CURRICULUM VITAE
                                                                      Paulo Eduardo Dias Garcia
1. PROFESSIONAL SUMMARY

1.1. OBJECTIVE

 Direction   and   management   or   consultancy   in   engineering   services   and   in   construction
 industry.

1.2. ADDRESS

 www.pauloeduardodiasgarcia.eng.br (site)
 http://meadiciona.com/pauloedgarcia (connection and relationship)
 contatos@pauloeduardodiasgarcia.eng.br (e-mail)
 55 (11) 8284.9887 (mobile) and 55 (11) 3257.0666 (home)
 Rua Piauí 490 Apto 84 Higienópolis CEP 01241-000 São Paulo Capital Brazil (home)

1.3. GRADUATION

 Civil Engineering (1969) by the Engineering School of Mackenzie University and Executive
 Education (1983, 1993 and 1996) by the Business Administration School of the Getulio
 Vargas Foundation.

1.4. LANGUAGES

 Portuguese (fluent), Spanish (intermediate), English and French (basic).

1.5. HISTORICAL

 Born   in  24   of  november   of       1946,     professional   with    generalist        profile   and
 multidisciplinary qualification.

 Experience in development of businesses and in implementation of designs, works and
 projects in the areas of engineering and civil, industrial and heavy construction.

 Activities in positions of works coordinator (1969 through 1975), projects implementation
 manager (1975 through 1982 and 2001 through 2004), studies and designs coordinator (1982
 through 1985), commercial manager and contracts administrator (1986 through 2001) and
 independent consultant (since 2004) in projects, contracts and businesses management.

 Actuation in Brazil (São Paulo, Rio de Janeiro and Minas Gerais) and Abroad (Argentina
 and Portugal), together of the companies of consultative engineering (design and project
 management), engineering special services (foundations and geotechnical), constructors
 and contractors.

 Services rendered in several infrastructure segments such like supply, buildings and
 popular habitations (housing), power, sports and leisure, base and transformation
 industries, basic and environmental sanitation and transports in the subway, air,
 railroad and road modes.

2. TECHNICAL ACTIVITIES

2.1. UNIVERSITY

 • Editor Head (1969) of Mackenzie Engineering Magazine of the Academic Center Horácio
   Lane.

2.2. PRACTICES

 • Geipot - Integration Executive Group of the Transports Politics (1967) of Transports
   Ministry, Brazil BR.
 • Enbasa Engineering and Commerce S.A. (1968) former Constructor Nogueira Baptista Ltda.

2.3. COURSES

 • Planning with PERT-CPM and Development Analysis (1968) at the São Paulo Engineering
   Institute.
 • Special of Business Administration (1973) at the Mackenzie University.
 • Earth and Rock Fill Dam (1980) at the Minas Gerais Engineers Society.
 • Industrialized Construction Technology (1980) at the Minas Gerais Engineers Society.
 • Advanced Projects Management (1985) at the Brazil Management Center.
 • Projects Implementation Management (1983), Informatics Management (1993) and Business
   Strategic Management (1996) at the Business Administration School of the Getulio Vargas
   Foundation in São Paulo.
• Word, Excel, PowerPoint and Access applications of the Windows XP (Basic and Advanced);
    MS-Project 2000 and AutoCAD 2002 (Basic and Intermediate) at the Education Center in
    Informatics (2003) of the Senac São Paulo.

3. PROFESSIONAL ACTIVITIES

3.1. Works Coordinator

  • Enbasa Engineering and Commerce S.A., current Serveng Civilsan S.A. Associated
    Engineering Companies, from january 1969 through july 1972.
  • Constructor Beter S.A., together with the Raymond International (foundation), from
    august 1972 through july 1974.
  • Ecicel Works Assistant Company Ltd, Enterprise Consortium between Ecisa Engineering
    Commerce and Industry S.A. and Ecel Construction and Engineering Office S.A., together
    with the Franki S.A. (foundation), from august 1974 through august 1975.

3.2. Projects Implementation Manager

  • Etel Roads Technical Enterprises S.A., together with the contracts of Constructor
    Mendes Junior S.A. and Cetenco Engineering S.A., from september 1975 through december
    1976.
  • Constructor Adolpho Lindemberg S.A., together with the Promon Engineering S.A.
    (design), from december 1976 through august 1978.
  • Hidrogeo - Enterprise Consortium between Hidroservice Designs Engineering Ltd with
    Geotécnica S.A., together with the Booz Allen Hamilton (advisement and support), from
    september 1.978 through january 1982.
  • Etep Technical Studies and Designs Ltd, when part of Group Suez, from march 2001
    through march 2004.

