PROSESSIONAL RESUME
PERSONAL INFORMATION
N a m e : Iman Seno Adji
Date of birth : Semarang, 6 April 1962
Gender : Male
Marital Status : Married
Nationality : Indonesia
CONTACT INFORMATION
Home Address : Cluster Caribbean Islands Blok J-1 No. 15, RT 04/RW 18, De Latinos BCD City
Kelurahan Rawa Buntu, Kecamatan Serpong, Kota Tangerang Selatan 15318
Office-phone : +62 21 57952112 ext. 608
Cell-phone : +62 811 884 389 (business hours), 811 811 6045 (after business hours)
Current Occupation : Program Officer – Water Resources & Disaster Management, JICA Indonesia Office
Office Address : Sentral Senayan II, 14th
Floor, Jl. Asia Afrika No. 8, Senayan, Jakarta 10270
E-mail Addresses : imansenoadji.in@jica.go.jp/ iman.senoadji@gmail.com
CAREER OBJECTIVE
A professional career in an international organization relevant to my background in procurement/contract
management as well as program/project management which can provide me with opportunities for continued
growth and career advancement in line with my professional expertise and qualification. I would always be
flexible, willing to learn and work with optimistic attitude to provide the best contribution to my employer.
SUMMARY
 Over 26 years of experiences working in the program/project management with focus on renewable energy
(solar energy), energy policy, electricity connection & power generation, railways, water resources and
disaster management sectors.
 In depth knowledge in managing disbursement forecast as well as actual disbursement in line with the
performance of project activities on site as part of project monitoring and monitoring activities.
2
 Detailed understanding of the procurement and contract management procedures as integral parts of
program/project management procedures to confirm the procurement activities have been applied in line with
the provisions of prevailing guidelines and agreed loan agreements.
 To provide helpful insight and necessary information to the person(s)-in-charge under the relevant
Executing/Implementing Agencies, Consultants, and Contractors who are not familiar with the prevailing
procedures stipulated in the guidelines and loan agreement.
 Having active role in the internal ex-post evaluation that has to be applied for projects that have been finished
and completed approximately two (2) years in advance and supporting external Consultant in conducting
external ex-post evaluation activities.
CAREER HISTORY
2008 – Present Japan International Cooperation Agency <JICA Indonesia>
Senior Program Officer, in-charge for a number of loan/non-loan projects
2005 – 2008 Agency for Rehabilitation & Reconstruction of Aceh and Nias <BRR NAD – Nias>
Project Manager, in-charge for a number of non-loan projects (energy & power sector)
2002 – 2005 United States Agency for International Development <USAID Indonesia>
Project Manager, in-charge for a number of non-loan projects (energy policy)
1988 – 2002 Agency for Assessment and Application of Technology <BPPT>
Project Engineer/Coordinator, in-charge for a number of loan/non-loan projects (RE projects)
EDUCATIONS AND QUALIFICATIONS
March 1988 Bachelor Degree, Mayor Study in Electrical & Power System, Faculty of Industrial
Technology, Institute of Technology Sepuluh-Nopember (ITS), Surabaya, Indonesia
August 1995 Master Degree, Mayor Study in Project Management and Engineering Economics, Faculty of
Civil and Environmental Engineering, University of Melbourne, Melbourne, Australia
CERTIFIED TRAININGS, WORKSHOPS AND SEMINARS
May 2016 International Contract Management for Public Works, JICA Thailand Office, Bangkok
Jan 2009 Project Cycle Management – Monitoring and Evaluation, JICA Thailand Office, Bangkok
May 2008 Project Management, Learnit Institute (Jakarta) in cooperation with Brain-bench Institute
(USA), Jakarta
Sep 2006 Clean Development Mechanism (CDM) Project Development, Training for Trainer, ADB-
BAPPENAS/Jakarta, Padang
May 2006 Procurement Management, Government of Indonesia Procurement System for Goods and
Services (Keppres 80/2003), BAPPENAS/Jakarta, Banda Aceh
Sep 2005 Negotiation Skills, Risk Control, Quantitative Approach, Risk Identification & Mapping,
PPM/Jakarta, Jakarta
July 2005 Competitive Marketing,Services Marketing,Creating Market Demand, PPM/Jakarta, Jakarta
Jun 2005 Market Research, PPM/Jakarta, Jakarta
May 2004 Acquisition Management (CTO), USAID/Washington, Jakarta
May 2003 Project Finance, Institute of International Education (IIE), in Bogor
Jan 2003 Development Credit Authority (DCA), USAID/Washington, Bangkok (Thailand)
3
Jan 2003 GHG Emission Reduction Projects Development, International Emission Trading
Association (IETA), Jakarta
Oct 2002 Planning, Achieving and Learning (PAL), USAID/Washington, Dhaka (Bangladesh)
Sept 2000 Eastern Indonesia Hybrid Energy Project, AES – CASE, Perth (Australia)
April 1997 Energy Management & Conservation, AEEMTRC (ASEAN), Jakarta
May 1991 Lighting Design & Engineering, Philips Ralin Electronics, Jakarta
Jan 1990 Photovoltaic Components Test Laboratory, TUEV Rheinland, Köln (Germany)
SPECIFIC SKILLS
 Proficient in MS Word, MS Excel, MS Power Point and MS Project
 Proficient in English > Oral/Writing > English Courses at PPIA (Perhimpunan Pelajar Indonesia Amerika)
 IALF (Indonesia Australia Language Foundation), University of Melbourne (Language Centre)
4
CURRICULUM VITAE
PROFESSIONAL ACCOMPLISHMENT
2008 – Present Japan International Cooperation Agency <JICA Indonesia>
This is a Donor Agency under the Government of Japan which provides a number financing
support schemes in the forms of technical assistance, technical cooperation, grant aid, and soft
loan for a number of loan/non-loan projects in Indonesia. The tasks of Senior Program Officer,
among others are consisting of:
 Oversee and monitor the implementation of a number of infrastructure projects under
