Mohammed Iftekhar
E&I Commissioning Engineer
E-Mail Id: ifnza26@yahoo.in
mohmdiftekharmz@yahoo.co.in
Mob No-00965-69018068 (Kuwait)
Mob No-0091-9892812506 (India)
Address Permanente (INDIA)
83/H/48 2nd
Floor Belgachia Road, Kolkota-700037 (W.B) India
Kuwait Driving License -Available
Dear Sir,
I would like to inform you that I am Mohammed Iftekhar working in Kuwait as a
Commissioning Engineer I am currently seeking a career with your company, where I can
utilize my extensive skills, leadership, and experience. I am willing to relocate any wear in
world as per company requirement
Qualifications: BE Instrument & Control Engineer
Total Experience: 17 Years
Expert knowledge of Construction, Pre-Commissioning, Commissioning & Maintenance)
logistics and integrated logistics management, Excellent ability for Preparing
Pre-Commissioning Procedure, Commissioning Procedurefinal report for startup of plant
and handover plant after establish the unit, Organize Manpower, Organize Vendor ,Organize
meeting, , Managing all type of document outgoing and incoming , Ability to work
independently in field and system side like trouble-shooting and operation from DCS (HMI)
handle very fast to control abnormal process operation to normal process.
I am giving my particulars as under for your perusal. You will find more detailed
information about my education and total work experience in below my career profile.
Presume you would give me an opportunity to have candid discussion.
You’re sincerely,
(Mohammad Iftekhar)
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
2
Career Profile
Professional Qualification
Instrument & Control Engineering (BE)
(Pass out By 1995)
Educational Qualification
High Secondary (HS)
(Pass out by 1991)
Technical Training Course on site
1. Training programs attendee course & operation
GE Compressors Startup
Functional Test, Loop checking, Logic Test, Cause and Effect checking, Initial Start-Up startup of
Compressor, Normal startup, Normal process Operation & Normal stop/Emergency Stop.
2. Training programs attendee Course & Operation ofDCS System.
Honeywell System ICS
Experion PKS system R.400.2
(SAT, Functional Test for ESD, F&G & DCS Logic, All signal checking from DCS system to field ESD logic
checking all Level-0,I,2&Level-3, interface checking between system to system & communication link
checking with DCS system and third-party all signal inspection with client ADCO re-per present.
3. Training programs attendee Course & Operation
YOKOGAWA CENTUM VP
YOKOGAWA ESD System
YOKOGAWA F&GSystem
PRM Plant Resource Manager
(SAT, Functional Test for ESD, F&G & DCS Logic, All signal checking from DCS system to field ESD logic
checking all Level-0,I,2&Level-3, interface checking between system to system & communication link
checking with DCS system and third-party all signal inspection with client ADCO re-per present.
4. Training programs attendee Course & Operation
Delta-V(Emerson process Management) DCS system Operation commissioning
SAT (Site Acceptances Test) Inspection & Trouble shooting
DCS Teleperm XP Siemens System operation
& Trouble shooting and configuration loop checking etc.
5. Training programs attendee Course
PLC Siemens Simatic S5-100U (CPU) System.
ESD System (Emergency Shut Down system)
6. Training programs attendee Course
ICS Triplex& HIMA PLC SAT Inspection & Trouble Shooting.
SSLS (Safety Shut-Down logic System) SAT (Site Acceptances Test) Inspection & Trouble shooting
7. Training programs attendee Course
RS3 Rosemount (DCS) System Operation Commissioning SAT (Site Acceptances Test) Inspection &
Trouble shooting.
8. Training programs attendee Course
OTES WSD System ESD System.
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
3
9. Training programs attendee Course
VSD (Power Flex 7000 Rockwell Automation) Variable Drive Compressor Operation and Trouble-shooting
