SlideShare a Scribd company logo
1 of 8
Download to read offline
Page 1 of 8
CURRICULAM VITAE
S.N. RAJU. DEEVENA
Riyadh,
Kingdom of Saudi Arabia (KSA).
CELL: (+966) 504322978 E. mail: satya.dsnraju@gmail.com
Career Objective: To be a part of a dynamic team whereby I can contribute valuable services
driven by new challenges to achieve personal and professional growth.
Total Professional Experience: I am having Overall 18 Years extensive experience (Including
3+ Years in OMAN and Saudi Arabia (GCC) and 14 Years in India) in the field of Quality
Department (Quality Management Systems Requirements- QMS, Quality Assurance &
Quality Control- QA/QC) and remaining Years in the Field of Site Execution Works.
1. Egis Rail (France).
Company Activity : PMCM for Riyadh Metro Rail Project.
Work Period : Oct’2014 to Till Date.
Duration : (2 Years + Till Continuing).
Position Held : QMS Engineer/ Lead Auditor.
Project Details : Riyadh Metro Rail Project, (Package-1 & 2).
Job responsibilities in brief:
 Audits carried out as per Approved Audit Schedule for 1st
Party (Internal-RMTC), 2nd
Party (DB Contractors) and 3rd
Party (Sub-Contractors for DB Contractors).
 Quality Requirements for Metro Systems and Sub-systems like, Track Works, Rolling
Stock, Power Supply and Third Rail, SCADA, Signaling, and Ventilation System in the
Tunnels.
 Quality Requirements for Design and Project Deliverables.
 Interface Issues on Quality Standards and Specifications/ Contractual Obligations with
internal and external Stakeholders.
Page 2 of 8
 Government Approvals and Permissions as per Standards/ Project Requirements.
 Audit Findings & Results Tracking for Internal and 2nd
Party.
 Develop and Implement ISO 9001 Mandatory Documented Procedures. And Ensure
DB Contractor shall be Implemented thought the Project.
 Tracking of Nonconformance Reports, Inspection Findings/ Corrective Actions, Work
Methods, and other Submittals required as per contractually.
 In respect to the adherence to the DB Contractors Project Quality Assurance and
Quality Control Plans & Procedures by the DB Contractors their Sub – Contractors and
their Suppliers in the first instance.
 Production, Training & Maintenance of RMTC Project Management, Construction
Management systems to enhance our functional performance.
 Ensure compliance with Quality Procedures.
 Conduct Quality Awareness Session for the Staff towards QMS standards and Project
requirements.
 Site visits for visual verification of procedure adherence, feedback from NCR’s and
feedback from progress meetings and individual reporting of concerns from general
workforce, Supervisors and Management.
 Ensure As-Built Quality Records are produced in respect to the ITP’s through
surveillances and audits.
 Offer guidance to the QC Inspectors in terms of ITP content and the required
compilation of records referenced within in respect to materials specifications,
tolerances, standards, there certification to compliance, their traceability and their
use in the realization of the product.
 Engage in supply chain QC compliance Onoff site if required.
 Attend at FATS & SATS of individual best suited to the task of surveillance, dependent
on the individual materials, tests or services being under scrutiny.
Reporting:
 Producing weekly, monthly reports to high standard and detail as requested.
Including dashboards of QAQC KPI’s as is required.
Page 3 of 8
2. M/S. L&T Construction, (Infra IC ) Limited.
Company Activity : Civil & MEP Works for Hyderabad Metro Rail.
Work Period : June’2012 to Sep’2014.
Duration : (2 Years and 3 Months).
Position Held : Sr. Manager (QA & QC).
Project Details : Hyderabad Metro Rail Project.
Job responsibilities in brief:
 Reports to Head- Quality;
 Develop Company Project Quality Plan (PQP) and update it according to Client/PMCM
requirement;
 Develop project specific procedures;
 Review and recommend comments on Project Quality Plan of Main Contractor/Sub
Contractor and their QA/QC organization Chart to PM/CM and Client;
 Quality Requirements for Metro Systems and Sub-systems like, Track Works, Rolling
Stock, Power Supply and Third Rail, SCADA, Signaling, and Ventilation System in the
Tunnels.
 Quality Requirements for Design Deliverables.
 Interface Issues on Quality Standards and Specifications/ Contractual Obligations with
internal and external Stakeholders.
 Government Approvals and Permissions as per Standards/ Project Requirements.
 Implement the QA/QC management system at site;
 Perform screening and preliminary selection for Civil QA/QC inspector prior to
PMCM/Client approval;
 Conduct Internal and External audit of Contractor and sub-contractor;
 Submit domestic and overseas factory audit reports to concern with
recommendation;
Page 4 of 8
 Coordinate quality inspections with all the site contractors, vendors, and all testing
on site;
 Coordinate with the client’s representative/PMCM on all quality issues and provide
feedback;
 Attend weekly quality meetings with client/PMCM;
 Coordinate with document controller in order to make sure correct forms and work
flows are used for all inspections;
 Coordinate with Planners to provide quality section feedback to PMCM/Client. In
addition whenever required check the KPIs established in report;
 Assist Client/PMCM in establishing quality procedures/documentation;
 Responsible for QA/QC training to all staff for all QA/QC documentation;
 Distribute relevant QA/QC documentation to site contractors;
 Verify that the quality related site activities are in accordance with the approved
documents example Method Statement, Shop drawings etc.;
 Participate in the site internal and external site audits;
 Coordinate the quality site inspection through the site QC inspectors/site engineers;
 Ensure all quality control documentation is compiled and completed for as-built hand
over through the Testing and Commissioning Manager;
 Ensuring preparation and incorporation of all the QMS documented procedures as
required by the Project and relating inspection and test plans and formats;
 Implementation of QMS processes and procedures;
 Assisting site Management in effective implementation of approved quality plans and
QMS procedures;
 Preparation of Internal Audits schedule;
 Quality awareness session for Staff on quality alerts and risk assessment workshops;
 Planning and coordinating for Conducting product quality rating analysis;
 Preparing Monthly Quality report for the top management;
 Investigate root cause analysis and correction for specific issues in relation to
repetitive Non-conformities;
 Implementation of Corrective and Preventive Action Plans;
Page 5 of 8
 Monitor Control of Documentation and Records across all packages;
 Develop Quality Alerts on specific issues following nonconformity;
 Capturing and record of Quality costs and calculate KPI’s;
 Maintaining and reviewing registers like Nonconformities, Quality cost, CWP’s,
internal Audits, Documents, Records, corrective action plan and Design Mixes;
 Introduce about Quality tools like 5’s, benchmarking, flow chart, comprehension to
adopt our routine works (personal and professional).
Strong Points:-
 Quality Audit, Surveillance and Inspections.
 Preparation of ISO documentation procedures.
 Quality control related site inspection & lab tests.
 Preparation of QAP & Methodologies of Workflow.
 Preparation of Check-lists.
 Preparation of ITP.
