- Education: Degree, Bachelor Of Civil Science Engineering, University of Engineering.
- Practice Details:
- Steel Structure, Reinforced Concrete & Steel Combined to Reinforced Concrete.
- Finishes & Interiors works: ‘’ Apply Updated Modern High Technique Materials, Tools, Equipment’’.
- INFRA Structures: ‘’ Tunnels, Bridges, All Undergrounds’ Types, All Roads’ Types, Airports, Potable / Waste
Water Treatment Stations, Sub-stations, Chiller Yard, All Underground Tanks’ Types,
Trenches, All Sub-Structures Reservoirs, Generators Buildings, Electricity Rooms, Pump
Stations, All Superstructure Reservoirs, Gates’ Houses Buildings, All Fences’ Types,
Services Blocks, Marines Works, On Shore Works, Poster Tanks, Courts.
- Repairs Works, Maintenance, Restoration & Rehabilitations: ‘’Apply update high technique Chemicals’’.
- External Works: ‘’All Types Of Net Works, Utilities, Lagoons, Swimming Pools, Sheds, All Playgrounds’ Types’’.
- landscaping Works: ‘’Hard & Soft‘’.
- Skills:
Comfortable Leadership & Management skills, Cost Management, Problem Solving, Maintain Quality Audits for multi projects to
ensure Compliance with the QHSSE policies, procedures and systems through effective participation in relevant Audits as per
QMS plan to ensure consistent & systematic application of best practices providing timely and effective support to concerned
users, Ensure that Quality Audits are completed on schedule and that resultant action plans are implemented, Ensure Audits'
results as Corrective Action reports are clearly communicated and followed up in a timely manner to close in line with established
company procedures, international standards and local regulations, Provide Audits for suppliers, vendors, subcontractors,
manufacturers, third lab, Internal Audits, enforcing policies and procedures, Kick off meeting prior to commencement of major
activities to identify the Potential risks, Excellent Quality improvement skill with subjective Quality Trainings to aware the
Construction team for execution of right activity in the first shot to avoid the cost of Quality, Strong skills to develop procedure and
systems; outstanding presentation, communication & inter-personal skills, Excellent knowledge of Material related to Civil, MEP,
Steel structures for High Rise Towers, Highways, Buildings, Bridges, Excellent problem solving skill for application of Communal
Accord towards the NCRs' & disputes with Compliance to the agreed procedure, Dynamic & Robust, personality, Positive thinking
with positive attitude Towards people, Excellent written, Communication, inter personal, liaison and problem solving skills with the
ability to work in multi cultural environment, Able provide leadership and direction for all aspects of construction throughout the
company, possess strong analytical and conflict management skills and the ability to trouble shoot issues, Strong leadership,
mentoring, communication and team building skills, Skilled at establishing and working collaboratively fast, dynamic team
environment with multiple projects and priorities, Strong organizational, Interpersonal, Presentation & Ability of communication
skills at all levels, Strong technical , Excellent problem-solving, Analytical, Verbal and written communication, Responsive to
changing demands, Strong leadership, Strong team building Possess sufficient technical knowledge to effectively identify
individual tasks necessary to complete complex projects and assignment, Have the ability to achieve results through motivation &
team working playing, Managing Multiple nationality staff, Excellent monitoring & supervisory involvement skills.
- Experience:
1) Position: Lead/Head Office QA/QC Department Manager
Employer: International Abdallah Fahd Enterprises Engineering Group – KSA. / Egypt.
Type of Projects: Infrastructure/Building.
Duration: 10/2014 - Present
Scope of Employer Contract: Management/Design/Contracting/Development.
Projects: EPC Upgrade, Engineering Services for Infrastructures, Utilities and Costal Engineering, Al Jubail Industrial
City intelligent system upgrade) - Royal Commission in Jubail, KSA. - Design and Studies for Infrastructure
&Tunnels development, Riyadh, KSA. - Recreational investment zone, Riyadh, KSA.
Specific Duties and Responsibilities/Scope of Work:
• Maintain the adapted current QMS. of Group.
• Set up & implement appropriate Specific Design Quality Assurance & Control Plan.
• Establish Specific Quality Assurance & Control Management System.
• Set up Specific Quality Assurance Procedure as per Specifications of related Projects.
• Make sure that all Client’s Data been gathered to the Inputs of Design process.
• Make sure that all Data being implemented during progress of Design process.
