Mohsin Ali is seeking a career opportunity that allows him to enhance his knowledge and professional skills in a challenging environment. He has a Bachelor's degree in Electronics Engineering and over 5 years of experience in quality assurance and quality control roles for power plants, fertilizer plants, transmission lines, and chemical plants. His experience includes inspection, testing, and commissioning of electrical, instrumentation, and control systems and ensuring compliance with standards and specifications. He is a member of the Pakistan Engineering Council and his qualifications are verified by the Higher Education Commission.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
I am working to recently Clean Fuels Project KNPC MAB1 (KUWAIT) project. With a back ground of total experience more than 10 years & involved in many complicated multidiscipline Gas Petrochemical Refinery and power Generation Plant, Experience in area of Supervision Quality Inspection, Broad Experience and good knowledge of execution Instrumentation. Installation / Pre-commissioning inspection for each phase of Instrumentation activities as per standard & project specification. Especially Instrument side. Having solid experience as a with the ability to follow the INSTRUMENT QA/QC ENGINEER he procedure ITP to include Site inspection, material equipment’s, instruments final inspection before pre-commissioning good supervision &coordinating with QC Engineer QC Manager within Company & Client.
I have good interpersonal and management skill, discipline, technical knowledge and self-confidence also good team player with excellent health. I thank you for your time& consideration, I can assure you that if given the opportunity, I shall discharge my duties to your satisfaction.
BACKGROUND INCLUDES
o Project Handling and execution
o Site activities Engineer in executing the project
o Technical support activities at site while project execution
o Site design changes as per IFC drawing
PROFESSIONAL SKILLS
o Quality Assurance / Quality Control
o A career span over 12 years experience in Aboard both.
o Strong Analytical, Training Skills and problem solving abilities. An Excellent ability
Responsibilities: E&I QA/QC
Responsibilities for Field Inspection as per Inspection Testing Plan (ITP’s) Related (E&I)
Jobs.QA/QC with the help of specification, drawings.
Inspection for Material Receiving related Electrical, Instrument as per Indent, Delivery
Note.
Inspection for Cable Laying (E & I) in Cable Trays, Trenches as per cross-sectional
drawings.
Inspection for Cable Trays (E&I) Installation (Perforated, Ladder, Mesh) as per drawing.
Responsible for all Red Marks/As Built drawing as per site modification.
Inspection for Lighting Installation as per circuit diagram, Panel Installation,Transformer
installation.
Inspection for Heating Tracing cables and Testing.
Having Good Knowledge of (NEC) National Electrical Code.
American Petroleum Institute (API ) Standards
IEC- international ELECTROTECHNICAL Commission Standards.
Inspection for the Installation of MCT’s.
Inspection for Lightning Protection (Lightning Arresters).
Inspection for EARTHING Cable Laying, CAD Weld - Exothermic Weld joints,
Earth Bus Bar, EARTHING Test.
Inspection for Motor Installation, Resistance/IR test & Motor torque test.
Inspection for Cable Continuity/IR, Cable termination, EARTHING test.
Prepare the NCR, CAR, TQ, ITP, and Method Statements & RFI’S.
Complete QA/QC Documentation as per Project specification.
Inspection for calibration of PI, PDIT, PT, TT, TE, FT, LT.
Functional Test of Ultrasonic Transmitters, LSL, LSH, LSHH, AT.
Inspection for Field Instrument Installation (PT,FT, LT, Control Valves as per Hook up drawing)
Inspection for Impulse Line Leak test.
Inspection for JB’S Installation, Panels, Cabinets Installation.
Preparing the complete Loop Folders like(DI,DO,AI,AO,RTD for Loop Checking Pre-
Commissioning with the attachments of Instrument loop package index, Functional loop test CR,
Material Receiving Calibration CR, Instrument Installation CR Instrument index, instrument Loop
Diagram & P& ID’S.
Responsible for clear the Punch Points.
Prepare the Final Dossier as per client HOS and Hand over to Mechanical Completion
Department (MC)
Final Walk Down of Hand over System (HOS) with Client.