3.3. Studies and Designs Coordinator

  • Hidroservice Designs Engineering Ltd, from january 1982 through december 1985.

3.4. Businesses Development Manager

  • Sondotécnica S.A., from January 1986 through november 1988 and from may 1997 through
    december 1998.
  • Griffin Drenasa Soils Mechanic Ltd, part of Griffin Dewatering Corporation, from
    december 1988 through november 1990.
  • Jaú S.A. Constructor and Incorporator, from october 1991 through november 1993.
  • Constructor and Paver São Luiz S.A., from january 1994 through december 1994 and from
    september 1994 through april 1997.
  • Jaakko Poyry Engineering Ltd, from january 1999 through january 2001.

3.5. Programming, Budget and Control Superintendent

  • CDHU - São Paulo State Housing and Urban Development Company, from january 1995 through
    august 1995.

3.6. Independent Consultant

  • Consultancy in Projects, Contracts and Businesses Management, since march 2004.

4. PROFESSIONAL EXPERIENCE

4.1. DESIGN, WORKS AND PROJECTS IMPLEMENTATION
4.1.1. Works Coordination

Coordination and studies of designs, quantities and prices; physical and financial
cronograms; PERT-CPM webs; monitoring of the BDI; planning and constructive methods of
works; programming and physical, financial and conformity controls; materials, labor and
equipment cronograms; supply of materials, labor and equipment; management of resources and
quality conformity, term and cost; management of the contracts; coordination of the works
and technical and administrative supervision:

  • Morumbi Stadium - Cicero Pompeu de Toledo (1969 and 1970), in the São Paulo City, for
    the SPFC - São Paulo Football Club.
  • Prestressed Concrete Bridge over the River Atibaia and Reinforced Concrete Bridge over
    the River Jaguari (1969 and 1971), at Highway SP 065 between Campinas SP and Jacarei
    SP, for the DER/SP - São Paulo Roads and Highways Department.
  • District Market for Food Supply of São Paulo City (1970 and 1971), at the Pirituba
    Quarter, for the PMSP - São Paulo Municipality.
• Reservoirs for Water Supply of São Paulo Metropolitan Region (1970 and 1971), at
    Brasilândia Village and Cangaiba Quarter, for the SABESP - São Paulo State Basic
    Sanitation Company.
  • Industrial Equipment Factory for Earthwork, Paving and Concrete (1970 and 1971), in
    Taboão da Serra SP, for the Dynapac S.A. part of Group Atlas Copco.
  • Oceanic Interceptor of Sewers of the Rio de Janeiro City (1971 and 1972) in the
    Botafogo Quarter, for the CEDAE – Rio de Janeiro State Water and Sewer Company.
  • Oxygen Factory, Cooling Towers, Coal Yard, Pit Furnace and Plates Reheating of the José
    Bonifácio de Andrade e Silva Steel Pant (1972 and 1973), in Cubatão SP, for COSIPA –
    Paulista Steel Plant S. A. part of System Usiminas.
  • Debugging of the Aricanduva Stream (1973 and 1974), tributary of the Tiête River, for
    EMURB - São Paulo Municipality Urbanization Company.
  • Tunnel and Boarding and Disembarkation Station of Passengers of the Metropolitan (1974
    and 1975), at Uruguaiana Street (Central Region), for the Metrô/RJ - Rio de Janeiro
    State Subway Company.