• Make sure that all Client’s Requirements been achieved to the Outputs of Design process.
• Liaise with all related Parties.
• Coordinate with all Design’s Team locally & internationally.
• Attend periodic locally & internationally meeting as required.
• Review all Outputs prior to be submitted.
• Maintain due improvements & Developments to the QMS.
• Maintain required scheduled plan Audits’.
• Make sure that all Outputs match the Client’s agreed contracted schedule.
1
2) Position: Licensed Consultant Supervision QHSSE Projects Manager
Employer: Engineering Associated Syndicate.
Type of Projects: Residential, Buildings, Infrastructures &Recreation.
Duration: 07/2012- 10/2014
Scope of Employers Contract: Management/Design/Supervision/Engineering/Consulting.
Projects: Villas. - Private building - Super Housing.
Specific Duties and Responsibilities/Scope of Work:
• Review all stages/phases of design process.
• Supervise, review & Implement Quality Assurance & Control aspects for all work activities.
• Review Preparation of projects specific QC plans, ITP and method statements.
• Manage proper reviews all submittals/shop drawings/certificates of compliance material.
• Provide effective leadership for QC personnel at the projects.
• Implement recording, filing and reporting system of QC works.
• Ensure that all quality levels were achieved, maintained and fully documented.
• To ensure that materials tests are appropriately undertaken following required specification, Standards and
Authority Requirements.
• Preparation of all quality control documentation required for final handover.
• Ensure that all non-conformance reports, surveillance reports and stop work orders raised by Quality control site personnel
were fully auction and closed out.
• Conduct quality audits to subcontractors and suppliers.
• Evaluate QC system for effectiveness, efficiency and capability.
• Advise project manager obtain Client approval for corrective actions to Unsatisfactory works.
• Review tender documents and give input regarding QC activities/ requirements.
3) Position: QA/QC Manager
Employer: International American Engineering Enterprises Company, Afghanistan.
Type of Projects: Military/Infrastructure/Rehabilitation/Upgrading/Repairs/Buildings.
Duration: 10/2011- 05/2012
Scope of Employers Contract: Management/Design/Supervision/Engineering.
Projects: US Forced Military Compound Complex.
Specific Duties and Responsibilities/Scope of Work:
• Conduct, Participate in Quality / technical compliance audits for all parties.
• Review the contract documents for each stage/phase in respect of QA/QC requirements and
Procedures and advice the Project Manager of any deficiency.
• Review all stages/phases of design process
• Review QA/QC site organization, make sure that key personnel CV’s are submitted.
• Review QA/QC Procedures and document control as submitted by all parties.
• Conduct and / or Participate in Quality or technical compliance audits for all parties.
•. Ensure traceability of all materials and equipment from purchasing and up to delivery on site.
• Closely monitor site activities; fully coordinate with discipline engineers, issue NCR’s if any.
• Participate with staff in assessing concession requests and field Design Changes as submitted
• Participate with staff in reviewing the Close out Report as submitted by any parties
• Maintain and measure compliance with the Technical Specification.
• Coordinate with CM to arrange and conduct Quality Meetings on regular time interval.
.
4) Position: Projects / Head Office QA/QC Manager
Employer: Emirates Contracting Company, UAE.
Type of Projects: Commercial/Residential/Buildings/Infrastructures/Recreation.
Duration: 08/2006 - 09/2011
Scope of Employers Contract: Management/Design/Supervision/Engineering.
Projects: International Compound Complex.
Specific Duties and Responsibilities/Scope of Work:
• Facilitate internal and external audits as per schedule to monitor internal QHSEE system.
• Review all stages/phases of design process.
•Determine cause of non-compliance & Identify corrective action.
• Manage the lessons learned program.
• Develop and expand the existing QA/QC department and structures.
• Set out and steadily improve a quality plan as company’s quality commitment.
• Develop, implement, communicate and maintain a QHSSE system to ensure compliance.
• Control internal, external complaint &feed back of client management.
• Maintaining KPI's and conducting Performance Assessments.
• Ensure adequate preventive and corrective measures are effectively implemented.
• Ensuring ISO-Certification on behalf of the company’s management.
• Establish procedures for complying with corporate and project specific requirements.
• Chair monthly meeting with contractors.
• Analyze root causes determine, and recommend process improvements.
• Prepare and issue monthly reports to be included in the overall monthly reports to the Client.
2
• Review photographic site records.
