CURRICULUM VITAE
1. Proposed Position : Procurement Specialist
2. Name of Firm :
3. Name of Staff : Virgilio G. Balandra
4. Date of Birth : August 13, 1947 Nationality: Filipino
5. Education :Master of Business Administration
Ateneo de Manila University Graduate School of Business
Makati City, Philippines
1989-1991 (Preparation of Thesis, defense, and graduation 1998)
Bachelor of Science in Civil Engineering
Cebu Institute of Technology (C.I.T.)
Cebu City, Philippines
1964 – 1969
Board Exam. Passed : Board Exam for Civil Engineers
Board Exam for Master Plumber
Honors Received : 8th
Place – Pre-Board Examination for Civil Engineers – (C.I.T.)
12th Place- Board Examination for Master Plumber
First Place – PERT/CPM Seminar by AMIEP, Quezon City
Home Address : Blk 10, Lot 32, Camella Avenue, Camella Homes Classic, Barangay
Don Bosco, Paranaque City. Cell Phone  +63906-218-95-83
Email address ----rivardnalab@yahoo.com
6. Membership of Professional Associations: Philippine Institute of Civil Engineer (PICE)
7. Other Training : -World Bank Procurement Guidelines Workshop by World Bank Group,
Papua New Guinea, April 29-30, 2010
- Secondary Education Development and Improvement Project (SEDIP)
Implementation Plan, Basic Management Concept and Principles by:
Department of Education (DepED), Manila, Philippines
-SEDIP School Mapping Exercise and School Building Prioritization
Model conducted by DepED and Pacific Consultants International, Cebu
City, Philippines
-Financial Orientation Workshop on Project Completion and Inventory
Management by DepEd and PCI on Sept 24-27, 2007, Cagayan de Oro
City.
-Government Electronic Procurement System (G-EPS) Training, by the
Department of Budget and Management, April 2, 2004, Cagayan de Oro.
-
-Seminar on Housing Development Projects, by PICE, March 10-11,
1995, Makati, Metro Manila
-Safety and First Aid Course by PHILSTRESS, Jan 26-Feb. 9, 1977 at
Marikina, Metro Manila
-Basic Supervisory Development Seminar by PHILSTRESS, Feb. 3- Mar
10, 1981, Marikina, Metro Manila.
-Master Plumber including Plumbing Design through Special Class--
-PERT/CPM by: Association of Management and Industrial Engineers of
the Philippines (AMIEP) Apr 24-May 22, 1976-Quezon City
- Industrial Building Technique – conducted by PICE
- National Roads and Bridges Maintenance Programming-DPWY, Cagayan
de Oro City.--1972
- Contract Management by DPWH, Cagayan de Oro City--1971
8. Countries of Work Experience: Palau, Timor Leste, Mongolia, Papua New Guinea,
Vietnam, Saudi Arabia, Kuwait, Malaysia, Philippines
9. Languages : PILIPINO (GOOD)
ENGLISH (GOOD)
10. Key Qualification: More than Forty years of experience in various civil engineering works,
portion of which includes procurement activities using WORLD BANK, JBIC, and ADB
procurement guidelines (including TIMOR LESTE Procurement guidelines), project
scheduling and monitoring and overall project management of infrastructure projects here
and abroad. Previously involved in the project monitoring, evaluation, coordination and
inspection of United States Agency for International Development (USAID) funded projects
under the ECONOMIC SUPPORT FUND SECRETARIAT- a government agency under the
Office of the President of the Philippines tasked to implement projects funded from the rental
of the U.S. bases through the USAID with projects such as school buildings, roads and
highways, slaughter houses, market buildings, etc., including coordination works with the
In-House consultants Louis Berger International, Inc. And TCGI Engineers.
To be mobilized by EGIS-EAU of France as Procurement Specialist for their
DRIP Project in India starting Nov. 30, 2015 for an initial duration of 4.5 months to prepare
Bidding documents and do Procurement Works related to the implementation of their Dam
rehabilitation and Improvement projects in the four provinces of India with Office in New
Delhi.
Hired by Egis-EAU of France as Procurement Specialist/Valuer for the Koror-
Airai Sanitation Project (KASP) from July 31, 2015 up to Sept 18, 2015 (First Input)
specifically to prepare Bid Documents for their Four Sanitation Projects in Malakal, Koror,
Airai, & Meyuns.
Hired by Woodfields Consultant, Inc. as Procurement Advisor for the Maynilad
World Bank funded projects Design and Build of 20 MLD Muntinlupa Sewage Treatment
Plant (STP)(ICB No.: MWMP-13-01) and The Proposed Combined Sewerage Interceptor
System for Muntinlupa STP (ICB No. WMP-12-04(A)), One month intermittent from Oct
14, 2013 to Aug 31, 2014. Procurement was extended from September 1, 2014 for the final
-
bid valuation stage for the 20 MLD STP and the Combined Sewerage Interceptor up to end
of year 2014.
Hired by PERT CONSULT International, Inc. to be part of the team that
conducted a Business Case Study for Selected Public Private Partnership (PPP) road project
that will extend the Central Luzon Expressway (CLEX Phase I), to be called the North Luzon
Expressway (NLEX East Expressway), that will connect La Mesa Parkway to Cabanatuan
city. Four (4) months intermittent project study from Feb to Aug 2013.
Hired by Charles Kendall & Partners for their Infrastructure Fund Project of the
National Procurement Commission under the office of the Prime Minister as a Senior
Procurement Specialist whose main task is to prepare all the necessary documents needed to
procure GOODS, WORKS, and SERVICES for the various projects for the different sectors
like Agriculture, Education, Power, Health, etc. funded by the Infrastructure Funds of the
government and Road Projects funded by ADB & JICA
Hired by PRIMEX (and seconded to Asian Development Bank) as International
Procurement Specialist-Team Leader for ADB Project Study-“NCB Threshold review for the
Road Construction Sector of Mongolia”, in order to come up with a recommendation, with
the assistance of the three national consultants from Mongolia, whether or not to increase
the NCB Threshold of Mongolia from $1 Million to $ 5 Million. Conducted 1 week visit to
Mongolia to gather documents and interview all stakeholders
Assigned as International Procurement Specialist of the Special Project Unit
(SPU) of the Mineral Resources Authority(MRA) of Papua New Guinea for their Mining
Sector Institutional Strengthening Technical Assistance Project 2 (MSISTAP2) funded by
the World Bank.
Completed Technical Assistance assignment with KELLOGG BROWN AND
ROOT as a Cost Estimator and Contract/Procurement Specialist (International Status) for the
feasibility study for National Irrigation Administration’s (NIA) ADB funded project for the
Rehabilitation of their Irrigation Operation System Efficiency Improvement project In Davao
and Iloilo provinces.
Assigned as Procurement Specialist of the Red River Delta Water Supply and
Sanitation Project in Hanoi, Vietnam from- First Input - September 8, 2008 – to Nov. 7,
2008. Second Input- Dec. 2, 2008 – to Dec. 17, 2008. The tasks include procurement
activities like preparing Request for Proposals, Preparing Criteria for Evaluation of Proposals
of Consultants, Evaluation and Rating of Proposals of Shortlisted Consultants based on the
approved Criteria. Preparing Technical Evaluation Report and and Combined Technical and
Financial Evaluation Report, providing Technical Assistance to the Central Project Office of
the Ministry of Agriculture and Rural Development using WORLD BANK Procurement
Guidelines.
Previously assigned, prior to Vietnam job, as head of the Agusan del Sur
Procurement group to implement and procure works contractors, oversee, and monitor the
SECONDARY EDUCATION DEVELOPMENT and IMPROVEMENT PROJECT
(SEDIP), a foreign assisted project of Department of Education (Funded by Japan Bank for
International Cooperation –JBIC, and Asian Development Bank) for 15 Social Reform
Agenda Provinces like Agusan del Sur, Surigao del Sur, Antique, Negros Oriental, etc., with
the primary tasked of Procurement of works, goods and services related to the construction of
new school buildings and repair of existing ones to eradicate or at least solve the classroom
shortages of the country.
-
Previously involved in direct supervision of projects here and abroad (Saudi
Arabia, Malaysia, Kuwait) such as bridges, flyover, precast, pre-stressed, and post-tensioned
projects, pile driving, mass housing projects and sub-division developments, water supply
and sewerage system, elevated water tank, water and sewerage treatment plants, and other
important projects including the renovation and improvement of Malacanang Presidential
Palace building, the official residence of the President of the Philippines.
10. Employment Record
To be mobilized on November 30, 2015 for an initial input of 4.5 months
Emplyer: Egis-EAU of France-India project
Position held: Procurement Specialist
11. Detailed Tasks Assigned
-Acts as Procurement
Specialist for the DRIP
Projects
-Preparation of the
Bidding Documents for
the following four sub-
projects:
a. Kerala
c. Madhya Pradesh,
d. Orissa,
e. Tamil Nadu
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Dam Rehabilitation and
Improvement Project (DRIP)World Bank Funded Project.