I am a competent professional with proven expertise in Electrical Systems, with 18 years of hands on experience including GCC Countries, Qatar UAE and Pakistan. Possess comprehensive knowledge in Execution & Supervision, QA/QC, Testing & Commissioning, Design Review, Planning and Site Management for the Electrical Systems involved in the Construction Sectors. Highly motivated and possess good communication and presentation skills.
E&I QC INSPECTOR RESUM AND documents.pdfIrfan786pak
I have good working experience more then 17 years in Oil and Gas ,Fertilizer, Chemical, Petrochemical, in Saudi Arabia & Pakistan , Having a good Experience in Maintenance, Pre Commissioning ,& Commissioning, Start-up and erection Activities, Good knowledge & working skills in plant Control Automation and different control systems such as DCS & ESD systems, Burner Management System, Condition Monitoring System, Turbine & Compressor Integrated Control Systems, F&G System, Production Wellheads, Water & Gas Injection Wellheads Hydraulic Control Panels etc. Ability to work alone as a shifter and fault finding & rectify. i am a Safety conscious & sound knowledge about work permits like cold, hot and entry work permits.in Maintenance and Commissioning 4 LTE2.48 % C4G + During my job I'm Responsible for the PM , CM & breakdown maintenance of various field Instrumentation like flow , pressure , temperature level transmitters , vibration probes , control / on - off valves which installed on Process piping , Skids . Self motivated Maintenance Professional with a demonstrated history of working in the Oil & Gas and Petrochemicals industry in instrument & Control system department securing16 years of Practical experience I am expertly capable in fault diagnosis , troubleshooting and process controls systems in process plant to ensure safety guidelines . I am experienced in modern process control instrumentation in chemicals , petrochemical , fertilizer , oil & gas and cryogenic plants in field of instrumentation . Highly skilled in electrical operations & maintenance . Has working proficiency in SAP system utilization and MS office My skills include but are not limited to : PLC , DCS & Vibration Monitoring System | Control Valve Operation & Maintenance | Loop Checking & SAT / FAT Activities | P & ID & Instruments Calibration | Transducers , SIS / SIL Concept , Positioners | Single Loop Controllers , I / P , ESD System | Turbine & Compressor Control Systems | Workshop / Field Test Equipment | Control Valves , Online Gas Analyzers | Burner Management System | Custody Transfer Metering | Commissioning Activities | Interpersonal Skills | Presentation Skills
I am available on
Email: irfanpak181@gmail.com
Mobile 📱: 00966533012366
1. Contact Information:
Flate#403 Block BXL Karachi Centre Near
Newtown Police Station Karachi Pakistan
Cell No.03337245877
E-mail: mohsin.ali@descon.com siyal.mohsinali@yahoo.com
OBECTIVES:
Seeking career in an organization, which enhance my knowledge, abilities
and professional skills in a challenging environment as well as provides a chance to improve
my career based on performance?
Having five years experience in Power Plant, Fertilizer, Electrical Transmission line &
Chemical Plant.
PERSONAL PROFILE:
Father`s Name: Haji hassan ali
Date of Birth 27 / 01 / 1982
NIC. No: 45104-8678957-7
Passport No: EV3999572
Religion: Islam
QUALIFICATION :
Degree/Diploma: BE (Bachelors in Engineering)
Field of Study: Electronics
University /College: Dawood College of Engineering and technology Karachi
5 YEARS E&I PROFESSIONAL EXPERIENCE :
• Preparation of Testing Procedure, Method statement / work instruction as per
specification and project requirements.
• Preparation of QIP Quality inspection plan and formats of different project in DHQ
• Deals with reviewing of all ITP's / QCP / Method Statement / Material Approval prior
for project plan preparation.
• Coordinating with Construction Supervisor project plan drawing review-having IFC
drawing officially approved documentation.
• Perform Hold Witness and Surveillance” Inspections and tests at construction sites to
ensure compliance with client requirements
• Review and evaluate quality document submittals.
• Witness on-site and off-site material and installations tests for compliance with client
specified standards.