5) Position: Sr. QA/QC Engineer - to - QA/QC Manager
Employer: European JV. Company – Lieghton Group, UAE.
Type Projects: Commercial/Educational/Residential/Industrial/Infrastructures.
Duration: 09/2002 - 07/2006
Scope of Employers Contract: Management/Design/Supervision/Engineering.
Projects: International Resort - International Petroleum Head Quarter High Rise Towers - High rise Complex Mall
expansion center - International Airport
Specific Duties and Responsibilities/Scope of Work:
• Control the quality of all parties by applying QHSSE system.
•Review, supervise, Develop, implement, conduct of inspection plans, checklists, inspections,
Material submittals, method statements, tests, test reports, meetings, site visits, corrective
Actions, preventive actions and training
• Review all stages/phases of design process.
• Issuing of Non-conformance Reports (NCR’s)/reviewing corrective/preventive actions.
• Undertaking off-site visits to facilities of sub-contractors’, suppliers’, testing laboratories.
• Undertake periodic quality audits and effective corrective and preventive actions for the non-conformances for
the continual improvement..
• Keep check on testing frequency, calibration status of test equipment.
• Develop & improve QHSSE system.
• Make sure that handing over of the project goes smoothly by finalizing all as-built drawings,
Operation and maintenance manuals and training for client’s staff.
• Implementation of lab manual on site.
• Reviews documentation (technical reports/specifications/procedures/method statement…..etc).
• Monitors and reports, in conjunction with Project Planning and Scheduling Engineer, the
Progress achieved by contractors
• Conducts appropriate KPI’s and Non-conformances.
6) Position: Senior Supervision QC Construction Engineer – to - Supervision QA/QC Construction Manager
Employer: Engineering Construction Company / Safaga / Egypt
Type Projects: Industrial/Commercial/Residential/Infrastructures/Maintenance.
Duration: 12/1994 - 08/2002
Scope of Employers Contract: Management/Design/Supervision/Engineering.
Projects: International Hotel - International Factories - Hospital’s Rehabilitation & Maintenance - Villas’ Restoration &
Maintenance. - International Hotel - International Touristy Resort ‘’Villas, Services Buildings of Chiller yard,
Sub-stations, Fuel tanks - Generators, Electricity rooms, Swimming Pools, Courts, Lagoons, Soft / Hard
Landscape, External Works’’.
Specific Duties and Responsibilities/Scope of Work:
• Regular visits to sites for monitoring of site activities according QHSSE.
• Review all stages/phases of design process.
• Advise of findings & area of concern and corrective action.
• Lead the team to evaluate all requests for Information, involvement and implementation of Field Quality Control
procedures, Safety & Progress aspects.
• Deep involvement in transmittals addressing, Construction methodology, Method Statements,
Project Quality Plan, Safety Plan, Schedules.
• Lead staff in final inspection of work and preparation of Punch List.
• Preparation and submission of the closeout report for the Project.
• Attend Executive meetings, weekly progress meetings/QHSSE & technical meetings.
• Communicate with the Design Consultant in a timely manner.
• Lead in reviewing and implementing pre-commissioning and commissioning plans.
• Advise Project Manager of any foreseen slippage of progress and propose corrective actions.
• Review weekly and monthly reports to Project Manager vs non-compliance/ CAR/PAR.
• Attend Executive meetings, weekly Progress meetings, Quality and Safety meetings and ensure
That weekly Technical meetings are attended by all relevant disciplines.
• Ensure that all staff are aware of the project approved procedures and drawings.
• Manage potential variation to scope's work which may generate cost/time impact/assessment.
7) Position: Resident Consultant QC Supervision Engineer
Employer: International Consulting Engineering Company - ACE
Type of Projects: Educational/Buildings/Infrastructures/Recreation.
Duration: 09/1993 - 12/1994
Scope of Employers Contract: Management/Design/Supervision/Engineering/Consulting.
Projects: Schools.
Specific Duties and Responsibilities/Scope of Work:
• Reviews and advises PM on the approval of contractor’s program, methods statements.
• Review all stages/phases of design process.
3
• Approves and monitors contractor’s qualify assurance and control, approve all submissions.
• Ensures that all appropriate and relevant field records are maintained.
• Maintains all records required by QHSSE's requirements.
• Reports progress and cost to the PM.
• Supports PM in negotiation of cost variations, extensions of time.
• Ensures compliance with the Contract.
• Certifies measurements and payments.
