This document discusses replacing the use of fuel gas with nitrogen for purging flare and vent systems offshore in Denmark. Using nitrogen would eliminate greenhouse gas emissions but require investments in nitrogen generation equipment. It estimates the potential reduction in CO2 emissions is 4000 tonnes per year with a total investment of 50 million Danish kroner. Individual flare and vent headers are analyzed to determine the cost effectiveness of nitrogen purging for each. Prioritizing projects based on the cost per tonne of CO2 reduced, some modifications could be combined to reduce costs. The timeline would depend on approval but investments could be phased in over multiple years.
Excel sheet Download Link: https://www.scribd.com/document/385945712/PSV-Sizing-Tool-API-Based-Calc-Sheets
PSV Sizing for Blocked Liquid Discharge Condition
PSV Sizing for Blocked Gas Discharge Condition
PSV Sizing for Fire Case of Liquid Filled Vessel
PSV Sizing for Control Valve Fail Open Case
Relief Valve Sizing for Thermal Expansion
Restriction Orifice Sizing for Gas Flow
Restriction Orifice Sizing for Liquid Flow
Single Phase Flow Line Sizing Tool
Gas Control Valve Sizing Tool
Importance & requirement of Rupture Disk in Industry. Sizing and selection of Safety Relief valves and Rupture Disks. Selection and types of rupture disks. Sizing calculation of rupture disks, PRVs and determination of required relief load.
Excel sheet Download Link: https://www.scribd.com/document/385945712/PSV-Sizing-Tool-API-Based-Calc-Sheets
PSV Sizing for Blocked Liquid Discharge Condition
PSV Sizing for Blocked Gas Discharge Condition
PSV Sizing for Fire Case of Liquid Filled Vessel
PSV Sizing for Control Valve Fail Open Case
Relief Valve Sizing for Thermal Expansion
Restriction Orifice Sizing for Gas Flow
Restriction Orifice Sizing for Liquid Flow
Single Phase Flow Line Sizing Tool
Gas Control Valve Sizing Tool
Importance & requirement of Rupture Disk in Industry. Sizing and selection of Safety Relief valves and Rupture Disks. Selection and types of rupture disks. Sizing calculation of rupture disks, PRVs and determination of required relief load.
Pressure Relief Valve Sizing for Single Phase FlowVikram Sharma
This presentation file provides a quick refresher to pressure relief valve sizing for single phase flow. The calculation guideline is as per API Std 520.
Report on Low temperature shift converter Catalyst reductionGULFAM KHALID
In 2014 we charged fresh Copper oxide catalyst (vendor: Jonhson Matthey) into Low temperature shift converter (LTS is a reactor in which water gas shift conversion occurs and it is exothermic reaction).During Start-up LTS new catalyst has to be reduced before taking it into service.Hydrogen gas is used as reducing agent and natural gas is used as a carrier gas.Detailed report on our reduction activity is uploaded
Pressure Safety Valve Sizing - API 520/521/526Vijay Sarathy
No chemical process facility is immune to the risk of overpressure to avoid dictating the necessity for overpressure protection. For every situation that demands safe containment of process gas, it becomes an obligation for engineers to equally provide pressure relieving and flaring provisions wherever necessary. The levels of protection are hierarchical, starting with designing an inherently safe process to avoid overpressure followed by providing alarms for operators to intervene and Emergency Shutdown provisions through ESD and SIL rated instrumentation. Beyond these design and instrument based protection measures, the philosophy of containment and abatement steps such as pressure relieving devices, flares, physical dikes and Emergency Response Services is employed
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIALVijay Sarathy
Centrifugal Compressors are a preferred choice in gas transportation industry, mainly due to their ability to cater to varying loads. In the event of a compressor shutdown as a planned event, i.e., normal shutdown (NSD), the anti-surge valve is opened to recycle gas from the discharge back to the suction (thereby moving the operating point away from the surge line) and the compressor is tripped via the driver (electric motor or Gas turbine / Steam Turbine). In the case of an unplanned event, i.e., emergency shutdown such as power failure, the compressor trips first followed by the anti-surge valve opening. In doing so, the gas content in the suction side & discharge side mix.