 ISO Procedures Implementations.
Page 6 of 8
3. M/S. BUREAU VERITAS (INDIA) Ltd.
Company Activity : QMS, QA/ QC & Site Level Technical Services.
Work Period : MAR’2008 to May’ 2012.
Duration : (4 Years and 2 Months).
Position Held : Sr. Manager (QA/QC)
Project Details : Power Plant, Oman (GCC).
 Barka-2 Power Plant, Barka, L&T Oman.
 Ultra Mega Power Project (5*800MW) TATA @ Mundra, Gujarat, India.
 Sky Towers (80 Floors) @ Dadar, Mumbai, India.
Job responsibilities in brief:
 Regular Monitoring the Work Schedule as per Agreement (Drawings and
Specifications);
 Review The Design Mix, Formats and Methodologies;
 Regular Monitoring of Finishing works like Plastering, Painting, and Flooring,
Waterproofing, and Interior works;
 Preparing Monthly Quality report for the top management;
 Investigate root cause analysis and correction for specific issues in relation to
repetitive Non-conformities;
 Implementation of Corrective and Preventive Action Plans;
 Monitor Control of Documentation and Records across all packages;
 ISO Procedures Implementation;
 Verify that the quality related site activities are in accordance with the approved
documents example Method Statement, Shop drawings etc.;
 Internal Audits Planned & Conducted;
 Trainings Planned & Conducted;
 Regular Inspection to the Site, Quality & Work flow point of view;
 Witness, Review and Monitoring the Quality control Lab tests;
 Labor & Materials procurement as per Work schedule.
Page 7 of 8
4. M/S. TUV SUD SOUTH ASIA Pvt. Ltd. (German Organization).
Company Activity : PMC Services for High Rise Structures.
Work Period : JULY’2002 to FEB’2008.
Duration : (5 Years and 8 Months).
Position Held : MANAGER QA/QC.
Project Details : Lanco Hills Town ship, Hyderabad, India.
GMR Airport Novotel Hotel, India.
Job responsibilities in brief:
 Monitoring the Work Schedule as per Agreement (Drawings and Specifications);
 ISO Procedures Implementation;
 Internal Audits Planned & Conducted;
 Trainings Planned & Conducted;
 Labor & Materials procurement as per Work schedule;
 Review The Design Mix, Formats and Methodologies;
 Minutes meetings with Contractor and Client and implementation as per Client
Requirements, Modifications at the time onwards;
 Regular Inspection to the Site, Quality & Work flow point of view;
 Maintaining the Records;
 Quality control Lab-in charge.
5. M/S. RENUKA CONSTRUCTIONS Pvt.Ltd.
Company Activity : Construction of Apartments.
Work Period : JULY’1998 --- JULY’2002.
Duration : (4 Years).
Position Held : SITE ENGINEER (Execution) &
Sr. SITE ENGINEER (QA/QC).
Page 8 of 8
Job responsibilities in brief:
 Individual buildings, Cement Concrete Roads;
 Scheduling of materials works and equipment’s;
 Constructions of Culverts;
 Fixing and setting of levels as per layout and plans approved using instruments;
 Quality materials tests and Site inspection;
 Preparation of Design Mix;
EDUCATIONAL QUALIFICATION:
 Bachelor of Technology (B. Tech- Civil) (1998 to 2002) - Regional Engineering College.
(R.E.C.Warangal), India.
 D.C.E (1994 to 1997) - Govt. polytechnic, Vijayawada, India.
Computer literacy:
Operating systems : Windows. M.S.Dos.
Application software : Micro station, M.S.Office.
Languages Conversant:
ENGLISH, HINDI, and TELUGU.
Achievements:
 I Got State 1400 Rank In CEEP.
 I Got State 41
st
Rank In ECET.
 Won 1
st
Prize In TECHNICAL QUIZ (ALL INDIA TECHNICAL FESTIVAL, Conducted By REC, Warangal).
 Appreciation Certificate Given by Government of Andhra Pradesh for Inspection of FOOD FOR WORK
Programme, Appointed by Warangal Dist. Collector.
Personal Details:
 Name : SATYANARAYANA RAJU. DEEVENA
 Date of Birth : 05/03/1978.
 Spouse Name : VINDHYA
 Son : ROHIT
RAJU S N DEEVENA