4.1.2. Projects Implementation Management

Supervision and coordination of the planning, programming and physical, financial and
conformity controls; supervision of the works, designs and supplies; coordination of the
designs interfaces with works, supplies with works and designs with supplies; supervision
and technical follow-up of works, designs and supplies; follow-up of the quality guarantee;
inspection and proceedings of products and material; diaries and reports of events and
evolution of the projects:

  • Steel Railway (1975 and 1976), between Belo Horizonte MG and Barra Mansa RJ (kms 66.03
    to 100.74), for the ENGEFER - Railroad Engineering Company S. A. current MRS Logistic
    S.A.
  • Factory of Load Wagons for Railroad and Passengers Cars for Subway (1977 and 1978), in
    Hortolândia SP, for the Cobrasma S.A. – Brazilian Machines Company, current Amsted
    Maxion - Foundry and Railway Equipment S.A.
  • Ouro Branco Steel Plant, (1978 to 1981), in Ouro Branco MG, for the AÇOMINAS - Minas
    Gerais Steel S.A. part of Group Gerdau.
  • Environmental Sanitation Program in Hydrographic Basin Springs of the High Tiete (2001
    to 2004), for the SEHAB - Housing and Urban Development Secretariat of São Paulo
    Municipality.
  • Programs and Projects of the HABI - Popular Housing Superintendence (2002 to 2004), for
    the SEHAB - Housing and Urban Development Secretariat of São Paulo Municipality.

4.1.3. Studies and Design Coordination

  • Final Pump Station and Treatment and Recovery Station of the Water Quality of the
    A.B.C. and Barueri (1982 to 1984), of the Sanegran System in the São Paulo Metropolitan
    Region, for the SABESP - São Paulo State Basic Sanitation Company.

4.1.4. Projects Implementation Planning

  • Expansion of the track and the terminal of the Funchal Airport (1985), in the Madeira
    Island, for the Santa Catarina Airport Cabinet, of the Portugal Finances and Plan
    Ministry.
  • Garabi Dams and Hydroelectric (1985), in the Uruguay River, for the Executive Committee
    of ELETROBRÁS – Brazil Energy Central Offices S.A. with the AEEA - Argentina Water and
    Electric Power.
  • Hotel Costa Verde (1985), in Cuiabá MT, for Santa Laura Enterprises S.A.

4.2. BUSINESSES DEVELOPMENT
4.2.1. Commercial Management

Market studies and strategies; development of work plans, businesses and public relations;
register of customers; analysis of calls for bids and quantities and prices spreadsheets;
coordination of technical and commercial proposals; negotiation of interests; analysis of
prices and term and mediation conditions and payment; evaluation of obligations and
responsibilities and guarantees and penalties; supervision and administration of the bid;
representation in associations and unions:

  • Foundations, Retaining Walls Structures, Earth Retention and Slopes Stabilization Works
    (1986 to 1990), in Civil Construction and Consultancy Engineering Companies, State
    Companies and the State and Municipal Secretaries of São Paulo Government.
  • Earth, Bridges and Current Works, Paving, Edifications, Granting of Collective
    Transport and Sanitation Concessions (1994 to 1997), in the States of São Paulo,
    Paraná, Minas Gerais and Rio de Janeiro.
  • Studies, Designs and Projects Management (1997 to 1998), together the DERSA - Road
    Development S.A., in the Monitoring Commission of the Concessions and Permits of
    Collective Services of the Transports Secretary, current ARTESP - Agency of Transports
    of the São Paulo State and the CPTM - Paulista Metropolitan Railroad Company.
• Services and Products of Consultancy Engineering (1999 to 2001) for the infrastructure
    areas, in the São Paulo State.

4.2.2. Contracts Administration

Development of the monitoring instrument and tools and evaluation of the contracts;
activation and follow-up of processes; technical, commercial and administrative feasibility
studies; planning and physical and financial controls; analyses of opportunities and
management of conflicts; economic and financial claim; grants advance and diligence;
diagnosis of performances and results and negotiation of interest, definition of strategies
and e loyalty of customers:

  • Foundations, Support Structures and Earth Works (1988 to 1990), with Public and Private
    Companies, Institutes, Institutions and Associations, in São Paulo State.
  • Environmental Sanitation, Popular Housing, Edifications and Real Estate Incorporations
    (1991 to 1993), together the SABESP - São Paulo State Basic Sanitation Company, CDHU -
    São Paulo State Housing and Urban Development Company, CPOS – Paulista Works and
    Services Company, ELETROPAULO - Electric Power S.A. CESP - São Paulo State Electric
    Power Company S.A., PROSASCO - Osasco Progress S.A., EMURB - São Paulo Municipality
    Urbanization Company, HABI - São Paulo Municipality Housing and Urban Development
    Secretariat and DTE - Constructions Technician Department of the São Paulo State Health
    Secretary.
  • PDL - Project of Legislative Decree (1999 to 2001), of the executive project agreement,
    technological and geometric control of the duplication of the SP 294, Highway between
    Bauru SP and Marília SP, between the Kms 360 to 375, 451 to458 and 470 to 472, for the
    DER/SP - São Paulo Roads and Highways Department, elaborated with the ALESP - São Paulo
    State Legislature, from the opinion describing the irregularities of the TCESP - São
    Paulo State Audit Court.