Therefore, settle out conditions is explained as the equilibrium pressure and temperature reached in the compressor piping and equipment volume following a compressor shutdown
Accumulation and Over-pressure: difference between accumulation and overpressureVarun Patel
Accumulation is pressure above the maximum allowable working pressure that vessel experience during high pressure event. Hence, when we say ‘accumulation’, its mean we are talking about the vessel or equipment.
On the other hand, Overpressure is pressure above the set pressure of the pressure safety valve that PSV experience during high pressure event. Hence, when we say ‘accumulation’, its mean we are talking about the pressure relief valve.
Comparison of Alternate Methods for Generating Nitrogen for Industrial Proces...Classic Controls, Inc.
Nitrogen is used extensively throughout various industries because of its properties as an inert gas. The volume of its use can make nitrogen cost a significant line item on an operation's expense report.
The article compares three methods of generating nitrogen and examines the relative costs of each.
Pressure Relief Valve Sizing for Single Phase FlowVikram Sharma
This presentation file provides a quick refresher to pressure relief valve sizing for single phase flow. The calculation guideline is as per API Std 520.
Report on Low temperature shift converter Catalyst reductionGULFAM KHALID
In 2014 we charged fresh Copper oxide catalyst (vendor: Jonhson Matthey) into Low temperature shift converter (LTS is a reactor in which water gas shift conversion occurs and it is exothermic reaction).During Start-up LTS new catalyst has to be reduced before taking it into service.Hydrogen gas is used as reducing agent and natural gas is used as a carrier gas.Detailed report on our reduction activity is uploaded
Pressure Safety Valve Sizing - API 520/521/526Vijay Sarathy
No chemical process facility is immune to the risk of overpressure to avoid dictating the necessity for overpressure protection. For every situation that demands safe containment of process gas, it becomes an obligation for engineers to equally provide pressure relieving and flaring provisions wherever necessary. The levels of protection are hierarchical, starting with designing an inherently safe process to avoid overpressure followed by providing alarms for operators to intervene and Emergency Shutdown provisions through ESD and SIL rated instrumentation. Beyond these design and instrument based protection measures, the philosophy of containment and abatement steps such as pressure relieving devices, flares, physical dikes and Emergency Response Services is employed
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIALVijay Sarathy
Centrifugal Compressors are a preferred choice in gas transportation industry, mainly due to their ability to cater to varying loads. In the event of a compressor shutdown as a planned event, i.e., normal shutdown (NSD), the anti-surge valve is opened to recycle gas from the discharge back to the suction (thereby moving the operating point away from the surge line) and the compressor is tripped via the driver (electric motor or Gas turbine / Steam Turbine). In the case of an unplanned event, i.e., emergency shutdown such as power failure, the compressor trips first followed by the anti-surge valve opening. In doing so, the gas content in the suction side & discharge side mix.
Therefore, settle out conditions is explained as the equilibrium pressure and temperature reached in the compressor piping and equipment volume following a compressor shutdown
Accumulation and Over-pressure: difference between accumulation and overpressureVarun Patel
Accumulation is pressure above the maximum allowable working pressure that vessel experience during high pressure event. Hence, when we say ‘accumulation’, its mean we are talking about the vessel or equipment.
On the other hand, Overpressure is pressure above the set pressure of the pressure safety valve that PSV experience during high pressure event. Hence, when we say ‘accumulation’, its mean we are talking about the pressure relief valve.
Comparison of Alternate Methods for Generating Nitrogen for Industrial Proces...Classic Controls, Inc.
Nitrogen is used extensively throughout various industries because of its properties as an inert gas. The volume of its use can make nitrogen cost a significant line item on an operation's expense report.
The article compares three methods of generating nitrogen and examines the relative costs of each.
Minimising emissions, maximising alternative fuelsA TEC Group
Dr. Stefan Kern, A TEC Production and Services GmbH, details the conversion of the kiln at Lafarge Retznei and shows how an optimised calciner design allowed for 100% alternative fuel usage.
"Minimising emissions, maximising alternative fuels". Article published on World Cement Magazine, edition June 2022.
International Journal of Engineering and Science Invention (IJESI)inventionjournals
International Journal of Engineering and Science Invention (IJESI) is an international journal intended for professionals and researchers in all fields of computer science and electronics. IJESI publishes research articles and reviews within the whole field Engineering Science and Technology, new teaching methods, assessment, validation and the impact of new technologies and it will continue to provide information on the latest trends and developments in this ever-expanding subject. The publications of papers are selected through double peer reviewed to ensure originality, relevance, and readability. The articles published in our journal can be accessed online
Australasian Lab managers Conference: Gas Generation Dr Nicole Pendini 2019Nicole Renee Pendini
This presentation focus on on-site Gas Generation for the laboratory space supplying a range of analytical and specialty applications within the lab environment. I will focus on keeping green by preventing weekly cylinder and bulk supply deliveries, that waste energy offsite to generate the gas and petrol to delivery to the laboratory. The overall cost savings vs other methods (ROI < 1.5 years including service) and of course how Laboratory managers can significantly reduce their OHS/E risk with onsite Nitrogen, Hydrogen and Zero Air gas generators.
Question Answer on Energy Conservation Vol 1 By Prem Baboo.pdfPremBaboo4
G.Cal/ton of Ammonia, G.Cal/ton of urea is the most important data in fertilizers industries for performance evaluation. The energy of the fertilizers is depends upon Reformer feed & fuel. Earlier thinking Fertilizers should be produced at any cost we have nothing to do with energy & pollution and what environment we don’t know? But today time has changed. We have to meet the energy & environment conditions otherwise penalty will be imposed and your factory will be closed. In this quiz we will discuss about energy. How to reduced energy and how to reduced pollution how to save environment? Etc. Hydrogen and could be a boon for renewable energy demand. But greening ammonia, the chemical primarily used to make fertilizer, will take a lot of heavy lifting. Green ammonia is two to three times more expensive than gray ammonia. Depends upon power source means where we are getting power from, i.e. Hydro power or non renewable source.
Zero Emission Vehicles-By Carbon Recycling Using Nanotechnologyirjes
Over the past few years, a small word with big potential has been rapidly insinuating itself
into the world’s consciousness. That word is “NANO”(one-billionth of a meter).It has conjured up
speculation about a seismic shift in almost every aspect of science and engineering with implications of
ethics economics, international relations, day-to-day life and even humanity’s conception of place in its
place in the universe. Nanotechnology is the science and technology of building devices, such as
electronic circuits, from single atoms and molecules. Petrol, which is available inadequately, is considered to
be one of the most time sources of energy. Our paper focuses on the prospect for zero emission
hydrocarbon fuelled vehicles with sustainable carbon cycle using nanotechnology in which exhausted
petrol is recycled again and again. This process involves two phases,
IRJET- Enhancement of Performance of Catalytic Converter using Phase Change M...
Use of nitrogen purge in flare and vent systems
1. DANISH OPERATORS
Offshore Oil and Gas Operators in Denmark
Esplanaden 50 1263 Copenhagen K Denmark
Telephone: +45 3363 4097 E-mail: info@danishoperators.com
Use of Nitrogen Purge
in Flare and Vent Systems
7 September 2009
2. 1. Title of Initiative
Use of Nitrogen Purge in Flare and Vent Systems.
2. Description of Initiative
The offshore installations flare and atmospheric vent headers are required to be purged in order to
prevent oxygen ingress to the flare and atmospheric vent systems. This is required in order to avoid
the formation of explosive mixtures in the headers, which could lead to explosions if ignited. Fuel
gas or nitrogen can be used as purge gas. The purge gas is injected at different locations in the
systems in order to maintain a positive pressure in the flare headers thus preventing air ingress.
Cold vents (atmospheric vent headers) are used to vent hydrocarbon gas from low pressure sources
where insufficient pressure is available to allow the gas to be flared. Under normal operating
conditions the volume of gas vented via the cold vent is minimal.