• Ensured E&I equipment works complied with project specifications, company
procedures, method statements and quality assurance and controls documentation
(strictly implementing the API STANDARDS & CODES)
Page: 1-3
2. • Ensure E&I equipment works complied with project specifications, company
procedures, method statements and quality assurance and control documentation
And also approve E&I material from client through MAR (Material approval request)
• Periodic Inspection of certified equipments to be installed as per required, zones.
• Inspection of earthing conductors, Pit, Rod and earth test.
• Installation inspection of electrical poles.
• Periodic inspection of installation routes and cable support systems prior to cable run.
• Inspection of cable laying cable drum meggering, cable continuity, and insulation test
• Installation inspection of fire alarm system, Public address system, Electrical
distribution, Local control panel, switches gear. LV HV motors.
• Calibration & Installation inspection of transmitters, control valves, pressure gauges,
temperature indicators, RTD’s, thermocouples, temperature transmitters, ultrasonic
level transmitters, laser level transmitters, displacement type level transmitters,
differential pressure transmitters, magnetic flow meters, orifice type flow meters, Rota
meters, positive displacement flow meters, vortex flow meters, all types of level,
temperature, pressure and flow switches.
• Loop-Checking of instruments, trouble shooting, testing and commissioning activities.
• Inspection of cable laying cable drum meggering, cable continuity, and insulation test
• Installation inspection of cable tray support, cable trays, junction box support, junction
boxes, control panels and all type of instruments.
• Termination inspection of instruments, junction boxes, switch gear, electrical panel
and DCS control panels.
• Analogue and digital controllers, Fire & Gas detection/protection systems.
• ESD (Emergency shutdown), Pneumatic and electronic shutdown panels and control
systems.
• Tasks to monitor all contractor/ subcontractor activity priors for deadline start of E&I
Workload.
• To undertake inspection of vendor skids before final acceptance by client.
On-site audits of subcontractor.
• Worked and Trouble shooting of Special Measuring Instruments like Micro motion
Coriollis Meters, Capacitance Type Level Meters, Ultra Sonic Flow Meters, and Vortex
Flow Meters.
• Followed all safety practices and procedures and corrected unsafe work practices
General
• Follow up all Engineering drawings & Technical Queries related to E&I work.
• Attending minutes of meeting with maintenance and technical support department for
support to raise technical queries, and clarified other problems with them.
Familiar with safe work permit system.
CURRENT EMPLOYMENT STATUS
PROJECTS PROFILE DETAILS:
Descon Engineering Ltd Pakistan
Project Title : Lotte Pakistan PTA Power Plant
Client: Lotte Pakistan PTA
Position Title: In charge QA/QC (E&I)
Working Duration: July 2011 to date
Page: 2-3
3. Descon Engineering Ltd Pakistan
Performed own duties in Head Office of Descon Engineering Ltd on permanent basis being a
project coordinator in QA/QC Department.
Position Title: QA/QC Engineer (E&I)
Working Duration: May 2011 to July 2011
Descon Engineering Ltd Pakistan
Project Title : Enven 1.3 Fertilizer Expansion Project
Client: Engro chemical ltd Daharki
Consultant: Snamprogetti Engineering Italy
Position Title: QA/QC Engineer (E&I)
Working Duration: Dec 2008 to May 2011
Descon Engineering Ltd Pakistan
Project Title : 6.6 kv Overhead Transmission Line
Client: Engro chemical ltd Daharki
Position Title: QA/QC Assistant Engineer (E&I)
Working Duration: Sep-2008 to Dec- 2008
Descon Engineering Ltd Pakistan
Project Title : Oxychem Chemical Plant
Client: Descon Oxychem Ltd
Position Title: QA/QC Assistant Engineer (E&I)
Working Duration: May- 2008 to Sep- 2008
Qadir Pur Gas Field Pakistan
Project Title : Liberty power plant
Client: TNT
Position Title: Trainee Engineer (E&I)
Working Duration: Aug 2006 to May- 2008
AFFILIATION:
• Member, [PEC]Pakistan Engineering Council (Electro/8302)
• Degree is verified from Higher Education commission (HEC), Foreign Affairs
.
REFERENCES:
• Will be furnished on demand.
Page: 3-3