RESUME
JOSE MARIA GENEBLAZA GOMEZ
1047 Crispin Salazar St. Janiuay, Iloilo, Philippines
Zip Code 5034
Cell phone no (KSA): +966554948267
Email: eisgomez@yahoo.com
CareerObjective
A highly energetic and industrious, talented, professional and dedicated Civil Engineer capable for jobs that best
utilizes skills obtained from academic study and over twenty five years of experience in the field of profession in
planning, designing and directing the construction and maintenance of Buildings, Roads, Bridges, Irrigation
System, Drainage System, and Water Supply Systems and willing to handle challenging, creative and
diversified projects.
ProfessionalExperience
November 24, 2013 to present: Site Inspector Kingdom of Saudi Arabia
Arabian Consulting Engineering Centre (ACEC)
Responsibilities:
1. Civil Inspector (MOT Projects Eastern Region)
A.) Improvement & Dualization of Urayra-Sarrar-Nariya Road (36 Km.) Eastern Region.
B.) Nariyah/Safaniyah Road.
C.) Repair & Widening of Abu-Hadriyah/Khafji Road to be 3 Lane Each Side.
2. Civil Inspector (MOT Projects Southern Region)
A.) Construction Of The Main Road Jazan (Group-1)
June 2010 – November 23, 2013: Private Practitioner Civil Engineer Jaro, Iloilo City, Philippines
In cooperation with other groups in contracting business.
Responsibilities:
1. Procured project bid documents from private and government agencies.
2. Reviewed plans, specifications, details and drawings from bid documents obtained.
3. Prepared cost estimates and program of works for the particular project.
4. Prepared bid documents and all necessary attachments for competitive bidding.
5. Prepared contract documents and review and evaluate tenders for construction projects.
6. Applied necessary required government permits such as building permits and ECC.
7. Procured and mobilization of construction materials and Manpower.
8. Conducted pre construction conference for proper observance of pert cpm , construction
Methods, s-curve and bar chart for the purpose of maximum project profit.
9. Insured the proper observance of safety legislation and procedures.
10. Observed actual field condition for possible variation order or change order.
11. Acted as project supervisor for construction work (Commercial and Residential Buildings Private and
Government owned)
12. Kept custody all technical records on site such as log books and weather charts.
13. Prepared accomplishment report weekly or monthly as needed.
14. Prepared progress billing to the owner or its authorized representatives.
15. Prepared as built plan for any revised items, plans and specifications.
16. Proper project turnover to the project owner or its authorized representative.
17. Prepared building documents for the purposes of Building Permits.
July 1994 – June 2010: Municipal Engineer Janiuay, Iloilo, Philippines
Local Government Unit of Janiuay
Responsibilities:
1. In charged for the design and build, rehabilitation and maintenance of all infrastructure projects of the
municipality, such as Buildings, Roads, Bridges, Drainage Systems, Water Supply Systems, Irrigation
Systems, River Controls, Dikes, Slope Protection, Plaza and Parks, Basketball Courts, Street Lights,
Micro-Hydro Electric with Transmission Lines, Low Cost Housing and Subdivisions, Government
Buildings, School Buildings, Day Care Centers, Health Centers, Post Harvest Facilities, Warehouses,
Market and Slaughterhouse, Multi-Purpose Buildings, Multi-Purpose Gymnasiums and
Auditoriums, Multi-Purpose Halls, Waiting Shed and other infrastructure project of the municipality.
2. Designed and prepared engineering designs, plans drawings, specifications, and cost estimates of projects
implemented by the Barangays and Municipality.
3. In charged for the proper implementation of the National Building Code of the Philippines. Such as
issuance of Building Permits, Issuance of Demolition Permits, Work Stoppage Order and Settled Lot
Boundary Disputes, Settled Disputes regarding illegal squatters, and other matters covered by the National
Building Code of the Philippines.
4. Prepared Feasibility Studies, Project Proposals for possible funding from Funding Institutions like the
Asian Development Bank and the World Bank, through channel with the National Government Agencies.
5. Served as data base of all infrastructure records of the municipality for future information.
6. Coordinated with the National and Provincial Government agencies for projects implemented
within the area of jurisdiction of the municipality for proper implementation.
7. Acted as member of the Bids and Awards Committee of the Municipality.
8. Acted as member of the Executive Committee for all programs and activities of the municipality.
9. Acted as member of the Municipal Disaster Coordinating Counsel of the Municipality.
10.Acted as member for the Municipal Counsel’s Chairman of Infrastructure and Public Works.
June 1993 – June 1994: Junior Engineer/Project Inspector Quezon city M.M., Philippines
G.H.T Project Consultants and Managers
Responsibilities:
1. Prepared Monthly Accomplishment Reports, Weather charts, and Project log books for submission to the
Supervising Engineer.
