SlideShare a Scribd company logo
1 of 10
Download to read offline
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 1 of 10
PERSONAL INFORMATION
NAME Abd Elnaser Shehata Abd Rabo ID No: 74244
NATIONALITY Egyptian
GENDER Male
PROFESSION QA/QC Manager
DATE OF BIRTH 6 Jan 1976
MARITAL STATUS Married
CONTACT INFORMATION
MAILING ADDRESS
Present Permanent
Jeddah , KSA
42B2 , 5th
District, El Ebour
City, Egypt
Postal Code: 11828
TELEPHONE
+20118556458 or +201002113942
00966597255717
Home Country Contact No.
EMAILs
a_sara104@yahoo.com
Abdelnaser.limitless@gmail.com
sa.linkedin.com/pub/abd-el-naser-
shehata/45/4a2/b3/
abdelnasser.shehata1
Email
abdelnasser.shehata@dargro
up.com
EDUCATIONAL QUALIFICATIONS
DEGREE/ DIPLOMA
FIELD OF
SPECIALISAT
ION
YEAR OF
PASSING
UNIVERSITY / BOARD/
INSTITUTION
LOCATION
B.Sc. Civil
Engineering
Civil May 2000
Shobra Faculty of
Engineering. – Zagazig
University
Egypt
PROFESSIONAL QUALIFICATIONS
Member in:
Egypt Engineers Syndicate
Saudi Council of Engineers (Professional Engineer -SCE)
DRIVING LICENCES
Egypt – Saudi Arabia
TOTAL EXPERIENCE
More than 14 Years
SUMMARY OF PROFESSIONAL EXPERIENCE
Experienced Construction Professional, having specialized in Quality Management Systems
in Construction Projects. Have Efficiently Deployed and Maintained Quality Management Systems
and Programs within Contractors/Consultants and PM/CM organizations and on different types of
Construction Mega Projects. Have a strong background in Managerial and Technical Aspects of
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 2 of 10
Construction Industry gained through active exposure to a diverse range of Construction and
Management functions.
Experience in the following:
Industrial projects (WWTP, PWTP, Pumping Station , Cement factories , infrastructure , High rise steel
buildings , Bridges , High Speed Rails and power plants).
 Heavy reinforced concrete structures.
 Circular slip forms (water pits, circular water tanks and cement silos- up to 60m diameters and 80m
height).
 Micro tunneling and Pipe jacking.
 Architecture & Finishing work
 Precast concrete, hollow core, Pre-stressed and Colored concrete.
 High rise buildings.
 Installation and testing of all types of pipes up to Dia. 2500 mm (Sewer, Force main, water, etc.)
 Construction of road ways (concrete and asphalt).
 Testing fresh and hardened concrete.
 Non Destructive Testing Welds "PT, MT, PAUT,UT &RT’’.
 Heavy Steel structure.
 Façade works and cladding.
 All types of pile work.
 Underground tunnels.
 Soil improvement.
 Infrastructure and storm drainage systems.
 Mass concrete.
 GRP & GRC.
 Fire proofing and refractory work.
 Landscape (soft & hard).
 White and steel Reinforced concrete and Fiber reinforced concrete.
 Bridges using white concrete technology.
 Quality Auditing.
 Quality Management.
 Data Analysis.
 Materials.
From August 2012 Till now
QA/QC Manager
Dar al-handasah [Shair and partners]
Project: Al Haramain High Speed Rail (phase 1 package 2 – Jeddah Station – HHR – S08139)
Owner: Ministry of Transport / Saudi Railways Organization (S.R.O)
Designer: Foster + Partners & Buro Happold
Engineer: Dar al-handasah [Shair and partners]
Contractors: Saudi Oger Consortium, Ben Laden Consortium, Al-Rajhi Consortium and Spanish
Consortium (ASC).
Project cost: 2,900,000,000 SAR (Jeddah Station only) /’’The whole project cost is around 50 Billions’’
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 3 of 10
My Duties as QA/QC Manager:
1. Mange the QA/QC program developing, implementing and monitoring the quality program for the
project.
2. Monitoring day-to-day operations of department personnel to ensure compliance with both client
and code specifications as well as monitoring the procedure and performance of all consultants in
the application of the QMS.
3. Driving the QA/QC culture across the team.
4. Coordinate with testing Agencies for Procedure Qualification Records (PQR) and all other required
tests.
5. Establish and monitor project KPIs.
6. Maintaining DAR’s Quality Management System and leading internal audits across the regional
offices to ensure the Division’s full compliance.
7. Ensure that the approved Project Quality Plan is implemented on the project.
8. Revise and approve the submitted ITPs, MSs, and work procedures from contractor.
9. Evaluate, analyzing, and improving concrete work including all different classes.
10. Handing over all completed civil work to MEP team&Phase2 Spanish consortium and co-ordinate
interfaces after preparation of snag list.
11. Lead presentation information in the management meeting with client such as audit reports, non-
conformances, corrective actions, preventive actions, improvements and KPIs data analysis.
12. Review contractor and Subcontractor Quality audits programs and follow implementation on sit.
13. Responsible for revising Inspection records, test package and other Quality control documents
handed over from contractor.
14. Co-ordinate non conformance identification, disposition and corrective action follow up.
15. Provide proactive advice to Project Management Team related to quality.
16. Carry out progressive partial turnover punch list items to ensure that the works are completed to the
fullest extent possible prior to acceptance.
17. Supporting the core team and project manager approving the submitted civil materials from
contractor materials.
18. Identify, analyze and document all defects, errors and operational characteristics that are
inconsistent with stated requirements and design specifications.
19. Arranging and managing weekly QA/QC meeting with contractor and attending weekly
progress meeting with contractor representing the client.
20. Collaborate with Contractor Department Managers (Construction Manager, Design Manager,
Environmental and Sustainability Manager, Health and Safety Manager, etc.) in preparing and
updating the quality, environment and safety management plans.
21. Provide support, training, advice and assistance as required to the project team in the
implementation of the Quality Management System.
22. Assess performance and quality of products against specified criteria and standards.
23. Monitor and control the status of punch list and exception lists relevant to quality dossiers.
24. Attend the weekly QA/QC, and commissioning meetings.
25. Follow the Testing & Commissioning program and handing over procedures and proper
implementation of the approved protocol.
26. Report the project status through the monthly report for top management.
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 4 of 10
From Nov. 2010 till June 2012 :
Sr. QC Engineer/Deputy site QA/QC manager
Kharafi National – Egypt
Project: West Damietta Simple Cycle Power Plant (500 MW)
“ Engineering, Procurement and Construction (EPC) contract”
Owner: East Delta Electricity Production Company
Designer: ECG
Engineer: PGESCo – (subsidiary of Bechtel)
My Duties as Sr. QC Engineer & Deputy QC Manager:
1. Supervise and manage all QC Civil functions in the workplace and manage a team of QC
engineers and inspectors for day to day QC functions
2. Coordinate with Non Destructive Examinations (NDE) sub contractors for enquiry quotations