Japanese ODA Loan with total annual turn-over is around US$50 million (water resources
and disaster management sector).
 Supervise and in-depth examination on the implementation of procurement and contract
management procedures (including reviewing the procurement procedures) carried out by
the relevant Executing/Implementing Agencies.
 In terms of project management/supervision (including review on contract amendment
procedures), routine disbursement forecast has to be made on monthly basis in order to
provide detailed monitoring system (including recovery effort) to project implementation on
site in line with target provided by JICA and the Executing/Implementing Agencies.
In terms of procurement and contract management, the job covers the following tasks:
 Review of pre-qualification document(s), pre-qualification evaluation result(s), tender
document(s), technical evaluation result(s), financial evaluation result (s), and contract (s) of
the relevant loan funded construction/civil works packages submitted by the Executing
Agency (for procurement of goods and services) ;
 Review of the shortlist(s), request for proposal document (s), technical evaluation result (s),
financial evaluation (s), and contract(s) submitted by Executing Agency (for employment of
consultant);
 Regarding on-going projects, review of explanatory note(s) and contract amendment(s) due
to changing the scope of works/services and contract prices (for both construction works
and consulting services).
Currently, I am in-charge (from 2012 – present) for a number of projects under “water
resources and disaster management sector” (the Executing Agency is Ministry of Public
Works). Among others, those are:
 Jatibarang Multipurpose Dam Construction Project (Semarang Upper River Basin);
 Semarang Pond Pumping Station Construction Project (Semarang Lower River Basin);
 Wonogiri Multipurposes Dam Construction Project (B. Solo Upper River Basin);
 Multipurposes Dykes Construction Project (Bengawan Solo Lower River Basin);
 Mt. Merapi, Progo River and Mt. Bawakaraeng Urgent Disaster Projects (Sabo Dams);
 Flood Control System Improvement Projects (Padang, Palembang, Surabaya, Mojokerto,
Gorontalo, and Manado River Basins);
 Flood Control System Improvement Projects (Citarum Upper River Basin);
 Flood Control System Improvement Projects (East Pluit Pumping Station).
Formerly, I was in-charge (from 2008 – 2012) for a number of projects under “transportation
sector” (the Executing Agency is Ministry of Transportation). Among others, those are:
 Jakarta Mass Rapid Transit (MRT) Project (Underground and Elevated Railway Tracks);
 Double Tracking on Java South Railway Line Project (Cirebon – Yogyakarta);
5
 Double Tracking of Java North Railway Line Project (Cikampek – Cirebon);
 Electrification and Double-double Tracking of Main Railway Line (Jabodetabek);
 Maritime Telecommunication System Development Project (Indonesia);
 Urgent Rehabilitation Project of Tanjung Priok Port (Jakarta);
 Depok-Depot and Power Substation Railway Project (Depok);
 Surabaya Airport and Additional Works (Surabaya).
2005 – 2008 Agency for Rehabilitation & Reconstruction of Aceh and Nias <BRR NAD – Nias>
This is a Financing Agency under the Government of Indonesia which was established in 2005
just after the tsunami disaster happening along the coast line of Aceh and North Sumatera. This
Agency provides a number of government funded projects as part of rehabilitation and
reconstruction efforts in Aceh and Nias. The tasks of Project Manager, among others, covered
the followings:
 Annual programming and budget planning of the proposed projects submitted by project
proponents (in Aceh and North Sumatera);
 Oversee procurement and contract management, and monitor project implementation and
management in accordance with the proposed targets;
 In-depth monitoring of disbursement plan and management in accordance with project
performance on site;
 Continuous monitoring-evaluation was also performed so that projects execution to be “in
compliance” with the prevailing procedures.
During my assignment, I was also involved in the budget preparation and management
(including from Multi-Donor Trust Fund) under “energy and power sector” in BRR NAD-Nias
(with total annual turn-over is approximately US$ 6 million) which covered the followings:
1. Rehabilitation projects in the power sector (such as diesel power plant, power distribution,
and household connections) in collaboration with PLN Regional NAD;
2. Facilitation and mediation to obtain financing for development of hydro power plant (at
Peusangan, District of Aceh Tengah), geothermal power plant (at Mt. Seulawah Agam,
District of Aceh Besar), fuel depot for PT Pertamina (at District of Simeulue Island), and
development of potential wind plant(s) in several areas (at Aceh and Nias Island);
3. Development of a number of small renewable energy projects (such as solar power systems
and micro hydro plants) in a several rural areas.
2002 – 2005 United States Agency for International Development <USAID Indonesia>
This is a Donor Agency under US Government which provides a number financing support
schemes in the forms of technical assistance and grant aid for a number of projects for energy
policy reform and pilot projects implementation in Indonesia. The tasks assigned to Project
Management/Development Specialist, among others are:
1. Regular monitoring and evaluation on project implementation to ensure significant impact
can be achieved in line with result oriented target;
2. Establish recovery plan to eliminate obstacles which might hinder the achievement of the
above-mentioned result oriented target;
3. Regular budget planning and accrual analysis, relevant procurement plan, technical review of