2. Coordinated with the Contractors or its authorized representatives for the proper project implementation.
3. Ensured quality control and quality assurance of projects implemented by the contractors.
4. Ensured personal responsibility under health and safety legislation and company directives are met.
5. Monitored project implementation (Buildings Private and Government owned) based on the forecasted
duration per project activity.
6. Monitored proper handling and warehousing of owner supplied construction materials.
7. Verified and checked contractors request for project change order/variation order.
June 1992 – May1993:Project Engineer Sta. Mesa, M.M., Philippines
MJ Graded Aluminum and Steel Fabrication
Responsibilities:
1. Prepared cost estimates, and materials quantity take off for the particular project.
2. Prepared project quotations and bid proposals.
3. Procured Materials and other project requirement.
4. Strategized and select allocation of work to sub-contractors.
5. In charged for the mobilization of manpower, materials, tools and equipment to the jobsites.
6. Ensured maximum profit for every projects implemented based on proper project implementation and
introduction of construction techniques, appropriate work sequencing, proper handling and warehousing of
material, man power health and safety are met.
7. Maintained a harmonious relationship with other engineering discipline and sub- contractors.
8. Ensured timely delivery of project completion which met the customer’s expectations.
9. Managed the implementation of Structural Steel Structures (Buildings and Warehouse).
June 1990 – August 1991: Office Engineer Dumaguete, Negros Oriental, Philippines
National Power Corporation
Responsibilities:
1. In charged of project monitoring, and prepared daily accomplishment report based on submitted Daily
Inspection Report of Field Engineers.
2. Conducted field inspection for Structural Steel Towers and Wood Poles.
3. Monitored daily service vehicle fuel consumption as per trip tickets submitted by the assigned drivers.
4. Prepared cost estimates of houses affected by Right of Way matters.
5. Performed other functions related to job description as per instruction from the project manager.
August 1989 – June 1990: Engineer/Estimator Jaro, Iloilo City, Philippines
Tomsil Construction and supply:
Responsibilities:
1. Prepared cost estimates based on engineering designs, plans, drawings, specifications for competitive
bidding purposes.
2. Acted as project site engineer for the construction of Private and Publicly Owned Buildings.
3. Done daily reporting of project status, issues and concerns related to the project implementation to the
owner/proprietor of the company.
4. Coordinated with various government agency engineers and inspectors for the smooth and proper project
Implementation.
5. Processed various progress billings and payments from the different government agencies and clients.
January 1989 – July 1989: Apprentice Civil Engineer Makati, M.M., Philippines
CRS Development Corporation
Responsibilities:
1. Acted as site engineer for the Construction of Farm Lot Subdivision.
2. In charged for the monitoring of leased heavy equipment hourly rentals and made report to the main office
for basis of payment.
3. Identified farm lot boundaries, sub lots boundaries, and installed road lots for the farm lot subdivision.
4. Prepared weekly accomplishment report, weather charts,and construction log books.
5. Catered walk in costumers interested for the farm lots subdivision and made referralto the main office.
Education / Qualifications
Masterof Engineering Jaro, Iloilo City, Philippines
Central Philippine University
Units Earned
Bachelor of Science in Civil Engineering Jaro, Iloilo City, Philippines
Central Philippine University
Graduated: March1988
ProfessionalAffiliations
Board Passer, Civil Engineering Licensure Board Examination 1988-Lic.#0055559.
Philippine Institute of Civil Engineers (PICE) Member
Municipal Engineers Association of the Philippines (MEAP) previously as member
Philippine Association of Building Officials, (PABO) previously as President for Western Visayas.
Skills
Efficient at using Microsoft Office: Word, Excel
Efficient at driving land based vehicles.
Hobbies / Interests
Tour, Mountain climbing, Listening to folk and country music and Drawing.
References
References available on request
Additional Certificates
May 2012 Construction Occupational Safety & Health
Pursuant to the provisions of Presidential Decree No. 442 otherwise known as
The Labor Code of the Philippine and Rule 1030 of the
Occupational Safety & Health Standards
Issued by: First Safety Systems Training Services
DOLE/BWC Accreditation No. 1030-07071010-0050
Jan. 2012 Authorized Managing Officers (AMO) Course
Per Philippine Contractors Accreditation Board (PCAB)
Resolution No. 435, series of 2011
Issued by: National Constructors Association of the Philippines, inc. (NACAP)
National and Region VI Chapter
Nov. 2010 Certification of Good Standing
Issued by: Republic of the Philippines,
Professional Regulation Commission
Aug. 2007 1st Township Development Summit
Issued by: Gawad Kalinga
June 2007 Assessment of Signs and Signboard Structures
Issued by: Republic of the Philippines
Department of Public Works and Highways

RESUME

  • 1.
