SADDAM ANGIE ABAS
Al-Ruwais- Alshamal
Doha, Qatar
 +974 33390926
 damshaker09@gmail.com
OBJECTIVES :
To work with an organization offering a dynamic and professional environment which will help to achieve the goals
of the organization and simultaneously enhance my skills and knowledge & enable to grow professionally within the
organization.
JOB QUALIFICATION :
 Registered Civil Engineer (PRC): License no. (0126564)
 Certified Lead Auditor IRCA UK, (ISO 9001:2008 & 2015 Quality Management System)
 Certified Supervisor PTW Holder (Qatar Petroleum)
 5 years fully educated Civil Engineer
 5 years of working experience as Site/QC Engineer
WORKING EXPERIENCES :
 Name of Employer : ALJABER TRADING & CONTRACTING COMPANY W.L.L
Address of Employer : P.O Box 1120 Doha-Qatar
Position : QA/QC ENGINEER
Duration : April 01, 2015 up to Present
Client : ASHGHAL
Consultant : CEG international
PROJECT TITLE : Construction of three (3) new schools around Doha & Villages of
(56) new schools-Package 06, Stage 09 Al-Ruwais, Qatar
DUTIES & RESPONSIBILITIES :
 Ensure full implementation, monitoring and checking of approved method of statement, Inspection test
plan as interface to the client & consultant requirements.
 Prepare inspection request to engineer approval as per ITP as required.
 Ensure that all sites activities are carried out according to reference documentation for parts of the plant
within his area of responsibility, authorizing their acceptance at quality control completion.
 Ensure that all materials delivered at site were inspected and conformed to the approved material
submittals.
 Prepare / Arrange Material Inspection Request (permanent) with the consultants on the materials
delivered on site for approval.
 Concrete works- pre-pour inspections of formwork, reinforcing steel, and concrete placement.
 Checking and signing the inspection requests prior to submission. Logging and filing the commented
IRs by the consultant. Calculate the percentage of approved IRs on first submission & forward it to the
Project Manager on a monthly basis.
 Conducting field inspections and producing inspection reports for various construction activities.
 Responsible for site inspection with Consultant.
 Follow up with the Consultants, Engineers, Sub-contractors on QA/QC issues.
 Closing of the consultant NCR & Site instructions in co-ordination with the Project Manager.
 Ensure that the quality records are generated and maintained as per the requirements of ISO 9001 –
2008 standard.
 Progressively built and compile the project turnover packages throughout the construction
schedule and maintain the up to date of the quality control records.
 Over seeing quality control, health and safety matters on site.
 Compile the final project turnovers and submission to client approval.
 Name of Employer : ALJABER TRADING & CONTRACTING COMPANY W.L.L
Address of Employer : P.O Box 1120 Doha-Qatar
Position : SITE ENGINEER
Duration : May 02, 2014 utpo April 01, 2015
Client : ASHGHAL
Consultant : ECG international
PROJECT TITLE : (1) Construction of three (3) new schools around Doha & Villages of
(56)new school-Package06, Stage 09 Al-Ruwais, Qatar
: (2) QP Dukhan Housing Project Phase IX, Dukhan Qatar
(December 09, 2014 up to February 28, 2015)
(Certified site supervisor of Qatar Petroleum Log# 13835)
: (3) Preparatory boys school #2, Alshamal Qatar
(May 2, 2014 up to December 09, 2014)
DUTIES & RESPONSIBILITIES :
 Day-to-day management of the site, including supervising and monitoring the site labor force and the
work of any subcontractors.
 Preparing daily site diary & weekly target completion of activities.
 Organize the work force in a safe manner.
 Ensuring the execution of works are carried out smoothly in accordance with the shop drawings, plan
scheduled, contract specification and project method of statement.
 Acting as the main technical adviser on a construction site for subcontractors, crafts people and
operatives.
 Bar bending and scheduling of steel bars submitted to ERF supplier.
 Dimensioning and quantity calculation take off.
 Daily monitoring of material status especially concrete and rebars during the period of construction to
avoid shortage and delay in the construction.
 Five (5) years of experience in civil construction- Site Engineer experience is considered an asset of
Aljaber trading & contacting company W.l.l.
 Name of Employer : MUST ENTERPRISES & CONSTRACTING
Address of Employer : Along Cotabato-Davao National Highway, Gang Sultan Kudarat
Maguindanao, Philippines
Position : SITE ENGINEER
Duration : September 10, 2012-November 23, 2013
PROJECT TITLE : 5-Storey academic Building Cotabato City, Philippines
DUTIES & RESPONSIBILITIES :
 Ensuring the execution of works are carried out smoothly in accordance with the shop drawings. Plan
scheduled, contract specification and project method of statement.