Additional Information
Working Field /Project Like
A. Oil & Gas Plant
B. Refinery
C. Distillation & Power Plant
D. Re-Bar Rolling Mills
E. Booster Station
F. Gathering Center (GC)
G. Well Head etc.
Excellent Knowledge Drawing Like
A. Plant Overall layout Diagram
B. Plot Plan Diagram
C. P&ID (Piping & Instrument Diagram)
PFD (Process Flow Diagram)
D. PSFS Process Safety Flow Schematics Diagram)
E. C&E Cause & Effect Diagram)
F. Interlock Logic Diagram
G. Cable Root Diagram
H. System Arctic Diagram
I. Panel Installation Diagram & Equipment installation Diagram
J. Instrument Installation Diagram
K. Instrument Hoop-up Diagram
L.DCS Graphic verification and color cod identification, Mark-up P & ID’s System wise &
Functional Schematic Drawing
Document Making like
A. Pre-Commissioning Procedure
B. Commissioning Procedure.
C. Final Operation Report.
D. MOM minutes of meeting
E. Operation condition data if any problem making report Etc.
Experience Construction works
A. Planning
B. Document review all related construction works
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
4
C. Installation of duck-bank
D. Installation of Panels
E. Installation of J.Bs
F. Installation of ESD,DCS,F&G,UCP system panels
G. Installation of Tray-works
H. Installation of Instruments like (PT, TT, LT, FT, AIT, H2S Monitor, Gas Monitor, UVR Detector,
Smoke Detector Etc.
I. Installation of Stanchions
J. Installation of Cabling laying (Pulling)
K. Installation of Valves
L. Calibration all type of Instruments
M. Calibration all type of Control Valves
N. Installation of instrument tubing as per hook-up drawing
Experience for work Pre-Commissioning
A. Solow Run test
B. MRT-Mechanical Running Test for Compressors & Motors
C. Heat Running Test for Compressor.
D. Lube-Oil Test for Compressor.
E. Pipe Line Flushing & Hydro test.
F. Removing blind for line-up process Etc.
Experience for Commissioning & Start-Up
A. Level-1 & Level-2 Shutdown Test for safety.
B. Service all Utility System
C. Startup of Instrument Air & Startup of Plant Air-Systems.
D. Startup of N2 Packages Systems.
E. Fire water systems in Service.
G. Potable water Systems in Service.
H. HP Flare in Service.
I. Drain System in Service.
J. Fuel Gas System in Service
K. Emergency diesel Generator in Service.
L. Startup-Plant Manul & Auto mode
M. Palnt Stability Test etc
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
5
Profile Details
At present working Construction Engineer Instrument
Company Worley Parsons
: From 25th
July 2015 till.
At: WPMP project Kuwait
Project No EF-1772.
Responsibilities Carried out
Work Permit Issuer / applicant and Supervision of Contractor activities for Instrumentation.
Review Inspection Notifications and attached documents and carry out Inspections for Instrument installation, cable
tray / JB installations, cable laying and testing, cable terminations.
Witness for I/O checking, Loop checking, Logic & Function test with KOC.
,review and signing off punch lists. Witness for Punch Clearing and signing off.
Regularly attend internal weekly meetings, meetings with Contractor, Subcontractors.
Preparation of engineering document and planning for startup the project & planning how to success completion
project as per schedule.
Review document like (P&ID), ILD, Cause and Effect, GA drawing, panel installation drawing, process hookup
drawing, location drawing, system installation drawing, JB Installation ,plant operation procedure etc.
All signal checking from DCS system, ESD system, SSLS system, BMS, CRU system interface checking between
system to system & communication link checking with DCS system and third-party signals.
Trouble shooting of all system and controllers and control valve and transmitters and Switches.
Checking all instrument alarm and set point in DCS system during SAT(Site Acceptance Test)
All loop checking Analog input/ Analog output & Digital input/Digital output signalAll logic checking from ESD
system Level -0 shut down, Level-1 shut down, Level-2 Shut down & Level-3 shut down.
Arranging of the document and keeping in the control room like all type of drawing (WMS, P&ID,Logic, alarm and
set point, instrument loop drawing , operation manual, loop checking Procedure,plant start-up procedure.
Loop checking of an open loop, Close loop & Ratio checking of controllers.
Co-ordination & Supervised instruments installation and bench calibration functional testing of plant logic.
Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of Work progress.
Carrier Summary
Duration : From 25 July 2015.
Project : BS-132(EF/1719 Project) New Booster Station
BS- 132&Enhancment at BS-131(KOC)
Position : Instrument Commissioning Engineer
PMC : Amec.
Client : Kuwait oil Company (KOC)
During this BS -132 running visit at BAB GAS Project
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
6
For Functional Test, Commissioning and startup of unit
As Commissioning Engineer
Project : BAB GAS Compression Project (CS-01/02/03)
Client: ADCO (Abu-Dhabi).
Company : SK Engineering & Construction Company
Duration : 28th
January 2006 to 23rd
July 2011.
Position : Instrument Commissioning Engineer
PMC : Amec (England)
Client : Kuwait oil Company (KOC)
Project : Facility Upgrade and Relocation of U/G Process Piping for GCs 1,2,9,10,11,16,17,19,20,22 & BS-170.
Company : SK Engineering & Construction Company
(EPC Contractor Korea) Po Box No-55653, Code No-54567 Sabahiya Kuwait
Location : Kuwait
Responsibilities Carried out
 Planning
Document review all related construction works, Installation of duck-bank, Installation of Panels
Installation of J.Bs, Installation of ESD,DCS, F&G,UCP system panels
Installation of Tray-works, Installation of Instruments like (PT, TT, LT, FT, AIT, H2S Monitor,
Gas Monitor, UVR Detector, Smoke Detector Etc. Installation of Stanchions
Installation of Cabling laying (Pulling), Installation of Valves ,Calibration all type of
Instruments ,Calibration all type of Control Valves, Installation of instrument tubing as per hook-
up drawing,
Preparation of engineering document and planning for startup the project & planning how to success fully
completion project as per schedule
 Making all document ready before start the job
 All signal checking from DCS system, ESD system, SSLS system, BMS, CRU system interface checking
between system to system & communication link checking with DCS system and third-party signal
 Trouble shooting of all system and controllers and control valve and transmitters and Switches.
 Checking all instrument alarm and set point in DCS system during SAT(Site Acceptance Test)
 All loop checking Analog input/ Analog output & Digital input/Digital output signal
 All logic checking from ESD system Level -0 shut down, Level-1 shut down, Level-2 Shut down &
Level-3 shut down.
 Arranging of document and keeping in control room like all type of drawing (WMS, P&ID,Logic, alarm
and set point, instrument loop drawing , operation manual, loop checking Procedure,plant startup
procedure.
 Loop checking of open loop, Close loop & Ratio checking of controllers.
 Co-ordination & Supervised instruments installation and bench calibration functional testing of plant
logic.
 Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of Work
progress.
 Planning of work before Shut-Down work and during shut-down loop checking Functional Testing.
 Commissioning & Pre-Commissioning of plant. Open and close command checking for ROV (MOV)
motor operated vale and limit/Torque switch adjusting etc.
 Plant startup and making of normal process operation, controller tuning etc.
Company : Doosan Korea Heave Industries& Construction
Company Ltd (EPC Contractor)
Post Box No-3006, Fujairha (UAE)
Position : Instrument Engineer
PMC : Fischener
Client : Fujairha Water & Power Plant (UAE)
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
7
Capacity : 5x12.5 MSF MIGD Plus 37.5 MIGD RO Plant Total &
Power Capacity is 100 MIGD& 600 MW Power Station
Duration : 13th
April 2003 to 9th
Jun 2004.
Location : Fujairha (UAE)
Remarks : Project Completed)
Job Responsibility
 Calibration of all Process Variable instrument
Like Flow transmitters, Temperature transmitters, Pressure transmitters,Level Transmitters & Flow
control valves, Pressure Control valves, Temperature control valves, Level control Valves &
switches/Gauges etc.
 Loop Checking for all type of Digital input/Digital output& Analog input/Analog output from DCS to
field stoke checking of control valve, all signal checking during SAT and loop checking time,
 Loop Checking for all type of Digital input/Digital output& Analog input/Analog output from (PLC) ESD
System ,SSLS System, TMS System to field instrument , Stoke checking of control valve, all signal
checking during SAT and loop checking time,
 Communication checking between DCS to ESD system.
 Co-ordination & Supervised instruments installation and bench calibration functional testing of plant
logic.
 Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of work progress.
 Planning of work before Shut-Down work and during shut-down loop checking Functional testing
 Commissioning & Pre-Commissioning of plant
 Responsible of AS Built of Drawing like P& I D, I L D, Trip Setting Summary &
Hook-up Drawing Etc & Assisting for Preparation of loops Packages.
 Participating on daily basis meeting & Discussion with the client & Operation Department for plant
startup and Shutdown schedule.
Company : Doosan Korea Heave Industries& Construction
Company Ltd (EPC Contractor)
Position : Instrument Engineer
Client : MEW (Ministry of water & Electricity Kuwait)
Capacity : 5x7 MSF MIGD Plus 35 MIGD Plus &
Power Capacity 600 MW Power plant.
Duration : 24th
May 2001 to Feb 2003.
Location : Kuwait
Remarks : Project Completed and transfer to another project
Fujahira UAE
Job Responsibility
 Arranging of all document as QA & QP (Quality assurance /Quality Procedure )
Checking all ITP as per our agreement between client and Company.
 Arranging all materials and test equipment for calibration ,Loop checking and installation,
 Arranging client to inspection of installation and calibration of instruments and logic checking
 Daily meeting with supervisor/Forman & Technicians making good relation with client & Labors.
 Attending Daily Official meeting, Daily Tool Box meeting & Coordination with staff and management.
 Calibration of instrument, Installation of instruments, Loop checking Analog input/Analog output &
Digital input/Digital output.
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
8
 Troubleshooting of instruments.
 Function checking of DCS system and PLC logic and ESD system.
Company : Duetshe Babcock (German Company) Energie-
Umwettechnik Aktiengesellschaft Post Box no-8865,
Mussfha Abu Dhabi (UAE)
Position : Instrument Supervisor
Client : Rebar Rolling Steel Mills (UAE)
Duration : 20th
Feb 2000 to 21st
December 2000
Location : Abu Dhabi
Remarks : Project Completed.
Job Responsibility
 Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of work progress.
 Installation of panels, Installation of Instruments, Installation of J/Box, Installation of cable, Installation of
tray work, Installation of stanchion, Installation DCS system,
 Arranging of all type drawing P&ID,ILD,Logic drawing, Connection list & Alarm set Point list.
 Calibration of instrument PT,TT, LT, FT, PG, TG, & Switches Pressure switches ,Level switches,
Temperature switches & Flow switches & speed meters.
 Loop checking of all instruments from control room to field action checking of valve.
Company : Saudi Arabia Saipem Company Ltd.
Position : Instrument Supervisor
Client : Saudi Aramco Company
Project : Khuff Gas Well Head Saud Aramco
Company Uthmanina,(KSA)Well head nos-1802, 1803,
1804, 1806, 1807, 1808,1809, 1810& 2000.
Duration : 12th
Jan 1998 to May 1999
Location : Saudi Arab (KSA)
Remarks : Manpower supply by M/S Fafco (Petcone).
Job Responsibility
 Installation of instrument, Installation of panel, Installation of J/Box Installation of stanchion, Cable
laying, loop checking & Function checking of WSD system, (Well Shutdown System) and trouble
shooting.
 Calibration of instrument Pressure transmitter,Flow transmitter.
 Loop checking of all instruments from control room to field action checking of valve.
 Commissioning of about 9 nos of wells.
Company : (GPS) Gulf Petrochemical Service LLC,
Contract-C 48234
Position : Instrument Supervisor
Client : PDO Petroleum Development of oman.
Project : NGL Gas Plant Yibal, H2S Plant, Al-Waisa, Yibal
Product Plant Under Taken By PDO Sultanate
Of Oman
Duration : 29th
April 1997 to 22nd
Nov 1997
Location : Sultanate of Oman
Remarks : Manpower supply by M/S GPS to PDO
Mohammed Iftekhar (Contact no-00965-69018068 Kuwait )
Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available
9
I am well versed with
Transmitters
Honeywell, Rosemount, Foxboro, ABB,Siemens Transmitters Configuration Calibration
Troubleshooting, Pre Commissioning, Commissioning, Logic functional Test & Bench
Calibration Etc.
Control Valves
Xemox, SIN WOO,ABB, Siemens, Fisher Control valve ,E Control valve Pneumatic and electronics& Smart
Control Valve Stroke checking Configuration Calibration and troubleshooting
Pre-Commissioning and commissioning logic checking & Field calibration Etc.
Motor operatedValve
Rotorque MOV, BIFFI MOV Torque set up open and close addejesment stroke checking configuration
troubleshooting and Pre-Commissioning and Commissioning logic checking.
Analyzers Transmitter
PH,H2S, LEL, Conductivity, O2, CO2 Configuration calibration and troubleshooting commissioning logic
checking process calibration.
I am fully confident and all the above said are true to the best of my knowledge.
Passport Details
Passport No- H-4234811
Place of Issue Kuwait
Address (INDIA)
83/H/48 Belgachia Road, Kolkota-700037 (W.B) India
Mohammad Iftekhar
Mail id.ifnza26@yahoo.in
mohmdiftekharmz@yahoo.co.in
Mob no-00965-66955646
Place-Kuwait
Date-12/05/2015

Instrument Engineeer

  • 1.
    Mohammed Iftekhar E&I CommissioningEngineer E-Mail Id: ifnza26@yahoo.in mohmdiftekharmz@yahoo.co.in Mob No-00965-69018068 (Kuwait) Mob No-0091-9892812506 (India) Address Permanente (INDIA) 83/H/48 2nd Floor Belgachia Road, Kolkota-700037 (W.B) India Kuwait Driving License -Available Dear Sir, I would like to inform you that I am Mohammed Iftekhar working in Kuwait as a Commissioning Engineer I am currently seeking a career with your company, where I can utilize my extensive skills, leadership, and experience. I am willing to relocate any wear in world as per company requirement Qualifications: BE Instrument & Control Engineer Total Experience: 17 Years Expert knowledge of Construction, Pre-Commissioning, Commissioning & Maintenance) logistics and integrated logistics management, Excellent ability for Preparing Pre-Commissioning Procedure, Commissioning Procedurefinal report for startup of plant and handover plant after establish the unit, Organize Manpower, Organize Vendor ,Organize meeting, , Managing all type of document outgoing and incoming , Ability to work independently in field and system side like trouble-shooting and operation from DCS (HMI) handle very fast to control abnormal process operation to normal process. I am giving my particulars as under for your perusal. You will find more detailed information about my education and total work experience in below my career profile. Presume you would give me an opportunity to have candid discussion. You’re sincerely, (Mohammad Iftekhar)
  • 2.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 2 Career Profile Professional Qualification Instrument & Control Engineering (BE) (Pass out By 1995) Educational Qualification High Secondary (HS) (Pass out by 1991) Technical Training Course on site 1. Training programs attendee course & operation GE Compressors Startup Functional Test, Loop checking, Logic Test, Cause and Effect checking, Initial Start-Up startup of Compressor, Normal startup, Normal process Operation & Normal stop/Emergency Stop. 2. Training programs attendee Course & Operation ofDCS System. Honeywell System ICS Experion PKS system R.400.2 (SAT, Functional Test for ESD, F&G & DCS Logic, All signal checking from DCS system to field ESD logic checking all Level-0,I,2&Level-3, interface checking between system to system & communication link checking with DCS system and third-party all signal inspection with client ADCO re-per present. 3. Training programs attendee Course & Operation YOKOGAWA CENTUM VP YOKOGAWA ESD System YOKOGAWA F&GSystem PRM Plant Resource Manager (SAT, Functional Test for ESD, F&G & DCS Logic, All signal checking from DCS system to field ESD logic checking all Level-0,I,2&Level-3, interface checking between system to system & communication link checking with DCS system and third-party all signal inspection with client ADCO re-per present. 4. Training programs attendee Course & Operation Delta-V(Emerson process Management) DCS system Operation commissioning SAT (Site Acceptances Test) Inspection & Trouble shooting DCS Teleperm XP Siemens System operation & Trouble shooting and configuration loop checking etc. 5. Training programs attendee Course PLC Siemens Simatic S5-100U (CPU) System. ESD System (Emergency Shut Down system) 6. Training programs attendee Course ICS Triplex& HIMA PLC SAT Inspection & Trouble Shooting. SSLS (Safety Shut-Down logic System) SAT (Site Acceptances Test) Inspection & Trouble shooting 7. Training programs attendee Course RS3 Rosemount (DCS) System Operation Commissioning SAT (Site Acceptances Test) Inspection & Trouble shooting. 8. Training programs attendee Course OTES WSD System ESD System.
  • 3.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 3 9. Training programs attendee Course VSD (Power Flex 7000 Rockwell Automation) Variable Drive Compressor Operation and Trouble-shooting Additional Information Working Field /Project Like A. Oil & Gas Plant B. Refinery C. Distillation & Power Plant D. Re-Bar Rolling Mills E. Booster Station F. Gathering Center (GC) G. Well Head etc. Excellent Knowledge Drawing Like A. Plant Overall layout Diagram B. Plot Plan Diagram C. P&ID (Piping & Instrument Diagram) PFD (Process Flow Diagram) D. PSFS Process Safety Flow Schematics Diagram) E. C&E Cause & Effect Diagram) F. Interlock Logic Diagram G. Cable Root Diagram H. System Arctic Diagram I. Panel Installation Diagram & Equipment installation Diagram J. Instrument Installation Diagram K. Instrument Hoop-up Diagram L.DCS Graphic verification and color cod identification, Mark-up P & ID’s System wise & Functional Schematic Drawing Document Making like A. Pre-Commissioning Procedure B. Commissioning Procedure. C. Final Operation Report. D. MOM minutes of meeting E. Operation condition data if any problem making report Etc. Experience Construction works A. Planning B. Document review all related construction works
  • 4.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 4 C. Installation of duck-bank D. Installation of Panels E. Installation of J.Bs F. Installation of ESD,DCS,F&G,UCP system panels G. Installation of Tray-works H. Installation of Instruments like (PT, TT, LT, FT, AIT, H2S Monitor, Gas Monitor, UVR Detector, Smoke Detector Etc. I. Installation of Stanchions J. Installation of Cabling laying (Pulling) K. Installation of Valves L. Calibration all type of Instruments M. Calibration all type of Control Valves N. Installation of instrument tubing as per hook-up drawing Experience for work Pre-Commissioning A. Solow Run test B. MRT-Mechanical Running Test for Compressors & Motors C. Heat Running Test for Compressor. D. Lube-Oil Test for Compressor. E. Pipe Line Flushing & Hydro test. F. Removing blind for line-up process Etc. Experience for Commissioning & Start-Up A. Level-1 & Level-2 Shutdown Test for safety. B. Service all Utility System C. Startup of Instrument Air & Startup of Plant Air-Systems. D. Startup of N2 Packages Systems. E. Fire water systems in Service. G. Potable water Systems in Service. H. HP Flare in Service. I. Drain System in Service. J. Fuel Gas System in Service K. Emergency diesel Generator in Service. L. Startup-Plant Manul & Auto mode M. Palnt Stability Test etc
  • 5.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 5 Profile Details At present working Construction Engineer Instrument Company Worley Parsons : From 25th July 2015 till. At: WPMP project Kuwait Project No EF-1772. Responsibilities Carried out Work Permit Issuer / applicant and Supervision of Contractor activities for Instrumentation. Review Inspection Notifications and attached documents and carry out Inspections for Instrument installation, cable tray / JB installations, cable laying and testing, cable terminations. Witness for I/O checking, Loop checking, Logic & Function test with KOC. ,review and signing off punch lists. Witness for Punch Clearing and signing off. Regularly attend internal weekly meetings, meetings with Contractor, Subcontractors. Preparation of engineering document and planning for startup the project & planning how to success completion project as per schedule. Review document like (P&ID), ILD, Cause and Effect, GA drawing, panel installation drawing, process hookup drawing, location drawing, system installation drawing, JB Installation ,plant operation procedure etc. All signal checking from DCS system, ESD system, SSLS system, BMS, CRU system interface checking between system to system & communication link checking with DCS system and third-party signals. Trouble shooting of all system and controllers and control valve and transmitters and Switches. Checking all instrument alarm and set point in DCS system during SAT(Site Acceptance Test) All loop checking Analog input/ Analog output & Digital input/Digital output signalAll logic checking from ESD system Level -0 shut down, Level-1 shut down, Level-2 Shut down & Level-3 shut down. Arranging of the document and keeping in the control room like all type of drawing (WMS, P&ID,Logic, alarm and set point, instrument loop drawing , operation manual, loop checking Procedure,plant start-up procedure. Loop checking of an open loop, Close loop & Ratio checking of controllers. Co-ordination & Supervised instruments installation and bench calibration functional testing of plant logic. Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of Work progress. Carrier Summary Duration : From 25 July 2015. Project : BS-132(EF/1719 Project) New Booster Station BS- 132&Enhancment at BS-131(KOC) Position : Instrument Commissioning Engineer PMC : Amec. Client : Kuwait oil Company (KOC) During this BS -132 running visit at BAB GAS Project
  • 6.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 6 For Functional Test, Commissioning and startup of unit As Commissioning Engineer Project : BAB GAS Compression Project (CS-01/02/03) Client: ADCO (Abu-Dhabi). Company : SK Engineering & Construction Company Duration : 28th January 2006 to 23rd July 2011. Position : Instrument Commissioning Engineer PMC : Amec (England) Client : Kuwait oil Company (KOC) Project : Facility Upgrade and Relocation of U/G Process Piping for GCs 1,2,9,10,11,16,17,19,20,22 & BS-170. Company : SK Engineering & Construction Company (EPC Contractor Korea) Po Box No-55653, Code No-54567 Sabahiya Kuwait Location : Kuwait Responsibilities Carried out  Planning Document review all related construction works, Installation of duck-bank, Installation of Panels Installation of J.Bs, Installation of ESD,DCS, F&G,UCP system panels Installation of Tray-works, Installation of Instruments like (PT, TT, LT, FT, AIT, H2S Monitor, Gas Monitor, UVR Detector, Smoke Detector Etc. Installation of Stanchions Installation of Cabling laying (Pulling), Installation of Valves ,Calibration all type of Instruments ,Calibration all type of Control Valves, Installation of instrument tubing as per hook- up drawing, Preparation of engineering document and planning for startup the project & planning how to success fully completion project as per schedule  Making all document ready before start the job  All signal checking from DCS system, ESD system, SSLS system, BMS, CRU system interface checking between system to system & communication link checking with DCS system and third-party signal  Trouble shooting of all system and controllers and control valve and transmitters and Switches.  Checking all instrument alarm and set point in DCS system during SAT(Site Acceptance Test)  All loop checking Analog input/ Analog output & Digital input/Digital output signal  All logic checking from ESD system Level -0 shut down, Level-1 shut down, Level-2 Shut down & Level-3 shut down.  Arranging of document and keeping in control room like all type of drawing (WMS, P&ID,Logic, alarm and set point, instrument loop drawing , operation manual, loop checking Procedure,plant startup procedure.  Loop checking of open loop, Close loop & Ratio checking of controllers.  Co-ordination & Supervised instruments installation and bench calibration functional testing of plant logic.  Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of Work progress.  Planning of work before Shut-Down work and during shut-down loop checking Functional Testing.  Commissioning & Pre-Commissioning of plant. Open and close command checking for ROV (MOV) motor operated vale and limit/Torque switch adjusting etc.  Plant startup and making of normal process operation, controller tuning etc. Company : Doosan Korea Heave Industries& Construction Company Ltd (EPC Contractor) Post Box No-3006, Fujairha (UAE) Position : Instrument Engineer PMC : Fischener Client : Fujairha Water & Power Plant (UAE)
  • 7.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 7 Capacity : 5x12.5 MSF MIGD Plus 37.5 MIGD RO Plant Total & Power Capacity is 100 MIGD& 600 MW Power Station Duration : 13th April 2003 to 9th Jun 2004. Location : Fujairha (UAE) Remarks : Project Completed) Job Responsibility  Calibration of all Process Variable instrument Like Flow transmitters, Temperature transmitters, Pressure transmitters,Level Transmitters & Flow control valves, Pressure Control valves, Temperature control valves, Level control Valves & switches/Gauges etc.  Loop Checking for all type of Digital input/Digital output& Analog input/Analog output from DCS to field stoke checking of control valve, all signal checking during SAT and loop checking time,  Loop Checking for all type of Digital input/Digital output& Analog input/Analog output from (PLC) ESD System ,SSLS System, TMS System to field instrument , Stoke checking of control valve, all signal checking during SAT and loop checking time,  Communication checking between DCS to ESD system.  Co-ordination & Supervised instruments installation and bench calibration functional testing of plant logic.  Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of work progress.  Planning of work before Shut-Down work and during shut-down loop checking Functional testing  Commissioning & Pre-Commissioning of plant  Responsible of AS Built of Drawing like P& I D, I L D, Trip Setting Summary & Hook-up Drawing Etc & Assisting for Preparation of loops Packages.  Participating on daily basis meeting & Discussion with the client & Operation Department for plant startup and Shutdown schedule. Company : Doosan Korea Heave Industries& Construction Company Ltd (EPC Contractor) Position : Instrument Engineer Client : MEW (Ministry of water & Electricity Kuwait) Capacity : 5x7 MSF MIGD Plus 35 MIGD Plus & Power Capacity 600 MW Power plant. Duration : 24th May 2001 to Feb 2003. Location : Kuwait Remarks : Project Completed and transfer to another project Fujahira UAE Job Responsibility  Arranging of all document as QA & QP (Quality assurance /Quality Procedure ) Checking all ITP as per our agreement between client and Company.  Arranging all materials and test equipment for calibration ,Loop checking and installation,  Arranging client to inspection of installation and calibration of instruments and logic checking  Daily meeting with supervisor/Forman & Technicians making good relation with client & Labors.  Attending Daily Official meeting, Daily Tool Box meeting & Coordination with staff and management.  Calibration of instrument, Installation of instruments, Loop checking Analog input/Analog output & Digital input/Digital output.
  • 8.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 8  Troubleshooting of instruments.  Function checking of DCS system and PLC logic and ESD system. Company : Duetshe Babcock (German Company) Energie- Umwettechnik Aktiengesellschaft Post Box no-8865, Mussfha Abu Dhabi (UAE) Position : Instrument Supervisor Client : Rebar Rolling Steel Mills (UAE) Duration : 20th Feb 2000 to 21st December 2000 Location : Abu Dhabi Remarks : Project Completed. Job Responsibility  Co-ordination with client, Engineers, Staffs,site workers, and checking of site activities of work progress.  Installation of panels, Installation of Instruments, Installation of J/Box, Installation of cable, Installation of tray work, Installation of stanchion, Installation DCS system,  Arranging of all type drawing P&ID,ILD,Logic drawing, Connection list & Alarm set Point list.  Calibration of instrument PT,TT, LT, FT, PG, TG, & Switches Pressure switches ,Level switches, Temperature switches & Flow switches & speed meters.  Loop checking of all instruments from control room to field action checking of valve. Company : Saudi Arabia Saipem Company Ltd. Position : Instrument Supervisor Client : Saudi Aramco Company Project : Khuff Gas Well Head Saud Aramco Company Uthmanina,(KSA)Well head nos-1802, 1803, 1804, 1806, 1807, 1808,1809, 1810& 2000. Duration : 12th Jan 1998 to May 1999 Location : Saudi Arab (KSA) Remarks : Manpower supply by M/S Fafco (Petcone). Job Responsibility  Installation of instrument, Installation of panel, Installation of J/Box Installation of stanchion, Cable laying, loop checking & Function checking of WSD system, (Well Shutdown System) and trouble shooting.  Calibration of instrument Pressure transmitter,Flow transmitter.  Loop checking of all instruments from control room to field action checking of valve.  Commissioning of about 9 nos of wells. Company : (GPS) Gulf Petrochemical Service LLC, Contract-C 48234 Position : Instrument Supervisor Client : PDO Petroleum Development of oman. Project : NGL Gas Plant Yibal, H2S Plant, Al-Waisa, Yibal Product Plant Under Taken By PDO Sultanate Of Oman Duration : 29th April 1997 to 22nd Nov 1997 Location : Sultanate of Oman Remarks : Manpower supply by M/S GPS to PDO
  • 9.
    Mohammed Iftekhar (Contactno-00965-69018068 Kuwait ) Mail ID ifnza26@yahoo.in /Kuwait Driving License-Available 9 I am well versed with Transmitters Honeywell, Rosemount, Foxboro, ABB,Siemens Transmitters Configuration Calibration Troubleshooting, Pre Commissioning, Commissioning, Logic functional Test & Bench Calibration Etc. Control Valves Xemox, SIN WOO,ABB, Siemens, Fisher Control valve ,E Control valve Pneumatic and electronics& Smart Control Valve Stroke checking Configuration Calibration and troubleshooting Pre-Commissioning and commissioning logic checking & Field calibration Etc. Motor operatedValve Rotorque MOV, BIFFI MOV Torque set up open and close addejesment stroke checking configuration troubleshooting and Pre-Commissioning and Commissioning logic checking. Analyzers Transmitter PH,H2S, LEL, Conductivity, O2, CO2 Configuration calibration and troubleshooting commissioning logic checking process calibration. I am fully confident and all the above said are true to the best of my knowledge. Passport Details Passport No- H-4234811 Place of Issue Kuwait Address (INDIA) 83/H/48 Belgachia Road, Kolkota-700037 (W.B) India Mohammad Iftekhar Mail id.ifnza26@yahoo.in mohmdiftekharmz@yahoo.co.in Mob no-00965-66955646 Place-Kuwait Date-12/05/2015