on-going and proposed project, and involvement in fact finding mission.
Besides, I was also in-charge for “economic growth” projects with total annual turn–over around
US$500,000 to cover the following project activities:
6
 Development Credit Authority (DCA), a specific tool to be provided to facilitate partial credit
guarantee (maximum 50%) to facilitate loan financing to a number of SMEs;
 Technical Assistance to support the establishment of Jakarta Bus Rapid Transit (BRT) in
Jakarta Area which is popularly named as Trans-Jakarta under DKI Provincial Government;
 Technical Assistance to support the Energy Policy Reform (Oil & Gas Sector) and Power
Sector Restructuring (Electricity & Power Sector) in line with the establishment of new Oil
& Gas Law and Electricity Law.
1988 – 2002 Agency for Assessment and Application of Technology <BPP Teknologi>
This is a Research Agency under the Government of Indonesia which was established to provide
assessment and application of new technology before its wide-spread use across the country
through the implementation of pilot projects under collaboration with overseas research
agencies in several areas in Indonesia. This Agency provides a number of government funded
pilot projects which I was assigned to manage, among others, are as follows:
 Project Financial Analyst for feasibility study of first Coal Mine-Mouth Mini Power Plant (2
x 7 MW) in cooperation with PT Indonesia Power and PT Berau Coal <the 1st
mine-mouth
coal pilot project in Indonesia>;
 Project Engineer for executing site surveys, market potential assessment,project preparation
and supervision, systemcomponent tests,site acceptance tests and capacity building for local
operators > development of photovoltaic/diesel hybrid power systems (14 x 40 kW) in
Central and South-East Sulawesi under Eastern Indonesia Hybrid Energy Project funded by
Aus AID <introduction of pilot project(s) in Eastern Indonesia>;
 Project Manager for the execution of site surveys, market potential assessments, project
preparation, and project implementation > development of photovoltaic powered submarine
lighting systems along coasts of North Java under Fishermen Lighting Development Project
<the1st fishermen lighting pilot project(s) in Indonesia>;
 Project Engineer for electrical work project supervision > Lahendong Geothermal Power
Plant Project owned by PT PLN (Persero) in Minahasa, North Sulawesi <the 1st
geothermal
power plant project in Lahendong, North Sulawesi>;
 Project Engineer in managing site surveys and feasibility study > health clinic photovoltaic
powered systems funded by DECON (Germany) in cooperation with the Ministry of Health
<introduction of stand-alone health clinic power plant in Maluku>;
 Project Coordinator in managing technical assessment > monitoring & evaluation of
photovoltaic power systems for lighting and pumping systems in Gunung Kidul, Yogyakarta
funded by NEDO (Japan) <monitoring-evaluation of grant-aid project>;
 Project Consultant for the implementation of consulting services on energy conservation and
management for public transport which was funded by ETSU/Fuel Wise Project (United
Kingdom) in cooperation with the Ministry of Energy and Mineral Resources <the 1st
fuel-
energy management for transportation sector in Indonesia>;
7
 Project Consultant for the execution of consulting services on detailed engineering design of
rural electrification funded by French Protocol Aid Project in cooperation with the Ministry
of Transmigration & Resettlement <introduction of pilot project(s) in Kalimantan>;
 Project Coordinator for refurbishment and rehabilitation of 10 units photovoltaic powered
pumping systems in NTT funded by GTZ (Germany) <recondition of old photovoltaic
powered pumping systems in NTT>;
 Project Engineer/Coordinator for the execution of site survey, market assessment, system
component test, capacity building for local operators, project preparation, commissioning
and supervision, site acceptance test > photovoltaic/diesel hybrid powered systems (45 kW)
for rural electrification in East Kalimantan funded by French Protocol Aid Project in
cooperation with the Ministry of Transmigration & Resettlement <preparation of pilot
project(s) in Kalimantan>;
 Project Coordinator for conducting site surveys on photovoltaic powered lighting systems
(50MWp) in Central Sulawesi financed by AusAID (Australia) <preparation of pilot
project(s) in Central Sulawesi>;;
 Project Engineer for the execution of system monitoring and evaluation of two (2) units of
photovoltaic powered TV repeater systems in North Sumatra funded by Renewable Energy
Indonesia (REI) Project in cooperation with TUEV Rheinland (Germany) <monitoring-
evaluation of grant-aid project>;
 Project Engineer for construction and installation of five (5) units photovoltaic powered
pumping systems in Riau, Sumatera, in cooperation with the Ministry of Public Works
<introduction of GOI financing pilot project(s) in Riau Islands>;
 Project Engineer for commissioning and supervision of 250 units of photovoltaic powered
solar home systems in Tana Toraja, South Sulawesi, funded by Presidential Aid (BANPRES)
<site acceptance test of GOI financing pilot project(s) in South Sulawesi>;
 Project Engineer for construction and installation of photovoltaic powered pumping system
in Mawasangka,South-East Sulawesi funded by Renewable Energy Indonesia (REI) Project
in cooperation with TUEV Rheinland (Germany) <introduction of pilot project in South-East
Sulawesi>;
 Project Coordinator for monitoring and evaluation three (3) units of photovoltaic powered
medical care systems in Serpong, Bengkulu and Maluku funded by Renewable Energy
Indonesia (REI) Project in cooperation with TUEV Rheinland (Germany) <monitoring-
evaluation of grant-aid project>.