Client: Ministry of Water/National Water Resources
Council
Project features : Dam Rehabilitation and Improvement
Project for the four provinces in India, namely; Kerala,
Madhya Pradesh, Orissa, & Tamil Nadu
From : July 31, 2015 – September 18, 2015 (First Input)
Second Input (3 weeks) tentative December 2015
Employer : Egis-EAU of france
Position held: Procurement Specialist/Valuer
11. Detailed Tasks Assigned
-Acts as Procurement
Specialist/Valuer of the
Koror-Airai Sanitation
Project (KASP) in Palau.
-Preparation of the
Bidding Documents for
the following sub-projects:
a. Sewerage Network 1:
Malakal
b. Sewerage Network 2:
Koror
c. WWTP Malakal
d. WWTP and Sewerage
Network Airai
- Assist the Team Leader
and the Internationa
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Koror-Airai Sanitation
Project (KASP) ADB Funded Project.
Client: Palau Public Utilities Corporation (PPUC)
Project features : Design and Build of the Malakal and
Airai WWTP, and the rehabilitation and expansion of the
Sewerage Network of Malakal and Koror.
-
expert to prepare and
complete bills of quantities
and cost estimates.
From : Sep. 1, 2014 – Dec. 31, 2014. Extension of the Procurement Activity for the Evaluation stage of the 20 MLD
STP and the Combined Sewage Interceptor system
From: Oct. 14, 2013 To – Aug. 31, 2014
Employer: WOODFIELDS CONSULTANT, Inc.
Positions held: PROCUREMENT ADVISOR
11. Detailed Tasks Assigned
-Acts as advisor to the
team for the following
activities:
-Evaluation of the
Prequalification
documents of the
applicants for the two
above mentioned projects.
-Preparation of the
Prequalification
Evaluation Reports.
-Preparation of the
Bidding Documents to be
issued to the prequalified
applicants.
-Evaluation of Bids, and
-Preparation of the Bid
Evaluation Reports.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Design and Build of 20
MLD Muntinlupa Sewage Treatment Plant (ICB No.:
MWMP-13-01) and the Proposed Combined Sewerage
Interceptor System for Muntinlupa STP (ICB No.:MWMP-
12-04(A) World Bank funded project
Year: Oct 14, 2013 to Feb 14, 2014 (1 month
intermittent assignment)
Client: Maynilad
Project features : Design and Build of the 20 MLD STP
which include preparation of process design, mass
balance, PID, civil and structural design, hydraulic
design, instrumentation design, mechanical and
electrical design, pipe laying of ≥ 700mmØ pipes and
sewage pipe laying of ≥ 150mmØ
From: Four months intermittent project study from Feb 26, 2013 To – Aug 25, 2013
Employer: PERT CONSULT International, Inc.
Positions held: PROCUREMENT SPECIALIST
11. Detailed Tasks Assigned
-Identification of
procurement needs
-Preparation of
procurement plans
- Identify PPP Modalities,
Risk Assessment, Level
of Access to Finance, and
Level of GOP Ownership.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Public Private
Partnership (PPP) Project
Year: Feb 26, 2013 to Aug 25, 2013 (4 months
intermittent assignment)
Client: Department of Public Works and Highways
Project features : Business Case Study to determine the
Alignment of the proposed extension of the Central
Luzon Expressway (CLEX Phase I), the NLEX East
Expressway, that will connect La Mesa Parkway to
Cabanatuan city
-
From: Mar 23, 2012 To – Dec 20, 2012
Employer: Charles Kendall & Partners
Positions held: INTERNATIONAL SENIOR PROCUREMENT SPECIALIST
11. Detailed Tasks Assigned
-Identification of
procurement needs
-Preparation of
procurement plans
- Follow up tender bidding
documents to make sure
these are available for the
pre-qualified bidders.
-Advertising REOI,
Invitation to Pre-Qualify
and Bid.
-Issue Bid Documents
and RFP.
-Preparation of Criteria for
Techncial Evaluation.
-Management of
Evaluation.
-Technical and Financial
Evaluation.
-Preparation of Combined
Technical and Financial
Evaluation Reports.
-Evaluation and award
recommendation.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: INFRASTRUCTURE
FUND Projects
Year: March 23, 2012 to Dec 20, 2012
Client: National Procurement Commission under the
office of the Prime Minister
Project features : Procurement of Goods, Works, and
Services for the different projects of the government
intended for the different sectors like Agriculture, Health,
Education, etc. funded by the Infrastructure Fund
including road projects financed by ADB(TIMOR LESTE
Road Network Upgrading Project) , and JICA (National
Road No. 1 Upgrading Project.).
Positions held: International Senior Procurement
Specialist:
Part of a six (6) man Int’l Procurement Team lead by an
Austrian as Project Director. With the Team are Austrian,
3 Filipinos, Nigerian and Indian.
Activities performed: Assist the National Procurement
Commission (NPC) members in the performance of
Procurement Activities for Goods, Works, and Services
funded by the government’s Infrastructure Fund (IF). The
NPC is in-charge of all Procurement Activities for
projects funded by the IF and all government funds
exceeding 1 Million U.S. Dollars for the following line
ministries; Transport, Petroleum Infrastructure, Solidarity
& Social, Health, MDG, IT infrastructure, Electricity,
Education, Public Building, Urban and Rural
Development, Water & Sanitation, and Agriculture
From: Dec 27, 2010 To – April 26, 2011
Employer: PRIMEX, Manila, Philippines (Seconded to Asian Development Bank)
Positions held: INTERNATIONAL PROCUREMENT SPECIALIST (Team Leader designate)
11. Detailed Tasks Assigned
-Review information of
participating bidders and
their nationalities,
construction completion
reports, bill of quantities,
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project:RSC-CO1500 (MON):
Reviewing Procurement in Mongolia’s Road
Construction Sector (ADB FUNDED PROJECT)
Year: December 27, 2010 to April 26, 2011
-
quoted prices, quality of
work delivered, etc.
- Planning and conducting
interviews with the
relevant stakeholders,
project employers, the
executing agencies
(Particularly MRTCUD
and MOF), Contractors,
and civil society
organizations.
-Coordinating with the
three national
consultants, and
reviewing the national
consultants reports to
ensure a consistently high
standard.
-Analyzing the collected
data and preparing the
consolidated reports to
ADB.
-Preparing weekly briefing
to ADB.
-Conducting necessary
mission to the field.
Location: Manila with 1 week visit to Ulaanbaatar,
Mongolia (Feb 13-Feb 19, 2011)
Client: Ministry of Finance and Economy
Project features : Project Study to determine whether or
not to increase the NCB Threshold of the Road
Construction Sector for Mongolia
Positions held: International Procurement Specialist-
Team Leader.
Activities performed: To lead the Team ( 3 National
Consultants from Mongolia and myself) to conduct a
study and develop methodologies and approaches to
achieve the objectives and to come up with a study and
a recommendation whether or not to increase the NCB
Threshold form $1 Million to $5 Million..
From: Feb 17, 2010 To – August 31, 2010
Employer: MINERAL RESOURCES AUTHORITY. Port Moresby, Papua New Guinea
Positions held: PROCUREMENT SPECIALIST (International Consultant)
11. Detailed Tasks Assigned
1. Managing Procurement
- Implement all policies and
procedures relating to
procurement activities required
by the Project.
- Ensure that the Bank
Procurement Guidelines are
followed in all procurement
transactions.
2, Planning, Record Keeping
and Reporting:
- Actively participate in the
discussion within SPU and
with the World Bank Task
Team on procurement
planning, adequately revise and
update the Project Procurement
plan for SPU Manager’s
consideration.
.Prepares correspondences and
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: MSISTAP2 - Mining
Sector Institutional Strengthening Technical Assistance
Project 2 (WORL BANK FUNDED PROJECT)
Year: February 17, 2010 to August 31, 2010
Location: Special Project Unit (SPU), Mineral
Resources Authority(MRA), Port Moresby, Papua New
Guinea
Client: Government of Papua New Guinea
Project features: Institutional Strengthening of the
Mining Sector to Improve development Outcomes from
Extractive Industries
Positions held: Procurement Specialist (International)
Activities performed: Preparation of Procurement Plans
-
coordinate with the World
Bank regarding its no objection
for the proposed contract
awards, following the SPU
evaluation committee
3. Cooperation with the SPU
Accountant:
- Cooperate with the SPU
accountant for regular
preparation of Project
- Prepares, together with the
Accountant, the estimated
budget of the contracts.
4. Training and Transfer of
Knowledge
- Work in close coordination
with the SPU Procurement
Specialist.
