The questionnaire is based on the typical questions on Boiler Draft In a Thermal Power Station boiler. There are around 48 questions based on the subject. All questions are objective type questions.
MS Lines, Turbine Casings and rotors and other steam lines including Steam Stop Valves, MSV, CV, ESV heating, Turbine Rolling, Flange and Stud heating, Turbovisory and speeding the turbine to 3000 RPM.
Boiler purge is the basic process of resetting boiler before lightup. This presentation explains the logic, schematics & working of purge procedure. For enhanced knowledge of this topic, I can be reached at tahoorkhn03@gmail.com.
The presentation deals with the most complex and fundamental process in a CFBC boiler. i.e., Combustion. Provides an insight into the various features in a CFBC boilers which are incorporated to enhance cpmbustion.
MS Lines, Turbine Casings and rotors and other steam lines including Steam Stop Valves, MSV, CV, ESV heating, Turbine Rolling, Flange and Stud heating, Turbovisory and speeding the turbine to 3000 RPM.
Boiler purge is the basic process of resetting boiler before lightup. This presentation explains the logic, schematics & working of purge procedure. For enhanced knowledge of this topic, I can be reached at tahoorkhn03@gmail.com.
The presentation deals with the most complex and fundamental process in a CFBC boiler. i.e., Combustion. Provides an insight into the various features in a CFBC boilers which are incorporated to enhance cpmbustion.
210 MW Turbine Cycle Heat Rate includes all parameters of Steam and Condensate at various inlets and outlets of HP, IP and LP Turbines, Condenser and also takes into consideration the regenerative HP, IP/LP Heaters in the Turbine Cycle. Well Illustrated with all diagrams.
Thermal Power Plant Boiler Efficiency ImprovementAnkur Gaikwad
Boiler is one of the central equipment used in power generation & chemical process industries. Consequently, improving boiler efficiency is instrumental in bringing down costs substantially with a few simple measures. Some of these measures are discussed in this presentation
The operations carried out to Light up the Boiler, from Air Cycle Establishment, Oil Handling Plant, Scanner air fans and Igniter Air Fans, Boiler Purging.
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
The presentation describes the cold rolling, warm rolling and hot rolling and synchronising of steam turbine. The Temperature Matching Chart for Turbine metal and Steam is also discussed in the presentation
Basic and detailed discussion on Coal Mill (Raymond) and Air Fans Performance in a Thermal Power Plant.
Gives an idea as to how the performance of Coal Mills and fans can be improved
210 MW Turbine Cycle Heat Rate includes all parameters of Steam and Condensate at various inlets and outlets of HP, IP and LP Turbines, Condenser and also takes into consideration the regenerative HP, IP/LP Heaters in the Turbine Cycle. Well Illustrated with all diagrams.
Thermal Power Plant Boiler Efficiency ImprovementAnkur Gaikwad
Boiler is one of the central equipment used in power generation & chemical process industries. Consequently, improving boiler efficiency is instrumental in bringing down costs substantially with a few simple measures. Some of these measures are discussed in this presentation
The operations carried out to Light up the Boiler, from Air Cycle Establishment, Oil Handling Plant, Scanner air fans and Igniter Air Fans, Boiler Purging.
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
The presentation describes the cold rolling, warm rolling and hot rolling and synchronising of steam turbine. The Temperature Matching Chart for Turbine metal and Steam is also discussed in the presentation
Basic and detailed discussion on Coal Mill (Raymond) and Air Fans Performance in a Thermal Power Plant.
Gives an idea as to how the performance of Coal Mills and fans can be improved
FellowBuddy.com is an innovative platform that brings students together to share notes, exam papers, study guides, project reports and presentation for upcoming exams.
We connect Students who have an understanding of course material with Students who need help.
Benefits:-
# Students can catch up on notes they missed because of an absence.
# Underachievers can find peer developed notes that break down lecture and study material in a way that they can understand
# Students can earn better grades, save time and study effectively
Our Vision & Mission – Simplifying Students Life
Our Belief – “The great breakthrough in your life comes when you realize it, that you can learn anything you need to learn; to accomplish any goal that you have set for yourself. This means there are no limits on what you can be, have or do.”