3. Coordinate with testing Agencies for Procedure Qualification Records (PQR) and all other
required tests.
4. Coordinate with Inspection agencies for all related inspection activities
Preparation ITPs, MS , and work procedures.
5. Evaluate, analyzing, and improving concrete work including all different classes.
6. Handing over all completed civil work to mechanical team
7. Auditing and reporting on the project compliance which includes assessing subcontractors and
suppliers.
8. Plan and undertake Subcontractor audits and reviews of Sub contractor quality control
programs
9. Responsible for compiling Inspection records and other Quality control documents and
preparation of final document dossier for final client submission.
10. Coordinate management review-presentation information such as audit reports, non-
conformances, corrective actions, improvements client and customer satisfaction results and
KPI data.
11. Attend training and seminars related to QMS.
12. Drive the QA/QC culture across the project team.
13. Manage and undertake internal audits.
14. Control all nonconformance reports and undertake remedial action, Co-ordinate non
conformance identification, disposition, and corrective action follow up.
15. Provide proactive advice to Project Management Team related to quality.
16. Carry out progressive partial turnover punch list items to ensure that the works are completed to
the fullest extent possible prior to acceptance.
17. Supporting the construction managers and engineering department to get client approval on all
used civil materials.
18. Coordinate with the client and Engineer on all quality matters.
19. Coordinate all receipt inspections.
20. Distribute relevant QA/QC documentation to site subcontractors.
21. Verify that the quality related site activities are in accordance with the applicable codes and
standards
22. Attending weekly QA/QC meeting with client and weekly progress meeting with client.
23. Attending the contractor daily video conference discussing all outstanding issues in the
project.
24. Auditing and reporting on the project compliance which includes assessing subcontractors and
suppliers.
25. Establish and monitor the project KPIs.
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 5 of 10
26. Monitoring performance for all subcontractors.
27. Manage and lead the quality and document control department.
28. Ensure all quality control documentation is complied and competed for as-built hand over
through the QC turnover engineer.
29. Review the client specification and undertake relevant training to the site QC inspectors.
30. Coordinate with the site QC manager for the completion of as-built turnover documentation.
31. Resolve any discrepancies between the completed milestone and quality documentation.
32. Review supplier’s inspection and test plans against the milestone scope of work.
33. Coordinate with the commissioning department to define the scope of work.
34. Assist the site subcontractors to compile turnover dossiers.
35. Provide progress information for incorporation into project reports.
36. Monitor hydrostatic test packs for incorporation into as-built dossiers.
37. Consider the implications of delays in QC as-built turnover documentation and bring to the
attention of the site QC manager.
38. Monitor and control the status of punch list and exception lists relevant to quality dossiers.
39. Attend the weekly QA/QC, and commissioning meetings.
From Nov. 2010 till July2011 :
Sr. QC Engineer
Kharafi National – Egypt
Project: Damietta and Shabab Simple Cycle Power Plant (1500 MW)
“ Engineering, Procurement and Construction (EPC) contract”
Owner: East Delta Electricity Production Company
Designer: ECG
Engineer: PGESCo - (subsidiary of Bechtel)
My Duties as Sr. QC Engineer & Deputy QC Manager:
1. Leading a team of 8engineers and 8 inspectors in addition to QC engineers of sub-
contractor(ARCHIRODON overseas Co.) achieving the following:
2. Supervise and manage all QC Civil functions in the workplace and manage a team of QC engineers
and inspectors for day to day QC functions
3. Coordinate with Non Destructive Examinations (NDE) sub contractors for enquiry quotations
4. Coordinate with testing Agencies for Procedure Qualification Records (PQR) and all other required
tests.
5. Inspection agencies for all related inspection activities
6. Act as a focal and coordination point for ISO internal and external audits and to conduct internal and
operation audits
7. Plan and undertake Subcontractor audits and reviews of Sub contractor quality control programs
8. Provide proactive advice to Project Management Team related to quality.
9. Attending weekly QA/QC meeting with client and weekly progress meeting with client.
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 6 of 10
From July 2006 till October 2010:
Sr. QC Engineer
Orascom for Construction Industries (Algeria & Syria)
 From Jul. 2009 till Oct. 2010:
Project: Central Electric Terga (3*400 MW) – combined cycle
Owner: Le Directeure de le Energie et de Mines
Designer: ALSTOM
Engineer: SKT
My Duties as Sr. QC Engineer:
1. Supervise and manage all QC functions in the workplace and manage all civil team of QC engineers
and inspectors for day to day QC functions
2. Manage all site inspections of (Excavation , shoring , jet grouting work , concrete work , steel
structure , infrastructure and finishing work).
3. Interface and coordinate with clients for production and QC matters and coordinate with third party
inspection agencies for all related inspection activities
4. Act as a focal and coordination point for ISO internal and external audits and to conduct internal and
operation audits
5. Plan and undertake Subcontractor audits and reviews of Sub contractor quality control programs.
6. Review material certification for project material to ensure it meets project specifications.
Checking also includes that subject material corresponds to actual material supplied as per
Material Test Record
7. Conduct inspection of activities of construction and testing works at site as required by
Inspection Test Plan to verify product conformity and full compliance with engineering
drawings, project specifications and project contract documents.
8. Provide proactive advise to Project Management Team related to quality.
9. Handing over all completed civil work to mechanical team
 From Apr.2008 till Jul. 2009:
Project: Grey lines at Aleppo for cement production and backing
Owner: Syrian Cement Company (SCC)- LA FARGE
Designer: FLSMIDTH
Engineer: FLSMIDTH
My Duties as Sr. QC Engineer:
1. Mange all site inspections for all factory buildings; (gypsum crusher, limestone crusher, basalt
crusher, pre-heater building , kilns and cooler, cement mill, pump rooms and the water system,
additives building , infrastructure and coal storage)
2. Following and supervise all the steel structure work (erection , touch-up painting , tightening and
hading over)
3.
4. Conducting all third party tests at site and reviewing the test reports prior to submit for owner
approval.
5. Coordinate with owner representative at site to solve any technical issues related to Quality of the