• Advises PM of potential claims and progress slippage.
• Prepares Completion/Maintenance certificates.
• Contract close out.
• Ensure that program of the works is constructed in accordance with the contract requirements,
• Supervise all activities, recommend appropriate safety measures.
• Respond promptly to the contractor's request for information.
• Liaise with the Material Engineer on required testing and the test results for works.
• Ensures that the contractor liaises with Authorities or any who interface with the project.
• Act proactive in ensuring the diversions do not cause any delays to the project.
• Monitor site QHSSE, liaise with Client, Prepare reports, and Keep records of works, plant.
• Assist the planning engineer to monitor progress, notify the senior of any potential delays.
8) Position: Construction Engineer - to - Senior Construction Engineer
Employer: International Saudi Engineering Enterprises Company.
Type of Projects: Residential/Commercial/Buildings/Infrastructures/Recreation.
Duration: 08/1993 - 07/1988
Scope of Employers Contract: Management/Design/Supervision/Engineering.
Projects: Potable / Waste water purification treatment station – Infrastructure ‘’Roads, Tunnel, Underground networks
– Bridges - Sewer tunnels – Offshore - Marine Works - On Shore Works’’.
Specific Duties and Responsibilities/Scope of Work:
• Communicate with the Design Consultant in a timely manner.
• Ensure staff involvement and implementation of Field QHSSE's aspects.
• Ensure Schedules and compliance with Project objectives.
• Lead in reviewing and implementing pre-commissioning and commissioning plans.
• Lead staff in final inspection of work and preparation of Punch List.
• Coordinate consultants and contractors in the assigned area to keep project compliant with
Budget, Schedule, QHSSE's Requirements.
• Lead staff in reviewing and assessing of the Close out Report submitted by Contractor.
• Advise Project Manager of any foreseen slippage of progress and propose corrective actions.
• Review and initial PM assessment of monthly progress invoices.
• Review weekly and monthly reports as presented by Contractor and present to Project Manager
Comments of non-compliance, and/or area of concern and corrective actions.
• Attend Executive meetings, weekly Progress meetings, Quality meetings and Safety meetings and ensure that
weekly Technical meetings are attended by all relevant disciplines.
• Manage on any potential variation to scope of work, which may generate cost or time impact and present assessment.
- Personal Data:
- Email Address: johnpolos15@hotmail.com
- Skype ID: managerall1
- Cell: 00201276381876
4

CV QAQC Manager Brf - Mngmt app.

  • 1.
    - Education: Degree,Bachelor Of Civil Science Engineering, University of Engineering. - Practice Details: - Steel Structure, Reinforced Concrete & Steel Combined to Reinforced Concrete. - Finishes & Interiors works: ‘’ Apply Updated Modern High Technique Materials, Tools, Equipment’’. - INFRA Structures: ‘’ Tunnels, Bridges, All Undergrounds’ Types, All Roads’ Types, Airports, Potable / Waste Water Treatment Stations, Sub-stations, Chiller Yard, All Underground Tanks’ Types, Trenches, All Sub-Structures Reservoirs, Generators Buildings, Electricity Rooms, Pump Stations, All Superstructure Reservoirs, Gates’ Houses Buildings, All Fences’ Types, Services Blocks, Marines Works, On Shore Works, Poster Tanks, Courts. - Repairs Works, Maintenance, Restoration & Rehabilitations: ‘’Apply update high technique Chemicals’’. - External Works: ‘’All Types Of Net Works, Utilities, Lagoons, Swimming Pools, Sheds, All Playgrounds’ Types’’. - landscaping Works: ‘’Hard & Soft‘’. - Skills: Comfortable Leadership & Management skills, Cost Management, Problem Solving, Maintain Quality Audits for multi projects to ensure Compliance with the QHSSE policies, procedures and systems through effective participation in relevant Audits as per QMS plan to ensure consistent & systematic application of best practices providing timely and effective support to concerned users, Ensure that Quality Audits are completed on schedule and that resultant action plans are implemented, Ensure Audits' results as Corrective Action reports are clearly communicated and followed up in a timely manner to close in line with established company procedures, international standards and local regulations, Provide Audits for suppliers, vendors, subcontractors, manufacturers, third lab, Internal Audits, enforcing policies and procedures, Kick off meeting prior to commencement of major activities to identify the Potential risks, Excellent Quality improvement skill with subjective Quality Trainings to aware the Construction team for execution of right activity in the first shot to avoid the cost of Quality, Strong skills to develop procedure and systems; outstanding presentation, communication & inter-personal skills, Excellent knowledge of Material related to Civil, MEP, Steel