More Related Content

Similar to Curriculum Vitae (Iman Seno Adji)

Sirikan_Resume 290916
Sirikan_Resume 290916Sirikan_Resume 290916
Sirikan_Resume 290916
Sirikan Tangkhawatchara
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
ronnyjawir
 
Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021
ssuser8943fd
 
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Ullah Khan
 
Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli, PMP
 
CV Johannes Hasahatan_2016_English
CV Johannes Hasahatan_2016_EnglishCV Johannes Hasahatan_2016_English
CV Johannes Hasahatan_2016_English
Johannes Hasahatan L. Tobing
 
Steven Hartanto - Resume
Steven Hartanto - ResumeSteven Hartanto - Resume
Steven Hartanto - Resume
Steven Hartanto
 
Laurencia C Wibawa (Syanti) CV
Laurencia C Wibawa (Syanti) CVLaurencia C Wibawa (Syanti) CV
Laurencia C Wibawa (Syanti) CV
Laurencia Wibawa
 
CV Astaria Anggun Putrihani.
CV Astaria Anggun Putrihani.CV Astaria Anggun Putrihani.
CV Astaria Anggun Putrihani.
Astaria Anggun Putrihani
 
Resume Tanawat
Resume TanawatResume Tanawat
Resume Tanawat
Tanawat Siriangkanon
 
CV-EU-eng-Mysore Ranganath
CV-EU-eng-Mysore RanganathCV-EU-eng-Mysore Ranganath
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
Engr Jerson Oducayen
 
Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015
Christoph Timbul Sinaga
 
3.0 (N) (K) Kanai Deb Nath - Project Economist- National_28-`2-2015
3.0 (N) (K) Kanai Deb Nath - Project Economist-  National_28-`2-20153.0 (N) (K) Kanai Deb Nath - Project Economist-  National_28-`2-2015
3.0 (N) (K) Kanai Deb Nath - Project Economist- National_28-`2-2015
kanai deb nath
 
CV updated
CV updatedCV updated
CV updated
daniel marpaung
 
Updated CV Nov 26 2015
Updated CV Nov 26 2015Updated CV Nov 26 2015
Updated CV Nov 26 2015
Virgilio Balandra
 