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 7 of 10
products.
6. Taking initiated action to prevent any of non-conformance at site
7. Properly interpret Contract or technical Specifications.
8. Review and approve subcontractor/sub vendors quality documents.
9. Perform quality assurance audits at various EPC stages.
10. Identify non-compliance and approve planned corrective actions.
11. Develop inspection and test plans and project specific Quality Plans in accordance with
project specifications
12. Assure that Project is quality controlled, optimally designed, engineered to appropriate
standards and specifications, meeting required product specification and HSE requirements.
13. Provide proactive advice to Project Management Team related to quality.
 From Jul. 2006 till Apr.2008:
Project: Grey & white lines at Aleppo for cement production and backing
Owner: Algerian Cement Company (ACC)- LA FARGE
Designer: FLSMIDTH
Engineer: FLSMIDTH
My Duties as Sr. QC Engineer:
1. Mange all site inspections for all factory buildings; (gypsum crusher, limestone crusher, basalt
crusher, pre-heater building , kilns and cooler, cement mill, pump rooms and the water system,
additives building , infrastructure and coal storage)
2. Conducting all third party tests at site and reviewing the test reports prior to submit for owner
approval.
3. Coordinate with owner representative at site to solve any technical issues related to Quality of the
products.
4. Taking initiated action to prevent any of non-conformance at site
5. Following and supervise all the steel structure work (erection , touch-up painting , tightening and
hading over)
6. Properly interpret Contract or technical Specifications.
7. Review and approve subcontractor/sub vendor’s quality documents.
8. Perform quality assurance audits at various EPC stages.
9. Identify non-compliance and approve planned corrective actions.
10. Develop inspection and test plans and project specific Quality Plans in accordance with
project specifications
11. Assure that Project is quality controlled, optimally designed, engineered to appropriate
standards and specifications, meeting required product specification and HSE requirements.
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 8 of 10
From Nov. 2001 till July 2006:
QC Engineer with K&M Engineering and Consulting LLC/CEL (joint venture)
 From Dec. 2005 till July 2006:
Project: SECONDARY CITIES PROJECT (LUXOR FARA No:3) – USAID GRANT NO. 263-0236
Owner: National Organization for Potable Water And Sanitary Drainage “NOPWASED”
Engineer: Camp Dresser and McKee International (CDM) in association with (AAW).
My Duties as QC Engineer:
1. Following and supervising Micro Tunneling and pipe jacking for 300m underground crossing
(canal and road)
2. Following and inspecting Construction of all concrete works of pump station3.
3. Following and inspecting Construction of electrical substation.
4. Following and inspecting Installation of force main ductile iron pipeline (1000mm).
5. Testing of force main ductile iron pipeline (1000mm).
6. Following and inspecting Road works above all force main pipeline.
7. Follow up NCR closing as earliest.
8. Ensure PROJECT deliverables fully satisfy QA/QC requirements specified in the
contract.
9. Properly interpret Contract or technical Specifications.
10. Assure that Project is quality controlled, optimally designed, engineered to appropriate
standards and specifications, meeting required product specification and HSE
requirements.
 From Nov. 2000 till Nov. 2005 :
Project: Water and Wastewater facilities Projects for three cities (Minia- Bani-Suaf – Fayoum)
MIDDLE EGYPT PROJECT – USAID GRANT NO. 263-0270
Owner: National Organization for Potable Water And Sanitary Drainage “NOPWASED”
Engineer: Montgomery Watson/ Harza (MWH) in association with ECG & AAW.
My Duties as QC Engineer:
1. Following and supervising Construction of structures of wastewater treatment plants as circular
tanks, pump stations, concrete channel , dry beds.
2. Following and supervising Construction of service buildings with finishing work and roof system.
3. Following and supervising Concrete Road Ways and landscape.
4. Following and supervising Earthwork (excavation – backfilling ) with shoring and dewatering
system
5. Following and supervising Installation of force main D.I. pipe lines with diam. 250 & 1000 mm
6. Following and supervising Pre-cast and cast in place MH’s with different types.
7. Testing of sewer MH’s and pipe lines.
8. Conduct inspection of activities of construction and testing works at site as required by
Inspection Test Plan to verify product conformity and full compliance with engineering
drawings, project specifications and project contract documents.
9. Ensuring that the inspection and tests are carried out in conformity with the field quality
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 9 of 10
control plan and obtaining the relevant documentation.
10. Review material certification for project material to ensure it meets project specifications.
Checking also includes that subject material corresponds to actual material supplied as per
Material Test Record
11. Follow up with contractors work to ensure the progress schedule will be implemented with
the given time frame and to check the quality of work shall always be implemented.
SN
Date
Company Location classification
From To
1 Aug.2012 present Dar al-handasah KSA QA/QC manager
2 Nov. 2010 June 2012 Kharafi National Egypt Sr. QC Engineer
3 July 2006 Oct. 2010
Orascom for
Construction
Industries (OCI)
Syria & Algeria Sr. QC Engineer
4 Nov. 2000 July 2006
Consulting
Engineering (CEL)
Egypt QC Engineer
COMPUTER SKILLS
Software/ Application Skill Level Years of Experience
Windows - Offices (Excel – Word –
Access - PowerPoint).
SAP90 – SAP2000, AutoCAD
Excellent More than 5 years
LANGUAGES
Language
Skill Level
Read Write Speak
Arabic Excellent Excellent Excellent
English
French
Very Good
Good
Very Good
Good
Very Good
Fair
PERSONAL SKILLS
• Self Motivated, high caliber, high skilled constructing industrial projects , High ability leading teamwork ,
working under pressure and fast track projects
• High skilled implementing international standards and codes.
Knowledge of NDE, Welding Technology, Painting and Code Systems.
• Able to prepare Method Statement, ITP’s, Inspection check lists and procedures.
• Data Analysis
• Management of technical consulting assignments.
•Provide proactive advice to Project Management Team related to quality.
• Report writing and business and technical correspondence.
CURRICULUM VITAE
__________________________________________________________________________________________________________________
Updated on 12-May-2015 Page 10 of 10
• Team leadership.
•Appraisal, development and training of staff.
• Management and Business Administration.
• Negotiation and Communication.
• Familiarity with ISO-9000 quality management systems.
• Maintain standards of safety and comply with Company’s Occupational Health & Safety
Management System requirements.
DETAILS IN Dar Al-Handasah
CURRENT CLASSIFICATION QA/QC Manager (Grade Pa3)
DATE OF JOINING August 2012
ID 74244
PROJECT HHR-S08139