structures for High Rise Towers, Highways, Buildings, Bridges, Excellent problem solving skill for application of Communal Accord towards the NCRs' & disputes with Compliance to the agreed procedure, Dynamic & Robust, personality, Positive thinking with positive attitude Towards people, Excellent written, Communication, inter personal, liaison and problem solving skills with the ability to work in multi cultural environment, Able provide leadership and direction for all aspects of construction throughout the company, possess strong analytical and conflict management skills and the ability to trouble shoot issues, Strong leadership, mentoring, communication and team building skills, Skilled at establishing and working collaboratively fast, dynamic team environment with multiple projects and priorities, Strong organizational, Interpersonal, Presentation & Ability of communication skills at all levels, Strong technical , Excellent problem-solving, Analytical, Verbal and written communication, Responsive to changing demands, Strong leadership, Strong team building Possess sufficient technical knowledge to effectively identify individual tasks necessary to complete complex projects and assignment, Have the ability to achieve results through motivation & team working playing, Managing Multiple nationality staff, Excellent monitoring & supervisory involvement skills. - Experience: 1) Position: Lead/Head Office QA/QC Department Manager Employer: International Abdallah Fahd Enterprises Engineering Group – KSA. / Egypt. Type of Projects: Infrastructure/Building. Duration: 10/2014 - Present Scope of Employer Contract: Management/Design/Contracting/Development. Projects: EPC Upgrade, Engineering Services for Infrastructures, Utilities and Costal Engineering, Al Jubail Industrial City intelligent system upgrade) - Royal Commission in Jubail, KSA. - Design and Studies for Infrastructure &Tunnels development, Riyadh, KSA. - Recreational investment zone, Riyadh, KSA. Specific Duties and Responsibilities/Scope of Work: • Maintain the adapted current QMS. of Group. • Set up & implement appropriate Specific Design Quality Assurance & Control Plan. • Establish Specific Quality Assurance & Control Management System. • Set up Specific Quality Assurance Procedure as per Specifications of related Projects. • Make sure that all Client’s Data been gathered to the Inputs of Design process. • Make sure that all Data being implemented during progress of Design process. • Make sure that all Client’s Requirements been achieved to the Outputs of Design process. • Liaise with all related Parties. • Coordinate with all Design’s Team locally & internationally. • Attend periodic locally & internationally meeting as required. • Review all Outputs prior to be submitted. • Maintain due improvements & Developments to the QMS. • Maintain required scheduled plan Audits’. • Make sure that all Outputs match the Client’s agreed contracted schedule. 1
  • 2.
    2) Position: LicensedConsultant Supervision QHSSE Projects Manager Employer: Engineering Associated Syndicate. Type of Projects: Residential, Buildings, Infrastructures &Recreation. Duration: 07/2012- 10/2014 Scope of Employers Contract: Management/Design/Supervision/Engineering/Consulting. Projects: Villas. - Private building - Super Housing. Specific Duties and Responsibilities/Scope of Work: • Review all stages/phases of design process. • Supervise, review & Implement Quality Assurance & Control aspects for all work activities. • Review Preparation of projects specific QC plans, ITP and method statements. • Manage proper reviews all submittals/shop drawings/certificates of compliance material. • Provide effective leadership for QC personnel at the projects. • Implement recording, filing and reporting system of QC works. • Ensure that all quality levels were achieved, maintained and fully documented. • To ensure that materials tests are appropriately undertaken following required specification, Standards and Authority Requirements. • Preparation of all quality control documentation required for final handover. • Ensure that all non-conformance reports, surveillance reports and stop work orders raised by Quality control site personnel were fully auction and closed out. • Conduct quality audits to subcontractors and suppliers. • Evaluate QC system for effectiveness, efficiency and capability. • Advise project manager obtain Client approval for corrective actions to Unsatisfactory works. • Review tender documents and give input regarding QC activities/ requirements. 