Sarada Chaturvedula CV 072016
Sarada Chaturvedula CV 072016Sarada Chaturvedula CV 072016
Sarada Chaturvedula CV 072016
Sarada Chaturvedula
 
tondi_nababan
tondi_nababantondi_nababan
tondi_nababan
Tondi Nababan
 
CV
CVCV
CV_Syahbuddin
CV_SyahbuddinCV_Syahbuddin
CV_Syahbuddin
Syahbuddin Pulungan
 

Similar to Curriculum Vitae (Iman Seno Adji) (20)

Sirikan_Resume 290916
Sirikan_Resume 290916Sirikan_Resume 290916
Sirikan_Resume 290916
 
RONNY_MT
RONNY_MTRONNY_MT
RONNY_MT
 
Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021Cv kanai deb nath, project economist dec- 2021
Cv kanai deb nath, project economist dec- 2021
 
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
 
Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016
 
CV Johannes Hasahatan_2016_English
CV Johannes Hasahatan_2016_EnglishCV Johannes Hasahatan_2016_English
CV Johannes Hasahatan_2016_English
 
Steven Hartanto - Resume
Steven Hartanto - ResumeSteven Hartanto - Resume
Steven Hartanto - Resume
 
Laurencia C Wibawa (Syanti) CV
Laurencia C Wibawa (Syanti) CVLaurencia C Wibawa (Syanti) CV
Laurencia C Wibawa (Syanti) CV
 
CV Astaria Anggun Putrihani.
CV Astaria Anggun Putrihani.CV Astaria Anggun Putrihani.
CV Astaria Anggun Putrihani.
 
Resume Tanawat
Resume TanawatResume Tanawat
Resume Tanawat
 
CV-EU-eng-Mysore Ranganath
CV-EU-eng-Mysore RanganathCV-EU-eng-Mysore Ranganath
CV-EU-eng-Mysore Ranganath
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
 
Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015Christoph Sinaga_CV 2015
Christoph Sinaga_CV 2015
 
3.0 (N) (K) Kanai Deb Nath - Project Economist- National_28-`2-2015
3.0 (N) (K) Kanai Deb Nath - Project Economist-  National_28-`2-20153.0 (N) (K) Kanai Deb Nath - Project Economist-  National_28-`2-2015
3.0 (N) (K) Kanai Deb Nath - Project Economist- National_28-`2-2015
 
CV updated
CV updatedCV updated
CV updated
 
Updated CV Nov 26 2015
Updated CV Nov 26 2015Updated CV Nov 26 2015
Updated CV Nov 26 2015
 
Sarada Chaturvedula CV 072016
Sarada Chaturvedula CV 072016Sarada Chaturvedula CV 072016
Sarada Chaturvedula CV 072016
 
tondi_nababan
tondi_nababantondi_nababan
tondi_nababan
 
CV
CVCV
CV
 
CV_Syahbuddin
CV_SyahbuddinCV_Syahbuddin
CV_Syahbuddin
 

Curriculum Vitae (Iman Seno Adji)

  • 1. 1 PROSESSIONAL RESUME PERSONAL INFORMATION N a m e : Iman Seno Adji Date of birth : Semarang, 6 April 1962 Gender : Male Marital Status : Married Nationality : Indonesia CONTACT INFORMATION Home Address : Cluster Caribbean Islands Blok J-1 No. 15, RT 04/RW 18, De Latinos BCD City Kelurahan Rawa Buntu, Kecamatan Serpong, Kota Tangerang Selatan 15318 Office-phone : +62 21 57952112 ext. 608 Cell-phone : +62 811 884 389 (business hours), 811 811 6045 (after business hours) Current Occupation : Program Officer – Water Resources & Disaster Management, JICA Indonesia Office Office Address : Sentral Senayan II, 14th Floor, Jl. Asia Afrika No. 8, Senayan, Jakarta 10270 E-mail Addresses : imansenoadji.in@jica.go.jp/ iman.senoadji@gmail.com CAREER OBJECTIVE A professional career in an international organization relevant to my background in procurement/contract management as well as program/project management which can provide me with opportunities for continued growth and career advancement in line with my professional expertise and qualification. I would always be flexible, willing to learn and work with optimistic attitude to provide the best contribution to my employer. SUMMARY  Over 26 years of experiences working in the program/project management with focus on renewable energy (solar energy), energy policy, electricity connection & power generation, railways, water resources and disaster management sectors.  In depth knowledge in managing disbursement forecast as well as actual disbursement in line with the performance of project activities on site as part of project monitoring and monitoring activities.
  • 2. 2  Detailed understanding of the procurement and contract management procedures as integral parts of program/project management procedures to confirm the procurement activities have been applied in line with the provisions of prevailing guidelines and agreed loan agreements.  To provide helpful insight and necessary information to the person(s)-in-charge under the relevant Executing/Implementing Agencies, Consultants, and Contractors who are not familiar with the prevailing procedures stipulated in the guidelines and loan agreement.  Having active role in the internal ex-post evaluation that has to be applied for projects that have been finished and completed approximately two (2) years in advance and supporting external Consultant in conducting external ex-post evaluation activities. CAREER HISTORY 2008 – Present Japan International Cooperation Agency <JICA Indonesia> Senior Program Officer, in-charge for a number of loan/non-loan projects 2005 – 2008 Agency for Rehabilitation & Reconstruction of Aceh and Nias <BRR NAD – Nias> Project Manager, in-charge for a number of non-loan projects (energy & power sector) 2002 – 2005 United States Agency for International Development <USAID Indonesia> Project Manager, in-charge for a number of non-loan projects (energy policy) 1988 – 2002 Agency for Assessment and Application of Technology <BPPT> Project Engineer/Coordinator, in-charge for a number of loan/non-loan projects (RE projects) EDUCATIONS AND QUALIFICATIONS March 1988 Bachelor Degree, Mayor Study in Electrical & Power System, Faculty of Industrial Technology, Institute of Technology Sepuluh-Nopember (ITS), Surabaya, Indonesia August 1995 Master Degree, Mayor Study in Project Management and Engineering Economics, Faculty of Civil and Environmental Engineering, University of Melbourne, Melbourne, Australia CERTIFIED TRAININGS, WORKSHOPS AND SEMINARS May 2016 International Contract Management for Public Works, JICA Thailand Office, Bangkok Jan 2009 Project Cycle Management – Monitoring and Evaluation, JICA Thailand Office, Bangkok May 2008 Project Management, Learnit Institute (Jakarta) in cooperation with Brain-bench Institute (USA), Jakarta Sep 2006 Clean Development Mechanism (CDM) Project Development, Training for Trainer, ADB- BAPPENAS/Jakarta, Padang May 2006 Procurement Management, Government of Indonesia Procurement System for Goods and Services (Keppres 80/2003), BAPPENAS/Jakarta, Banda Aceh Sep 2005 Negotiation Skills, Risk Control, Quantitative Approach, Risk Identification & Mapping, PPM/Jakarta, Jakarta July 2005 Competitive Marketing,Services Marketing,Creating Market Demand, PPM/Jakarta, Jakarta Jun 2005 Market Research, PPM/Jakarta, Jakarta May 2004 Acquisition Management (CTO), USAID/Washington, Jakarta May 2003 Project Finance, Institute of International Education (IIE), in Bogor Jan 2003 Development Credit Authority (DCA), USAID/Washington, Bangkok (Thailand)
  • 3. 3 Jan 2003 GHG Emission Reduction Projects Development, International Emission Trading Association (IETA), Jakarta Oct 2002 Planning, Achieving and Learning (PAL), USAID/Washington, Dhaka (Bangladesh) Sept 2000 Eastern Indonesia Hybrid Energy Project, AES – CASE, Perth (Australia) April 1997 Energy Management & Conservation, AEEMTRC (ASEAN), Jakarta May 1991 Lighting Design & Engineering, Philips Ralin Electronics, Jakarta Jan 1990 Photovoltaic Components Test Laboratory, TUEV Rheinland, Köln (Germany) SPECIFIC SKILLS  Proficient in MS Word, MS Excel, MS Power Point and MS Project  Proficient in English > Oral/Writing > English Courses at PPIA (Perhimpunan Pelajar Indonesia Amerika)  IALF (Indonesia Australia Language Foundation), University of Melbourne (Language Centre)
