision of new Lighting Network, Relocation and Protection of Existing Water Lines ,
Replacement of O.H Power Lines With Underground Cables, Provision of Contingency Ducts , Road Furniture ,
Storm Water System
KEY EXPERIENCE
• Work experience in various infrastructures Projects of leading Clients such as
Abudhabi Municipality, Urban Development committee Abudhabi, ALDAR,
ADDC, Etisalat and ADSSC. Department of Transport Abudhabi, ALDAR,
MUSANADA etc.
• Work Experience with CESMM3 standard, FIIDIC contract.
• Preparation Variation Orders / Claims and Prolongation cost
• Updating Project cash flow chart Planned Vs Actual.
• Preparation and submission of project closeout reports to support TOC, PAC. FAC
& Performance Certificate
• Preparation and submission of Final payments, Interim Payment report /
Summary to Client / consultant/Cost Consultant or Project Management.
• Dealing with consultants such as Hyder consultant, Parsons International,
Adkins,
Dorsch Grouppe,Fedrric Harries, High Point Rendal,Aecom,Ital consult.
Keo etc. for passing the interim Payments and final payments.
• Preparing and Submission of Inspection Request for Approval by Co-ordinate
with Site Engineers and Consultant.
• Preparing and Submission of Measurement Sheets for Approval by Co-ordinate
with Consultant Land Surveyor and Quantity Surveyor.
• Preparation of recap qty for the project.
• Preparing and Submission of Daily, Weekly, Monthly Progress Report to
Consultant & Head Office.
• Dealing with Sub-Contractor to prepare and Forward the Sub Contractor’s
Payment Bill-Monthly & Preparing Comparative statement.
• Preparing Rate Analysis and forwarding it to the consultant for approval of non
B.O.Q Items.
• Co-ordaining with Consultant & Client for clearing the submitted Monthly bills
without any delay.
•Costing and Progress monitoring, Preparation of financial statement.
•Preparing and certifying As built drawing after the completion of work
• Preparation of Final Bill and Final Measurements, Approval from clients
• Costing and Progress monitoring, Preparation of financial statement.
• Preparation of Final Bill and Final Measurements, Approval from clients
• Preparation of financial reports.
•Preparation of Reconciliation statement for earth work, electrical, &irrigation works.
Pages 5 of 7
• Planning and supervising various types of construction projects.
• Estimation of various construction projects.
• Estimate, Purchasing, Assembling, Installation testing and commissioning of
different types of pipelines, Cranes, Ground Support Equipments and other
custom based projects.
• Specialized in Customer support division.
•Experienced in ISO 9001:2000 standards
Opportunities
2. Worked as Site Engineer and Quantity Surveyor for M/s Kunil Builders & Contractors, Mangalore, INDIA.
● Coordinating with Internal Sections, Consultant and Client for Bill Preparation.
● Supervision of all type of civil & Electrical works.
● Reporting the requirements of men, material & machineries to HO.
● Approving & Forwarding the Sub –Contractors & Suppliers Bill's.
● Compilation of Daily, Weekly & Monthly Progress Reports to HO.
3. Worked as Site Inspector for M/s Millennium civil Engineers, Mangalore, INDIA.
● Supervision of all type of civil works
● coordinating and providing technical assistance to sub contractors for
carrying out work at site.
● also involved in preparation of shop drawings and site studies for pricing.
● Quantity take off for material requirement.
COMPUTER PROFICIENCY
PROFESSIONAL QUALIFICATION
Pages 6 of 7
1 Spread Sheets MS Excel
2 Drafting
MS Word, Power Point, & Photo Impression 3,
Internet.
3 Draughting
Auto CAD 2004 - 2010,
APPROVAL
PERSONNEL INFORMATION
Date of Birth 24 th June 1977
Martial Status Married
Passport No. H1914386
Place of Issue Bangalore
Validity 17-06-2019
Languages Known
English, Hindi, Kannada, Konkani, Tulu,
Malayalam.
Email Address alpeesdsouza @yahoo.com , alpee2020@rediffmail.com
Driving License Having UAE valid driving License
Pages 7 of 7
1 Academic SSLC first Class, PUC commerce
2 Technical
Diploma in Civil Engineering NC
Under Board of Technical Education Bangalore.
3 Technical
CERTIFIED COST ENGINEER.(Through 3
FOLD Education Center DUBAI from AACE
International USA)
1
QUANTITY
SURVEYOR
ABU DHABI MUNICIPALITY - UAE

CV - Dsouza UPDATED 03-04-2016

  • 1.
