SlideShare a Scribd company logo
PRODUCTION PLANNING
AND PROCESS
PLANNING
Unit-3
PRODUCT PLANNING
• Product Planning is the ongoing process of
identifying and articulating market
requirements that define a product’s feature
set.
• Product planning serves as the basis for
decisions about price, distribution and
promotion.
EXTENDING ORIGINAL PRODUCT
INFORMATION
VALUE ANALYSIS
• Value, as defined, is the ratio of function
to cost. Value can therefore be increased by
either improving the function or reducing
the cost
LACK OF PRODUCT PLANNING
• Unsatisfied customer
• Durability deteriaration
• Lack of quality
• Loss of brand name., Etc
PROCESS PLANNING
ROUTING
SCHEDULING
DISPATCHING
FOLLOW UP
PROCESS PLANNING – INPUT INFO.
• PRODUCT
• PROCESS
• CAPACITY
• ORDERS
• DUE DATES
• RESOURCES
• ETC.,
STEPS IN PROCESS PLANNING
• Analyzing environment
• Establishing objectives or goals
• Seeking necessary Information
QUANTITY DETERMINATION –
BATCH PRODUCTION
• Economic batch quantity (EBQ), also called "optimal batch
quantity" or economic production quantity, is a measure used
to determine the quantity of units that can be produced at
minimum average costs in a given batch or production run.
• Economic Production Quantity model (also known as the EPQ
model) is an extension of the Economic Order Quantity
model. The Economic Batch Quantity model, or production
lot-size model, is similar to the EOQ model in that an optimum
is to be calculated for the batch quantity to be produced.
EBQ
In working with this EBQ model, principal assumptions are:
• The demand (D) is known and constant within a certain period of time
• The unit cost of the inventory item (U) is constant
• The annual holding-cost per unit (Ch) is constant
• The setup-cost per batch (C) is constant
• The production time (tp) is known and constant
• there is one kind of product
• There is no interaction with other products
• The aspect of time does not play a role, just the setup time does
• The setup cost is constant and does not act upon the batch quantity.
Variables
• K = setup cost
• D = demand rate
• F = holding cost
• T = cycle length
• P = production rate
Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)

More Related Content

Similar to unit 3.ppt

Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Mohanumar S
 
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ahirwarrajeev198
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
karthi keyan
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
Sadrani Yash
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
PraveenManickam2
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
hafidhisaidi
 
UNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTINGUNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTING
Ramesh Kumar Natesan
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
kshitij808555
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
AttiMurugan
 
Standard costing
Standard costingStandard costing
Standard costing
Visakhapatnam
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
shrinivas kulkarni
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
KunalJagtap5
 
MG6863 Engineering Economics
MG6863 Engineering EconomicsMG6863 Engineering Economics
MG6863 Engineering Economics
P Manimaran
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management a
Rai University
 
Inventory mgt
Inventory mgtInventory mgt
Inventory mgt
Sanjeewani Jayathunga
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory models
Stephen Ong
 
Session 8 cost planning and definition (1)
Session 8  cost planning and definition (1)Session 8  cost planning and definition (1)
Session 8 cost planning and definition (1)
Marwan AL Hashdei
 
NUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain ManagementNUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain Management
yxiinyu
 
15 operations, quality and productivity
15  operations, quality and productivity15  operations, quality and productivity
15 operations, quality and productivity
Beulah Heights University
 

Similar to unit 3.ppt (20)

Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 1-IE6605 & PRODUCTION PLANNING AND CONTROL
 
ACCA
ACCAACCA
ACCA
 
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdfppc-unit-1-productionplanningandcontrol-211107105312.pdf
ppc-unit-1-productionplanningandcontrol-211107105312.pdf
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 
capacity planning.pptx
capacity planning.pptxcapacity planning.pptx
capacity planning.pptx
 
UNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTINGUNIT IV COST ACCOUNTING
UNIT IV COST ACCOUNTING
 
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptxPRODUCTION AND OPERATIONS MANAGEMENT.pptx
PRODUCTION AND OPERATIONS MANAGEMENT.pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Standard costing
Standard costingStandard costing
Standard costing
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
MG6863 Engineering Economics
MG6863 Engineering EconomicsMG6863 Engineering Economics
MG6863 Engineering Economics
 
eMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management aeMba ii pmom_unit-3.1 inventory management a
eMba ii pmom_unit-3.1 inventory management a
 
Inventory mgt
Inventory mgtInventory mgt
Inventory mgt
 
Bba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory modelsBba 3274 qm week 7 inventory models
Bba 3274 qm week 7 inventory models
 
Session 8 cost planning and definition (1)
Session 8  cost planning and definition (1)Session 8  cost planning and definition (1)
Session 8 cost planning and definition (1)
 
NUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain ManagementNUS DOS3701 Week 3 PPT Supply Chain Management
NUS DOS3701 Week 3 PPT Supply Chain Management
 
15 operations, quality and productivity
15  operations, quality and productivity15  operations, quality and productivity
15 operations, quality and productivity
 

More from rknatarajan

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energyUNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energy
rknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
rknatarajan
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
rknatarajan
 