3) Position: QA/QC Manager Employer: International American Engineering Enterprises Company, Afghanistan. Type of Projects: Military/Infrastructure/Rehabilitation/Upgrading/Repairs/Buildings. Duration: 10/2011- 05/2012 Scope of Employers Contract: Management/Design/Supervision/Engineering. Projects: US Forced Military Compound Complex. Specific Duties and Responsibilities/Scope of Work: • Conduct, Participate in Quality / technical compliance audits for all parties. • Review the contract documents for each stage/phase in respect of QA/QC requirements and Procedures and advice the Project Manager of any deficiency. • Review all stages/phases of design process • Review QA/QC site organization, make sure that key personnel CV’s are submitted. • Review QA/QC Procedures and document control as submitted by all parties. • Conduct and / or Participate in Quality or technical compliance audits for all parties. •. Ensure traceability of all materials and equipment from purchasing and up to delivery on site. • Closely monitor site activities; fully coordinate with discipline engineers, issue NCR’s if any. • Participate with staff in assessing concession requests and field Design Changes as submitted • Participate with staff in reviewing the Close out Report as submitted by any parties • Maintain and measure compliance with the Technical Specification. • Coordinate with CM to arrange and conduct Quality Meetings on regular time interval. . 4) Position: Projects / Head Office QA/QC Manager Employer: Emirates Contracting Company, UAE. Type of Projects: Commercial/Residential/Buildings/Infrastructures/Recreation. Duration: 08/2006 - 09/2011 Scope of Employers Contract: Management/Design/Supervision/Engineering. Projects: International Compound Complex. Specific Duties and Responsibilities/Scope of Work: • Facilitate internal and external audits as per schedule to monitor internal QHSEE system. • Review all stages/phases of design process. •Determine cause of non-compliance & Identify corrective action. • Manage the lessons learned program. • Develop and expand the existing QA/QC department and structures. • Set out and steadily improve a quality plan as company’s quality commitment. • Develop, implement, communicate and maintain a QHSSE system to ensure compliance. • Control internal, external complaint &feed back of client management. • Maintaining KPI's and conducting Performance Assessments. • Ensure adequate preventive and corrective measures are effectively implemented. • Ensuring ISO-Certification on behalf of the company’s management. • Establish procedures for complying with corporate and project specific requirements. • Chair monthly meeting with contractors. • Analyze root causes determine, and recommend process improvements. • Prepare and issue monthly reports to be included in the overall monthly reports to the Client. 2
  • 3.
    • Review photographicsite records. 5) Position: Sr. QA/QC Engineer - to - QA/QC Manager Employer: European JV. Company – Lieghton Group, UAE. Type Projects: Commercial/Educational/Residential/Industrial/Infrastructures. Duration: 09/2002 - 07/2006 Scope of Employers Contract: Management/Design/Supervision/Engineering. Projects: International Resort - International Petroleum Head Quarter High Rise Towers - High rise Complex Mall expansion center - International Airport Specific Duties and Responsibilities/Scope of Work: • Control the quality of all parties by applying QHSSE system. •Review, supervise, Develop, implement, conduct of inspection plans, checklists, inspections, Material submittals, method statements, tests, test reports, meetings, site visits, corrective Actions, preventive actions and training • Review all stages/phases of design process. • Issuing of Non-conformance Reports (NCR’s)/reviewing corrective/preventive actions. • Undertaking off-site visits to facilities of sub-contractors’, suppliers’, testing laboratories. • Undertake periodic quality audits and effective corrective and preventive actions for the non-conformances for the continual improvement.. • Keep check on testing frequency, calibration status of test equipment. • Develop & improve QHSSE system. • Make sure that handing over of the project goes smoothly by finalizing all as-built drawings, Operation and maintenance manuals and training for client’s staff. • Implementation of lab manual on site. • Reviews documentation (technical reports/specifications/procedures/method statement…..etc). • Monitors and reports, in conjunction with Project Planning and Scheduling Engineer, the Progress achieved by contractors • Conducts appropriate KPI’s and Non-conformances. 