    ALPEES D' SOUZA (SeniorQuantity Surveyor) P.O BOX 30541, ABU DHABI, UAE. E-mail: alpeesdsouza@yahoo.com Web: www.ghantootroads.com PHONE: +971-050-3268608 ■OBJECTIVE To be a part of the top management of a growth oriented company where I can contribute to the company's prosperity and development and improve my expertise in the construction industry. ■PROFILE ► Total 16 years experience in Construction Industry: 1998 to till date - 10 years in UAE and 6 years in INDIA ► Professional Qualification: Diploma in Civil Engineering. (From Department of Technical Education, Bangalore, INDIA) ► Certified Cost Engineer (CCE) (Diploma from 3FOLD Education Center, Dubai) ► Chief Quantity Surveyor with M/s GHANTOOT TRANSPORT AND GENERAL CONTRACTING Est. , Abu dhabi , U.A.E. (ISO 9001,14001&18001 Certified) from May 2004 to till date. ► Work Experience with Authorities : Abudhabi Municipality, Urban Development committee Abudhabi, ALDAR, ADDC, Etisalat and ADSSC. Department of Transport Abudhabi, ALDAR, MUSANADA ■PROFESSIONAL EXPERIENCE 1. Working as Chief Quantity Surveyor for Gantoot Transport and General Contracting Est. ABU DHABI – UAE (ISO – 9001, 14001&18001Certified) PROJECT - 1: Al Shamkha Project – Third Area, Bridge interchange. (May2004 to May 2005) • CLIENT: Abu Dhabi Municipality, UAE. • CONSULTANT: M/s High - Point Rendel. Pages 1 of 7
  • 2.
    • COST: 45,000,000Dhs. • SCOPE: This Project contains one Main Bridge of Superstructure – 2 span continuous insitu Post – Tensioned Concrete Box Girder, Span 53. 15 m. Total 12 km (4 lanes) road with Reinforced soil wall structure. PROJECT - 2: Interchange at Al Falah Area, Bridge interchange. (May 2005 to April 2006) • CLIENT: Abu Dhabi Municipality, UAE. • CONSULTANT: M/s Frederic R. Harris Inc. • COST: 63,000,000 Dhs. • SCOPE : It consists one main Bridge of Superstructure - 2 Span , continuous CAST - INSITU POST-TENSIONED CONCRETE BOX GIRDER 2 X 44.783 ( 89.57 M ), Three Protection Culverts for Gas Pipe Line , with 346 Pile's of avg. Depth 9.70 M, Including 20,000 sm Reinforced Earth Soil Wall Structure. Ducts & Relocation for various Existing services and it consist 8 km Road. PROJECT - 3: Construction of Internal Roads in Al-Shamkha Area (April 2006 to June2006) • CLIENT: Abu Dhabi Municipality, UAE. • CONSULTANT: Hyder Consulting Middle East Limited • COST: 145,000,000 Dhs. • SCOPE. This Project contains Approach roads to Villas, Service reservation, Utility protection & future ducts, road marking & signs, guardrail, storm water, Irrigation works, Street lighting & Electrical works. Ducts & Relocation for various Existing Services. PROJECT - 4: Construction of Internal Roads in Khalifa City – A, (June 2006 to 12-07-2008) • CLIENT: Abu Dhabi Municipality, UAE. • CONSULTANT: M/s Frederic R. Harris Inc... • COST: 185,000,000 Dhs. • SCOPE. This Project contains Approach roads to Villas, Service reservation, Utility protection & future ducts, road marking & signs, guardrail, storm water, Irrigation works, Street lighting & Electrical works. Ducts & Relocation for various Existing Services. PROJECT - 5: Public Housing Project at Al Wathba – 20 villas (July 2007 to December 2007) • CLIENT: Development Committee for Management of Residential and Service Facilities in The Emirate of Abudhabi. • CONSULTANT: M/s Dorsch Cosult. • COST: 25,000,000 Dhs. • SCOPE. This Project contains Approach roads to Villas, Service reservation, Utility protection & future ducts, road marking & signs, guardrail, storm water, Pages 2 of 7
  • 3.