Like Us - https://www.facebook.com/FellowBuddycom
FellowBuddy.com is an innovative platform that brings students together to share notes, exam papers, study guides, project reports and presentation for upcoming exams.
We connect Students who have an understanding of course material with Students who need help.
Benefits:-
# Students can catch up on notes they missed because of an absence.
# Underachievers can find peer developed notes that break down lecture and study material in a way that they can understand
# Students can earn better grades, save time and study effectively
Our Vision & Mission – Simplifying Students Life
Our Belief – “The great breakthrough in your life comes when you realize it, that you can learn anything you need to learn; to accomplish any goal that you have set for yourself. This means there are no limits on what you can be, have or do.”
Like Us - https://www.facebook.com/FellowBuddycom
Boiler Efficiency Calculation by Direct & Indirect MethodTahoor Alam Khan
This PPT explains detailed calculations in Boiler Efficiency calculations through direct and indirect method. It also explains pros and cons of boiler efficiency calculation through direct and indirect method. For further clarifications you can reach out to me at tahoorkhn03@gmail.com or connect with me on my linkedin profile by clicking at www.linkedin.com/in/tahoorkhan
The presentation is based on the discussions of starting operations of a coal based thermal power plant. This presentation is based on the in-house training to the operation engineers of the thermal power plant. It describes the activity chart for the starting of boiler, Turbine and synchronising of Generator, picking up the load etc.
This is a presentation series part 3 on Frequently Asked Questions on Steam Turbines in large steam power plants. All questions are answered properly and any doubt may be mailed to the writer.
Green building concepts and good building practicesManohar Tatwawadi
The power sector must adopt the green building concepts and go for good building practices. In fact all industries need to go for the same. The same practices can also be adopted in all commercial as well as residential buildings.
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
Discussions on Auxiliary consumption in a 4 X 210 MW TPS, the common systems and individual unitwise Auxiliary consumption has been briefed in the presentation. Also savings in various aspects due to increase in Boiler Efficiency are also discussed in the presentation.
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
The presentation gives an idea as to how the compressed air system is designed and the performance of the compressed air system. The losses, conservation of energy, the cost of leakages etc are discussed in the presentation
Questions and answers on turbines used in Power Plants. The discussion is definitely going to reduce your doubts and give you all answers on your questions. This is part 1 and the series will be continued till your doubts are cleared. you can mail me the questions and i will try to give you all answers as early as possible.
The presentation gives a basic idea of cooling towers in big industries including the Power Plants. The performance of cooling towers and the commonenly used terms with reference to the cooling towers are also discussed at length. Care to be taken while in freezing temperatures in the European countries is also discussed.
The presentation is based on the discussions about the safety in Power Plants and substations. The presentation is a part of the seminar on Electrical safety and reliability. The reporting of accidents was also discussed at length in the seminar
Cost accounting, cost control and cost reduction in TPSManohar Tatwawadi
The subject matter discuss in details about the cost accounting being practiced in a thermal power station for calculating the actual cost of generation of electricity. The cost centres and the cost affecting factors alongwith steps to reduce the cost of generation are described in the presentation. The PPMS system adopted can be further be well designed by any power plant engineer.
Environmental and pollution control in Thermal Power StationsManohar Tatwawadi
The presentation gives the basic idea as to the environment, pollutions and laws, the governing bodies and the limits of the emmissions. Also specifically about the solid waste, liquid waste and the gas emmissions from the Thermal Power Plants.
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...Manohar Tatwawadi
The discussion is for the Energy Conservation drive in the thermal power plants in the Auxilliary Consumption of the Electrical Auxilliaries in the Plant and thereby identify the steps to be taken for the reduction in Auxilliary Consumption
The presentation details the process of combustion in a 500 MW Coal based Thermal Power Plant where the main fuel is Pulverised coal. It details about the combustion of coal partical in the furnace and also the combustion equations related to the process, the excess air that is supplied.
The presentation gives an idea about the primary requirements for the establishment of a coal based THERMAL POWER STATION. The estimates are quite fair.