More Related Content

What's hot

What's hot (20)

Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
Piping Engineer
Piping EngineerPiping Engineer
Piping Engineer
 
CV_Venkat_16(Onshore Drilling Rig, Oil & Gas,SCM,Manufacturing,)
CV_Venkat_16(Onshore Drilling Rig, Oil & Gas,SCM,Manufacturing,)CV_Venkat_16(Onshore Drilling Rig, Oil & Gas,SCM,Manufacturing,)
CV_Venkat_16(Onshore Drilling Rig, Oil & Gas,SCM,Manufacturing,)
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
Vijay konathala Resume
Vijay konathala ResumeVijay konathala Resume
Vijay konathala Resume
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
New_Hissam_CV (3).PDF
New_Hissam_CV (3).PDFNew_Hissam_CV (3).PDF
New_Hissam_CV (3).PDF
 
Senior Document Controller & Admin Support
Senior Document Controller & Admin SupportSenior Document Controller & Admin Support
Senior Document Controller & Admin Support
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Resident Engineer
Resident EngineerResident Engineer
Resident Engineer
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)Huzoor-_feb_20091 CV (2)
Huzoor-_feb_20091 CV (2)
 
CV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA ManagerCV of Mohammad Mujeebuddin - PMO QA Manager
CV of Mohammad Mujeebuddin - PMO QA Manager
 
Senior Document Controller & PMT-Administrative Support
Senior Document Controller & PMT-Administrative SupportSenior Document Controller & PMT-Administrative Support
Senior Document Controller & PMT-Administrative Support
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
DOCUMENT CONTROLLER
DOCUMENT CONTROLLERDOCUMENT CONTROLLER
DOCUMENT CONTROLLER
 
JULIOS CV-T
JULIOS CV-TJULIOS CV-T
JULIOS CV-T
 
edwin cv for QA-QC Manager
edwin cv for QA-QC Manageredwin cv for QA-QC Manager
edwin cv for QA-QC Manager
 
CV for linkedin
CV for linkedinCV for linkedin
CV for linkedin
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 

Viewers also liked

1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Env_Sustain_Solutions _PPT
Env_Sustain_Solutions _PPTEnv_Sustain_Solutions _PPT
Env_Sustain_Solutions _PPTVasu Patil
 
English twitter 04
English twitter 04English twitter 04
English twitter 04jotavazquez
 
58528 primaria lengua 2010 (cuadernillo)
58528 primaria lengua 2010 (cuadernillo)58528 primaria lengua 2010 (cuadernillo)
58528 primaria lengua 2010 (cuadernillo)Mayte Pelegrin Salas
 
100 Clssified list
100 Clssified list100 Clssified list
100 Clssified listbilal120
 
Edu Portal Solution
Edu Portal SolutionEdu Portal Solution
Edu Portal SolutionMandar Joshi
 
Refererat social collaboration 04042013
Refererat social collaboration 04042013Refererat social collaboration 04042013
Refererat social collaboration 04042013Social Hub Zürich
 
Informe parcial por grupos
Informe parcial por gruposInforme parcial por grupos
Informe parcial por gruposnatis12349
 
Wireframe de una web
Wireframe de una webWireframe de una web
Wireframe de una webJorge Llanten
 
Kienbaum Human Resources Climate Study 2015
Kienbaum Human Resources Climate Study 2015Kienbaum Human Resources Climate Study 2015
Kienbaum Human Resources Climate Study 2015Kienbaum Consultants
 
CV - Daniel Perez Rodriguez
CV - Daniel Perez RodriguezCV - Daniel Perez Rodriguez
CV - Daniel Perez Rodriguezsupertany
 
Logistics and Transportation Plan for Chocolates from Switzerland to Singapore
Logistics and Transportation Plan for Chocolates from Switzerland to SingaporeLogistics and Transportation Plan for Chocolates from Switzerland to Singapore
Logistics and Transportation Plan for Chocolates from Switzerland to SingaporeSanket Golechha
 

Viewers also liked (20)

1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Ski Erg lyzarsky trenazer
Ski Erg lyzarsky trenazerSki Erg lyzarsky trenazer
Ski Erg lyzarsky trenazer
 
Env_Sustain_Solutions _PPT
Env_Sustain_Solutions _PPTEnv_Sustain_Solutions _PPT
Env_Sustain_Solutions _PPT
 
English twitter 04
English twitter 04English twitter 04
English twitter 04
 
58528 primaria lengua 2010 (cuadernillo)
58528 primaria lengua 2010 (cuadernillo)58528 primaria lengua 2010 (cuadernillo)
58528 primaria lengua 2010 (cuadernillo)
 