-Prepares formal and informal
training programs on World
Bank procurement processes
and reporting requirements for
the SPU Procurement
Specialist and other SPU
- Mentor the SPU Procurement
Specialist and other staff
and other Procurement Activities using World Bank
Procurement Guidelines for the 5 components of the
project namely; 1. Strengthening the Policy and
Regulatory Framework for the mining Sector; 2.
Strengthening mining sector governance, regulation and
sustainable development outcomes; 3. Improving
Revenue Collection and audits of the sector; 4.
Strengthening the foundation for a conflict free mining
sector in Bougainville; 5. Project Management
From: Aug 26, 2009 To Oct 16, 2009 – (52 days Input only for Feasibility Study for NIA’s ADB Project)
Employer: KELLOGG BROWN AND ROOT PTY LTD.
Positions held: COST ESTIMATOR and CONTRACT SPECIALIST (International Consultant)
11. Detailed Tasks Assigned
In collaboration with other
Specialist
- Prepares Cost Estimates for
proposed Irrigation
Rehabilitation Investments.
- Prepares detailed procurement
plans for Irrigation
rehabilitation projects including
contract packaging.
- Prepares cost estimates for
consulting services for
proposed investment projects
including packaging and
procurement plans.
- Prepares procurement plans
for equipment and other
support services for proposed
investment projects.
-Prepares draft procurement
plans as annex for ADB RRP
documents.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: PPTA 7141-PHI-
Irrigation System Operation Efficiency Improvement
Project (ADB FUNDED)
Year: Aug 26, 2009 to Oct. 16, 2009 (52 days Input for
Feasibility Project
Location: NIA Bldg., Quezon City, Philippines
Client: National Irrigation Administration
Project features: Feasibility Studies for the
Rehabilitation of Irrigation facilities in Davao Del Norte
and Iloilo)
Positions held: Cost Estimator and Contract Specialist
(International)Activities performed: Cost Estimating and
Preparation of Procurement Plans using ADB
Procurement Guidelines
-
From: Sept 8, 2008 To Nov 7, 2008 – First Input
Dec. 2, 2008 To Dec. 17, 2008 – Second Input
Employer: Sinclair Knight Merz (SKM)/Pert Consult International
Positions held: Procurement Specialist (International)
11. Detailed Tasks Assigned
- Prepares and updates
procurement plans and follow
up to obtain approval from the
reviewing authorities.
- Prepares Terms of Reference
and Request for Proposals
using WORLD BANK
Procurement Guidelines.
- Follow up with the reviewing
authorities and the World Bank
(as necessary) to facilitate
approval of procurement
documents.
- Evaluate bids for consulting
proposals by providing
guidance to members of the
procurement evaluation
committees.
-Assist the CPO in the review
of bid evaluation reports,
preparation of Technical
Evaluation Reports, and other
documents for submission to
the WORLD BANK.
-All other activities related to
procurement of Goods and
services including procurement
of consultants and Civil Works
Contractor.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Red River Delta-Rural
Water Supply and Sanitation Project (WORLD BANK
-IDA FUNDED)
Year: Sept 8, 2008- to Nov. 7, 2008 – First Input
Dec. 2, 2008- to Dec. 17, 2008-Second Input
Location: Hanoi, Vietnam
Client: Ministry of Agriculture and Rural Development-
Center for Rural Water Supply and Sanitation (MARD-
CERWASS)
Main project features: Water Supply and Sanitation
Infrastructure.
Positions held: Procurement Specialist (International)
Activities performed: Procurement using WORLD
BANK GUIDELINES
From :August 2002 To : July 2008
Employer: Filipinas Dravo Corp./ Pacific Consultants International (PCI)
Positions held: Civil Works/Procurement Specialist
11. Detailed Tasks Assigned
-Coordinate with the National
Project Management Office
(NPMO) of the Department of
Education (DepED) and PCI,
the lead consultant, for the
preparation of Bid Documents
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Secondary Education
Development and Improvement Project (SEDIP)- JBIC
and ADB Funded Project
-
and Approved Budget for the
Contract under Bidding
(ABCB)
-Schedules Advertisement,
Issuance of Bid Documents,
Pre-Bid Conference, and Bid
Openings.
-Schedules and conducts Pre-
Construction conferences, and
regular periodic meetings.
Prepares reports for submission
to the head office of the
DepED.
-Coordinate with the Provincial
Governor, Municipal Mayors,
Municipal Engineers, BAC
members, Education Officials
for the conduct of Ground
Breaking Ceremonies, and Turn
Over ceremonies.
-Conduct Equity Generation
Activities
-Inspects, monitors, & checks
all on-going school building
constructions.
-Coordination and Monitoring
of the delivery of School
Equipment, Books, and
Furnitures.
Year: 2002 to 2008
Location: Agusan del Sur, Philippines
Client: Department of Education
Main project features: Construction of Secondary
Education School Buildings for the whole province.
Positions held: Procurement Specialist
Activities performed: Procurement of Contractor and
Project Monitoring and Evaluation for Civil Works
Package and Coordination and Monitoring of the delivery
of School Equipment, Books, and Furnitures
From :Nov 1999 To : July 2002
Employer: Engineering & Development Corporation of the Philippines (EDCOP)/SYMOND PHILS.
Positions held: Senior Civil Engineer
11. Detailed Tasks Assigned
-Construction Management
Services and monitoring of the
construction of Transmission
and Distribution Networks for
Water and Waste Water
including elevated Water Tank,
Water Treatment Plant, Raw
Water Reservoir, Filtration and
Treatment Plant, Sewage
Treatment Plant and Sewage
Pumping Stations, and Deep
Well Drilling and upgrading of
the existing Water Network and
Sewer Distribution System.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: 1. Fort Bonifacio Water
Supply and Waste Water Sanitation Project.
2. Clark –Vivendi Water Network and Sewer
Distribution System
Year: 1999 - 2002
Location: 1. Fort Bonifacio, Taguig, Philippines
2. Clark Economic Zone, Clark Field, Pampanga, Phils.
Client: 1. Fort Bonifacio Development Corporation
2. Clark – Vivendi Water Corporation
Main project features: Water Supply and Sanitation
Infrastructure Development.
Positions held: Senior Civil EngineerActivities
-
performed: Construction Management and Engineering
Supervision.
From : March 1997 To : December 1997
Employer: Filipinas Dravo Corporation
Positions held: Construction Manager
11. Detailed Tasks Assigned
-Set goals and objectives for
the project engineers
supervising the construction of
Row Houses, Single detached
and duplex housing units and
conducts regular inspection and
coordination meeting at site
with the contractors.
-Organizes and Checks the
preparation of estimates,
construction schedules and
bidding documents for the
construction of land
development, drainage and
sanitary sewer, water and fire
protection lines.
-Oversees the preparation of
documents for the application
of the different permits like
locational clearance, Dept. of
Agrarian land conversion,
environmental clearance
certificate, development and
building permits, water permit,
electrical distribution and
lighting facilities and other
government licenses.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Living Water Sub-
division
Year: 1997
Location: Pililia, Rizal
Client: Filipinas Dravo Land Development Corporatin
Main project features: Land Development and Housing
Construction.
Positions held: Construction Manager
Activities performed: Planning, Organizing, Staffing,
Leading and Controlling.
From November 1993 To : December 1996
Employer: Borland Development Corporation
Positions held: Assistant General Manager
11. Detailed Tasks Assigned
-Planning, organizing, staffing,
leading and controlling project
and office operation for the
successful implementation of
various sub-division and mass
housing projects.
-Conducts regular inspection
and coordination meeting at the
jobsite with the project
engineers and construction staff
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: 3 company owned
subdivision development and housing project
Year: 1993 to 1996
Location: Novaliches, Quezon City
Client: Borland Development Corp.(company owned)
-
and with the contractors.
-Formulate policies and
guidelines to be implemented
for the sales, promotion, and
advertisement of all housing
projects undertaken by the
company.
-Takes charge of the
recruitment and accreditation
of real estate brokers, set up
objectives, conduct meeting,
orientations, and briefing for
pricing, commission scheme
and incentives for the brokers.
-Supervises and controls the
preparation of distribution of
sales kit, fliers, and other sales
materials.
Main project features: Sub-division development and
Housing Construction
Positions held: Assistant General Manager
Activities performed: Planning, Leading, Staffing,
Controlling.
From : October 1992 To : October 1993
Employer: Fluor Daniel Arabia, Ltd.
Positions held: Associate Project Controls Engineer
11. Detailed Tasks Assigned
-Coordination and direction of
estimating, planning and
scheduling, cost engineering
functions and resources for the
purpose of providing high
quality estimates, budgets, cost
and schedule analysis and
timely, accurate reports for
measuring the performance and
progress of the project. Prepare
weekly progress reports for
fabrication of carbon and
stainless steel spools.
