Introduction to
Geography
Unit 1: It’s Nature and Perspective
Questions that “Geography”
addresses:
• Where are things located?
• Why are they important?
• How are places related?
• How are places connected?
• How are humans affected by these
locations?
Definition of Geography
 Scientific and systematic study of both the
physical and cultural features of the earth’s
surface. It is a spatial perspective looking at
patterns and distributions on the earth’s surface
The word geography was invented by the Greek
scholar Eratosthenes. It is based on 2 Greek
words:
Geo – “Earth”
graphy – “to write”
Difference between “Physical
Geography” and “Human or Cultural
Geography:
•Physical Geography is the study of the four
spheres (Lithosphere, Atmosphere,
Hydrosphere, and Biosphere)
•Human (or Cultural) Geography is the study of
the spatial differentiation and organization of
human activity on the earth’s surface.
What is Physical
Geography?
The different disciplines in
Physical Geography:
•Geomorphology: studies the form and structure of the
surface of the earth
•Climatology: involves the study of long term weather
conditions on the earth
•Hydrography: concerns the distribution of water (oceans,
rivers, lakes, and their uses)
•Biogeography: studies the flora (plant life) and the fauna
(animal life)
•Pedology: study of the soils
•Ecology: studies the interactions between life forms and
the environment
•Geology: study of rocks and the earth’s interior
What is Human
Geography?
Human Geography (Definitions)
• The study of how people make places, how we
organize space and society, how we interact with
each other in places and across space, and how
we make sense of others and ourselves in our
locality, region, and world. (De Blij)
• The scientific study of the location of people &
activities on the Earth’s surface, where & why
human activities are located where they are,
reasons geographers look at the world from a
spatial perspective & interaction, and diffusion of
people & ideas. (Rubenstein)
What we study in Human
Geography?
•Historical Geography
•Demography and Population Geography
•Political Geography: nations, boundaries,
geopolitics, military movements, treaties,
devolution, choke points, and imperialism
•Geography of Religions
•Geography of Languages
What we study in Human
Geography?
•Urban Geography: settlements, cities, and
transportation systems
•Economic Geography: industries, economic
development, and manufacturing regions
•Agricultural Geography
•Medical geography
•Social Geography
•Environmental Geography
GEOGRAPHIC
THOUGHT
FIVE THEMES OF GEOGRAPHY
• Location
• Place
• Region
• Movement
• Human-Environment
Location
Location-position on the earth’s surface
• Absolute Location: use of grids – (i.e.
latitude and longitude)
• Relative Location: a way of expressing a
location in relation to another site
Site and Situation
 Site – the physical character of a place.
(climate, water sources, topography, soil,
vegetation, latitude, elevation) the combination of
physical features gives each place distinctive
character.
 Situation – the location of a place relative to
other places.
Place
Place – specific geographic settings with
distinctive physical, social, and cultural
attributes
 Sense of place: infusing a place with
meaning and emotion.
 Perception of place: belief or
understanding of what a place is like, often
based on books, movies, stories, or
pictures.
The Cultural Landscape
 The visible expression of human activity
 The natural landscape as modified by
human activities and bearing the imprint
of a culture group
 Can also be called the “Built
Environment”
Movement
 Spatial analysis: the study of
geography phenomena on the
earth’s surface
- How are things organized on Earth?
- How do they appear on the landscape?
- Why of where? and so what?
Geographic inquiry
focuses on the SPATIAL:
1. Distance
2. Accessibility
3. Connectivity
Culture
Culture is an all-encompassing term that
identifies not only the whole tangible lifestyle
of peoples, but also their prevailing values
and beliefs.
- cultural trait
- cultural complex
- cultural hearth
Diffusion
- the process of dissemination, the spread of
an idea or innovation from its hearth to other
areas.
What slows/prevents diffusion?
- time-distance decay
- cultural barriers
Two Types of Diffusion
1. Expansion Diffusion – idea or
innovation spreads outward from the
heart.
a. Contagious –
spreads adjacently
b. Hierarchical –
spreads to most linked
people or places first.
c. Stimulus – idea
promotes a
local experiment or
change in the way
people do things.
Expansion Diffusion
Stimulus
Diffusion
Example:
Because Hindus believe cows
are holy, cows often roam the
streets in villages and towns.
The McDonalds restaurants in
India feature veggie burgers.
Regions
1. Formal/Uniform region: defined by a
commonality, typically a cultural linkage or
a physical characteristic.
e.g. German speaking region of Europe
2. Functional/Nodal region: defined by a set
of social, political, or economic activities or
the interactions that occur within it.
e.g. an urban area, magazine
circulation, radio station
3. Perceptual Region/Vernacular: ideas
in our minds, based on accumulated
knowledge of places and regions,
that define an area of “sameness” or
“connectedness.”
What are Geographic
Questions?
Why do Geographers use
Maps, and What do Maps
Tell Us?
Two Types of Maps:
Reference Maps
- Show locations of
places and geographic
features
- Absolute locations
What are reference
maps used for?
Thematic Maps
- Tell a story about the
degree of an attribute,
the pattern of its
distribution, or its
movement.
- Relative locations
What are thematic
maps used for?
 Mental Maps:
Maps we carry in our minds of places we
have been and places we have heard of.
can see: terra incognita, landmarks, paths, and accessibility
 Activity Spaces:
the places we travel to routinely in our
rounds of daily activity.
 How are activity spaces and mental maps related?
WHAT ARE
LANDSCAPE?
‘Landscape’ is a concept which includes the
physical environment and people’s perception
and appreciation of that environment. It is not
restricted to the purely visual, but may comprise
and encompass the ways in which individuals and
communities perceive the natural and physical
resources, as through traditions, lore, and legends
that express the significant and memorable
elements of a landscape.
Landscape means the natural and physical
attributes of land together with air and water which
change over time and which is made known by
people’s evolving perceptions and associations
[such as beliefs, uses, values and relationships] .
WHY ARE
LANDSCAPES
IMPORTANT?
ECONOMIC SOCIAL/CULTURAL ECOLOGICAL
Tourism
Branding
Attracting
Investment
Attracting
Residents
Productive
Capacity
Quality of Life
Spiritual
Renewal
Sense of Place
and Identity
Cultural Values
Historical
Linkages
Indigenous
Habitats
Regeneration
Conservation
IMPORTANCE OF LANDSCAPES
Threats to Landscapes and
Features
 Subdivision and associated urban development
 Buildings and structures which singly or cumulatively
intrude into or dominate a landscape
 Infrastructure, including roads, driveways, pylons and
transmission towers, which intrudes into and dominates
landscapes
 Monoculture forestry and other cultivation activities which
introduce hard geometric lines and patterns into the
landscape, cover landforms and coastal margins, produce
sediments loads during harvesting and homogenize the
landscape
 Earthworks which modify landforms and which are
visually intrusive through creating cuttings and filling
(including aggregate and mineral extraction)
ACTIVITY:
In a one whole sheet of paper. Write a 300
word analyzation about the impact of
geographical and cultural diversities on the
lives of the people. Recreate through video
presentation “major” impacts that disturbed
the lives of the many.
ASSIGNMENT:
In a white cartolina draw and create a
panoramic view of global village that
you have in mind. Write also an
analysis of the global village you draw
in an A4 size bond paper.
ONLINE REPORTING
REPORTERS TOPICS
1. Landscapes of Primary Activities-
Agriculture
1. How agriculture help
people;
2. Significant agricultural
practices from different
parts of the world.
2.
Landscapes of Secondary Activities
1. Industrial Revolution; Industrial
Location Definition of Industrial
Revolution;
2. Evolution of Industrial Revolution
WORLD HISTORY 1
Activity
1. Explain the role of geography in shaping human
history.
2. In your opinion, does theistic evolution have a basis
for its explanation?
3. How does theistic evolution reconcile the theories of
evolution and creation?
4. Do you agree with the theory of evolution? Justify
your answer.
5. Should we be grateful to the people who devote their
time to study and conduct researches on the origin of
the Earth? Why?
Reporters Topics
Clarido, Justine Marie Physical Features of the Earth
Soliva, Erick Origin of the Earth
Conejos, Hannah Mae Origin of Mankind
Reyes, I-jay Paleolithic and Neolithic Period
Dasalla, Michaella Mesopotamian Civilization
Quiton, Micah Mae Chinese Civilization

Unit_1_AP ch. 1.ppt

  • 1.
    Introduction to Geography Unit 1:It’s Nature and Perspective
  • 2.
    Questions that “Geography” addresses: •Where are things located? • Why are they important? • How are places related? • How are places connected? • How are humans affected by these locations?
  • 3.
    Definition of Geography Scientific and systematic study of both the physical and cultural features of the earth’s surface. It is a spatial perspective looking at patterns and distributions on the earth’s surface The word geography was invented by the Greek scholar Eratosthenes. It is based on 2 Greek words: Geo – “Earth” graphy – “to write”
  • 4.
    Difference between “Physical Geography”and “Human or Cultural Geography: •Physical Geography is the study of the four spheres (Lithosphere, Atmosphere, Hydrosphere, and Biosphere) •Human (or Cultural) Geography is the study of the spatial differentiation and organization of human activity on the earth’s surface.
  • 5.
  • 6.
    The different disciplinesin Physical Geography: •Geomorphology: studies the form and structure of the surface of the earth •Climatology: involves the study of long term weather conditions on the earth •Hydrography: concerns the distribution of water (oceans, rivers, lakes, and their uses) •Biogeography: studies the flora (plant life) and the fauna (animal life) •Pedology: study of the soils •Ecology: studies the interactions between life forms and the environment •Geology: study of rocks and the earth’s interior
  • 7.
  • 9.
    Human Geography (Definitions) •The study of how people make places, how we organize space and society, how we interact with each other in places and across space, and how we make sense of others and ourselves in our locality, region, and world. (De Blij) • The scientific study of the location of people & activities on the Earth’s surface, where & why human activities are located where they are, reasons geographers look at the world from a spatial perspective & interaction, and diffusion of people & ideas. (Rubenstein)
  • 10.
    What we studyin Human Geography? •Historical Geography •Demography and Population Geography •Political Geography: nations, boundaries, geopolitics, military movements, treaties, devolution, choke points, and imperialism •Geography of Religions •Geography of Languages
  • 11.
    What we studyin Human Geography? •Urban Geography: settlements, cities, and transportation systems •Economic Geography: industries, economic development, and manufacturing regions •Agricultural Geography •Medical geography •Social Geography •Environmental Geography
  • 12.
  • 13.
    FIVE THEMES OFGEOGRAPHY • Location • Place • Region • Movement • Human-Environment
  • 14.
    Location Location-position on theearth’s surface • Absolute Location: use of grids – (i.e. latitude and longitude) • Relative Location: a way of expressing a location in relation to another site
  • 15.
    Site and Situation Site – the physical character of a place. (climate, water sources, topography, soil, vegetation, latitude, elevation) the combination of physical features gives each place distinctive character.  Situation – the location of a place relative to other places.
  • 16.
    Place Place – specificgeographic settings with distinctive physical, social, and cultural attributes  Sense of place: infusing a place with meaning and emotion.  Perception of place: belief or understanding of what a place is like, often based on books, movies, stories, or pictures.
  • 17.
    The Cultural Landscape The visible expression of human activity  The natural landscape as modified by human activities and bearing the imprint of a culture group  Can also be called the “Built Environment”
  • 18.
    Movement  Spatial analysis:the study of geography phenomena on the earth’s surface - How are things organized on Earth? - How do they appear on the landscape? - Why of where? and so what?
  • 19.
    Geographic inquiry focuses onthe SPATIAL: 1. Distance 2. Accessibility 3. Connectivity
  • 20.
    Culture Culture is anall-encompassing term that identifies not only the whole tangible lifestyle of peoples, but also their prevailing values and beliefs. - cultural trait - cultural complex - cultural hearth
  • 21.
    Diffusion - the processof dissemination, the spread of an idea or innovation from its hearth to other areas. What slows/prevents diffusion? - time-distance decay - cultural barriers
  • 22.
    Two Types ofDiffusion 1. Expansion Diffusion – idea or innovation spreads outward from the heart.
  • 23.
    a. Contagious – spreadsadjacently b. Hierarchical – spreads to most linked people or places first. c. Stimulus – idea promotes a local experiment or change in the way people do things. Expansion Diffusion
  • 24.
    Stimulus Diffusion Example: Because Hindus believecows are holy, cows often roam the streets in villages and towns. The McDonalds restaurants in India feature veggie burgers.
  • 25.
    Regions 1. Formal/Uniform region:defined by a commonality, typically a cultural linkage or a physical characteristic. e.g. German speaking region of Europe
  • 26.
    2. Functional/Nodal region:defined by a set of social, political, or economic activities or the interactions that occur within it. e.g. an urban area, magazine circulation, radio station
  • 27.
    3. Perceptual Region/Vernacular:ideas in our minds, based on accumulated knowledge of places and regions, that define an area of “sameness” or “connectedness.”
  • 28.
  • 29.
    Why do Geographersuse Maps, and What do Maps Tell Us?
  • 30.
    Two Types ofMaps: Reference Maps - Show locations of places and geographic features - Absolute locations What are reference maps used for? Thematic Maps - Tell a story about the degree of an attribute, the pattern of its distribution, or its movement. - Relative locations What are thematic maps used for?
  • 31.
     Mental Maps: Mapswe carry in our minds of places we have been and places we have heard of. can see: terra incognita, landmarks, paths, and accessibility  Activity Spaces: the places we travel to routinely in our rounds of daily activity.  How are activity spaces and mental maps related?
  • 32.
  • 33.
    ‘Landscape’ is aconcept which includes the physical environment and people’s perception and appreciation of that environment. It is not restricted to the purely visual, but may comprise and encompass the ways in which individuals and communities perceive the natural and physical resources, as through traditions, lore, and legends that express the significant and memorable elements of a landscape. Landscape means the natural and physical attributes of land together with air and water which change over time and which is made known by people’s evolving perceptions and associations [such as beliefs, uses, values and relationships] .
  • 34.
  • 35.
    ECONOMIC SOCIAL/CULTURAL ECOLOGICAL Tourism Branding Attracting Investment Attracting Residents Productive Capacity Qualityof Life Spiritual Renewal Sense of Place and Identity Cultural Values Historical Linkages Indigenous Habitats Regeneration Conservation IMPORTANCE OF LANDSCAPES
  • 36.
    Threats to Landscapesand Features  Subdivision and associated urban development  Buildings and structures which singly or cumulatively intrude into or dominate a landscape  Infrastructure, including roads, driveways, pylons and transmission towers, which intrudes into and dominates landscapes  Monoculture forestry and other cultivation activities which introduce hard geometric lines and patterns into the landscape, cover landforms and coastal margins, produce sediments loads during harvesting and homogenize the landscape  Earthworks which modify landforms and which are visually intrusive through creating cuttings and filling (including aggregate and mineral extraction)
  • 37.
    ACTIVITY: In a onewhole sheet of paper. Write a 300 word analyzation about the impact of geographical and cultural diversities on the lives of the people. Recreate through video presentation “major” impacts that disturbed the lives of the many.
  • 38.
    ASSIGNMENT: In a whitecartolina draw and create a panoramic view of global village that you have in mind. Write also an analysis of the global village you draw in an A4 size bond paper.
  • 39.
    ONLINE REPORTING REPORTERS TOPICS 1.Landscapes of Primary Activities- Agriculture 1. How agriculture help people; 2. Significant agricultural practices from different parts of the world. 2. Landscapes of Secondary Activities 1. Industrial Revolution; Industrial Location Definition of Industrial Revolution; 2. Evolution of Industrial Revolution
  • 40.
  • 41.
    Activity 1. Explain therole of geography in shaping human history. 2. In your opinion, does theistic evolution have a basis for its explanation? 3. How does theistic evolution reconcile the theories of evolution and creation? 4. Do you agree with the theory of evolution? Justify your answer. 5. Should we be grateful to the people who devote their time to study and conduct researches on the origin of the Earth? Why?
  • 42.
    Reporters Topics Clarido, JustineMarie Physical Features of the Earth Soliva, Erick Origin of the Earth Conejos, Hannah Mae Origin of Mankind Reyes, I-jay Paleolithic and Neolithic Period Dasalla, Michaella Mesopotamian Civilization Quiton, Micah Mae Chinese Civilization