  • 4. 4 CURRICULUM VITAE PROFESSIONAL ACCOMPLISHMENT 2008 – Present Japan International Cooperation Agency <JICA Indonesia> This is a Donor Agency under the Government of Japan which provides a number financing support schemes in the forms of technical assistance, technical cooperation, grant aid, and soft loan for a number of loan/non-loan projects in Indonesia. The tasks of Senior Program Officer, among others are consisting of:  Oversee and monitor the implementation of a number of infrastructure projects under Japanese ODA Loan with total annual turn-over is around US$50 million (water resources and disaster management sector).  Supervise and in-depth examination on the implementation of procurement and contract management procedures (including reviewing the procurement procedures) carried out by the relevant Executing/Implementing Agencies.  In terms of project management/supervision (including review on contract amendment procedures), routine disbursement forecast has to be made on monthly basis in order to provide detailed monitoring system (including recovery effort) to project implementation on site in line with target provided by JICA and the Executing/Implementing Agencies. In terms of procurement and contract management, the job covers the following tasks:  Review of pre-qualification document(s), pre-qualification evaluation result(s), tender document(s), technical evaluation result(s), financial evaluation result (s), and contract (s) of the relevant loan funded construction/civil works packages submitted by the Executing Agency (for procurement of goods and services) ;  Review of the shortlist(s), request for proposal document (s), technical evaluation result (s), financial evaluation (s), and contract(s) submitted by Executing Agency (for employment of consultant);  Regarding on-going projects, review of explanatory note(s) and contract amendment(s) due to changing the scope of works/services and contract prices (for both construction works and consulting services). Currently, I am in-charge (from 2012 – present) for a number of projects under “water resources and disaster management sector” (the Executing Agency is Ministry of Public Works). Among others, those are:  Jatibarang Multipurpose Dam Construction Project (Semarang Upper River Basin);  Semarang Pond Pumping Station Construction Project (Semarang Lower River Basin);  Wonogiri Multipurposes Dam Construction Project (B. Solo Upper River Basin);  Multipurposes Dykes Construction Project (Bengawan Solo Lower River Basin);  Mt. Merapi, Progo River and Mt. Bawakaraeng Urgent Disaster Projects (Sabo Dams);  Flood Control System Improvement Projects (Padang, Palembang, Surabaya, Mojokerto, Gorontalo, and Manado River Basins);  Flood Control System Improvement Projects (Citarum Upper River Basin);  Flood Control System Improvement Projects (East Pluit Pumping Station). Formerly, I was in-charge (from 2008 – 2012) for a number of projects under “transportation sector” (the Executing Agency is Ministry of Transportation). Among others, those are:  Jakarta Mass Rapid Transit (MRT) Project (Underground and Elevated Railway Tracks);  Double Tracking on Java South Railway Line Project (Cirebon – Yogyakarta);
  • 5. 5  Double Tracking of Java North Railway Line Project (Cikampek – Cirebon);  Electrification and Double-double Tracking of Main Railway Line (Jabodetabek);  Maritime Telecommunication System Development Project (Indonesia);  Urgent Rehabilitation Project of Tanjung Priok Port (Jakarta);  Depok-Depot and Power Substation Railway Project (Depok);  Surabaya Airport and Additional Works (Surabaya). 2005 – 2008 Agency for Rehabilitation & Reconstruction of Aceh and Nias <BRR NAD – Nias> This is a Financing Agency under the Government of Indonesia which was established in 2005 just after the tsunami disaster happening along the coast line of Aceh and North Sumatera. This Agency provides a number of government funded projects as part of rehabilitation and reconstruction efforts in Aceh and Nias. The tasks of Project Manager, among others, covered the followings:  Annual programming and budget planning of the proposed projects submitted by project proponents (in Aceh and North Sumatera);  Oversee procurement and contract management, and monitor project implementation and management in accordance with the proposed targets;  In-depth monitoring of disbursement plan and management in accordance with project performance on site;  Continuous monitoring-evaluation was also performed so that projects execution to be “in compliance” with the prevailing procedures. During my assignment, I was also involved in the budget preparation and management (including from Multi-Donor Trust Fund) under “energy and power sector” in BRR NAD-Nias (with total annual turn-over is approximately US$ 6 million) which covered the followings: 1. Rehabilitation projects in the power sector (such as diesel power plant, power distribution, and household connections) in collaboration with PLN Regional NAD; 2. Facilitation and mediation to obtain financing for development of hydro power plant (at Peusangan, District of Aceh Tengah), geothermal power plant (at Mt. Seulawah Agam, District of Aceh Besar), fuel depot for PT Pertamina (at District of Simeulue Island), and development of potential wind plant(s) in several areas (at Aceh and Nias Island); 3. Development of a number of small renewable energy projects (such as solar power systems and micro hydro plants) in a several rural areas. 2002 – 2005 United States Agency for International Development <USAID Indonesia> This is a Donor Agency under US Government which provides a number financing support schemes in the forms of technical assistance and grant aid for a number of projects for energy policy reform and pilot projects implementation in Indonesia. The tasks assigned to Project Management/Development Specialist, among others are: 1. Regular monitoring and evaluation on project implementation to ensure significant impact can be achieved in line with result oriented target; 2. Establish recovery plan to eliminate obstacles which might hinder the achievement of the above-mentioned result oriented target; 3. Regular budget planning and accrual analysis, relevant procurement plan, technical review of on-going and proposed project, and involvement in fact finding mission. Besides, I was also in-charge for “economic growth” projects with total annual turn–over around US$500,000 to cover the following project activities:
  • 6. 6  Development Credit Authority (DCA), a specific tool to be provided to facilitate partial credit guarantee (maximum 50%) to facilitate loan financing to a number of SMEs;  Technical Assistance to support the establishment of Jakarta Bus Rapid Transit (BRT) in Jakarta Area which is popularly named as Trans-Jakarta under DKI Provincial Government;  Technical Assistance to support the Energy Policy Reform (Oil & Gas Sector) and Power Sector Restructuring (Electricity & Power Sector) in line with the establishment of new Oil & Gas Law and Electricity Law. 1988 – 2002 Agency for Assessment and Application of Technology <BPP Teknologi> This is a Research Agency under the Government of Indonesia which was established to provide assessment and application of new technology before its wide-spread use across the country through the implementation of pilot projects under collaboration with overseas research agencies in several areas in Indonesia. This Agency provides a number of government funded pilot projects which I was assigned to manage, among others, are as follows:  Project Financial Analyst for feasibility study of first Coal Mine-Mouth Mini Power Plant (2 x 7 MW) in cooperation with PT Indonesia Power and PT Berau Coal <the 1st mine-mouth coal pilot project in Indonesia>;  Project Engineer for executing site surveys, market potential assessment,project preparation and supervision, systemcomponent tests,site acceptance tests and capacity building for local operators > development of photovoltaic/diesel hybrid power systems (14 x 40 kW) in Central and South-East Sulawesi under Eastern Indonesia Hybrid Energy Project funded by Aus AID <introduction of pilot project(s) in Eastern Indonesia>;  Project Manager for the execution of site surveys, market potential assessments, project preparation, and project implementation > development of photovoltaic powered submarine lighting systems along coasts of North Java under Fishermen Lighting Development Project <the1st fishermen lighting pilot project(s) in Indonesia>;  Project Engineer for electrical work project supervision > Lahendong Geothermal Power Plant Project owned by PT PLN (Persero) in Minahasa, North Sulawesi <the 1st geothermal power plant project in Lahendong, North Sulawesi>;  Project Engineer in managing site surveys and feasibility study > health clinic photovoltaic powered systems funded by DECON (Germany) in cooperation with the Ministry of Health <introduction of stand-alone health clinic power plant in Maluku>;  Project Coordinator in managing technical assessment > monitoring & evaluation of photovoltaic power systems for lighting and pumping systems in Gunung Kidul, Yogyakarta funded by NEDO (Japan) <monitoring-evaluation of grant-aid project>;  Project Consultant for the implementation of consulting services on energy conservation and management for public transport which was funded by ETSU/Fuel Wise Project (United Kingdom) in cooperation with the Ministry of Energy and Mineral Resources <the 1st fuel- energy management for transportation sector in Indonesia>;
  • 7. 7  Project Consultant for the execution of consulting services on detailed engineering design of rural electrification funded by French Protocol Aid Project in cooperation with the Ministry of Transmigration & Resettlement <introduction of pilot project(s) in Kalimantan>;  Project Coordinator for refurbishment and rehabilitation of 10 units photovoltaic powered pumping systems in NTT funded by GTZ (Germany) <recondition of old photovoltaic powered pumping systems in NTT>;  Project Engineer/Coordinator for the execution of site survey, market assessment, system component test, capacity building for local operators, project preparation, commissioning and supervision, site acceptance test > photovoltaic/diesel hybrid powered systems (45 kW) for rural electrification in East Kalimantan funded by French Protocol Aid Project in cooperation with the Ministry of Transmigration & Resettlement <preparation of pilot project(s) in Kalimantan>;  Project Coordinator for conducting site surveys on photovoltaic powered lighting systems (50MWp) in Central Sulawesi financed by AusAID (Australia) <preparation of pilot project(s) in Central Sulawesi>;;  Project Engineer for the execution of system monitoring and evaluation of two (2) units of photovoltaic powered TV repeater systems in North Sumatra funded by Renewable Energy Indonesia (REI) Project in cooperation with TUEV Rheinland (Germany) <monitoring- evaluation of grant-aid project>;  Project Engineer for construction and installation of five (5) units photovoltaic powered pumping systems in Riau, Sumatera, in cooperation with the Ministry of Public Works <introduction of GOI financing pilot project(s) in Riau Islands>;  Project Engineer for commissioning and supervision of 250 units of photovoltaic powered solar home systems in Tana Toraja, South Sulawesi, funded by Presidential Aid (BANPRES) <site acceptance test of GOI financing pilot project(s) in South Sulawesi>;  Project Engineer for construction and installation of photovoltaic powered pumping system in Mawasangka,South-East Sulawesi funded by Renewable Energy Indonesia (REI) Project in cooperation with TUEV Rheinland (Germany) <introduction of pilot project in South-East Sulawesi>;  Project Coordinator for monitoring and evaluation three (3) units of photovoltaic powered medical care systems in Serpong, Bengkulu and Maluku funded by Renewable Energy Indonesia (REI) Project in cooperation with TUEV Rheinland (Germany) <monitoring- evaluation of grant-aid project>.