 Acting as the main technical adviser on a construction site for subcontractors, crafts people and
operatives.
 Estimation of cost and material quantities for progress billing.
 Bar bending and scheduling of steel bars using MS Excel and Autocad.
 Dimensioning and quantity calculation take off.
 Daily monitoring of material status especially concrete and rebars during the period of construction to
avoid shortage and delay in the construction.
 Day-to-day management of the site, including supervising and monitoring the site labor force and the
work of any subcontractors.
 Managing, monitoring and interpreting the contract design documents supplied by the client.
 Conducts regular project walk-thru to check on the progress of works and spot potential problems in
terms of civil and architectural make-up.
 Maintaining comprehensive inspection and test records for any future reference and documentation.
 Checking plans, drawings and quantities for accuracy of calculations.
 Oversee field activities and provide daily updates to Project Management Team Engineer on work
progress.
 Liaising with clients and their representatives (architects, engineers and surveyors), including attending
regular meetings to keep them informed of progress.
 Liaising with the local authority to ensure compliance with local construction regulations and by-laws.
 Witness material and product testing and validate testing result.
 Ensuring all materials used and work performed are as per project specifications.
 Name of Employer : VICENTE T. LAO CONSTRUCTION CORPORATION
Address of Employer : Panacan, Davao City, Philippines
Position : QUANTITY COST & MONITORING STAFF (QCMS)
Duration : April 25, 2011 Up to August 30, 2012
DUTIES & RESPONSIBILITIES :
 Monitoring of cost in entire project including labor cost material, cost equipment rental, cost
consumables that could be directly submitted directly to the manager reported weekly.
 Supervised and monitor man powers in the project, daily activities, actual accomplishments and project
status.
 Conducting feasibility studies to estimate materials, time and labor costs.
 Prepare progress reports on project under construction; maintain records of changes and field notes;
prepare necessary correspondence, daily inspection report, and punch lists.
 Review contractor billings; approve progress payments; ensure completion of work in accordance with
contract provisions and perform other related contract administration duties.
 Coordination of work effort.
 Supervised and monitor the procedures for Asphalt overlaying of road pavements must be in the
standards of DPWH codes.
 Prepare and plan the schedule of manpower, materials, consumables, miscellaneous and equipment
needed in the project.
 Conduct audit to the monthly expenses report and monitoring billing of the project.
 Prepare detailed price unit analysis, quantity calculation and construction cost. Dimensioning and
quantity calculation take off.
EDUCATIONAL ATTAINMENT :
Tertiary Level:
Name of School : Cotabato City State Polytechnic College (2006-2011)
Address : Sinsuat Avenue, Cotabato City, Philippines
Date Graduated : April 5, 2011
Course Graduated : Bachelor of Science in Civil Engineering
Secondary Level:
Rasheeda High School Inc. Lugay-Lugay Cotabato city, Philippines
(2002-2006) March 23, 2006
Primary Level:
Lugay-Lugay Central School Lugay-Lugay Cotabato city, Philippines
(1996-2002) March 27, 2002
IN-SERVICE TRAININGS / SEMINARS ATTENTED :
 PROJECT MANAGEMENT PROFESSIONAL at 3fold training center, State of Qatar.
(November 6-December 25, 2015)
 QUALITY MANAGEMENT SYSTEM (ISO 9001:2008 & 2015) at Chicago training
center, State of Qatar. (August 31-September 4, 2015)
 QUALITY ASSURANCE & QUALITY CONTROL FOR CONSTRUCTION
SERVICES at Oryx Rotana Hotel, Doha, State of Qatar. (June 19 & 26, 2015)
 SNAGR at Oryx Rotana Hotel, Doha, State of Qatar. (March 27, 2015)
 FIRE AND LIFE SAFETY, TUNNELS AND COMPLEX BUILDING at Oryx Rotana
Hotel, Doha, State of Qatar. (March 13, 2015)
 CONSTRUCTION SAFETY AND HEALTH COURSE as promulgated by the Bureau of
Working Conditions, Department of Labor and Employment (DOLE). Held at DPWH
Kidapawan City, Philippines (November 7-11, 2011).
 OJT -Construction of NDC-3 Storey Academic Building Cotabato City under RG Salanatin
Construction Inc.