    Irrigation works, Streetlighting & Electrical works. Ducts & Relocation for various Existing Services. PROJECT – 6 : Widening of Air Port Road From IP-40 to IP-49 (October 2008 to 04-12-2009) • CLIENT: Abudhabi Municipality • CONSULTANT: M/s Ital Cosult. • COST: 175,940,000 Dhs. SCOPE. This Project contains 1 lane both Widening of both side of roads , Service reservation, Utility protection & future ducts, road marking & signs, guardrail, storm water, Irrigation works, Street lighting & Electrical works. Ducts & Relocation for various Existing Services PROJECT – 7 : ROADS FOR THE NEW INDUSTRIAL AREA SOUTH OF CHANNEL IN MUSSAFF AREA (ICAD) CONTRACT -992 (June 2008 to Dece-2009) • CLIENT: Abudhabi Municipality • CONSULTANT: M/s Cansult Mounsell • COST: 267,800,000 Dhs. SCOPE : Construction of Six Lanes Divided Roads of Approximately 7 km in Length, Construction of Roundabout and two ramps, Construction of two utility bridges to Protect the Existing Gas and Oil Pipelines, Provision of new Lighting Network, Relocation and Protection of Existing Water Lines , Replacement of O.H Power Lines With Underground Cables, Provision of Contingency Ducts , Road Furniture , Storm Water System. PROJECT – 8 : MAINTENANCE AND REHABILITATION WORK FOR ABUDHABI STRATEGIC ROADS ZONE-1 , ABUDHABI REGION CONTRACT. No : 47-2009 (Dece-2009 to Oct 2011) • CLIENT: Department of Transport • CONSULTANT: M/s Cansult Mounsell • COST: 316,941,561.46 Dhs. FINAL PAYMENT & MEASUREMENTS PROJECT – 9 : Construction of Internal Roads in Mussafah East & West Contract No : 228 (12/11/2007 to 31/10/209) • CLIENT: Abudhabi Municipality • CONSULTANT: M/s Altorath Engineering Consultants. • COST : 116,073,552.39 PROJECT – 10: Roads & Infrastructure for Abu Dhabi International Shooting Club. Contract No : 2000 (08-04-2006 to 30-04-2008) • CLIENT: Abudhabi Municipality • CONSULTANT: M/s W.S. Atkins & Partners Overseas • COST : 93,590,693.00 Pages 3 of 7
  • 4.
    • PROJECT – 11:Roads for Mohammed Bin Zayed City 4th Stage East Contract No : 953/4-1 (14-03-2007 to 06-10-2008) • CLIENT: Abudhabi Municipality • CONSULTANT: M/s Cansult • COST : 210,719,629.35 PROJECT – 12: Construction and Maintenance of separate roads in western region Contract No : 225 (23-07-2005 to 22-07-2007) • CLIENT: Abudhabi Municipality • CONSULTANT: M/s Samer Group L.L.C • COST : 79,999,000.00 • PROJECT – 13: Paving Road Between Araada and Al Burair Police Station in western region Contract No : 23/2006 (09-05-2006 to 09/01/2008) • CLIENT: Abudhabi Municipality • CONSULTANT: M/s Gibb Limited. • COST : 38,500,000.00 PROJECT – 14: AL FALAH COMMUNITY DEVELOPMENT Infrastructure Works Package- A(Village 2 & 3) Contract No : A290101/2009/C/034A (01-05-2010 to 31-03-2013) • CLIENT: M/S ALDAR • PROJECT MANAGEMENT: M/S FLUOR • CONSULTANT: M/s Hyder, Ital , Halcrow and MWH COST CONSULTANT: M/s RLB Dubai COST : 668,158,000 AED PROJECT – 15 : TRAFFIC ALLEVIATION PROJECT/DALMA MALL ACCESS Contract No: DOT/DC/MR/108/12 (14-08-2013 to till date) • CLIENT: M/S Department of Transport • CONSULTANT: M/s PARSONS COST: 77,000,000AED PROJECT – 16 : IMPROVEMENT OF MAFRAQ TO AL GHWAIFAT SECTION-4B, AL MAFRAQ TO HIMEEM INTERCHANGE Contract No: PD/CA/BPS/AG/R9/P47-2014/14/010 (01-03-2014 to till date) • CLIENT: M/S DEPARTMENT OF TRANSPORT ABUDHABI • EMPOLYER : M/s MUSANADA • CONSULTANT: M/s DORSH GROUPPE Pages 4 of 7
  • 5.