-Conducts field inspection and
monitoring of actual
accomplishment of the
contractor needed in the
checking of periodic
accomplishments and billing.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Zuluf Am Capacity
Increase Project
Year: 1992-1993
Location: Tanajib, Saudi Arabia
Client: ARAMCO
Main project features: Gas Pipes
Positions held: Associate Project Controls Engineer
Activities performed: Project Monitoring
From : July 1991 To : August 1992
Employer: M. S. Al-Suwaidi
Positions held: Planning Engineer
11. Detailed Tasks Assigned
-Prepares construction
schedule, planning, scheduling,
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
-
and monitoring of documents
for the construction of
Polypropylene Plant for IBN
ZAHR and Ethylene,
Propylene, Butadiene Tanks &
Dike Walls for the Arabian
Petrochemical Company.
-Preparation of Monthly
accomplishments for
submission to the project
consultant, MITSUI
ENGINEERING, for their
checking and endorsement.
-Preparation of Two weeks look
ahead for the 2 projects.
Name of assignment or project: 1. Polypropylene Plant
2. Ethylene, Propylene, Butadiene Tanks & Dike Walls
Year: 1991 – 1992 =
Location: Jubail, Kingdom of Saudi Arabia
Client: 1. IBN ZAHR 2. Arabian Petrochemical co.
Main project features: Construction of Petrochemical
Structures.
Positions held: Planning Engineer
Activities performed: Project Scheduling, Monitoring
and Evaluation.
From : July 1990 To : July 1991
Employer: URSI –Trans-Asia (Phils.), Inc.
Positions held: Senior Civil Engineer
11. Detailed Tasks Assigned
-Coordinates with the different
Resident Engineers for the
collection of progress reports to
be submitted to the president.
-Prepares report and
correspondence, checks
PERT/CPM schedule and other
submittals of the different
contractors before submitting
them to the DPWH.
-Prepares document needed for
the submission of bids for new
projects.
-Monitoring and evaluation of
the different IBRD Funded
projects of the company.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Bohol-Iloilo-Masbate-
Fifth IBRD (World Bank Funded) Highway and Bridge
Reconstruction Program
Year: 1990 – 1991
Location: Bohol, Iloilo, & Masbate
Client: 1. Department of Public Highways
Main project features: Construction and Rehabilitation
of Roads and Bridges
Positions held: Senior Civil Engineer
Activities performed: Project Scheduling, Monitoring
and Evaluation.
From : Jan 1988 To : July 1991
Employer: Economic Support Fund Secretariat
Positions held: Planning Officer
11. Detailed Tasks Assigned
-Works hand in hand with the
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
-
In-house consultants (Louis
Berger International, Inc. And
TCGI Engineers) in the review
of Inception Reports,
Investment Reports for new
projects funded by USAID.
Assists in the evaluation and
rating of submitted proposals
for the pre-qualification and
selection of project consultants.
Coordinates and monitors
various functions of all USAID
funded projects from tenders,
contracts, payments up to
completion and closing of
project accounts. Prepares bid
documents to be handed out to
participating contractors.
Coordinates with USAID
Engineers for matters related to
the implementation of the
projects. Conducts inspection
trip to assigned package to
monitor and check the
accomplishments of the
different contractors within the
assigned package.
Name of assignment or project: Various USAID funded
projects
Year: 1988 – 1991
Location: Luzon, Visayas, and Mindanao, Philippines.
Client: USAID and Office of the Philippine President
Main project features: Construction of School Buildings,
Markets, Roads, and other Infrastructures
Positions held: Planning Officer
Activities performed: Procurement of Consultants and
Contractors, Project Scheduling, Monitoring and
Evaluation.
From : April 1986 To : August 1987
Employer: AG & P – Campenon Bernard Kuwait
Positions held: Concrete Work Supervisor
11. Detailed Tasks Assigned
-Supervises construction of
concrete and asphalt roads,
drainage and sewer lines,
bridges, and other structures.
Supervises, excavation,
backfilling, and compaction of
trenches for electric, sewer and
gas pipes. Supervises
installation/fittings of PVC,
asbestos and glass reinforced
pipes. Supervises waterproofing
and installation of protection
boards on all PTT manholes.
-Supervises the erection and
installation of pre-cast, pre-
stressed, and post-tensioned
concrete girders for bridges and
skyways. Coordinates with the
Project Consultant FREEMAN
FOX all daily activities.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Jahra-Ghazaly
Motorway.
Year: 1986 – 1987
Location: Kuwait City
Client: Government of Kuwait
Main project features: Modern State Highways and
Bridges.
Positions held: Concrete Work Supervisor
Activities performed: Construction Supervision.
From : November 1983 To : July 1984
-
Employer: T.A.S.- Ekistics Sdn. Bhd., Kluang, Johore, Malaysi
Positions held: Assistant Project Manager
11. Detailed Tasks Assigned
- Planning, organizing, staffing,
leading and controlling for the
construction of 43 government
school buildings within Johore
State, Malaysia. Coordinates
with other department for the
scheduling and delivery of
precast units and the scheduling
of Heavy Equipment. Checks
and monitors actual costs
against budgetary estimates
regularly. Prepares reports for
submission to the government
consultant BINARUNDING.
(Note: Project was rescinded
because of political and
financial reasons. Our 3 months
salary not paid.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Construction of 43
government school buildings in Johore State, Malaysia
Year: 1983 – 1984 =
Location: Johore, Malaysia
Client: Ministry of Education
Main project features: Construction of School buildings
Positions held: Assistant Project Manager
From : January 1981 To : November 1983
Employer: PHILSTRESS
Positions held: General Field Superintendent
11. Detailed Tasks Assigned
-Give respective assignments to
the field engineers and the
office engineer for the smooth
and successful implementation
of various projects of the
company such as school
buildings, housing projects,
industrial and Commercial
buildings, and bridges using
pre-cast, pre-stressed, and post-
tensioned components.
-Checks scheduling of all
materials and equipment like
crane, trailers, etc. to be used in
all the projects.
-Cost control, monitoring, and
supervision.
-Conducts periodic meeting at
site with client and government
inspectors.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Fabrication, delivery, and
Installation of Pre-Cast, Pre-Stressed concrete products.
Year: 1981 – 1983
Location: Marikina, Metro Manila, Philippines
Client: Private and Government Sector
Main project features: Fabrication and Erection of Pre-
Cast, Pre-Stressed, Post-Tensioned concrete components
Positions held: General Field Superintendent
From : January 1980 To : December 1980
Employer: SAUDI PRE-CAST AND PRE-FAB CO. (SAPRECO)
Positions held: Planning Engineer
-
11. Detailed Tasks Assigned
-Prepares Bar Chart and
Schedule of Activities using
Bar Char and PERT/CPM of
the company’s project in Jubail,
Saudi Arabia/.
-Compute forward pass and
backward pass of each activities
to determine the early finish
and late finish respectively of
each activities to establish the
critical path of the schedule.
-Prepares monthly progress
billing.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Jubail Ladies Dormitory
Year: Jan 1980 – Dec 1980
Location: Riyadh and Jubail, Kingdom of Saudi Arabia
Client: Government
Main project features: Construction of Ladies Dorm
Positions held: Planning Engineer
From : February 1975 To : December 1979
Employer: PHILSTRESS
Positions held: From Office Engineer to Superintendent
11. Detailed Tasks Assigned
-Supervision and administration
of all projects undertaken by the
company, schedules flow of
equipment and other resources
needed.
-Checks and control welding
works of all grillage plates,
plate connectors and shear keys
on all erection works.
-Schedules x-ray tests on
randomly selected welded
connections.
-Reviews and checks all
fabrication drawings.
-Supervision of erection works
for integrated concrete
structural frames including pile
driving.
-Supervision of all post-
tensioning activities for waffle
slabs and girders. Checks if all
strands have been stressed to
the designed stresses
-Prepares estimates for labor,
materials, and equipment.
Organizes manpower and all
resources needed for all
projects. Supervises foundation
works from pile driving to
concreting works and erecting
of pre-cast, pre-stressed, post-
tensioned components. Prepares
PERT/CPM, bar charts and
time grid diagram. Prepares
operating budget and cost
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Fabrication, delivery, and
installation of various projects
Year: 1975 – 1979
Location: Metro Manila, Philippines
Client: Various Government and Private Sector
Main project features: Fabrication, delivery, and
construction of Pre-cast, Pre-stressed, post-tensioned
components.
Positions held: Office Engineer to Superintendent
-
analysis.
-Checks jobsite casting of
structural wall panels
From : December 1969 To : December 1974
Employer: Gingoog City Engineer’s Office
Positions held: Maintenance Section Chief
11. Detailed Tasks Assigned
-Prepares Program of Work for
the Maintenance of the National
Highway.
-Schedules and assigns worker
to do the different tasks for the
Maintenance work.