4.3. INDEPENDENT CONSULTANCY
4.3.1. Contracts Management

Consultancy, advisement and technical, commercial and administrative support as well as
audits and evaluations; audits and inspections with issue of decisions, opinions and
reports in processes of studies, designs, works, services and projects; tenders, supplies,
actions and inspections; coordination, inspections and controls; planning, programming and
follow-ups regarding contracts in the private and public sectors, in the scope of events,
consulting engineering, construction, assembly and too much sectors:

  • Event of XI UNCTAD - Conference about Trade and Development World, held in São Paulo SP
    (2004) with the participation of 196 countries, promoted for the UN - United Nations
    Organization in partnership with Tourism and Events Anhembi S.A., Municipal Secretary
    of International Relations, Ministry of Defense (Army and Air Force) and the Foreign
    Affairs Ministry (Itamaraty).

4.3.2. Projects Management

Preparation of analysis, studies and diagnosis of designs and technical specifications;
budgets, planning and controls; supplies and processes of bids, as well as of suppliers,
manufacturers, rendering of services and including respective structures, equipment, tools
and too much management resources, aiming to relate, recommend and to program actions for
costs reduction, optimization of terms and improvement of the services, works and products
quality that compose the project or the proper company:

  • Penha Classes Importer and Distributor Ltda (2005) in São Paulo SP.
  • MPE - Assemblies and Projects Special S.A. (october 2007 through march 2008) for the
    contract in regimen of Turn Key involving Design, Suppliment, Construction and Assembly
    of the Expansion of the Plant of Infra Structure and Utilities of the Mining Casa de
    Pedra, part of CSN - National Steel Company S.A., in Congonhas MG.

4.3.3. Businesses Management

Representation technical, commercial and administrative, elaboration and implementation of
businesses and marketing plans; planning, organization and supervision of human resources,
material and financial; management, control and direction of the work crews; coordination
of the agents intervening in the market; disclosure, promotion and sales of products,
services, material, machines and equipment for constructors and contractors, designers,
construction and project managers, suppliers and rendering of services as well as
industries of the branch:

  • Interactions (since 2006) between interested companies       and   the   market   of   the
    engineering services and of the construction industry.

My Curriculum Vitae

  • 1.
    CURRICULUM VITAE Paulo Eduardo Dias Garcia 1. PROFESSIONAL SUMMARY 1.1. OBJECTIVE Direction and management or consultancy in engineering services and in construction industry. 1.2. ADDRESS www.pauloeduardodiasgarcia.eng.br (site) http://meadiciona.com/pauloedgarcia (connection and relationship) contatos@pauloeduardodiasgarcia.eng.br (e-mail) 55 (11) 8284.9887 (mobile) and 55 (11) 3257.0666 (home) Rua Piauí 490 Apto 84 Higienópolis CEP 01241-000 São Paulo Capital Brazil (home) 1.3. GRADUATION Civil Engineering (1969) by the Engineering School of Mackenzie University and Executive Education (1983, 1993 and 1996) by the Business Administration School of the Getulio Vargas Foundation. 1.4. LANGUAGES Portuguese (fluent), Spanish (intermediate), English and French (basic). 1.5. HISTORICAL Born in 24 of november of 1946, professional with generalist profile and multidisciplinary qualification. Experience in development of businesses and in implementation of designs, works and projects in the areas of engineering and civil, industrial and heavy construction. Activities in positions of works coordinator (1969 through 1975), projects implementation manager (1975 through 1982 and 2001 through 2004), studies and designs coordinator (1982 through 1985), commercial manager and contracts administrator (1986 through 2001) and independent consultant (since 2004) in projects, contracts and businesses management. Actuation in Brazil (São Paulo, Rio de Janeiro and Minas Gerais) and Abroad (Argentina and Portugal), together of the companies of consultative engineering (design and project management), engineering special services (foundations and geotechnical), constructors and contractors. Services rendered in several infrastructure segments such like supply, buildings and popular habitations (housing), power, sports and leisure, base and transformation industries, basic and environmental sanitation and transports in the subway, air, railroad and road modes. 2. TECHNICAL ACTIVITIES 2.1. UNIVERSITY • Editor Head (1969) of Mackenzie Engineering Magazine of the Academic Center Horácio Lane. 2.2. PRACTICES • Geipot - Integration Executive Group of the Transports Politics (1967) of Transports Ministry, Brazil BR. • Enbasa Engineering and Commerce S.A. (1968) former Constructor Nogueira Baptista Ltda. 2.3. COURSES • Planning with PERT-CPM and Development Analysis (1968) at the São Paulo Engineering Institute. • Special of Business Administration (1973) at the Mackenzie University. • Earth and Rock Fill Dam (1980) at the Minas Gerais Engineers Society. • Industrialized Construction Technology (1980) at the Minas Gerais Engineers Society. • Advanced Projects Management (1985) at the Brazil Management Center. • Projects Implementation Management (1983), Informatics Management (1993) and Business Strategic Management (1996) at the Business Administration School of the Getulio Vargas Foundation in São Paulo.
  • 2.
    • Word, Excel,PowerPoint and Access applications of the Windows XP (Basic and Advanced); MS-Project 2000 and AutoCAD 2002 (Basic and Intermediate) at the Education Center in Informatics (2003) of the Senac São Paulo. 3. PROFESSIONAL ACTIVITIES 3.1. Works Coordinator • Enbasa Engineering and Commerce S.A., current Serveng Civilsan S.A. Associated Engineering Companies, from january 1969 through july 1972. • Constructor Beter S.A., together with the Raymond International (foundation), from august 1972 through july 1974. • Ecicel Works Assistant Company Ltd, Enterprise Consortium between Ecisa Engineering Commerce and Industry S.A. and Ecel Construction and Engineering Office S.A., together with the Franki S.A. (foundation), from august 1974 through august 1975. 3.2. Projects Implementation Manager • Etel Roads Technical Enterprises S.A., together with the contracts of Constructor Mendes Junior S.A. and Cetenco Engineering S.A., from september 1975 through december 1976. • Constructor Adolpho Lindemberg S.A., together with the Promon Engineering S.A. (design), from december 1976 through august 1978. • Hidrogeo - Enterprise Consortium between Hidroservice Designs Engineering Ltd with Geotécnica S.A., together with the Booz Allen Hamilton (advisement and support), from september 1.978 through january 1982. • Etep Technical Studies and Designs Ltd, when part of Group Suez, from march 2001 through march 2004. 3.3. Studies and Designs Coordinator • Hidroservice Designs Engineering Ltd, from january 1982 through december 1985. 3.4. Businesses Development Manager • Sondotécnica S.A., from January 1986 through november 1988 and from may 1997 through december 1998. • Griffin Drenasa Soils Mechanic Ltd, part of Griffin Dewatering Corporation, from december 1988 through november 1990. • Jaú S.A. Constructor and Incorporator, from october 1991 through november 1993. • Constructor and Paver São Luiz S.A., from january 1994 through december 1994 and from september 1994 through april 1997. • Jaakko Poyry Engineering Ltd, from january 1999 through january 2001. 3.5. Programming, Budget and Control Superintendent • CDHU - São Paulo State Housing and Urban Development Company, from january 1995 through august 1995. 3.6. Independent Consultant • Consultancy in Projects, Contracts and Businesses Management, since march 2004. 4. PROFESSIONAL EXPERIENCE 4.1. DESIGN, WORKS AND PROJECTS IMPLEMENTATION 4.1.1. Works Coordination Coordination and studies of designs, quantities and prices; physical and financial cronograms; PERT-CPM webs; monitoring of the BDI; planning and constructive methods of works; programming and physical, financial and conformity controls; materials, labor and equipment cronograms; supply of materials, labor and equipment; management of resources and quality conformity, term and cost; management of the contracts; coordination of the works and technical and administrative supervision: • Morumbi Stadium - Cicero Pompeu de Toledo (1969 and 1970), in the São Paulo City, for the SPFC - São Paulo Football Club. • Prestressed Concrete Bridge over the River Atibaia and Reinforced Concrete Bridge over the River Jaguari (1969 and 1971), at Highway SP 065 between Campinas SP and Jacarei SP, for the DER/SP - São Paulo Roads and Highways Department. • District Market for Food Supply of São Paulo City (1970 and 1971), at the Pirituba Quarter, for the PMSP - São Paulo Municipality.
  • 3.
    • Reservoirs forWater Supply of São Paulo Metropolitan Region (1970 and 1971), at Brasilândia Village and Cangaiba Quarter, for the SABESP - São Paulo State Basic Sanitation Company. • Industrial Equipment Factory for Earthwork, Paving and Concrete (1970 and 1971), in Taboão da Serra SP, for the Dynapac S.A. part of Group Atlas Copco. • Oceanic Interceptor of Sewers of the Rio de Janeiro City (1971 and 1972) in the Botafogo Quarter, for the CEDAE – Rio de Janeiro State Water and Sewer Company. • Oxygen Factory, Cooling Towers, Coal Yard, Pit Furnace and Plates Reheating of the José Bonifácio de Andrade e Silva Steel Pant (1972 and 1973), in Cubatão SP, for COSIPA – Paulista Steel Plant S. A. part of System Usiminas. • Debugging of the Aricanduva Stream (1973 and 1974), tributary of the Tiête River, for EMURB - São Paulo Municipality Urbanization Company. • Tunnel and Boarding and Disembarkation Station of Passengers of the Metropolitan (1974 and 1975), at Uruguaiana Street (Central Region), for the Metrô/RJ - Rio de Janeiro State Subway Company. 4.1.2. Projects Implementation Management Supervision and coordination of the planning, programming and physical, financial and conformity controls; supervision of the works, designs and supplies; coordination of the designs interfaces with works, supplies with works and designs with supplies; supervision and technical follow-up of works, designs and supplies; follow-up of the quality guarantee; inspection and proceedings of products and material; diaries and reports of events and evolution of the projects: • Steel Railway (1975 and 1976), between Belo Horizonte MG and Barra Mansa RJ (kms 66.03 to 100.74), for the ENGEFER - Railroad Engineering Company S. A. current MRS Logistic S.A. • Factory of Load Wagons for Railroad and Passengers Cars for Subway (1977 and 1978), in Hortolândia SP, for the Cobrasma S.A. – Brazilian Machines Company, current Amsted Maxion - Foundry and Railway Equipment S.A. • Ouro Branco Steel Plant, (1978 to 1981), in Ouro Branco MG, for the AÇOMINAS - Minas Gerais Steel S.A. part of Group Gerdau. • Environmental Sanitation Program in Hydrographic Basin Springs of the High Tiete (2001 to 2004), for the SEHAB - Housing and Urban Development Secretariat of São Paulo Municipality. • Programs and Projects of the HABI - Popular Housing Superintendence (2002 to 2004), for the SEHAB - Housing and Urban Development Secretariat of São Paulo Municipality. 4.1.3. Studies and Design Coordination • Final Pump Station and Treatment and Recovery Station of the Water Quality of the A.B.C. and Barueri (1982 to 1984), of the Sanegran System in the São Paulo Metropolitan Region, for the SABESP - São Paulo State Basic Sanitation Company. 4.1.4. Projects Implementation Planning • Expansion of the track and the terminal of the Funchal Airport (1985), in the Madeira Island, for the Santa Catarina Airport Cabinet, of the Portugal Finances and Plan Ministry. • Garabi Dams and Hydroelectric (1985), in the Uruguay River, for the Executive Committee of ELETROBRÁS – Brazil Energy Central Offices S.A. with the AEEA - Argentina Water and Electric Power. • Hotel Costa Verde (1985), in Cuiabá MT, for Santa Laura Enterprises S.A. 4.2. BUSINESSES DEVELOPMENT 4.2.1. Commercial Management Market studies and strategies; development of work plans, businesses and public relations; register of customers; analysis of calls for bids and quantities and prices spreadsheets; coordination of technical and commercial proposals; negotiation of interests; analysis of prices and term and mediation conditions and payment; evaluation of obligations and responsibilities and guarantees and penalties; supervision and administration of the bid; representation in associations and unions: • Foundations, Retaining Walls Structures, Earth Retention and Slopes Stabilization Works (1986 to 1990), in Civil Construction and Consultancy Engineering Companies, State Companies and the State and Municipal Secretaries of São Paulo Government. • Earth, Bridges and Current Works, Paving, Edifications, Granting of Collective Transport and Sanitation Concessions (1994 to 1997), in the States of São Paulo, Paraná, Minas Gerais and Rio de Janeiro. • Studies, Designs and Projects Management (1997 to 1998), together the DERSA - Road Development S.A., in the Monitoring Commission of the Concessions and Permits of Collective Services of the Transports Secretary, current ARTESP - Agency of Transports of the São Paulo State and the CPTM - Paulista Metropolitan Railroad Company.