PERSONAL DATA :
Date of Birth : December 09, 1988
Place of Birth : Lugay-Lugay Cotabato city, Philippines
Age : 27 Years Old
Civil Status : Single
Height : 5’8”
Weight : 79 Kg.
Religion : Islam
Citizenship : Filipino
Spoken Language : English, Arabic, Tagalog, Visaya, Maranao, Maguindanaon, Iranun
Saddam A. Abas -PDF

Saddam A. Abas -PDF

  • 1.
    SADDAM ANGIE ABAS Al-Ruwais-Alshamal Doha, Qatar  +974 33390926  damshaker09@gmail.com OBJECTIVES : To work with an organization offering a dynamic and professional environment which will help to achieve the goals of the organization and simultaneously enhance my skills and knowledge & enable to grow professionally within the organization. JOB QUALIFICATION :  Registered Civil Engineer (PRC): License no. (0126564)  Certified Lead Auditor IRCA UK, (ISO 9001:2008 & 2015 Quality Management System)  Certified Supervisor PTW Holder (Qatar Petroleum)  5 years fully educated Civil Engineer  5 years of working experience as Site/QC Engineer WORKING EXPERIENCES :  Name of Employer : ALJABER TRADING & CONTRACTING COMPANY W.L.L Address of Employer : P.O Box 1120 Doha-Qatar Position : QA/QC ENGINEER Duration : April 01, 2015 up to Present Client : ASHGHAL Consultant : CEG international PROJECT TITLE : Construction of three (3) new schools around Doha & Villages of (56) new schools-Package 06, Stage 09 Al-Ruwais, Qatar DUTIES & RESPONSIBILITIES :  Ensure full implementation, monitoring and checking of approved method of statement, Inspection test plan as interface to the client & consultant requirements.  Prepare inspection request to engineer approval as per ITP as required.  Ensure that all sites activities are carried out according to reference documentation for parts of the plant within his area of responsibility, authorizing their acceptance at quality control completion.  Ensure that all materials delivered at site were inspected and conformed to the approved material submittals.  Prepare / Arrange Material Inspection Request (permanent) with the consultants on the materials delivered on site for approval.  Concrete works- pre-pour inspections of formwork, reinforcing steel, and concrete placement.  Checking and signing the inspection requests prior to submission. Logging and filing the commented IRs by the consultant. Calculate the percentage of approved IRs on first submission & forward it to the Project Manager on a monthly basis.  Conducting field inspections and producing inspection reports for various construction activities.  Responsible for site inspection with Consultant.
  • 2.
     Follow upwith the Consultants, Engineers, Sub-contractors on QA/QC issues.  Closing of the consultant NCR & Site instructions in co-ordination with the Project Manager.  Ensure that the quality records are generated and maintained as per the requirements of ISO 9001 – 2008 standard.  Progressively built and compile the project turnover packages throughout the construction schedule and maintain the up to date of the quality control records.  Over seeing quality control, health and safety matters on site.  Compile the final project turnovers and submission to client approval.  Name of Employer : ALJABER TRADING & CONTRACTING COMPANY W.L.L Address of Employer : P.O Box 1120 Doha-Qatar Position : SITE ENGINEER Duration : May 02, 2014 utpo April 01, 2015 Client : ASHGHAL Consultant : ECG international PROJECT TITLE : (1) Construction of three (3) new schools around Doha & Villages of (56)new school-Package06, Stage 09 Al-Ruwais, Qatar : (2) QP Dukhan Housing Project Phase IX, Dukhan Qatar (December 09, 2014 up to February 28, 2015) (Certified site supervisor of Qatar Petroleum Log# 13835) : (3) Preparatory boys school #2, Alshamal Qatar (May 2, 2014 up to December 09, 2014) DUTIES & RESPONSIBILITIES :  Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.  Preparing daily site diary & weekly target completion of activities.  Organize the work force in a safe manner.  Ensuring the execution of works are carried out smoothly in accordance with the shop drawings, plan scheduled, contract specification and project method of statement.  Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.  Bar bending and scheduling of steel bars submitted to ERF supplier.  Dimensioning and quantity calculation take off.  Daily monitoring of material status especially concrete and rebars during the period of construction to avoid shortage and delay in the construction.  Five (5) years of experience in civil construction- Site Engineer experience is considered an asset of Aljaber trading & contacting company W.l.l.  Name of Employer : MUST ENTERPRISES & CONSTRACTING Address of Employer : Along Cotabato-Davao National Highway, Gang Sultan Kudarat Maguindanao, Philippines Position : SITE ENGINEER Duration : September 10, 2012-November 23, 2013 PROJECT TITLE : 5-Storey academic Building Cotabato City, Philippines
  • 3.