    COST: 1,115,207,0000AED SCOPE :Construction of Eight Lanes Divided Roads of Approximately 27 km in Length, including 3 major Bridge Interchanges, Construction of Roundabout and two ramps, Construction of two utility bridges to Protect the Existing Gas and Oil Pipelines, Provision of new Lighting Network, Relocation and Protection of Existing Water Lines , Replacement of O.H Power Lines With Underground Cables, Provision of Contingency Ducts , Road Furniture , Storm Water System KEY EXPERIENCE • Work experience in various infrastructures Projects of leading Clients such as Abudhabi Municipality, Urban Development committee Abudhabi, ALDAR, ADDC, Etisalat and ADSSC. Department of Transport Abudhabi, ALDAR, MUSANADA etc. • Work Experience with CESMM3 standard, FIIDIC contract. • Preparation Variation Orders / Claims and Prolongation cost • Updating Project cash flow chart Planned Vs Actual. • Preparation and submission of project closeout reports to support TOC, PAC. FAC & Performance Certificate • Preparation and submission of Final payments, Interim Payment report / Summary to Client / consultant/Cost Consultant or Project Management. • Dealing with consultants such as Hyder consultant, Parsons International, Adkins, Dorsch Grouppe,Fedrric Harries, High Point Rendal,Aecom,Ital consult. Keo etc. for passing the interim Payments and final payments. • Preparing and Submission of Inspection Request for Approval by Co-ordinate with Site Engineers and Consultant. • Preparing and Submission of Measurement Sheets for Approval by Co-ordinate with Consultant Land Surveyor and Quantity Surveyor. • Preparation of recap qty for the project. • Preparing and Submission of Daily, Weekly, Monthly Progress Report to Consultant & Head Office. • Dealing with Sub-Contractor to prepare and Forward the Sub Contractor’s Payment Bill-Monthly & Preparing Comparative statement. • Preparing Rate Analysis and forwarding it to the consultant for approval of non B.O.Q Items. • Co-ordaining with Consultant & Client for clearing the submitted Monthly bills without any delay. •Costing and Progress monitoring, Preparation of financial statement. •Preparing and certifying As built drawing after the completion of work • Preparation of Final Bill and Final Measurements, Approval from clients • Costing and Progress monitoring, Preparation of financial statement. • Preparation of Final Bill and Final Measurements, Approval from clients • Preparation of financial reports. •Preparation of Reconciliation statement for earth work, electrical, &irrigation works. Pages 5 of 7
  • 6.
    • Planning andsupervising various types of construction projects. • Estimation of various construction projects. • Estimate, Purchasing, Assembling, Installation testing and commissioning of different types of pipelines, Cranes, Ground Support Equipments and other custom based projects. • Specialized in Customer support division. •Experienced in ISO 9001:2000 standards Opportunities 2. Worked as Site Engineer and Quantity Surveyor for M/s Kunil Builders & Contractors, Mangalore, INDIA. ● Coordinating with Internal Sections, Consultant and Client for Bill Preparation. ● Supervision of all type of civil & Electrical works. ● Reporting the requirements of men, material & machineries to HO. ● Approving & Forwarding the Sub –Contractors & Suppliers Bill's. ● Compilation of Daily, Weekly & Monthly Progress Reports to HO. 3. Worked as Site Inspector for M/s Millennium civil Engineers, Mangalore, INDIA. ● Supervision of all type of civil works ● coordinating and providing technical assistance to sub contractors for carrying out work at site. ● also involved in preparation of shop drawings and site studies for pricing. ● Quantity take off for material requirement. COMPUTER PROFICIENCY PROFESSIONAL QUALIFICATION Pages 6 of 7 1 Spread Sheets MS Excel 2 Drafting MS Word, Power Point, & Photo Impression 3, Internet. 3 Draughting Auto CAD 2004 - 2010,
  • 7.
    APPROVAL PERSONNEL INFORMATION Date ofBirth 24 th June 1977 Martial Status Married Passport No. H1914386 Place of Issue Bangalore Validity 17-06-2019 Languages Known English, Hindi, Kannada, Konkani, Tulu, Malayalam. Email Address alpeesdsouza @yahoo.com , alpee2020@rediffmail.com Driving License Having UAE valid driving License Pages 7 of 7 1 Academic SSLC first Class, PUC commerce 2 Technical Diploma in Civil Engineering NC Under Board of Technical Education Bangalore. 3 Technical CERTIFIED COST ENGINEER.(Through 3 FOLD Education Center DUBAI from AACE International USA) 1 QUANTITY SURVEYOR ABU DHABI MUNICIPALITY - UAE