Empfehlungen im Web
Empfehlungen im WebEmpfehlungen im Web
Empfehlungen im Web
 
Cop FISM 2015
Cop FISM 2015Cop FISM 2015
Cop FISM 2015
 
Sillas
SillasSillas
Sillas
 
100 Clssified list
100 Clssified list100 Clssified list
100 Clssified list
 
Vender a través de Mercados electrónicos
Vender a través de Mercados electrónicos Vender a través de Mercados electrónicos
Vender a través de Mercados electrónicos
 
Edu Portal Solution
Edu Portal SolutionEdu Portal Solution
Edu Portal Solution
 
Refererat social collaboration 04042013
Refererat social collaboration 04042013Refererat social collaboration 04042013
Refererat social collaboration 04042013
 
Informe parcial por grupos
Informe parcial por gruposInforme parcial por grupos
Informe parcial por grupos
 
Wireframe de una web
Wireframe de una webWireframe de una web
Wireframe de una web
 
Kienbaum Human Resources Climate Study 2015
Kienbaum Human Resources Climate Study 2015Kienbaum Human Resources Climate Study 2015
Kienbaum Human Resources Climate Study 2015
 
Prehistoria proyecto Colegio Andalucía
Prehistoria  proyecto Colegio AndalucíaPrehistoria  proyecto Colegio Andalucía
Prehistoria proyecto Colegio Andalucía
 
CV - Daniel Perez Rodriguez
CV - Daniel Perez RodriguezCV - Daniel Perez Rodriguez
CV - Daniel Perez Rodriguez
 
Logistics and Transportation Plan for Chocolates from Switzerland to Singapore
Logistics and Transportation Plan for Chocolates from Switzerland to SingaporeLogistics and Transportation Plan for Chocolates from Switzerland to Singapore
Logistics and Transportation Plan for Chocolates from Switzerland to Singapore
 
Social Media, Web 2.0 & Hotels
Social Media, Web 2.0 & HotelsSocial Media, Web 2.0 & Hotels
Social Media, Web 2.0 & Hotels
 
Innovar en comunicación. Fermin Abella. Fermin Abella
Innovar en comunicación. Fermin Abella. Fermin AbellaInnovar en comunicación. Fermin Abella. Fermin Abella
Innovar en comunicación. Fermin Abella. Fermin Abella
 

Similar to updated CV Abdel Naser

Curriculam Vitae_ Ribin Khader
Curriculam Vitae_ Ribin KhaderCurriculam Vitae_ Ribin Khader
Curriculam Vitae_ Ribin KhaderRibin Khader
 
Application and CV 2016 Latest 8-23-2016
Application and CV  2016 Latest 8-23-2016Application and CV  2016 Latest 8-23-2016
Application and CV 2016 Latest 8-23-2016Victor Miguel Pinat
 
RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10Satyanarayana Raju
 
CV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerCV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerAbdul Rehman
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QSWAQAR AZEEM
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitaeHarvey Sarda
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Ayman Issa
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cvMadhu Civil
 
Project Management and Development Economics Project (Slides)
Project Management and Development Economics Project (Slides)Project Management and Development Economics Project (Slides)
Project Management and Development Economics Project (Slides)Pang Khai Shuen
 
CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.gorg3337
 

Similar to updated CV Abdel Naser (20)

Curriculam Vitae_ Ribin Khader
Curriculam Vitae_ Ribin KhaderCurriculam Vitae_ Ribin Khader
Curriculam Vitae_ Ribin Khader
 
Application and CV 2016 Latest 8-23-2016
Application and CV  2016 Latest 8-23-2016Application and CV  2016 Latest 8-23-2016
Application and CV 2016 Latest 8-23-2016
 
Vinay CV
Vinay CVVinay CV
Vinay CV
 
RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10
 
Engineer Mahboob's CV
Engineer Mahboob's CVEngineer Mahboob's CV
Engineer Mahboob's CV
 
CV Abdul Rehman Document Controller
CV Abdul Rehman Document ControllerCV Abdul Rehman Document Controller
CV Abdul Rehman Document Controller
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QS
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
cp civil (1)
cp civil (1)cp civil (1)
cp civil (1)
 
Suresh cv-21.01.16
Suresh  cv-21.01.16Suresh  cv-21.01.16
Suresh cv-21.01.16
 
Mohammed Naveed uddin CV
Mohammed Naveed uddin CVMohammed Naveed uddin CV
Mohammed Naveed uddin CV
 
Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016Curriculum Vitae end to start 19-7-2016
Curriculum Vitae end to start 19-7-2016
 
cv of murtuza 2016
cv of murtuza 2016cv of murtuza 2016
cv of murtuza 2016
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
Project Management and Development Economics Project (Slides)
Project Management and Development Economics Project (Slides)Project Management and Development Economics Project (Slides)
Project Management and Development Economics Project (Slides)
 
Abdul Muqeet CV Latest
Abdul Muqeet CV LatestAbdul Muqeet CV Latest
Abdul Muqeet CV Latest
 
Chirag's CV as on 13-05-2015
Chirag's CV  as on 13-05-2015Chirag's CV  as on 13-05-2015
Chirag's CV as on 13-05-2015
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.CV QAQC Manager Brf - Mngmt app.
CV QAQC Manager Brf - Mngmt app.
 

updated CV Abdel Naser

  • 1. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 1 of 10 PERSONAL INFORMATION NAME Abd Elnaser Shehata Abd Rabo ID No: 74244 NATIONALITY Egyptian GENDER Male PROFESSION QA/QC Manager DATE OF BIRTH 6 Jan 1976 MARITAL STATUS Married CONTACT INFORMATION MAILING ADDRESS Present Permanent Jeddah , KSA 42B2 , 5th District, El Ebour City, Egypt Postal Code: 11828 TELEPHONE +20118556458 or +201002113942 00966597255717 Home Country Contact No. EMAILs a_sara104@yahoo.com Abdelnaser.limitless@gmail.com sa.linkedin.com/pub/abd-el-naser- shehata/45/4a2/b3/ abdelnasser.shehata1 Email abdelnasser.shehata@dargro up.com EDUCATIONAL QUALIFICATIONS DEGREE/ DIPLOMA FIELD OF SPECIALISAT ION YEAR OF PASSING UNIVERSITY / BOARD/ INSTITUTION LOCATION B.Sc. Civil Engineering Civil May 2000 Shobra Faculty of Engineering. – Zagazig University Egypt PROFESSIONAL QUALIFICATIONS Member in: Egypt Engineers Syndicate Saudi Council of Engineers (Professional Engineer -SCE) DRIVING LICENCES Egypt – Saudi Arabia TOTAL EXPERIENCE More than 14 Years SUMMARY OF PROFESSIONAL EXPERIENCE Experienced Construction Professional, having specialized in Quality Management Systems in Construction Projects. Have Efficiently Deployed and Maintained Quality Management Systems and Programs within Contractors/Consultants and PM/CM organizations and on different types of Construction Mega Projects. Have a strong background in Managerial and Technical Aspects of
  • 2. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 2 of 10 Construction Industry gained through active exposure to a diverse range of Construction and Management functions. Experience in the following: Industrial projects (WWTP, PWTP, Pumping Station , Cement factories , infrastructure , High rise steel buildings , Bridges , High Speed Rails and power plants).  Heavy reinforced concrete structures.  Circular slip forms (water pits, circular water tanks and cement silos- up to 60m diameters and 80m height).  Micro tunneling and Pipe jacking.  Architecture & Finishing work  Precast concrete, hollow core, Pre-stressed and Colored concrete.  High rise buildings.  Installation and testing of all types of pipes up to Dia. 2500 mm (Sewer, Force main, water, etc.)  Construction of road ways (concrete and asphalt).  Testing fresh and hardened concrete.  Non Destructive Testing Welds "PT, MT, PAUT,UT &RT’’.  Heavy Steel structure.  Façade works and cladding.  All types of pile work.  Underground tunnels.  Soil improvement.  Infrastructure and storm drainage systems.  Mass concrete.  GRP & GRC.  Fire proofing and refractory work.  Landscape (soft & hard).  White and steel Reinforced concrete and Fiber reinforced concrete.  Bridges using white concrete technology.  Quality Auditing.  Quality Management.  Data Analysis.  Materials. From August 2012 Till now QA/QC Manager Dar al-handasah [Shair and partners] Project: Al Haramain High Speed Rail (phase 1 package 2 – Jeddah Station – HHR – S08139) Owner: Ministry of Transport / Saudi Railways Organization (S.R.O) Designer: Foster + Partners & Buro Happold Engineer: Dar al-handasah [Shair and partners] Contractors: Saudi Oger Consortium, Ben Laden Consortium, Al-Rajhi Consortium and Spanish Consortium (ASC). Project cost: 2,900,000,000 SAR (Jeddah Station only) /’’The whole project cost is around 50 Billions’’
  • 3. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 3 of 10 My Duties as QA/QC Manager: 1. Mange the QA/QC program developing, implementing and monitoring the quality program for the project. 2. Monitoring day-to-day operations of department personnel to ensure compliance with both client and code specifications as well as monitoring the procedure and performance of all consultants in the application of the QMS. 3. Driving the QA/QC culture across the team. 4. Coordinate with testing Agencies for Procedure Qualification Records (PQR) and all other required tests. 5. Establish and monitor project KPIs. 6. Maintaining DAR’s Quality Management System and leading internal audits across the regional offices to ensure the Division’s full compliance. 7. Ensure that the approved Project Quality Plan is implemented on the project. 8. Revise and approve the submitted ITPs, MSs, and work procedures from contractor. 9. Evaluate, analyzing, and improving concrete work including all different classes. 10. Handing over all completed civil work to MEP team&Phase2 Spanish consortium and co-ordinate interfaces after preparation of snag list. 11. Lead presentation information in the management meeting with client such as audit reports, non- conformances, corrective actions, preventive actions, improvements and KPIs data analysis. 12. Review contractor and Subcontractor Quality audits programs and follow implementation on sit. 13. Responsible for revising Inspection records, test package and other Quality control documents handed over from contractor. 14. Co-ordinate non conformance identification, disposition and corrective action follow up. 15. Provide proactive advice to Project Management Team related to quality. 16. Carry out progressive partial turnover punch list items to ensure that the works are completed to the fullest extent possible prior to acceptance. 17. Supporting the core team and project manager approving the submitted civil materials from contractor materials. 18. Identify, analyze and document all defects, errors and operational characteristics that are inconsistent with stated requirements and design specifications. 19. Arranging and managing weekly QA/QC meeting with contractor and attending weekly progress meeting with contractor representing the client. 20. Collaborate with Contractor Department Managers (Construction Manager, Design Manager, Environmental and Sustainability Manager, Health and Safety Manager, etc.) in preparing and updating the quality, environment and safety management plans. 21. Provide support, training, advice and assistance as required to the project team in the implementation of the Quality Management System. 22. Assess performance and quality of products against specified criteria and standards. 23. Monitor and control the status of punch list and exception lists relevant to quality dossiers. 24. Attend the weekly QA/QC, and commissioning meetings. 25. Follow the Testing & Commissioning program and handing over procedures and proper implementation of the approved protocol. 26. Report the project status through the monthly report for top management.