The use of fuel gas in flare and vent headers for purging purposes results in environmental
emissions. These can be in the form of CO2 or NOx when the fuel gas used in the HP and LP flare
headers is burnt or in the form of CH4 and other species present in the atmospheric vent header
purge gas when this is cold vented. The green house effect associated with the CH4 is around 23
times worse than that for the CO2 emissions.
The replacement of the use of fuel gas with nitrogen for purging the flare and atmospheric vent
headers is one of the options currently being investigated in order to reduce environmental impact.
The use of nitrogen will eliminate the environmental emissions described in the above paragraph. It
should be noted that, when replacing purge fuel gas with nitrogen for Atmospheric Vent headers,
the NOx emissions increase. This is due to the NOx emissions produced in the gas turbines when
generating the necessary power for N2 generation. However, the environmental impact of cold
venting in terms of CO2 emissions is seen as much higher than that of the increased NOx emissions
for nitrogen generation.
This initiative is applicable to the DUC Facilities only. Nitrogen is currently being used on the
Dong Energy Siri facilities for purging the flare system. A flare recovery system is planned to be
installed on Hess South Arne Facility which will eliminate the need to purge the flare headers with
nitrogen.
In the case that Flare Gas Recovery is installed on any of the DUC platforms, it will not be
necessary to replace the use of fuel gas with nitrogen for purging purposes as the purge fuel gas
would be recovered and sent back to the process. If the pay back time for changing from fuel gas to
nitrogen purge is significantly less than an expected implementation time for a flare gas recovery
system, nitrogen purge should be considered.
Nitrogen will still be required in order to purge the flare stack, downstream of the Fast Opening
Valves that are normally installed in the main headers as part of flare recovery projects. This is
considered to be a project requirement and therefore considered to be outside the scope of this
report.
1/7
3. 3. Potential for Reduction of Environmental Emissions
Table 1 below summarises the potential for environmental emissions reduction as well as an
estimate of the total investment required to replace the use of fuel gas with nitrogen for the purpose
of purging the DUC Facilities Flare Header. The total potential reduction in fuel gas usage is around
0,06MMSCFD. The figures below exclude the Gorm HP, LP and Vent headers given that the
platform does not have sufficient nitrogen generation capacity to supply the required flow rate. It is
not considered feasible at this stage to proceed with the installation of a new nitrogen generation
unit for this purpose.
Table 1
Net CO2 Emissions
Reduction, tonnes/year
(Notes 1, 2 and 3)
NOx Emissions
Reduction, kg/year
(Note 4)
Estimated Total
Investment (Note 8)
MM DKK
DKK/(ton/year of CO2
reduction)
(Note 5)
4000 457 50 12500
Notes:
1. Figure takes into account CO2 emissions generated when combusting FG in the Gas Turbines for
generating the power necessary to produce purge nitrogen.
2. Figure represents approx 0,2% of the total DUC CO2 emissions for 2008.
3. Value includes both the burnt and unburnt fractions of fuel gas used for purging the HP/LP flare and
atmospheric vent headers.
4. When replacing purge fuel gas with nitrogen for Atmospheric Vent headers, the NOx emissions increase.
This is due to the NOx emissions produced in the gas turbines when generating the necessary power for N2
generation. However, these will be small as compared to those generated in the flare tips when burning the
purge FG and as a result a net reduction is achieved for all the categories.
5. Required investment to reduce CO2 emission by 1 tonne per year. Figure represents the average for all
DUC Facilities. The individual values for each particular flare/vent header ranges from 243 DKK for the Dan
FG vent header (most attractive option) to 122541 DKK for the Tyra East LP flare header (less attractive
option). The values for all headers are shown in Table 2 below and are to be used when prioritising any
future works.
6. Given that the nitrogen purity currently generated offshore is not completely pure (purity> 93%) some
oxygen will be introduced into the flare headers. However, the Upper Flammability Limit (UFL) of natural
gas in oxygen is around 61% in volume (assuming pure methane). The volume fraction of gas during normal
operation in all flare headers will be above 99.9%, which is well above the UFL. The normal flaring rates
will have to be reduced to 0,0009 MMSCFD or lower in order to create flammable mixture. Rates as low as
those are never experienced during operation. Therefore a flammable mixture is not predicted under any
circumstance.
2/7
4. 3/7
7. The flammability of all mixtures expected in the flare tips, resulting from the replacement of fuel gas with
nitrogen have been checked and found not to be a problem. This is due to the high hydrocarbon/nitrogen
ratio seen in the flare headers.
8. Includes engineering, equipment and installation costs.
Table 2 below shows the above values and other relevant information for each individual header.
5. 4/7
Table 2
Header
Flare/Vent Stack
ID
Total FG
required
Current
Estimated
Equivalent
CO2 emissions
Required
N2
Net CO2
Emissions
reduction
Opex Increase
(cost of N2
Generation)
Net
economic
benefit
Cost
Estimate for
modifications
Cost/(tonnes/year of
CO2 reduction)
Comments
inch Nm3/h kg/h Nm3/h tonnes/year DKK/year DKK/year DKK DKK/(tonne/year)
DAN FG-Vent 12,39/6,36 1,3185 68,5 1,1367 597,1 1892 63715 150000 251 N2 generation is sufficient to meet requirements. N2 purging facilities exist. N2 flowmeter to be installed.
TYW-A Vent 13,62 1,6614 86,4 1,4323 752,3 2383 80282 1000000 1329 N2 generation is sufficient to meet requirements. New N2 purging facilities are required (pipework + flow meter)
TYE Vent 13,62 1,6614 86,4 1,4323 752,3 2383 80282 1875000 2492 N2 generation is sufficient to meet requirements. New N2 purging facilities are required (pipework + flow meter)
DAN FG- HP 23,50 12,4584 28,2 10,4009 216,8 17308 141885 600000 2768 N2 purge facilities are installed. N2 generation system capacity is 150N/m3. Normal consumption is 0 according to Design Manual.
Halfdan Vent 6,36 0,1190 6,2 0,1026 53,9 171 5749 150000 2784 N2 generation is sufficient to meet requirements. New N2 purging facilities are required (pipework + flow meter)
HWA Vent 10,42 0,6577 34,2 0,5670 297,8 944 31782 1000000 3358 N2 generation is sufficient to meet requirements. New N2 purging facilities are required (pipework + flow meter)
HALFDAN HP 23,50 11,3464 25,6 9,4553 197,1 15735 129220 750000 3806
N2 purge facilities are installed. N2 is supplied by N2 Generation package HDAC-A-0801 with a design capacity of 320 Nm3/h. Consumption is 100Nm3/h giving a spare capacity of 220 Nm3/h.
PCV designed for 44 Nm3/h. Flow to glycol regen package discontinuous. Nitrogen line to HDC has been disconnected. PCV OK for required purge flow.
HALFDAN LP 13,62 1,6614 3,8 1,4323 28,7 2383 18829 150000 5224 As per Halfdan HP header above.
Dan F Vent 10,42 0,6577 34,2 0,5670 297,8 944 31782 2000000 6715 N2 generation is sufficient to meet requirements. N2 purging facilities exist. N2 flowmeter to be installed.
DAN FG LP 12,39 1,2330 2,8 1,0323 21,4 1718 14033 300000 14019 As per Dan FG HP header above.
HWA HP 2 headers 13,62 / 17,62 10,9217 24,7 4,9234 201,9 8193 132370 5000000 24768 N2 Generation System produces 30Nm3/h. LP/IP Comp consumption is 20Nm3/h. There is sufficient spare capacity to meet the requirements. Piping mods required.
TYW HP 23,50 10,9675 24,8 9,4553 189,6 15735 124302 5700000 30069
Platform A: N2 Generation package supplies 60Nm3/h. LP comp consumes 2,4 Nm3/h. Capacity available will be sufficient to meet requirements. Platform E: N2 is supplied by N2 Gen Unit WEA-
A-8501. Generation capacity is 80Nm3/h and consumption 44 Nm3/h. Spare capacity of 36Nm3/h will be sufficient. Only piping mods are required.
TYE HP 23,50 12,0853 27,3 9,7738 210,8 16265 138203 11250000 53377
N2 generation system capacity is 40N/m3, consumption is 11Nm3/h, therefore there is sufficient capacity to meet the requirements. Two of the purging points are located on Platforms E and F.
Nitrogen for these platforms is supplied by nitrogen bottles. It is not recommended to run nitrogen pipes across the bridges in order to replace FG purge with N2. Replacement is only to be applied to
Platform A.
DAN FD - HP 17,62 8,0380 18,2 6,3475 140,6 10563 92213 13300000 94576
N2 is available. Two N2 generation packages are available on Dan FC platform (A-0802 and A-0807) with a total combined capacity of 105Nm3/h. N2 from Dan FF is also available (A-0801) with
a capacity of 138Nm3/h. Consumption is not known but given the small flow rate required and the high generation capacity as compared with other platforms it will be assumed that there is
sufficient capacity available to meet the requirements.
TYE LP 13,62 1,6614 3,8 1,4323 28,7 2383 18829 3750000 130592 Capacity available will be sufficient to meet requirements. See TW HP Flare above . Only piping mods are required.
HWA LP 8,33 0,3847 0,9 0,3168 6,7 527 4389 1000000 149417 As per Harald HP header above.
TYW LP 10,42 0,7682 1,7 0,6005 13,5 999 8825 2300000 170899 Capacity available will be sufficient to meet requirements. See TW HP Flare above . Only piping mods are required.
GORM LP 10,42 1,4897 3,4 1,1440 26,2 1904 17152 - -
Gorm F: N2 Generation System produces 10Nm3/h and supplies LP Compressor C-4201. LP comp consumption is 7 Nm3/h. , which makes the N2 Generator insufficient to supply the required N2
purge flow rates. Given the small gain to be obtained, is not considered feasible to install extra N2 generation capacity.
GORM HP 23,50 15,9784 36,1 13,1277 278,1 21846 182331 - -
Gorm F: N2 Generation System produces 10Nm3/h and supplies LP Compressor C-4201. LP comp consumption is 7 Nm3/h. , which makes the N2 Generator insufficient to supply the required N2
purge flow rates. Given the small gain to be obtained, is not considered feasible to install extra N2 generation capacity.
GORM Vent 10,42 0,6577 34,2 0,5670 297,8 944 31782 - -
Gorm F: N2 Generation System produces 10Nm3/h and supplies LP Compressor C-4201. LP comp consumption is 7 Nm3/h. , which makes the N2 Generator insufficient to supply the required N2
purge flow rates. Given the small gain to be obtained, is not considered feasible to install extra N2 generation capacity.
See next page for calculation methodology.
6. Calculation Methodology
Purge gas rates calculation (applicable to both fuel gas and nitrogen):
Calculated based on API 521 (5th
Edition, 2007) equation.
Q = 0,0035283* D^3,46 * K
Where,
Q is the purge gas rate, expressed in normal cubic metres per hour (standard cubic feet per hour);
D is the flare stack diameter, expressed in metres (inches);
K is a constant which depends on the purge gas composition. Different values are used for fuel gas and
nitrogen.
Equivalent CO2 emissions
Equivalent CO2 emissions are calculated as follows:
For burnt Fuel Gas
CO2 emissions (kg/h) = Fuel Gas normal volume flow rate (Nm3/h) x 2.26 kg CO2 / Nm3*
*Figure based on an Emission Factor of 57 kgCO2/GJ and a Heating Value of 39,6GJ/1000Nm3.
For cold vented Fuel Gas
Equivalent CO2 emissions (kg/h) = Normal volume flow rate (Nm3/h) x 2,26 kg CO2 / Nm3 x 23**
**Figure takes into account more harmful environmental effect of unburnt CH4 (advised by Production
Department)
Net CO2 Emissions reduction
Net CO2 Emissions reduction = Equivalent CO2 emissions - CO2 Emissions resulting from N2 generation
Net economic benefit
Net economic benefit =Additional Revenue (sales gas) + CO2 emissions reduction- Cost of fuel gas for N2
Generation
CO2 emissions reduction: according to Forudsætninger for samfundsøkonomiske analyser på energiområdet,
May 2009, the CO2 saving should be included in the economic assessment. A rate of 84,925 DKK/tonne is
used for the calculations.
NOx Emissions reduction / increase
For fuel gas burnt if flare tips: NOx emissions (mass units) = 0,0015 * flare gas mass flow rate
For fuel gas burnt in gas turbines = Fuel Gas normal volume flow rate (Nm3/h) x 0,0049 kg NOx / Nm3***
***Figure based on an Emission Factor of 124g NOX /GJ and a Heating Value of 39,6GJ/1000Nm3.
CAPEX:
Includes engineering, equipment and installations costs.
5/7
7. 4. Investments by Major Components and Years
As stated in Table 1 above the total required investment is DKK 50.3MM. The cost estimates for
the modifications required for each individual header are presented in Table 2 above.
The implementation of the modifications is to be prioritised according to the cost / (ton/year of CO2
reduction). Some of the modifications for a particular platform (e.g HP/LP/Vent headers) could be
combined in a single CFI package if it is decided to proceed with them.
The timeline for implementation is subject to the decision to proceed with the project.
5. Operating Costs and Revenues
5.1 Total Net Economic Benefit
The total net economic benefit that would be obtained if all the proposed projects were
implemented is given in Table 3 below.
Table 3:
Additional Revenue from increased gas sales
(purge FG sold).
0.88 MMDKK/year
Additional Revenue from CO2 emissions
reduction (CO2 quotas sold)
0.34 MMDKK/year
Cost of FG for N2 Generation -0.10 MMDKK/year
Net Economic Benefit 1.12 MMDKK/year
*Gas price 32.6 DKK/GJ, Heating Value = 39.6 GJ/1000Nm3.
See Section 6 below for payback period calculation.
6. Operating Economic Assessment
A brief economic assessment based on payback period is present below for both the most attractive
option and for the implementation of all the options. Included in the assessment is the value of CO2
emission reduction. According to Forudsætninger for samfundsøkonomiske analyser på
energiområdet, Februry 2009, the CO2 saving should be included in the economic assessment. A
rate of 84,925 DKK/tonne of CO2 is used for the assessment assessment.
Most attractive option:
The most attractive option in terms of Cost/(tonnes/year of CO2 reduction), is the installation of a
nitrogen flow meter on the existing nitrogen line to the Dan FG atmospheric vent header. The
following economic assessment is made for this option:
Required investment = DKK 150000 (includes cost of flowmeter, engineering and installation)
6/7
8. Additional Revenue (FG Export) = 14890 DKK /year
CO2 Emission Reduction = 50706 DKK /year
Cost of FG for N2 Generation = - 1892 DKK /year
Net Economic Benefit = 63704 DKK /year
Payback period = 150000 / 63704 = 2,4 years
Assuming that all the proposed projects are implemented:
Required investment = MMDKK 50.3
Net Economic Benefit (Table 3) = 1.12 MMDKK /year
Payback period = 50.3 / 1.12 = 45 years
For the most attractive option the payback period of 2,4 years makes this worth pursuing and as
such should be progressed to better define the costs. For all other individual options, and the
implementation of all the options combined, the payback period exceeds 4 years such that the main
drive for this initiative is seen as not an economic one.
7. Possible Socio-Economic Calculation
Refer to Section 3 above.
8. Possible Socio-Economic Assessment
Refer to Section 3 above.
9. Recommendations
1. Decision to proceed with this initiative and scope of implementation to be confirmed.
2. The installation of flare gas recovery systems on the DUC platforms is currently being studied.
It is recommended to wait for the results of such studies before taking the decision to proceed
with the implementation of this initiative.
3. To check the fuel gas flow rates currently being used offshore in order to ensure that the correct
flows are in place.
7/7