-Conducts Traffic Surveys,
Traffic countings, Weighing of
different types of vehicle and
gathering of other datas needed
for the ADB funded
Construction of Iligan-Cagayan
de Oro-Butuan Road.
12. Work Undertaken that Best Illustrates Capability to
Handle the Tasks Assigned
Name of assignment or project: Maintenance of the
National Highway and other road networks within
Gingoog City, Philippines; And Data gathering for the
ADB funded project Iligan-Cagayan de Oro-Butuan
Road (1974)
Year: 1969 – 1974
Location: Gingoog City, Misamis Oriental, Philippines
Client: Dept of Public Highways
Main project features: Maintenance of Roads and Bridges
and Construction of Iligan-Cagayan de Oro- Butuan
Road
Positions held: Engineering Aide and later as
Maintenance Section Chief.
13. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my
disqualification or dismissal, if engaged.
Date: 26/11/2015
[Signature of staff member or authorized representative of the staff] Day/Month/Year
Full name of authorized representative:

Updated CV Nov 26 2015

  • 1.
    - CURRICULUM VITAE 1. ProposedPosition : Procurement Specialist 2. Name of Firm : 3. Name of Staff : Virgilio G. Balandra 4. Date of Birth : August 13, 1947 Nationality: Filipino 5. Education :Master of Business Administration Ateneo de Manila University Graduate School of Business Makati City, Philippines 1989-1991 (Preparation of Thesis, defense, and graduation 1998) Bachelor of Science in Civil Engineering Cebu Institute of Technology (C.I.T.) Cebu City, Philippines 1964 – 1969 Board Exam. Passed : Board Exam for Civil Engineers Board Exam for Master Plumber Honors Received : 8th Place – Pre-Board Examination for Civil Engineers – (C.I.T.) 12th Place- Board Examination for Master Plumber First Place – PERT/CPM Seminar by AMIEP, Quezon City Home Address : Blk 10, Lot 32, Camella Avenue, Camella Homes Classic, Barangay Don Bosco, Paranaque City. Cell Phone  +63906-218-95-83 Email address ----rivardnalab@yahoo.com 6. Membership of Professional Associations: Philippine Institute of Civil Engineer (PICE) 7. Other Training : -World Bank Procurement Guidelines Workshop by World Bank Group, Papua New Guinea, April 29-30, 2010 - Secondary Education Development and Improvement Project (SEDIP) Implementation Plan, Basic Management Concept and Principles by: Department of Education (DepED), Manila, Philippines -SEDIP School Mapping Exercise and School Building Prioritization Model conducted by DepED and Pacific Consultants International, Cebu City, Philippines -Financial Orientation Workshop on Project Completion and Inventory Management by DepEd and PCI on Sept 24-27, 2007, Cagayan de Oro City. -Government Electronic Procurement System (G-EPS) Training, by the Department of Budget and Management, April 2, 2004, Cagayan de Oro.
  • 2.
    - -Seminar on HousingDevelopment Projects, by PICE, March 10-11, 1995, Makati, Metro Manila -Safety and First Aid Course by PHILSTRESS, Jan 26-Feb. 9, 1977 at Marikina, Metro Manila -Basic Supervisory Development Seminar by PHILSTRESS, Feb. 3- Mar 10, 1981, Marikina, Metro Manila. -Master Plumber including Plumbing Design through Special Class-- -PERT/CPM by: Association of Management and Industrial Engineers of the Philippines (AMIEP) Apr 24-May 22, 1976-Quezon City - Industrial Building Technique – conducted by PICE - National Roads and Bridges Maintenance Programming-DPWY, Cagayan de Oro City.--1972 - Contract Management by DPWH, Cagayan de Oro City--1971 8. Countries of Work Experience: Palau, Timor Leste, Mongolia, Papua New Guinea, Vietnam, Saudi Arabia, Kuwait, Malaysia, Philippines 9. Languages : PILIPINO (GOOD) ENGLISH (GOOD) 10. Key Qualification: More than Forty years of experience in various civil engineering works, portion of which includes procurement activities using WORLD BANK, JBIC, and ADB procurement guidelines (including TIMOR LESTE Procurement guidelines), project scheduling and monitoring and overall project management of infrastructure projects here and abroad. Previously involved in the project monitoring, evaluation, coordination and inspection of United States Agency for International Development (USAID) funded projects under the ECONOMIC SUPPORT FUND SECRETARIAT- a government agency under the Office of the President of the Philippines tasked to implement projects funded from the rental of the U.S. bases through the USAID with projects such as school buildings, roads and highways, slaughter houses, market buildings, etc., including coordination works with the In-House consultants Louis Berger International, Inc. And TCGI Engineers. To be mobilized by EGIS-EAU of France as Procurement Specialist for their DRIP Project in India starting Nov. 30, 2015 for an initial duration of 4.5 months to prepare Bidding documents and do Procurement Works related to the implementation of their Dam rehabilitation and Improvement projects in the four provinces of India with Office in New Delhi. Hired by Egis-EAU of France as Procurement Specialist/Valuer for the Koror- Airai Sanitation Project (KASP) from July 31, 2015 up to Sept 18, 2015 (First Input) specifically to prepare Bid Documents for their Four Sanitation Projects in Malakal, Koror, Airai, & Meyuns. Hired by Woodfields Consultant, Inc. as Procurement Advisor for the Maynilad World Bank funded projects Design and Build of 20 MLD Muntinlupa Sewage Treatment Plant (STP)(ICB No.: MWMP-13-01) and The Proposed Combined Sewerage Interceptor System for Muntinlupa STP (ICB No. WMP-12-04(A)), One month intermittent from Oct 14, 2013 to Aug 31, 2014. Procurement was extended from September 1, 2014 for the final
  • 3.
    - bid valuation stagefor the 20 MLD STP and the Combined Sewerage Interceptor up to end of year 2014. Hired by PERT CONSULT International, Inc. to be part of the team that conducted a Business Case Study for Selected Public Private Partnership (PPP) road project that will extend the Central Luzon Expressway (CLEX Phase I), to be called the North Luzon Expressway (NLEX East Expressway), that will connect La Mesa Parkway to Cabanatuan city. Four (4) months intermittent project study from Feb to Aug 2013. Hired by Charles Kendall & Partners for their Infrastructure Fund Project of the National Procurement Commission under the office of the Prime Minister as a Senior Procurement Specialist whose main task is to prepare all the necessary documents needed to procure GOODS, WORKS, and SERVICES for the various projects for the different sectors like Agriculture, Education, Power, Health, etc. funded by the Infrastructure Funds of the government and Road Projects funded by ADB & JICA Hired by PRIMEX (and seconded to Asian Development Bank) as International Procurement Specialist-Team Leader for ADB Project Study-“NCB Threshold review for the Road Construction Sector of Mongolia”, in order to come up with a recommendation, with the assistance of the three national consultants from Mongolia, whether or not to increase the NCB Threshold of Mongolia from $1 Million to $ 5 Million. Conducted 1 week visit to Mongolia to gather documents and interview all stakeholders Assigned as International Procurement Specialist of the Special Project Unit (SPU) of the Mineral Resources Authority(MRA) of Papua New Guinea for their Mining Sector Institutional Strengthening Technical Assistance Project 2 (MSISTAP2) funded by the World Bank. Completed Technical Assistance assignment with KELLOGG BROWN AND ROOT as a Cost Estimator and Contract/Procurement Specialist (International Status) for the feasibility study for National Irrigation Administration’s (NIA) ADB funded project for the Rehabilitation of their Irrigation Operation System Efficiency Improvement project In Davao and Iloilo provinces. Assigned as Procurement Specialist of the Red River Delta Water Supply and Sanitation Project in Hanoi, Vietnam from- First Input - September 8, 2008 – to Nov. 7, 2008. Second Input- Dec. 2, 2008 – to Dec. 17, 2008. The tasks include procurement activities like preparing Request for Proposals, Preparing Criteria for Evaluation of Proposals of Consultants, Evaluation and Rating of Proposals of Shortlisted Consultants based on the approved Criteria. Preparing Technical Evaluation Report and and Combined Technical and Financial Evaluation Report, providing Technical Assistance to the Central Project Office of the Ministry of Agriculture and Rural Development using WORLD BANK Procurement Guidelines. Previously assigned, prior to Vietnam job, as head of the Agusan del Sur Procurement group to implement and procure works contractors, oversee, and monitor the SECONDARY EDUCATION DEVELOPMENT and IMPROVEMENT PROJECT (SEDIP), a foreign assisted project of Department of Education (Funded by Japan Bank for International Cooperation –JBIC, and Asian Development Bank) for 15 Social Reform Agenda Provinces like Agusan del Sur, Surigao del Sur, Antique, Negros Oriental, etc., with the primary tasked of Procurement of works, goods and services related to the construction of new school buildings and repair of existing ones to eradicate or at least solve the classroom shortages of the country.