  • 4. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 4 of 10 From Nov. 2010 till June 2012 : Sr. QC Engineer/Deputy site QA/QC manager Kharafi National – Egypt Project: West Damietta Simple Cycle Power Plant (500 MW) “ Engineering, Procurement and Construction (EPC) contract” Owner: East Delta Electricity Production Company Designer: ECG Engineer: PGESCo – (subsidiary of Bechtel) My Duties as Sr. QC Engineer & Deputy QC Manager: 1. Supervise and manage all QC Civil functions in the workplace and manage a team of QC engineers and inspectors for day to day QC functions 2. Coordinate with Non Destructive Examinations (NDE) sub contractors for enquiry quotations 3. Coordinate with testing Agencies for Procedure Qualification Records (PQR) and all other required tests. 4. Coordinate with Inspection agencies for all related inspection activities Preparation ITPs, MS , and work procedures. 5. Evaluate, analyzing, and improving concrete work including all different classes. 6. Handing over all completed civil work to mechanical team 7. Auditing and reporting on the project compliance which includes assessing subcontractors and suppliers. 8. Plan and undertake Subcontractor audits and reviews of Sub contractor quality control programs 9. Responsible for compiling Inspection records and other Quality control documents and preparation of final document dossier for final client submission. 10. Coordinate management review-presentation information such as audit reports, non- conformances, corrective actions, improvements client and customer satisfaction results and KPI data. 11. Attend training and seminars related to QMS. 12. Drive the QA/QC culture across the project team. 13. Manage and undertake internal audits. 14. Control all nonconformance reports and undertake remedial action, Co-ordinate non conformance identification, disposition, and corrective action follow up. 15. Provide proactive advice to Project Management Team related to quality. 16. Carry out progressive partial turnover punch list items to ensure that the works are completed to the fullest extent possible prior to acceptance. 17. Supporting the construction managers and engineering department to get client approval on all used civil materials. 18. Coordinate with the client and Engineer on all quality matters. 19. Coordinate all receipt inspections. 20. Distribute relevant QA/QC documentation to site subcontractors. 21. Verify that the quality related site activities are in accordance with the applicable codes and standards 22. Attending weekly QA/QC meeting with client and weekly progress meeting with client. 23. Attending the contractor daily video conference discussing all outstanding issues in the project. 24. Auditing and reporting on the project compliance which includes assessing subcontractors and suppliers. 25. Establish and monitor the project KPIs.
  • 5. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 5 of 10 26. Monitoring performance for all subcontractors. 27. Manage and lead the quality and document control department. 28. Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer. 29. Review the client specification and undertake relevant training to the site QC inspectors. 30. Coordinate with the site QC manager for the completion of as-built turnover documentation. 31. Resolve any discrepancies between the completed milestone and quality documentation. 32. Review supplier’s inspection and test plans against the milestone scope of work. 33. Coordinate with the commissioning department to define the scope of work. 34. Assist the site subcontractors to compile turnover dossiers. 35. Provide progress information for incorporation into project reports. 36. Monitor hydrostatic test packs for incorporation into as-built dossiers. 37. Consider the implications of delays in QC as-built turnover documentation and bring to the attention of the site QC manager. 38. Monitor and control the status of punch list and exception lists relevant to quality dossiers. 39. Attend the weekly QA/QC, and commissioning meetings. From Nov. 2010 till July2011 : Sr. QC Engineer Kharafi National – Egypt Project: Damietta and Shabab Simple Cycle Power Plant (1500 MW) “ Engineering, Procurement and Construction (EPC) contract” Owner: East Delta Electricity Production Company Designer: ECG Engineer: PGESCo - (subsidiary of Bechtel) My Duties as Sr. QC Engineer & Deputy QC Manager: 1. Leading a team of 8engineers and 8 inspectors in addition to QC engineers of sub- contractor(ARCHIRODON overseas Co.) achieving the following: 2. Supervise and manage all QC Civil functions in the workplace and manage a team of QC engineers and inspectors for day to day QC functions 3. Coordinate with Non Destructive Examinations (NDE) sub contractors for enquiry quotations 4. Coordinate with testing Agencies for Procedure Qualification Records (PQR) and all other required tests. 5. Inspection agencies for all related inspection activities 6. Act as a focal and coordination point for ISO internal and external audits and to conduct internal and operation audits 7. Plan and undertake Subcontractor audits and reviews of Sub contractor quality control programs 8. Provide proactive advice to Project Management Team related to quality. 9. Attending weekly QA/QC meeting with client and weekly progress meeting with client.
  • 6. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 6 of 10 From July 2006 till October 2010: Sr. QC Engineer Orascom for Construction Industries (Algeria & Syria)  From Jul. 2009 till Oct. 2010: Project: Central Electric Terga (3*400 MW) – combined cycle Owner: Le Directeure de le Energie et de Mines Designer: ALSTOM Engineer: SKT My Duties as Sr. QC Engineer: 1. Supervise and manage all QC functions in the workplace and manage all civil team of QC engineers and inspectors for day to day QC functions 2. Manage all site inspections of (Excavation , shoring , jet grouting work , concrete work , steel structure , infrastructure and finishing work). 3. Interface and coordinate with clients for production and QC matters and coordinate with third party inspection agencies for all related inspection activities 4. Act as a focal and coordination point for ISO internal and external audits and to conduct internal and operation audits 5. Plan and undertake Subcontractor audits and reviews of Sub contractor quality control programs. 6. Review material certification for project material to ensure it meets project specifications. Checking also includes that subject material corresponds to actual material supplied as per Material Test Record 7. Conduct inspection of activities of construction and testing works at site as required by Inspection Test Plan to verify product conformity and full compliance with engineering drawings, project specifications and project contract documents. 8. Provide proactive advise to Project Management Team related to quality. 9. Handing over all completed civil work to mechanical team  From Apr.2008 till Jul. 2009: Project: Grey lines at Aleppo for cement production and backing Owner: Syrian Cement Company (SCC)- LA FARGE Designer: FLSMIDTH Engineer: FLSMIDTH My Duties as Sr. QC Engineer: 1. Mange all site inspections for all factory buildings; (gypsum crusher, limestone crusher, basalt crusher, pre-heater building , kilns and cooler, cement mill, pump rooms and the water system, additives building , infrastructure and coal storage) 2. Following and supervise all the steel structure work (erection , touch-up painting , tightening and hading over) 3. 4. Conducting all third party tests at site and reviewing the test reports prior to submit for owner approval. 5. Coordinate with owner representative at site to solve any technical issues related to Quality of the