The presentation details about the Boiler Operation specifically while lightup of boiler and loading of boiler. the course participants discuss in details about the operations carried in their respective power stations
The discussion on "Handling of Turbines During Emergencies" has been detailed in the ppt. Some case studies are also discussed in the session where the course participants express their difficulties while coming across the emergencies in handling the turbines at their locations.
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
The presentation discusses about the change in performance parameters of a pulveriser due to change in coal quality and the measurement of performance and troubleshooting of coal firing system as a whole.
The Presentation describes the basics about the Efficiency and performance of a steam based power plant. It also describes how the heat rate of the power plant is important from the point of view of fuel savings.
Welcome to WIPAC Monthly the magazine brought to you by the LinkedIn Group Water Industry Process Automation & Control.
In this month's edition, along with this month's industry news to celebrate the 13 years since the group was created we have articles including
A case study of the used of Advanced Process Control at the Wastewater Treatment works at Lleida in Spain
A look back on an article on smart wastewater networks in order to see how the industry has measured up in the interim around the adoption of Digital Transformation in the Water Industry.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Typical questionnaire on "Boiler Draft" Related to Thermal Power Stations
1. BOILER DRAFT, AIR PREHEATERS & FLUE GAS
CLEANING SYSTEM
BOILER DRAFT & DRAFT CONTROL
Q. 1. What is Boiler Draught?
Ans. Draft is defined as the difference between atmospheric pressure and the static pressure
of combustion gases in a furnace, gas passage, flue or stack.
Q.2. How Natural Draft is produced?
Ans. A stack of sufficient height to cause the necessary pressure differential, creates natural
draft with the resulting air and flue gas flows.
Q.3. What are the types of Mechanical Draft created by fans?
Ans. Mechanical draft created by fans is of three types; a) Forced Draft, b) Induced Draft and c)
Balanced Draft.
Q.4. Natural draft depends on the temperature of Hot Gasses in the stack True / False.
Q.5. If the Stack height is increased, it will produce more draft. True/ False.
Q.6. In the forced draft system, the entire furnace casing is under a positive pressure. True/
False
Q.7. In the Induced Draft system the entire boiler is under negative pressure. True/ False
Q.8. The capacity of the ID Fan in case of Induced draft system will be more than the FD Fan
used for Forced Draft System. True/ False.
Q.9. In the Balanced Draft system maximum negative pressure is at the suction of ID Fan. True/
False.
Q.10. The Draft measurements at various points in the Boiler casing can reflect the cleanliness
of the boiler. True/ False
Q.11. Forced Draft Fan controls the Furnace pressure in the Balanced Draft System. True /
False. (Induced Draft fan controls the Furnace Pressure).
Q.12. Forced Draft Fan controls the combustion air supplied to the Boiler. True/ False.
2. Q.13. The air supplied for the purpose of conveying the coal/fuel to the boiler furnace is known
as Secondary air. True / False (It is the primary air which is used for conveying the coal to the
furnace)
Q.14. The primary and secondary air is heated in the Airheater before it is supplied for the
purpose. True/ False
Q.15. The purpose of supplying Primary air to the mill is to remove the surface moisture in the
raw coal and then to convey the pulverized coal to the boiler furnace. True/ False.
Q.16. Forced Draft Fans suction is from, a) atmosphere, b) Furnace, c) Airheater.
Q.17. Induced Draft Fan suction is from, a) Furnace, b) Airheater, c) ESP, d) Chimney.
Q.18. The secondary air heated in the Air Preheater is admitted, a) in the furnace windbox, b)
In ESP, c) in the chimney.
Q.18. The hot primary Air from the air Preheater is supplied to, a) the Furnace, b) The ESP, c)
Pulveriser.
Q.19. The tuning of secondary air is done by controlling the a) Suction Dampers, b) Blade pitch
control, c) guide vanes of the Forced Draft Fan.
Q.20. The air preheater bypass to avoid the corrosion of the cold end of the APH, is provided in
a) Flue gas path, b) Primary air path, c) the secondary air path.
Q.21. The air for cooling the scanners is provided by Scanner Fans from, a) FD Fan discharge, b)
PA Fan discharge, c) ID Fan Discharge.