More Related Content

What's hot (20)

Kailash cv
Kailash cvKailash cv
Kailash cv
 
Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3Sushil Kumar Jain resume (International) mod 3
Sushil Kumar Jain resume (International) mod 3
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
CV-SBERA
CV-SBERACV-SBERA
CV-SBERA
 
Praneshkumar QC Supervisor
Praneshkumar QC SupervisorPraneshkumar QC Supervisor
Praneshkumar QC Supervisor
 
CV_QC_Mahaboob khan (2)
CV_QC_Mahaboob khan (2)CV_QC_Mahaboob khan (2)
CV_QC_Mahaboob khan (2)
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
Sanjeev cv
Sanjeev   cvSanjeev   cv
Sanjeev cv
 
CV_Ramesh_M_K (1)
CV_Ramesh_M_K (1)CV_Ramesh_M_K (1)
CV_Ramesh_M_K (1)
 
Mallappa Beleri Resume
Mallappa Beleri ResumeMallappa Beleri Resume
Mallappa Beleri Resume
 
Abdelrahman Ibrahim C.V October-2015
Abdelrahman Ibrahim C.V October-2015Abdelrahman Ibrahim C.V October-2015
Abdelrahman Ibrahim C.V October-2015
 
Welding, Painting Multi Certified Qc
Welding, Painting Multi Certified Qc Welding, Painting Multi Certified Qc
Welding, Painting Multi Certified Qc
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
106 quality assurance
106 quality assurance106 quality assurance
106 quality assurance
 
Cv senior qc manager mk-bencharif - english
Cv senior qc manager  mk-bencharif - englishCv senior qc manager  mk-bencharif - english
Cv senior qc manager mk-bencharif - english
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
Tamil_Updated_Resume
Tamil_Updated_ResumeTamil_Updated_Resume
Tamil_Updated_Resume
 
CV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, AaronCV_Goh Yeu Shan, Aaron
CV_Goh Yeu Shan, Aaron
 

Viewers also liked

Session 7 Carl-Henrik Sandbreck
Session 7 Carl-Henrik SandbreckSession 7 Carl-Henrik Sandbreck
Session 7 Carl-Henrik SandbreckCalleSand
 
Supriya Sehgal
Supriya SehgalSupriya Sehgal
Supriya Sehgalmayurz91
 
Vehicles solars
Vehicles solarsVehicles solars
Vehicles solarslauura25
 
V ehicles solars
V       ehicles solarsV       ehicles solars
V ehicles solarslauura25
 
Differentiated Instruction
Differentiated InstructionDifferentiated Instruction
Differentiated Instructionkritzerjb
 
Prisoners of age
Prisoners of agePrisoners of age
Prisoners of agekritzerjb
 
Microwave hybrid circuits
Microwave hybrid circuitsMicrowave hybrid circuits
Microwave hybrid circuitsVikram Bansal
 
EDPM Official bibliography Assignment 2
EDPM Official bibliography Assignment 2EDPM Official bibliography Assignment 2
EDPM Official bibliography Assignment 2Khimran Surjan
 
Jadual harga elektrik 2011 Boleh print
Jadual harga elektrik 2011 Boleh printJadual harga elektrik 2011 Boleh print
Jadual harga elektrik 2011 Boleh printRoslan Ismail
 

Viewers also liked (15)

Session 7 Carl-Henrik Sandbreck
Session 7 Carl-Henrik SandbreckSession 7 Carl-Henrik Sandbreck
Session 7 Carl-Henrik Sandbreck
 
Aminah mths no 2
Aminah mths no 2Aminah mths no 2
Aminah mths no 2
 
Supriya Sehgal
Supriya SehgalSupriya Sehgal
Supriya Sehgal
 
Vehicles solars
Vehicles solarsVehicles solars
Vehicles solars
 
V ehicles solars
V       ehicles solarsV       ehicles solars
V ehicles solars
 
Differentiated Instruction
Differentiated InstructionDifferentiated Instruction
Differentiated Instruction
 
Advocacy
AdvocacyAdvocacy
Advocacy
 
Prisoners of age
Prisoners of agePrisoners of age
Prisoners of age
 
Microwave hybrid circuits
Microwave hybrid circuitsMicrowave hybrid circuits
Microwave hybrid circuits
 
EDPM Official bibliography Assignment 2
EDPM Official bibliography Assignment 2EDPM Official bibliography Assignment 2
EDPM Official bibliography Assignment 2
 
Jadual harga elektrik 2011 Boleh print
Jadual harga elektrik 2011 Boleh printJadual harga elektrik 2011 Boleh print
Jadual harga elektrik 2011 Boleh print
 
Edpm sba
Edpm sbaEdpm sba
Edpm sba
 
It sba 2015
It sba 2015It sba 2015
It sba 2015
 
Pob sba
Pob sbaPob sba
Pob sba
 
Oa sba
Oa sbaOa sba
Oa sba
 

Similar to RAJU-CV(UPDATED) on 2016 Aug 10

Similar to RAJU-CV(UPDATED) on 2016 Aug 10 (20)

cv of murtuza 2016
cv of murtuza 2016cv of murtuza 2016
cv of murtuza 2016
 
Mohammed Naveed uddin CV
Mohammed Naveed uddin CVMohammed Naveed uddin CV
Mohammed Naveed uddin CV
 
Resume
ResumeResume
Resume
 
kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01kamlesh_joshi At GSCC. 01
kamlesh_joshi At GSCC. 01
 
Manohar CV QA-QC
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QC
 
Dnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _ResumeDnyaneshwar Yadav _Resume
Dnyaneshwar Yadav _Resume
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
Ranjit Singh
Ranjit Singh Ranjit Singh
Ranjit Singh
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
Turnover Engineer
Turnover EngineerTurnover Engineer
Turnover Engineer
 
SALMAN CV (8-8-2015)
SALMAN CV (8-8-2015)SALMAN CV (8-8-2015)
SALMAN CV (8-8-2015)
 
Suresh cv-21.01.16
Suresh  cv-21.01.16Suresh  cv-21.01.16
Suresh cv-21.01.16
 
CV of Ramy Ahmed- Updated
CV of Ramy Ahmed- UpdatedCV of Ramy Ahmed- Updated
CV of Ramy Ahmed- Updated
 
Vinay CV
Vinay CVVinay CV
Vinay CV
 
Resume - Jihad Labban
Resume - Jihad LabbanResume - Jihad Labban
Resume - Jihad Labban
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
Henry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality ProfessionalHenry P. Agsaullo_Jr_Quality Professional
Henry P. Agsaullo_Jr_Quality Professional
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
Lead Regulatory Engineer
Lead Regulatory EngineerLead Regulatory Engineer
Lead Regulatory Engineer
 

RAJU-CV(UPDATED) on 2016 Aug 10

  • 1. Page 1 of 8 CURRICULAM VITAE S.N. RAJU. DEEVENA Riyadh, Kingdom of Saudi Arabia (KSA). CELL: (+966) 504322978 E. mail: satya.dsnraju@gmail.com Career Objective: To be a part of a dynamic team whereby I can contribute valuable services driven by new challenges to achieve personal and professional growth. Total Professional Experience: I am having Overall 18 Years extensive experience (Including 3+ Years in OMAN and Saudi Arabia (GCC) and 14 Years in India) in the field of Quality Department (Quality Management Systems Requirements- QMS, Quality Assurance & Quality Control- QA/QC) and remaining Years in the Field of Site Execution Works. 1. Egis Rail (France). Company Activity : PMCM for Riyadh Metro Rail Project. Work Period : Oct’2014 to Till Date. Duration : (2 Years + Till Continuing). Position Held : QMS Engineer/ Lead Auditor. Project Details : Riyadh Metro Rail Project, (Package-1 & 2). Job responsibilities in brief:  Audits carried out as per Approved Audit Schedule for 1st Party (Internal-RMTC), 2nd Party (DB Contractors) and 3rd Party (Sub-Contractors for DB Contractors).  Quality Requirements for Metro Systems and Sub-systems like, Track Works, Rolling Stock, Power Supply and Third Rail, SCADA, Signaling, and Ventilation System in the Tunnels.  Quality Requirements for Design and Project Deliverables.  Interface Issues on Quality Standards and Specifications/ Contractual Obligations with internal and external Stakeholders.
  • 2. Page 2 of 8  Government Approvals and Permissions as per Standards/ Project Requirements.  Audit Findings & Results Tracking for Internal and 2nd Party.  Develop and Implement ISO 9001 Mandatory Documented Procedures. And Ensure DB Contractor shall be Implemented thought the Project.  Tracking of Nonconformance Reports, Inspection Findings/ Corrective Actions, Work Methods, and other Submittals required as per contractually.  In respect to the adherence to the DB Contractors Project Quality Assurance and Quality Control Plans & Procedures by the DB Contractors their Sub – Contractors and their Suppliers in the first instance.  Production, Training & Maintenance of RMTC Project Management, Construction Management systems to enhance our functional performance.  Ensure compliance with Quality Procedures.  Conduct Quality Awareness Session for the Staff towards QMS standards and Project requirements.  Site visits for visual verification of procedure adherence, feedback from NCR’s and feedback from progress meetings and individual reporting of concerns from general workforce, Supervisors and Management.  Ensure As-Built Quality Records are produced in respect to the ITP’s through surveillances and audits.  Offer guidance to the QC Inspectors in terms of ITP content and the required compilation of records referenced within in respect to materials specifications, tolerances, standards, there certification to compliance, their traceability and their use in the realization of the product.  Engage in supply chain QC compliance Onoff site if required.  Attend at FATS & SATS of individual best suited to the task of surveillance, dependent on the individual materials, tests or services being under scrutiny. Reporting:  Producing weekly, monthly reports to high standard and detail as requested. Including dashboards of QAQC KPI’s as is required.
  • 3. Page 3 of 8 2. M/S. L&T Construction, (Infra IC ) Limited. Company Activity : Civil & MEP Works for Hyderabad Metro Rail. Work Period : June’2012 to Sep’2014. Duration : (2 Years and 3 Months). Position Held : Sr. Manager (QA & QC). Project Details : Hyderabad Metro Rail Project. Job responsibilities in brief:  Reports to Head- Quality;  Develop Company Project Quality Plan (PQP) and update it according to Client/PMCM requirement;  Develop project specific procedures;  Review and recommend comments on Project Quality Plan of Main Contractor/Sub Contractor and their QA/QC organization Chart to PM/CM and Client;  Quality Requirements for Metro Systems and Sub-systems like, Track Works, Rolling Stock, Power Supply and Third Rail, SCADA, Signaling, and Ventilation System in the Tunnels.  Quality Requirements for Design Deliverables.  Interface Issues on Quality Standards and Specifications/ Contractual Obligations with internal and external Stakeholders.  Government Approvals and Permissions as per Standards/ Project Requirements.  Implement the QA/QC management system at site;  Perform screening and preliminary selection for Civil QA/QC inspector prior to PMCM/Client approval;  Conduct Internal and External audit of Contractor and sub-contractor;  Submit domestic and overseas factory audit reports to concern with recommendation;
  • 4. Page 4 of 8  Coordinate quality inspections with all the site contractors, vendors, and all testing on site;  Coordinate with the client’s representative/PMCM on all quality issues and provide feedback;  Attend weekly quality meetings with client/PMCM;  Coordinate with document controller in order to make sure correct forms and work flows are used for all inspections;  Coordinate with Planners to provide quality section feedback to PMCM/Client. In addition whenever required check the KPIs established in report;  Assist Client/PMCM in establishing quality procedures/documentation;  Responsible for QA/QC training to all staff for all QA/QC documentation;  Distribute relevant QA/QC documentation to site contractors;  Verify that the quality related site activities are in accordance with the approved documents example Method Statement, Shop drawings etc.;  Participate in the site internal and external site audits;  Coordinate the quality site inspection through the site QC inspectors/site engineers;  Ensure all quality control documentation is compiled and completed for as-built hand over through the Testing and Commissioning Manager;  Ensuring preparation and incorporation of all the QMS documented procedures as required by the Project and relating inspection and test plans and formats;  Implementation of QMS processes and procedures;  Assisting site Management in effective implementation of approved quality plans and QMS procedures;  Preparation of Internal Audits schedule;  Quality awareness session for Staff on quality alerts and risk assessment workshops;  Planning and coordinating for Conducting product quality rating analysis;  Preparing Monthly Quality report for the top management;  Investigate root cause analysis and correction for specific issues in relation to repetitive Non-conformities;  Implementation of Corrective and Preventive Action Plans;
  • 5. Page 5 of 8  Monitor Control of Documentation and Records across all packages;  Develop Quality Alerts on specific issues following nonconformity;  Capturing and record of Quality costs and calculate KPI’s;  Maintaining and reviewing registers like Nonconformities, Quality cost, CWP’s, internal Audits, Documents, Records, corrective action plan and Design Mixes;  Introduce about Quality tools like 5’s, benchmarking, flow chart, comprehension to adopt our routine works (personal and professional). Strong Points:-  Quality Audit, Surveillance and Inspections.  Preparation of ISO documentation procedures.  Quality control related site inspection & lab tests.  Preparation of QAP & Methodologies of Workflow.  Preparation of Check-lists.  Preparation of ITP.  ISO Procedures Implementations.
  • 6. Page 6 of 8 3. M/S. BUREAU VERITAS (INDIA) Ltd. Company Activity : QMS, QA/ QC & Site Level Technical Services. Work Period : MAR’2008 to May’ 2012. Duration : (4 Years and 2 Months). Position Held : Sr. Manager (QA/QC) Project Details : Power Plant, Oman (GCC).  Barka-2 Power Plant, Barka, L&T Oman.  Ultra Mega Power Project (5*800MW) TATA @ Mundra, Gujarat, India.  Sky Towers (80 Floors) @ Dadar, Mumbai, India. Job responsibilities in brief:  Regular Monitoring the Work Schedule as per Agreement (Drawings and Specifications);  Review The Design Mix, Formats and Methodologies;  Regular Monitoring of Finishing works like Plastering, Painting, and Flooring, Waterproofing, and Interior works;  Preparing Monthly Quality report for the top management;  Investigate root cause analysis and correction for specific issues in relation to repetitive Non-conformities;  Implementation of Corrective and Preventive Action Plans;  Monitor Control of Documentation and Records across all packages;  ISO Procedures Implementation;  Verify that the quality related site activities are in accordance with the approved documents example Method Statement, Shop drawings etc.;  Internal Audits Planned & Conducted;  Trainings Planned & Conducted;  Regular Inspection to the Site, Quality & Work flow point of view;  Witness, Review and Monitoring the Quality control Lab tests;  Labor & Materials procurement as per Work schedule.
  • 7. Page 7 of 8 4. M/S. TUV SUD SOUTH ASIA Pvt. Ltd. (German Organization). Company Activity : PMC Services for High Rise Structures. Work Period : JULY’2002 to FEB’2008. Duration : (5 Years and 8 Months). Position Held : MANAGER QA/QC. Project Details : Lanco Hills Town ship, Hyderabad, India. GMR Airport Novotel Hotel, India. Job responsibilities in brief:  Monitoring the Work Schedule as per Agreement (Drawings and Specifications);  ISO Procedures Implementation;  Internal Audits Planned & Conducted;  Trainings Planned & Conducted;  Labor & Materials procurement as per Work schedule;  Review The Design Mix, Formats and Methodologies;  Minutes meetings with Contractor and Client and implementation as per Client Requirements, Modifications at the time onwards;  Regular Inspection to the Site, Quality & Work flow point of view;  Maintaining the Records;  Quality control Lab-in charge. 5. M/S. RENUKA CONSTRUCTIONS Pvt.Ltd. Company Activity : Construction of Apartments. Work Period : JULY’1998 --- JULY’2002. Duration : (4 Years). Position Held : SITE ENGINEER (Execution) & Sr. SITE ENGINEER (QA/QC).
  • 8. Page 8 of 8 Job responsibilities in brief:  Individual buildings, Cement Concrete Roads;  Scheduling of materials works and equipment’s;  Constructions of Culverts;  Fixing and setting of levels as per layout and plans approved using instruments;  Quality materials tests and Site inspection;  Preparation of Design Mix; EDUCATIONAL QUALIFICATION:  Bachelor of Technology (B. Tech- Civil) (1998 to 2002) - Regional Engineering College. (R.E.C.Warangal), India.  D.C.E (1994 to 1997) - Govt. polytechnic, Vijayawada, India. Computer literacy: Operating systems : Windows. M.S.Dos. Application software : Micro station, M.S.Office. Languages Conversant: ENGLISH, HINDI, and TELUGU. Achievements:  I Got State 1400 Rank In CEEP.  I Got State 41 st Rank In ECET.  Won 1 st Prize In TECHNICAL QUIZ (ALL INDIA TECHNICAL FESTIVAL, Conducted By REC, Warangal).  Appreciation Certificate Given by Government of Andhra Pradesh for Inspection of FOOD FOR WORK Programme, Appointed by Warangal Dist. Collector. Personal Details:  Name : SATYANARAYANA RAJU. DEEVENA  Date of Birth : 05/03/1978.  Spouse Name : VINDHYA  Son : ROHIT RAJU S N DEEVENA