    RESUME JOSE MARIA GENEBLAZAGOMEZ 1047 Crispin Salazar St. Janiuay, Iloilo, Philippines Zip Code 5034 Cell phone no (KSA): +966554948267 Email: eisgomez@yahoo.com CareerObjective A highly energetic and industrious, talented, professional and dedicated Civil Engineer capable for jobs that best utilizes skills obtained from academic study and over twenty five years of experience in the field of profession in planning, designing and directing the construction and maintenance of Buildings, Roads, Bridges, Irrigation System, Drainage System, and Water Supply Systems and willing to handle challenging, creative and diversified projects. ProfessionalExperience November 24, 2013 to present: Site Inspector Kingdom of Saudi Arabia Arabian Consulting Engineering Centre (ACEC) Responsibilities: 1. Civil Inspector (MOT Projects Eastern Region) A.) Improvement & Dualization of Urayra-Sarrar-Nariya Road (36 Km.) Eastern Region. B.) Nariyah/Safaniyah Road. C.) Repair & Widening of Abu-Hadriyah/Khafji Road to be 3 Lane Each Side. 2. Civil Inspector (MOT Projects Southern Region) A.) Construction Of The Main Road Jazan (Group-1) June 2010 – November 23, 2013: Private Practitioner Civil Engineer Jaro, Iloilo City, Philippines In cooperation with other groups in contracting business. Responsibilities: 1. Procured project bid documents from private and government agencies. 2. Reviewed plans, specifications, details and drawings from bid documents obtained. 3. Prepared cost estimates and program of works for the particular project. 4. Prepared bid documents and all necessary attachments for competitive bidding. 5. Prepared contract documents and review and evaluate tenders for construction projects. 6. Applied necessary required government permits such as building permits and ECC. 7. Procured and mobilization of construction materials and Manpower. 8. Conducted pre construction conference for proper observance of pert cpm , construction Methods, s-curve and bar chart for the purpose of maximum project profit. 9. Insured the proper observance of safety legislation and procedures. 10. Observed actual field condition for possible variation order or change order. 11. Acted as project supervisor for construction work (Commercial and Residential Buildings Private and Government owned) 12. Kept custody all technical records on site such as log books and weather charts. 13. Prepared accomplishment report weekly or monthly as needed. 14. Prepared progress billing to the owner or its authorized representatives. 15. Prepared as built plan for any revised items, plans and specifications. 16. Proper project turnover to the project owner or its authorized representative. 17. Prepared building documents for the purposes of Building Permits. July 1994 – June 2010: Municipal Engineer Janiuay, Iloilo, Philippines Local Government Unit of Janiuay Responsibilities: 1. In charged for the design and build, rehabilitation and maintenance of all infrastructure projects of the municipality, such as Buildings, Roads, Bridges, Drainage Systems, Water Supply Systems, Irrigation Systems, River Controls, Dikes, Slope Protection, Plaza and Parks, Basketball Courts, Street Lights, Micro-Hydro Electric with Transmission Lines, Low Cost Housing and Subdivisions, Government
  • 2.
    Buildings, School Buildings,Day Care Centers, Health Centers, Post Harvest Facilities, Warehouses, Market and Slaughterhouse, Multi-Purpose Buildings, Multi-Purpose Gymnasiums and Auditoriums, Multi-Purpose Halls, Waiting Shed and other infrastructure project of the municipality. 2. Designed and prepared engineering designs, plans drawings, specifications, and cost estimates of projects implemented by the Barangays and Municipality. 3. In charged for the proper implementation of the National Building Code of the Philippines. Such as issuance of Building Permits, Issuance of Demolition Permits, Work Stoppage Order and Settled Lot Boundary Disputes, Settled Disputes regarding illegal squatters, and other matters covered by the National Building Code of the Philippines. 4. Prepared Feasibility Studies, Project Proposals for possible funding from Funding Institutions like the Asian Development Bank and the World Bank, through channel with the National Government Agencies. 5. Served as data base of all infrastructure records of the municipality for future information. 6. Coordinated with the National and Provincial Government agencies for projects implemented within the area of jurisdiction of the municipality for proper implementation. 7. Acted as member of the Bids and Awards Committee of the Municipality. 8. Acted as member of the Executive Committee for all programs and activities of the municipality. 9. Acted as member of the Municipal Disaster Coordinating Counsel of the Municipality. 10.Acted as member for the Municipal Counsel’s Chairman of Infrastructure and Public Works. June 1993 – June 1994: Junior Engineer/Project Inspector Quezon city M.M., Philippines G.H.T Project Consultants and Managers Responsibilities: 1. Prepared Monthly Accomplishment Reports, Weather charts, and Project log books for submission to the Supervising Engineer. 2. Coordinated with the Contractors or its authorized representatives for the proper project implementation. 3. Ensured quality control and quality assurance of projects implemented by the contractors. 4. Ensured personal responsibility under health and safety legislation and company directives are met. 5. Monitored project implementation (Buildings Private and Government owned) based on the forecasted duration per project activity. 6. Monitored proper handling and warehousing of owner supplied construction materials. 7. Verified and checked contractors request for project change order/variation order. June 1992 – May1993:Project Engineer Sta. Mesa, M.M., Philippines MJ Graded Aluminum and Steel Fabrication Responsibilities: 1. Prepared cost estimates, and materials quantity take off for the particular project. 2. Prepared project quotations and bid proposals. 3. Procured Materials and other project requirement. 4. Strategized and select allocation of work to sub-contractors. 5. In charged for the mobilization of manpower, materials, tools and equipment to the jobsites. 6. Ensured maximum profit for every projects implemented based on proper project implementation and introduction of construction techniques, appropriate work sequencing, proper handling and warehousing of material, man power health and safety are met. 7. Maintained a harmonious relationship with other engineering discipline and sub- contractors. 8. Ensured timely delivery of project completion which met the customer’s expectations. 9. Managed the implementation of Structural Steel Structures (Buildings and Warehouse). June 1990 – August 1991: Office Engineer Dumaguete, Negros Oriental, Philippines National Power Corporation Responsibilities: 1. In charged of project monitoring, and prepared daily accomplishment report based on submitted Daily Inspection Report of Field Engineers. 2. Conducted field inspection for Structural Steel Towers and Wood Poles. 3. Monitored daily service vehicle fuel consumption as per trip tickets submitted by the assigned drivers. 4. Prepared cost estimates of houses affected by Right of Way matters. 5. Performed other functions related to job description as per instruction from the project manager.
  • 3.
    August 1989 –June 1990: Engineer/Estimator Jaro, Iloilo City, Philippines Tomsil Construction and supply: Responsibilities: 1. Prepared cost estimates based on engineering designs, plans, drawings, specifications for competitive bidding purposes. 2. Acted as project site engineer for the construction of Private and Publicly Owned Buildings. 3. Done daily reporting of project status, issues and concerns related to the project implementation to the owner/proprietor of the company. 4. Coordinated with various government agency engineers and inspectors for the smooth and proper project Implementation. 5. Processed various progress billings and payments from the different government agencies and clients. January 1989 – July 1989: Apprentice Civil Engineer Makati, M.M., Philippines CRS Development Corporation Responsibilities: 1. Acted as site engineer for the Construction of Farm Lot Subdivision. 2. In charged for the monitoring of leased heavy equipment hourly rentals and made report to the main office for basis of payment. 3. Identified farm lot boundaries, sub lots boundaries, and installed road lots for the farm lot subdivision. 4. Prepared weekly accomplishment report, weather charts,and construction log books. 5. Catered walk in costumers interested for the farm lots subdivision and made referralto the main office. Education / Qualifications Masterof Engineering Jaro, Iloilo City, Philippines Central Philippine University Units Earned Bachelor of Science in Civil Engineering Jaro, Iloilo City, Philippines Central Philippine University Graduated: March1988 ProfessionalAffiliations Board Passer, Civil Engineering Licensure Board Examination 1988-Lic.#0055559. Philippine Institute of Civil Engineers (PICE) Member Municipal Engineers Association of the Philippines (MEAP) previously as member Philippine Association of Building Officials, (PABO) previously as President for Western Visayas. Skills Efficient at using Microsoft Office: Word, Excel Efficient at driving land based vehicles. Hobbies / Interests Tour, Mountain climbing, Listening to folk and country music and Drawing. References References available on request Additional Certificates May 2012 Construction Occupational Safety & Health Pursuant to the provisions of Presidential Decree No. 442 otherwise known as The Labor Code of the Philippine and Rule 1030 of the Occupational Safety & Health Standards Issued by: First Safety Systems Training Services DOLE/BWC Accreditation No. 1030-07071010-0050 Jan. 2012 Authorized Managing Officers (AMO) Course Per Philippine Contractors Accreditation Board (PCAB)
  • 4.
    Resolution No. 435,series of 2011 Issued by: National Constructors Association of the Philippines, inc. (NACAP) National and Region VI Chapter Nov. 2010 Certification of Good Standing Issued by: Republic of the Philippines, Professional Regulation Commission Aug. 2007 1st Township Development Summit Issued by: Gawad Kalinga June 2007 Assessment of Signs and Signboard Structures Issued by: Republic of the Philippines Department of Public Works and Highways