Q.22. The Secondary air from the windbox enters into the furnace from the a) Secondary air
Dampers, b) Through the mill, c) Through the coal pipes.
Q.23. The Primary Air Fans in the 270 MW BHEL Boilers handle, a) Cold Air, b) Hot Air, c) Flue
gas.
Q.24. The PA supplied to the mill is a) a mixture of Hot and Cold air, b) only Hot air, c) Cold air.
Q.25. The Function of the Primary air is a) for drying of fuel, b) for transport of pulverized coal
from mill to furnace, c) both the above a and b.
Q.26. The Primary air demand is related to a) Boiler Load demand, b) ensure and maintain
Sufficient velocity of pulverized fuel, c) Both the above.
Q.27. The Furnace pressure is controlled by a) ID Fan b) FD Fan c) PA Fans.
3. Q.28. The air preheaters improve the Boiler Efficiency because; a) Flue gas temperature is
increased, b) The combustion air temperature is increased, c) ESP performance improves.
Q.29. The Air preheaters heat the combustion air with heat recovered from a) Waste steam, b)
Hot Flue gases, c) Turbine steam.
Q.30. The Air preheaters are a) Heat Excahagers, 2) Fans, c) Turbines.
Q.31. In the trisector Air Heater there is always some leakage from a) Air to Flue gas, b) Flue
gas to air, c) There is no leakage.
Q.32. The amount of Air leakage in the Rotating Air heaters is a) more, b) less than the Tubular
type air preheaters.
Q.33. The thrust bearing of the rotating trisector air preheater is located at the a) Top of the Air
heater, b) in the centre of the Airheater, c) at the lower end of the shaft.
Q.34. To avoid uneven thermal expansion and contraction resulting in damage to the rotating
wheel, a) The rotation must be started before starting the steam generator b) the rotation
may be started after boiler lightup, c) should be kept in rotation for some time after the steam
generator is shut down.
Q.35 With the addition of SO3 in the flue gas the Acid Dew Point a) Increases, b) Decreases, c)
has no effect.
Q.36. Erosion problems in Air Heater arise because of a) Fly ash in Flue gas, b) Temperature of
flue gas, c) Sulphur oxides in flue gas.
Q.37. Corrosion at the cold end of the airheater is due to a) Nitrogen in flue gas, b) Sulphur
oxides in Flue gas, c) Oxygen in Flue gas.
Q.38. The Fly Ash in pulverized fuel boilers is a) 80% of total ash, b) 20% of total ash, c) 50% of
total ash.
Q.39. The ash particles will settle down if the flue gas velocity is a) suddenly reduced, b)
Suddenly increased, c) no effect on change in velocity.
Q.40. What are the stages involved in Flue gas Cleaning?
Ans:- Three stages are involved in the process of Flue gas cleaning. A) Ash particle separation,
b) Collection of Ash Particles in the hopper and c) Handling of Ash so collected.
Q.41. State the three stages involved in the Electrostatic Precipitation Process?
4. Ans.:- Following are the stages involved in the precipitation process. A) Particle Charging, b)
Particle migration to collecting plates and c) Particle removal from the collecting
plates/electrodes
Q.42. Particle resistivity is an influencing factor for ESP Efficiency. True / False.
Q.43. The collecting Electrodes in the ESP are a) Rods, b) Plates, c) Screens.
Q.43. The emitting / Discharge electrodes are a) Plates, b) Spiral wires, c) Insulators.
Q.44. Rapping of the collecting and emitting electrodes is done to a) dislodge the ash from the
electrodes, b) to separate the ash from the flue gas, c) to take the ash to the ash handling
system.
Q.45. Resistivity of the fly ash can be reduced by conditioning by SO3, True / False.
Q.46. Excessive fouling of Discharge Electrodes will result in Low Precipitator Current. True /
False.
Q.47. Excessive fouling of Collecting Electrodes will result in Low Precipitator Voltage. True /
False.
Q.48. The gas to cloth ratio in the design of Febric Filter is expressed as face velocity in a)
m/sec, b) m2
, c) m3
.
*******