This document provides an overview of a book on value stream design for lean manufacturing. It discusses:
1) The book aims to illustrate the effectiveness of the value stream method for production design and optimization. It presents the method systematically and expands on traditional representations, guidelines, and application areas.
2) The value stream method visualizes the entire value chain and supports optimal production design through application of design guidelines. The book introduces eight consecutive design guidelines and expands traditional product family formation.
3) The book provides examples from industrial projects and aims to demonstrate how the value stream method can be applied to complex productions beyond its original use in the automotive industry. It is addressed to corporate managers and production planners.