  • 4.
    - Previously involved indirect supervision of projects here and abroad (Saudi Arabia, Malaysia, Kuwait) such as bridges, flyover, precast, pre-stressed, and post-tensioned projects, pile driving, mass housing projects and sub-division developments, water supply and sewerage system, elevated water tank, water and sewerage treatment plants, and other important projects including the renovation and improvement of Malacanang Presidential Palace building, the official residence of the President of the Philippines. 10. Employment Record To be mobilized on November 30, 2015 for an initial input of 4.5 months Emplyer: Egis-EAU of France-India project Position held: Procurement Specialist 11. Detailed Tasks Assigned -Acts as Procurement Specialist for the DRIP Projects -Preparation of the Bidding Documents for the following four sub- projects: a. Kerala c. Madhya Pradesh, d. Orissa, e. Tamil Nadu 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Dam Rehabilitation and Improvement Project (DRIP)World Bank Funded Project. Client: Ministry of Water/National Water Resources Council Project features : Dam Rehabilitation and Improvement Project for the four provinces in India, namely; Kerala, Madhya Pradesh, Orissa, & Tamil Nadu From : July 31, 2015 – September 18, 2015 (First Input) Second Input (3 weeks) tentative December 2015 Employer : Egis-EAU of france Position held: Procurement Specialist/Valuer 11. Detailed Tasks Assigned -Acts as Procurement Specialist/Valuer of the Koror-Airai Sanitation Project (KASP) in Palau. -Preparation of the Bidding Documents for the following sub-projects: a. Sewerage Network 1: Malakal b. Sewerage Network 2: Koror c. WWTP Malakal d. WWTP and Sewerage Network Airai - Assist the Team Leader and the Internationa 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Koror-Airai Sanitation Project (KASP) ADB Funded Project. Client: Palau Public Utilities Corporation (PPUC) Project features : Design and Build of the Malakal and Airai WWTP, and the rehabilitation and expansion of the Sewerage Network of Malakal and Koror.
  • 5.
    - expert to prepareand complete bills of quantities and cost estimates. From : Sep. 1, 2014 – Dec. 31, 2014. Extension of the Procurement Activity for the Evaluation stage of the 20 MLD STP and the Combined Sewage Interceptor system From: Oct. 14, 2013 To – Aug. 31, 2014 Employer: WOODFIELDS CONSULTANT, Inc. Positions held: PROCUREMENT ADVISOR 11. Detailed Tasks Assigned -Acts as advisor to the team for the following activities: -Evaluation of the Prequalification documents of the applicants for the two above mentioned projects. -Preparation of the Prequalification Evaluation Reports. -Preparation of the Bidding Documents to be issued to the prequalified applicants. -Evaluation of Bids, and -Preparation of the Bid Evaluation Reports. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Design and Build of 20 MLD Muntinlupa Sewage Treatment Plant (ICB No.: MWMP-13-01) and the Proposed Combined Sewerage Interceptor System for Muntinlupa STP (ICB No.:MWMP- 12-04(A) World Bank funded project Year: Oct 14, 2013 to Feb 14, 2014 (1 month intermittent assignment) Client: Maynilad Project features : Design and Build of the 20 MLD STP which include preparation of process design, mass balance, PID, civil and structural design, hydraulic design, instrumentation design, mechanical and electrical design, pipe laying of ≥ 700mmØ pipes and sewage pipe laying of ≥ 150mmØ From: Four months intermittent project study from Feb 26, 2013 To – Aug 25, 2013 Employer: PERT CONSULT International, Inc. Positions held: PROCUREMENT SPECIALIST 11. Detailed Tasks Assigned -Identification of procurement needs -Preparation of procurement plans - Identify PPP Modalities, Risk Assessment, Level of Access to Finance, and Level of GOP Ownership. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Public Private Partnership (PPP) Project Year: Feb 26, 2013 to Aug 25, 2013 (4 months intermittent assignment) Client: Department of Public Works and Highways Project features : Business Case Study to determine the Alignment of the proposed extension of the Central Luzon Expressway (CLEX Phase I), the NLEX East Expressway, that will connect La Mesa Parkway to Cabanatuan city
  • 6.
    - From: Mar 23,2012 To – Dec 20, 2012 Employer: Charles Kendall & Partners Positions held: INTERNATIONAL SENIOR PROCUREMENT SPECIALIST 11. Detailed Tasks Assigned -Identification of procurement needs -Preparation of procurement plans - Follow up tender bidding documents to make sure these are available for the pre-qualified bidders. -Advertising REOI, Invitation to Pre-Qualify and Bid. -Issue Bid Documents and RFP. -Preparation of Criteria for Techncial Evaluation. -Management of Evaluation. -Technical and Financial Evaluation. -Preparation of Combined Technical and Financial Evaluation Reports. -Evaluation and award recommendation. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: INFRASTRUCTURE FUND Projects Year: March 23, 2012 to Dec 20, 2012 Client: National Procurement Commission under the office of the Prime Minister Project features : Procurement of Goods, Works, and Services for the different projects of the government intended for the different sectors like Agriculture, Health, Education, etc. funded by the Infrastructure Fund including road projects financed by ADB(TIMOR LESTE Road Network Upgrading Project) , and JICA (National Road No. 1 Upgrading Project.). Positions held: International Senior Procurement Specialist: Part of a six (6) man Int’l Procurement Team lead by an Austrian as Project Director. With the Team are Austrian, 3 Filipinos, Nigerian and Indian. Activities performed: Assist the National Procurement Commission (NPC) members in the performance of Procurement Activities for Goods, Works, and Services funded by the government’s Infrastructure Fund (IF). The NPC is in-charge of all Procurement Activities for projects funded by the IF and all government funds exceeding 1 Million U.S. Dollars for the following line ministries; Transport, Petroleum Infrastructure, Solidarity & Social, Health, MDG, IT infrastructure, Electricity, Education, Public Building, Urban and Rural Development, Water & Sanitation, and Agriculture From: Dec 27, 2010 To – April 26, 2011 Employer: PRIMEX, Manila, Philippines (Seconded to Asian Development Bank) Positions held: INTERNATIONAL PROCUREMENT SPECIALIST (Team Leader designate) 11. Detailed Tasks Assigned -Review information of participating bidders and their nationalities, construction completion reports, bill of quantities, 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project:RSC-CO1500 (MON): Reviewing Procurement in Mongolia’s Road Construction Sector (ADB FUNDED PROJECT) Year: December 27, 2010 to April 26, 2011
  • 7.
    - quoted prices, qualityof work delivered, etc. - Planning and conducting interviews with the relevant stakeholders, project employers, the executing agencies (Particularly MRTCUD and MOF), Contractors, and civil society organizations. -Coordinating with the three national consultants, and reviewing the national consultants reports to ensure a consistently high standard. -Analyzing the collected data and preparing the consolidated reports to ADB. -Preparing weekly briefing to ADB. -Conducting necessary mission to the field. Location: Manila with 1 week visit to Ulaanbaatar, Mongolia (Feb 13-Feb 19, 2011) Client: Ministry of Finance and Economy Project features : Project Study to determine whether or not to increase the NCB Threshold of the Road Construction Sector for Mongolia Positions held: International Procurement Specialist- Team Leader. Activities performed: To lead the Team ( 3 National Consultants from Mongolia and myself) to conduct a study and develop methodologies and approaches to achieve the objectives and to come up with a study and a recommendation whether or not to increase the NCB Threshold form $1 Million to $5 Million.. From: Feb 17, 2010 To – August 31, 2010 Employer: MINERAL RESOURCES AUTHORITY. Port Moresby, Papua New Guinea Positions held: PROCUREMENT SPECIALIST (International Consultant) 11. Detailed Tasks Assigned 1. Managing Procurement - Implement all policies and procedures relating to procurement activities required by the Project. - Ensure that the Bank Procurement Guidelines are followed in all procurement transactions. 2, Planning, Record Keeping and Reporting: - Actively participate in the discussion within SPU and with the World Bank Task Team on procurement planning, adequately revise and update the Project Procurement plan for SPU Manager’s consideration. .Prepares correspondences and 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: MSISTAP2 - Mining Sector Institutional Strengthening Technical Assistance Project 2 (WORL BANK FUNDED PROJECT) Year: February 17, 2010 to August 31, 2010 Location: Special Project Unit (SPU), Mineral Resources Authority(MRA), Port Moresby, Papua New Guinea Client: Government of Papua New Guinea Project features: Institutional Strengthening of the Mining Sector to Improve development Outcomes from Extractive Industries Positions held: Procurement Specialist (International) Activities performed: Preparation of Procurement Plans
  • 8.