    DUTIES & RESPONSIBILITIES:  Ensuring the execution of works are carried out smoothly in accordance with the shop drawings. Plan scheduled, contract specification and project method of statement.  Acting as the main technical adviser on a construction site for subcontractors, crafts people and operatives.  Estimation of cost and material quantities for progress billing.  Bar bending and scheduling of steel bars using MS Excel and Autocad.  Dimensioning and quantity calculation take off.  Daily monitoring of material status especially concrete and rebars during the period of construction to avoid shortage and delay in the construction.  Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.  Managing, monitoring and interpreting the contract design documents supplied by the client.  Conducts regular project walk-thru to check on the progress of works and spot potential problems in terms of civil and architectural make-up.  Maintaining comprehensive inspection and test records for any future reference and documentation.  Checking plans, drawings and quantities for accuracy of calculations.  Oversee field activities and provide daily updates to Project Management Team Engineer on work progress.  Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress.  Liaising with the local authority to ensure compliance with local construction regulations and by-laws.  Witness material and product testing and validate testing result.  Ensuring all materials used and work performed are as per project specifications.  Name of Employer : VICENTE T. LAO CONSTRUCTION CORPORATION Address of Employer : Panacan, Davao City, Philippines Position : QUANTITY COST & MONITORING STAFF (QCMS) Duration : April 25, 2011 Up to August 30, 2012 DUTIES & RESPONSIBILITIES :  Monitoring of cost in entire project including labor cost material, cost equipment rental, cost consumables that could be directly submitted directly to the manager reported weekly.  Supervised and monitor man powers in the project, daily activities, actual accomplishments and project status.  Conducting feasibility studies to estimate materials, time and labor costs.  Prepare progress reports on project under construction; maintain records of changes and field notes; prepare necessary correspondence, daily inspection report, and punch lists.  Review contractor billings; approve progress payments; ensure completion of work in accordance with contract provisions and perform other related contract administration duties.  Coordination of work effort.  Supervised and monitor the procedures for Asphalt overlaying of road pavements must be in the standards of DPWH codes.  Prepare and plan the schedule of manpower, materials, consumables, miscellaneous and equipment needed in the project.  Conduct audit to the monthly expenses report and monitoring billing of the project.  Prepare detailed price unit analysis, quantity calculation and construction cost. Dimensioning and quantity calculation take off.
  • 4.
    EDUCATIONAL ATTAINMENT : TertiaryLevel: Name of School : Cotabato City State Polytechnic College (2006-2011) Address : Sinsuat Avenue, Cotabato City, Philippines Date Graduated : April 5, 2011 Course Graduated : Bachelor of Science in Civil Engineering Secondary Level: Rasheeda High School Inc. Lugay-Lugay Cotabato city, Philippines (2002-2006) March 23, 2006 Primary Level: Lugay-Lugay Central School Lugay-Lugay Cotabato city, Philippines (1996-2002) March 27, 2002 IN-SERVICE TRAININGS / SEMINARS ATTENTED :  PROJECT MANAGEMENT PROFESSIONAL at 3fold training center, State of Qatar. (November 6-December 25, 2015)  QUALITY MANAGEMENT SYSTEM (ISO 9001:2008 & 2015) at Chicago training center, State of Qatar. (August 31-September 4, 2015)  QUALITY ASSURANCE & QUALITY CONTROL FOR CONSTRUCTION SERVICES at Oryx Rotana Hotel, Doha, State of Qatar. (June 19 & 26, 2015)  SNAGR at Oryx Rotana Hotel, Doha, State of Qatar. (March 27, 2015)  FIRE AND LIFE SAFETY, TUNNELS AND COMPLEX BUILDING at Oryx Rotana Hotel, Doha, State of Qatar. (March 13, 2015)  CONSTRUCTION SAFETY AND HEALTH COURSE as promulgated by the Bureau of Working Conditions, Department of Labor and Employment (DOLE). Held at DPWH Kidapawan City, Philippines (November 7-11, 2011).  OJT -Construction of NDC-3 Storey Academic Building Cotabato City under RG Salanatin Construction Inc. PERSONAL DATA : Date of Birth : December 09, 1988 Place of Birth : Lugay-Lugay Cotabato city, Philippines Age : 27 Years Old Civil Status : Single Height : 5’8” Weight : 79 Kg. Religion : Islam Citizenship : Filipino Spoken Language : English, Arabic, Tagalog, Visaya, Maranao, Maguindanaon, Iranun