  • 7. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 7 of 10 products. 6. Taking initiated action to prevent any of non-conformance at site 7. Properly interpret Contract or technical Specifications. 8. Review and approve subcontractor/sub vendors quality documents. 9. Perform quality assurance audits at various EPC stages. 10. Identify non-compliance and approve planned corrective actions. 11. Develop inspection and test plans and project specific Quality Plans in accordance with project specifications 12. Assure that Project is quality controlled, optimally designed, engineered to appropriate standards and specifications, meeting required product specification and HSE requirements. 13. Provide proactive advice to Project Management Team related to quality.  From Jul. 2006 till Apr.2008: Project: Grey & white lines at Aleppo for cement production and backing Owner: Algerian Cement Company (ACC)- LA FARGE Designer: FLSMIDTH Engineer: FLSMIDTH My Duties as Sr. QC Engineer: 1. Mange all site inspections for all factory buildings; (gypsum crusher, limestone crusher, basalt crusher, pre-heater building , kilns and cooler, cement mill, pump rooms and the water system, additives building , infrastructure and coal storage) 2. Conducting all third party tests at site and reviewing the test reports prior to submit for owner approval. 3. Coordinate with owner representative at site to solve any technical issues related to Quality of the products. 4. Taking initiated action to prevent any of non-conformance at site 5. Following and supervise all the steel structure work (erection , touch-up painting , tightening and hading over) 6. Properly interpret Contract or technical Specifications. 7. Review and approve subcontractor/sub vendor’s quality documents. 8. Perform quality assurance audits at various EPC stages. 9. Identify non-compliance and approve planned corrective actions. 10. Develop inspection and test plans and project specific Quality Plans in accordance with project specifications 11. Assure that Project is quality controlled, optimally designed, engineered to appropriate standards and specifications, meeting required product specification and HSE requirements.
  • 8. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 8 of 10 From Nov. 2001 till July 2006: QC Engineer with K&M Engineering and Consulting LLC/CEL (joint venture)  From Dec. 2005 till July 2006: Project: SECONDARY CITIES PROJECT (LUXOR FARA No:3) – USAID GRANT NO. 263-0236 Owner: National Organization for Potable Water And Sanitary Drainage “NOPWASED” Engineer: Camp Dresser and McKee International (CDM) in association with (AAW). My Duties as QC Engineer: 1. Following and supervising Micro Tunneling and pipe jacking for 300m underground crossing (canal and road) 2. Following and inspecting Construction of all concrete works of pump station3. 3. Following and inspecting Construction of electrical substation. 4. Following and inspecting Installation of force main ductile iron pipeline (1000mm). 5. Testing of force main ductile iron pipeline (1000mm). 6. Following and inspecting Road works above all force main pipeline. 7. Follow up NCR closing as earliest. 8. Ensure PROJECT deliverables fully satisfy QA/QC requirements specified in the contract. 9. Properly interpret Contract or technical Specifications. 10. Assure that Project is quality controlled, optimally designed, engineered to appropriate standards and specifications, meeting required product specification and HSE requirements.  From Nov. 2000 till Nov. 2005 : Project: Water and Wastewater facilities Projects for three cities (Minia- Bani-Suaf – Fayoum) MIDDLE EGYPT PROJECT – USAID GRANT NO. 263-0270 Owner: National Organization for Potable Water And Sanitary Drainage “NOPWASED” Engineer: Montgomery Watson/ Harza (MWH) in association with ECG & AAW. My Duties as QC Engineer: 1. Following and supervising Construction of structures of wastewater treatment plants as circular tanks, pump stations, concrete channel , dry beds. 2. Following and supervising Construction of service buildings with finishing work and roof system. 3. Following and supervising Concrete Road Ways and landscape. 4. Following and supervising Earthwork (excavation – backfilling ) with shoring and dewatering system 5. Following and supervising Installation of force main D.I. pipe lines with diam. 250 & 1000 mm 6. Following and supervising Pre-cast and cast in place MH’s with different types. 7. Testing of sewer MH’s and pipe lines. 8. Conduct inspection of activities of construction and testing works at site as required by Inspection Test Plan to verify product conformity and full compliance with engineering drawings, project specifications and project contract documents. 9. Ensuring that the inspection and tests are carried out in conformity with the field quality
  • 9. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 9 of 10 control plan and obtaining the relevant documentation. 10. Review material certification for project material to ensure it meets project specifications. Checking also includes that subject material corresponds to actual material supplied as per Material Test Record 11. Follow up with contractors work to ensure the progress schedule will be implemented with the given time frame and to check the quality of work shall always be implemented. SN Date Company Location classification From To 1 Aug.2012 present Dar al-handasah KSA QA/QC manager 2 Nov. 2010 June 2012 Kharafi National Egypt Sr. QC Engineer 3 July 2006 Oct. 2010 Orascom for Construction Industries (OCI) Syria & Algeria Sr. QC Engineer 4 Nov. 2000 July 2006 Consulting Engineering (CEL) Egypt QC Engineer COMPUTER SKILLS Software/ Application Skill Level Years of Experience Windows - Offices (Excel – Word – Access - PowerPoint). SAP90 – SAP2000, AutoCAD Excellent More than 5 years LANGUAGES Language Skill Level Read Write Speak Arabic Excellent Excellent Excellent English French Very Good Good Very Good Good Very Good Fair PERSONAL SKILLS • Self Motivated, high caliber, high skilled constructing industrial projects , High ability leading teamwork , working under pressure and fast track projects • High skilled implementing international standards and codes. Knowledge of NDE, Welding Technology, Painting and Code Systems. • Able to prepare Method Statement, ITP’s, Inspection check lists and procedures. • Data Analysis • Management of technical consulting assignments. •Provide proactive advice to Project Management Team related to quality. • Report writing and business and technical correspondence.
  • 10. CURRICULUM VITAE __________________________________________________________________________________________________________________ Updated on 12-May-2015 Page 10 of 10 • Team leadership. •Appraisal, development and training of staff. • Management and Business Administration. • Negotiation and Communication. • Familiarity with ISO-9000 quality management systems. • Maintain standards of safety and comply with Company’s Occupational Health & Safety Management System requirements. DETAILS IN Dar Al-Handasah CURRENT CLASSIFICATION QA/QC Manager (Grade Pa3) DATE OF JOINING August 2012 ID 74244 PROJECT HHR-S08139