6) Position: Senior Supervision QC Construction Engineer – to - Supervision QA/QC Construction Manager Employer: Engineering Construction Company / Safaga / Egypt Type Projects: Industrial/Commercial/Residential/Infrastructures/Maintenance. Duration: 12/1994 - 08/2002 Scope of Employers Contract: Management/Design/Supervision/Engineering. Projects: International Hotel - International Factories - Hospital’s Rehabilitation & Maintenance - Villas’ Restoration & Maintenance. - International Hotel - International Touristy Resort ‘’Villas, Services Buildings of Chiller yard, Sub-stations, Fuel tanks - Generators, Electricity rooms, Swimming Pools, Courts, Lagoons, Soft / Hard Landscape, External Works’’. Specific Duties and Responsibilities/Scope of Work: • Regular visits to sites for monitoring of site activities according QHSSE. • Review all stages/phases of design process. • Advise of findings & area of concern and corrective action. • Lead the team to evaluate all requests for Information, involvement and implementation of Field Quality Control procedures, Safety & Progress aspects. • Deep involvement in transmittals addressing, Construction methodology, Method Statements, Project Quality Plan, Safety Plan, Schedules. • Lead staff in final inspection of work and preparation of Punch List. • Preparation and submission of the closeout report for the Project. • Attend Executive meetings, weekly progress meetings/QHSSE & technical meetings. • Communicate with the Design Consultant in a timely manner. • Lead in reviewing and implementing pre-commissioning and commissioning plans. • Advise Project Manager of any foreseen slippage of progress and propose corrective actions. • Review weekly and monthly reports to Project Manager vs non-compliance/ CAR/PAR. • Attend Executive meetings, weekly Progress meetings, Quality and Safety meetings and ensure That weekly Technical meetings are attended by all relevant disciplines. • Ensure that all staff are aware of the project approved procedures and drawings. • Manage potential variation to scope's work which may generate cost/time impact/assessment. 7) Position: Resident Consultant QC Supervision Engineer Employer: International Consulting Engineering Company - ACE Type of Projects: Educational/Buildings/Infrastructures/Recreation. Duration: 09/1993 - 12/1994 Scope of Employers Contract: Management/Design/Supervision/Engineering/Consulting. Projects: Schools. Specific Duties and Responsibilities/Scope of Work: • Reviews and advises PM on the approval of contractor’s program, methods statements. • Review all stages/phases of design process. 3
  • 4.
    • Approves andmonitors contractor’s qualify assurance and control, approve all submissions. • Ensures that all appropriate and relevant field records are maintained. • Maintains all records required by QHSSE's requirements. • Reports progress and cost to the PM. • Supports PM in negotiation of cost variations, extensions of time. • Ensures compliance with the Contract. • Certifies measurements and payments. • Advises PM of potential claims and progress slippage. • Prepares Completion/Maintenance certificates. • Contract close out. • Ensure that program of the works is constructed in accordance with the contract requirements, • Supervise all activities, recommend appropriate safety measures. • Respond promptly to the contractor's request for information. • Liaise with the Material Engineer on required testing and the test results for works. • Ensures that the contractor liaises with Authorities or any who interface with the project. • Act proactive in ensuring the diversions do not cause any delays to the project. • Monitor site QHSSE, liaise with Client, Prepare reports, and Keep records of works, plant. • Assist the planning engineer to monitor progress, notify the senior of any potential delays. 8) Position: Construction Engineer - to - Senior Construction Engineer Employer: International Saudi Engineering Enterprises Company. Type of Projects: Residential/Commercial/Buildings/Infrastructures/Recreation. Duration: 08/1993 - 07/1988 Scope of Employers Contract: Management/Design/Supervision/Engineering. Projects: Potable / Waste water purification treatment station – Infrastructure ‘’Roads, Tunnel, Underground networks – Bridges - Sewer tunnels – Offshore - Marine Works - On Shore Works’’. Specific Duties and Responsibilities/Scope of Work: • Communicate with the Design Consultant in a timely manner. • Ensure staff involvement and implementation of Field QHSSE's aspects. • Ensure Schedules and compliance with Project objectives. • Lead in reviewing and implementing pre-commissioning and commissioning plans. • Lead staff in final inspection of work and preparation of Punch List. • Coordinate consultants and contractors in the assigned area to keep project compliant with Budget, Schedule, QHSSE's Requirements. • Lead staff in reviewing and assessing of the Close out Report submitted by Contractor. • Advise Project Manager of any foreseen slippage of progress and propose corrective actions. • Review and initial PM assessment of monthly progress invoices. • Review weekly and monthly reports as presented by Contractor and present to Project Manager Comments of non-compliance, and/or area of concern and corrective actions. • Attend Executive meetings, weekly Progress meetings, Quality meetings and Safety meetings and ensure that weekly Technical meetings are attended by all relevant disciplines. • Manage on any potential variation to scope of work, which may generate cost or time impact and present assessment. - Personal Data: - Email Address: johnpolos15@hotmail.com - Skype ID: managerall1 - Cell: 00201276381876 4