    - coordinate with theWorld Bank regarding its no objection for the proposed contract awards, following the SPU evaluation committee 3. Cooperation with the SPU Accountant: - Cooperate with the SPU accountant for regular preparation of Project - Prepares, together with the Accountant, the estimated budget of the contracts. 4. Training and Transfer of Knowledge - Work in close coordination with the SPU Procurement Specialist. -Prepares formal and informal training programs on World Bank procurement processes and reporting requirements for the SPU Procurement Specialist and other SPU - Mentor the SPU Procurement Specialist and other staff and other Procurement Activities using World Bank Procurement Guidelines for the 5 components of the project namely; 1. Strengthening the Policy and Regulatory Framework for the mining Sector; 2. Strengthening mining sector governance, regulation and sustainable development outcomes; 3. Improving Revenue Collection and audits of the sector; 4. Strengthening the foundation for a conflict free mining sector in Bougainville; 5. Project Management From: Aug 26, 2009 To Oct 16, 2009 – (52 days Input only for Feasibility Study for NIA’s ADB Project) Employer: KELLOGG BROWN AND ROOT PTY LTD. Positions held: COST ESTIMATOR and CONTRACT SPECIALIST (International Consultant) 11. Detailed Tasks Assigned In collaboration with other Specialist - Prepares Cost Estimates for proposed Irrigation Rehabilitation Investments. - Prepares detailed procurement plans for Irrigation rehabilitation projects including contract packaging. - Prepares cost estimates for consulting services for proposed investment projects including packaging and procurement plans. - Prepares procurement plans for equipment and other support services for proposed investment projects. -Prepares draft procurement plans as annex for ADB RRP documents. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: PPTA 7141-PHI- Irrigation System Operation Efficiency Improvement Project (ADB FUNDED) Year: Aug 26, 2009 to Oct. 16, 2009 (52 days Input for Feasibility Project Location: NIA Bldg., Quezon City, Philippines Client: National Irrigation Administration Project features: Feasibility Studies for the Rehabilitation of Irrigation facilities in Davao Del Norte and Iloilo) Positions held: Cost Estimator and Contract Specialist (International)Activities performed: Cost Estimating and Preparation of Procurement Plans using ADB Procurement Guidelines
  • 9.
    - From: Sept 8,2008 To Nov 7, 2008 – First Input Dec. 2, 2008 To Dec. 17, 2008 – Second Input Employer: Sinclair Knight Merz (SKM)/Pert Consult International Positions held: Procurement Specialist (International) 11. Detailed Tasks Assigned - Prepares and updates procurement plans and follow up to obtain approval from the reviewing authorities. - Prepares Terms of Reference and Request for Proposals using WORLD BANK Procurement Guidelines. - Follow up with the reviewing authorities and the World Bank (as necessary) to facilitate approval of procurement documents. - Evaluate bids for consulting proposals by providing guidance to members of the procurement evaluation committees. -Assist the CPO in the review of bid evaluation reports, preparation of Technical Evaluation Reports, and other documents for submission to the WORLD BANK. -All other activities related to procurement of Goods and services including procurement of consultants and Civil Works Contractor. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Red River Delta-Rural Water Supply and Sanitation Project (WORLD BANK -IDA FUNDED) Year: Sept 8, 2008- to Nov. 7, 2008 – First Input Dec. 2, 2008- to Dec. 17, 2008-Second Input Location: Hanoi, Vietnam Client: Ministry of Agriculture and Rural Development- Center for Rural Water Supply and Sanitation (MARD- CERWASS) Main project features: Water Supply and Sanitation Infrastructure. Positions held: Procurement Specialist (International) Activities performed: Procurement using WORLD BANK GUIDELINES From :August 2002 To : July 2008 Employer: Filipinas Dravo Corp./ Pacific Consultants International (PCI) Positions held: Civil Works/Procurement Specialist 11. Detailed Tasks Assigned -Coordinate with the National Project Management Office (NPMO) of the Department of Education (DepED) and PCI, the lead consultant, for the preparation of Bid Documents 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Secondary Education Development and Improvement Project (SEDIP)- JBIC and ADB Funded Project
  • 10.
    - and Approved Budgetfor the Contract under Bidding (ABCB) -Schedules Advertisement, Issuance of Bid Documents, Pre-Bid Conference, and Bid Openings. -Schedules and conducts Pre- Construction conferences, and regular periodic meetings. Prepares reports for submission to the head office of the DepED. -Coordinate with the Provincial Governor, Municipal Mayors, Municipal Engineers, BAC members, Education Officials for the conduct of Ground Breaking Ceremonies, and Turn Over ceremonies. -Conduct Equity Generation Activities -Inspects, monitors, & checks all on-going school building constructions. -Coordination and Monitoring of the delivery of School Equipment, Books, and Furnitures. Year: 2002 to 2008 Location: Agusan del Sur, Philippines Client: Department of Education Main project features: Construction of Secondary Education School Buildings for the whole province. Positions held: Procurement Specialist Activities performed: Procurement of Contractor and Project Monitoring and Evaluation for Civil Works Package and Coordination and Monitoring of the delivery of School Equipment, Books, and Furnitures From :Nov 1999 To : July 2002 Employer: Engineering & Development Corporation of the Philippines (EDCOP)/SYMOND PHILS. Positions held: Senior Civil Engineer 11. Detailed Tasks Assigned -Construction Management Services and monitoring of the construction of Transmission and Distribution Networks for Water and Waste Water including elevated Water Tank, Water Treatment Plant, Raw Water Reservoir, Filtration and Treatment Plant, Sewage Treatment Plant and Sewage Pumping Stations, and Deep Well Drilling and upgrading of the existing Water Network and Sewer Distribution System. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: 1. Fort Bonifacio Water Supply and Waste Water Sanitation Project. 2. Clark –Vivendi Water Network and Sewer Distribution System Year: 1999 - 2002 Location: 1. Fort Bonifacio, Taguig, Philippines 2. Clark Economic Zone, Clark Field, Pampanga, Phils. Client: 1. Fort Bonifacio Development Corporation 2. Clark – Vivendi Water Corporation Main project features: Water Supply and Sanitation Infrastructure Development. Positions held: Senior Civil EngineerActivities
  • 11.
    - performed: Construction Managementand Engineering Supervision. From : March 1997 To : December 1997 Employer: Filipinas Dravo Corporation Positions held: Construction Manager 11. Detailed Tasks Assigned -Set goals and objectives for the project engineers supervising the construction of Row Houses, Single detached and duplex housing units and conducts regular inspection and coordination meeting at site with the contractors. -Organizes and Checks the preparation of estimates, construction schedules and bidding documents for the construction of land development, drainage and sanitary sewer, water and fire protection lines. -Oversees the preparation of documents for the application of the different permits like locational clearance, Dept. of Agrarian land conversion, environmental clearance certificate, development and building permits, water permit, electrical distribution and lighting facilities and other government licenses. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Living Water Sub- division Year: 1997 Location: Pililia, Rizal Client: Filipinas Dravo Land Development Corporatin Main project features: Land Development and Housing Construction. Positions held: Construction Manager Activities performed: Planning, Organizing, Staffing, Leading and Controlling. From November 1993 To : December 1996 Employer: Borland Development Corporation Positions held: Assistant General Manager 11. Detailed Tasks Assigned -Planning, organizing, staffing, leading and controlling project and office operation for the successful implementation of various sub-division and mass housing projects. -Conducts regular inspection and coordination meeting at the jobsite with the project engineers and construction staff 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: 3 company owned subdivision development and housing project Year: 1993 to 1996 Location: Novaliches, Quezon City Client: Borland Development Corp.(company owned)
  • 12.
    - and with thecontractors. -Formulate policies and guidelines to be implemented for the sales, promotion, and advertisement of all housing projects undertaken by the company. -Takes charge of the recruitment and accreditation of real estate brokers, set up objectives, conduct meeting, orientations, and briefing for pricing, commission scheme and incentives for the brokers. -Supervises and controls the preparation of distribution of sales kit, fliers, and other sales materials. Main project features: Sub-division development and Housing Construction Positions held: Assistant General Manager Activities performed: Planning, Leading, Staffing, Controlling. From : October 1992 To : October 1993 Employer: Fluor Daniel Arabia, Ltd. Positions held: Associate Project Controls Engineer 11. Detailed Tasks Assigned -Coordination and direction of estimating, planning and scheduling, cost engineering functions and resources for the purpose of providing high quality estimates, budgets, cost and schedule analysis and timely, accurate reports for measuring the performance and progress of the project. Prepare weekly progress reports for fabrication of carbon and stainless steel spools. -Conducts field inspection and monitoring of actual accomplishment of the contractor needed in the checking of periodic accomplishments and billing. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Zuluf Am Capacity Increase Project Year: 1992-1993 Location: Tanajib, Saudi Arabia Client: ARAMCO Main project features: Gas Pipes Positions held: Associate Project Controls Engineer Activities performed: Project Monitoring From : July 1991 To : August 1992 Employer: M. S. Al-Suwaidi Positions held: Planning Engineer 11. Detailed Tasks Assigned -Prepares construction schedule, planning, scheduling, 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
  • 13.