UNIT - III.ppt
UNIT - III.pptUNIT - III.ppt
UNIT - III.ppt
rknatarajan
 
UNIT - V.ppt
UNIT - V.pptUNIT - V.ppt
UNIT - V.ppt
rknatarajan
 
UNIT - I.ppt
UNIT - I.pptUNIT - I.ppt
UNIT - I.ppt
rknatarajan
 
UNIT - II.ppt
UNIT - II.pptUNIT - II.ppt
UNIT - II.ppt
rknatarajan
 
UNIT - IV.ppt
UNIT - IV.pptUNIT - IV.ppt
UNIT - IV.ppt
rknatarajan
 
unit 5.ppt
unit 5.pptunit 5.ppt
unit 5.ppt
rknatarajan
 
unit 4.ppt
unit 4.pptunit 4.ppt
unit 4.ppt
rknatarajan
 
unit 2.pptx
unit 2.pptxunit 2.pptx
unit 2.pptx
rknatarajan
 
types of gears - bearings
types of gears - bearingstypes of gears - bearings
types of gears - bearings
rknatarajan
 
DTS Unit i
DTS Unit   iDTS Unit   i
DTS Unit i
rknatarajan
 
Mechanism1
Mechanism1Mechanism1
Mechanism1
rknatarajan
 
Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2
rknatarajan
 
Unit 3 machine vision
Unit 3 machine vision Unit 3 machine vision
Unit 3 machine vision
rknatarajan
 
Robotics - unit-2 - end effector
Robotics - unit-2 - end effectorRobotics - unit-2 - end effector
Robotics - unit-2 - end effector
rknatarajan
 
Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2
rknatarajan
 

More from rknatarajan (20)

UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energyUNIT-IV FMM.PUMPS  the mechanical principal involved in transfer of energy
UNIT-IV FMM.PUMPS the mechanical principal involved in transfer of energy
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
UNIT - III.ppt
UNIT - III.pptUNIT - III.ppt
UNIT - III.ppt
 
UNIT - V.ppt
UNIT - V.pptUNIT - V.ppt
UNIT - V.ppt
 
UNIT - I.ppt
UNIT - I.pptUNIT - I.ppt
UNIT - I.ppt
 
UNIT - II.ppt
UNIT - II.pptUNIT - II.ppt
UNIT - II.ppt
 
UNIT - IV.ppt
UNIT - IV.pptUNIT - IV.ppt
UNIT - IV.ppt
 
unit 5.ppt
unit 5.pptunit 5.ppt
unit 5.ppt
 
unit 4.ppt
unit 4.pptunit 4.ppt
unit 4.ppt
 
unit 2.pptx
unit 2.pptxunit 2.pptx
unit 2.pptx
 
types of gears - bearings
types of gears - bearingstypes of gears - bearings
types of gears - bearings
 
DTS Unit i
DTS Unit   iDTS Unit   i
DTS Unit i
 
Mechanism1
Mechanism1Mechanism1
Mechanism1
 
Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2Kinematics fundamentals lecture_2
Kinematics fundamentals lecture_2
 
Unit 3 machine vision
Unit 3 machine vision Unit 3 machine vision
Unit 3 machine vision
 
Robotics - unit-2 - end effector
Robotics - unit-2 - end effectorRobotics - unit-2 - end effector
Robotics - unit-2 - end effector
 
Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2Me8099 -robotics-- unit-2
Me8099 -robotics-- unit-2
 

Recently uploaded

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 

Recently uploaded (20)

H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 

unit 3.ppt

  • 2. PRODUCT PLANNING • Product Planning is the ongoing process of identifying and articulating market requirements that define a product’s feature set. • Product planning serves as the basis for decisions about price, distribution and promotion.
  • 3.
  • 5. VALUE ANALYSIS • Value, as defined, is the ratio of function to cost. Value can therefore be increased by either improving the function or reducing the cost
  • 6. LACK OF PRODUCT PLANNING • Unsatisfied customer • Durability deteriaration • Lack of quality • Loss of brand name., Etc
  • 8. PROCESS PLANNING – INPUT INFO. • PRODUCT • PROCESS • CAPACITY • ORDERS • DUE DATES • RESOURCES • ETC.,
  • 9. STEPS IN PROCESS PLANNING • Analyzing environment • Establishing objectives or goals • Seeking necessary Information
  • 10. QUANTITY DETERMINATION – BATCH PRODUCTION • Economic batch quantity (EBQ), also called "optimal batch quantity" or economic production quantity, is a measure used to determine the quantity of units that can be produced at minimum average costs in a given batch or production run. • Economic Production Quantity model (also known as the EPQ model) is an extension of the Economic Order Quantity model. The Economic Batch Quantity model, or production lot-size model, is similar to the EOQ model in that an optimum is to be calculated for the batch quantity to be produced.
  • 11. EBQ In working with this EBQ model, principal assumptions are: • The demand (D) is known and constant within a certain period of time • The unit cost of the inventory item (U) is constant • The annual holding-cost per unit (Ch) is constant • The setup-cost per batch (C) is constant • The production time (tp) is known and constant • there is one kind of product • There is no interaction with other products • The aspect of time does not play a role, just the setup time does • The setup cost is constant and does not act upon the batch quantity. Variables • K = setup cost • D = demand rate • F = holding cost • T = cycle length • P = production rate Formula: Sqrt(2x annual demandx setup costs)/(inventory carrying cost per unit)