  • 4.
    • Services andProducts of Consultancy Engineering (1999 to 2001) for the infrastructure areas, in the São Paulo State. 4.2.2. Contracts Administration Development of the monitoring instrument and tools and evaluation of the contracts; activation and follow-up of processes; technical, commercial and administrative feasibility studies; planning and physical and financial controls; analyses of opportunities and management of conflicts; economic and financial claim; grants advance and diligence; diagnosis of performances and results and negotiation of interest, definition of strategies and e loyalty of customers: • Foundations, Support Structures and Earth Works (1988 to 1990), with Public and Private Companies, Institutes, Institutions and Associations, in São Paulo State. • Environmental Sanitation, Popular Housing, Edifications and Real Estate Incorporations (1991 to 1993), together the SABESP - São Paulo State Basic Sanitation Company, CDHU - São Paulo State Housing and Urban Development Company, CPOS – Paulista Works and Services Company, ELETROPAULO - Electric Power S.A. CESP - São Paulo State Electric Power Company S.A., PROSASCO - Osasco Progress S.A., EMURB - São Paulo Municipality Urbanization Company, HABI - São Paulo Municipality Housing and Urban Development Secretariat and DTE - Constructions Technician Department of the São Paulo State Health Secretary. • PDL - Project of Legislative Decree (1999 to 2001), of the executive project agreement, technological and geometric control of the duplication of the SP 294, Highway between Bauru SP and Marília SP, between the Kms 360 to 375, 451 to458 and 470 to 472, for the DER/SP - São Paulo Roads and Highways Department, elaborated with the ALESP - São Paulo State Legislature, from the opinion describing the irregularities of the TCESP - São Paulo State Audit Court. 4.3. INDEPENDENT CONSULTANCY 4.3.1. Contracts Management Consultancy, advisement and technical, commercial and administrative support as well as audits and evaluations; audits and inspections with issue of decisions, opinions and reports in processes of studies, designs, works, services and projects; tenders, supplies, actions and inspections; coordination, inspections and controls; planning, programming and follow-ups regarding contracts in the private and public sectors, in the scope of events, consulting engineering, construction, assembly and too much sectors: • Event of XI UNCTAD - Conference about Trade and Development World, held in São Paulo SP (2004) with the participation of 196 countries, promoted for the UN - United Nations Organization in partnership with Tourism and Events Anhembi S.A., Municipal Secretary of International Relations, Ministry of Defense (Army and Air Force) and the Foreign Affairs Ministry (Itamaraty). 4.3.2. Projects Management Preparation of analysis, studies and diagnosis of designs and technical specifications; budgets, planning and controls; supplies and processes of bids, as well as of suppliers, manufacturers, rendering of services and including respective structures, equipment, tools and too much management resources, aiming to relate, recommend and to program actions for costs reduction, optimization of terms and improvement of the services, works and products quality that compose the project or the proper company: • Penha Classes Importer and Distributor Ltda (2005) in São Paulo SP. • MPE - Assemblies and Projects Special S.A. (october 2007 through march 2008) for the contract in regimen of Turn Key involving Design, Suppliment, Construction and Assembly of the Expansion of the Plant of Infra Structure and Utilities of the Mining Casa de Pedra, part of CSN - National Steel Company S.A., in Congonhas MG. 4.3.3. Businesses Management Representation technical, commercial and administrative, elaboration and implementation of businesses and marketing plans; planning, organization and supervision of human resources, material and financial; management, control and direction of the work crews; coordination of the agents intervening in the market; disclosure, promotion and sales of products, services, material, machines and equipment for constructors and contractors, designers, construction and project managers, suppliers and rendering of services as well as industries of the branch: • Interactions (since 2006) between interested companies and the market of the engineering services and of the construction industry.