    - and monitoring ofdocuments for the construction of Polypropylene Plant for IBN ZAHR and Ethylene, Propylene, Butadiene Tanks & Dike Walls for the Arabian Petrochemical Company. -Preparation of Monthly accomplishments for submission to the project consultant, MITSUI ENGINEERING, for their checking and endorsement. -Preparation of Two weeks look ahead for the 2 projects. Name of assignment or project: 1. Polypropylene Plant 2. Ethylene, Propylene, Butadiene Tanks & Dike Walls Year: 1991 – 1992 = Location: Jubail, Kingdom of Saudi Arabia Client: 1. IBN ZAHR 2. Arabian Petrochemical co. Main project features: Construction of Petrochemical Structures. Positions held: Planning Engineer Activities performed: Project Scheduling, Monitoring and Evaluation. From : July 1990 To : July 1991 Employer: URSI –Trans-Asia (Phils.), Inc. Positions held: Senior Civil Engineer 11. Detailed Tasks Assigned -Coordinates with the different Resident Engineers for the collection of progress reports to be submitted to the president. -Prepares report and correspondence, checks PERT/CPM schedule and other submittals of the different contractors before submitting them to the DPWH. -Prepares document needed for the submission of bids for new projects. -Monitoring and evaluation of the different IBRD Funded projects of the company. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Bohol-Iloilo-Masbate- Fifth IBRD (World Bank Funded) Highway and Bridge Reconstruction Program Year: 1990 – 1991 Location: Bohol, Iloilo, & Masbate Client: 1. Department of Public Highways Main project features: Construction and Rehabilitation of Roads and Bridges Positions held: Senior Civil Engineer Activities performed: Project Scheduling, Monitoring and Evaluation. From : Jan 1988 To : July 1991 Employer: Economic Support Fund Secretariat Positions held: Planning Officer 11. Detailed Tasks Assigned -Works hand in hand with the 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
  • 14.
    - In-house consultants (Louis BergerInternational, Inc. And TCGI Engineers) in the review of Inception Reports, Investment Reports for new projects funded by USAID. Assists in the evaluation and rating of submitted proposals for the pre-qualification and selection of project consultants. Coordinates and monitors various functions of all USAID funded projects from tenders, contracts, payments up to completion and closing of project accounts. Prepares bid documents to be handed out to participating contractors. Coordinates with USAID Engineers for matters related to the implementation of the projects. Conducts inspection trip to assigned package to monitor and check the accomplishments of the different contractors within the assigned package. Name of assignment or project: Various USAID funded projects Year: 1988 – 1991 Location: Luzon, Visayas, and Mindanao, Philippines. Client: USAID and Office of the Philippine President Main project features: Construction of School Buildings, Markets, Roads, and other Infrastructures Positions held: Planning Officer Activities performed: Procurement of Consultants and Contractors, Project Scheduling, Monitoring and Evaluation. From : April 1986 To : August 1987 Employer: AG & P – Campenon Bernard Kuwait Positions held: Concrete Work Supervisor 11. Detailed Tasks Assigned -Supervises construction of concrete and asphalt roads, drainage and sewer lines, bridges, and other structures. Supervises, excavation, backfilling, and compaction of trenches for electric, sewer and gas pipes. Supervises installation/fittings of PVC, asbestos and glass reinforced pipes. Supervises waterproofing and installation of protection boards on all PTT manholes. -Supervises the erection and installation of pre-cast, pre- stressed, and post-tensioned concrete girders for bridges and skyways. Coordinates with the Project Consultant FREEMAN FOX all daily activities. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Jahra-Ghazaly Motorway. Year: 1986 – 1987 Location: Kuwait City Client: Government of Kuwait Main project features: Modern State Highways and Bridges. Positions held: Concrete Work Supervisor Activities performed: Construction Supervision. From : November 1983 To : July 1984
  • 15.
    - Employer: T.A.S.- EkisticsSdn. Bhd., Kluang, Johore, Malaysi Positions held: Assistant Project Manager 11. Detailed Tasks Assigned - Planning, organizing, staffing, leading and controlling for the construction of 43 government school buildings within Johore State, Malaysia. Coordinates with other department for the scheduling and delivery of precast units and the scheduling of Heavy Equipment. Checks and monitors actual costs against budgetary estimates regularly. Prepares reports for submission to the government consultant BINARUNDING. (Note: Project was rescinded because of political and financial reasons. Our 3 months salary not paid. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Construction of 43 government school buildings in Johore State, Malaysia Year: 1983 – 1984 = Location: Johore, Malaysia Client: Ministry of Education Main project features: Construction of School buildings Positions held: Assistant Project Manager From : January 1981 To : November 1983 Employer: PHILSTRESS Positions held: General Field Superintendent 11. Detailed Tasks Assigned -Give respective assignments to the field engineers and the office engineer for the smooth and successful implementation of various projects of the company such as school buildings, housing projects, industrial and Commercial buildings, and bridges using pre-cast, pre-stressed, and post- tensioned components. -Checks scheduling of all materials and equipment like crane, trailers, etc. to be used in all the projects. -Cost control, monitoring, and supervision. -Conducts periodic meeting at site with client and government inspectors. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Fabrication, delivery, and Installation of Pre-Cast, Pre-Stressed concrete products. Year: 1981 – 1983 Location: Marikina, Metro Manila, Philippines Client: Private and Government Sector Main project features: Fabrication and Erection of Pre- Cast, Pre-Stressed, Post-Tensioned concrete components Positions held: General Field Superintendent From : January 1980 To : December 1980 Employer: SAUDI PRE-CAST AND PRE-FAB CO. (SAPRECO) Positions held: Planning Engineer
  • 16.
    - 11. Detailed TasksAssigned -Prepares Bar Chart and Schedule of Activities using Bar Char and PERT/CPM of the company’s project in Jubail, Saudi Arabia/. -Compute forward pass and backward pass of each activities to determine the early finish and late finish respectively of each activities to establish the critical path of the schedule. -Prepares monthly progress billing. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Jubail Ladies Dormitory Year: Jan 1980 – Dec 1980 Location: Riyadh and Jubail, Kingdom of Saudi Arabia Client: Government Main project features: Construction of Ladies Dorm Positions held: Planning Engineer From : February 1975 To : December 1979 Employer: PHILSTRESS Positions held: From Office Engineer to Superintendent 11. Detailed Tasks Assigned -Supervision and administration of all projects undertaken by the company, schedules flow of equipment and other resources needed. -Checks and control welding works of all grillage plates, plate connectors and shear keys on all erection works. -Schedules x-ray tests on randomly selected welded connections. -Reviews and checks all fabrication drawings. -Supervision of erection works for integrated concrete structural frames including pile driving. -Supervision of all post- tensioning activities for waffle slabs and girders. Checks if all strands have been stressed to the designed stresses -Prepares estimates for labor, materials, and equipment. Organizes manpower and all resources needed for all projects. Supervises foundation works from pile driving to concreting works and erecting of pre-cast, pre-stressed, post- tensioned components. Prepares PERT/CPM, bar charts and time grid diagram. Prepares operating budget and cost 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Fabrication, delivery, and installation of various projects Year: 1975 – 1979 Location: Metro Manila, Philippines Client: Various Government and Private Sector Main project features: Fabrication, delivery, and construction of Pre-cast, Pre-stressed, post-tensioned components. Positions held: Office Engineer to Superintendent
  • 17.
    - analysis. -Checks jobsite castingof structural wall panels From : December 1969 To : December 1974 Employer: Gingoog City Engineer’s Office Positions held: Maintenance Section Chief 11. Detailed Tasks Assigned -Prepares Program of Work for the Maintenance of the National Highway. -Schedules and assigns worker to do the different tasks for the Maintenance work. -Conducts Traffic Surveys, Traffic countings, Weighing of different types of vehicle and gathering of other datas needed for the ADB funded Construction of Iligan-Cagayan de Oro-Butuan Road. 12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned Name of assignment or project: Maintenance of the National Highway and other road networks within Gingoog City, Philippines; And Data gathering for the ADB funded project Iligan-Cagayan de Oro-Butuan Road (1974) Year: 1969 – 1974 Location: Gingoog City, Misamis Oriental, Philippines Client: Dept of Public Highways Main project features: Maintenance of Roads and Bridges and Construction of Iligan-Cagayan de Oro- Butuan Road Positions held: Engineering Aide and later as Maintenance Section Chief. 13. Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged. Date: 26/11/2015 [Signature of staff member or authorized representative of the staff] Day/Month/Year Full name of authorized representative: