1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Franconia Road Sidewalk
Project No. ST-000036-004
Contract No. CN 14304064, Task Order No. 08
Lee District
May 10, 2017
2. Franconia Road Sidewalk
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
3. Project Details
Franconia Road Sidewalk
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Description:
The Franconia Road Sidewalk project was substantially completed on April 16,
2017. The scope of this improvement included construction of a concrete sidewalk,
curb ramps, curb & gutter, storm drainage, tree filters, and other enhanced safety
and accessibility improvements.
Project Overview:
• 870 linear feet of new concrete sidewalk that links existing sidewalks
• New curb & gutter and asphalt pavement
• 4 curb ramps
• 3 tree box filters
• 400 LF new storm drainage pipe, and 9 new storm drainage structures
Project Team:
• Department of Transportation – Francesco Lauretti
• Utilities Design and Construction Division (UDCD) – Qais Bashir
• Project Inspector, UDCD – James Beachum
• Survey Analyst, UDCD – Gregory Harper
4. Franconia Road Sidewalk
Lee District, Tax Map #82-2
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
PROJECT SITE
5. Franconia Road Sidewalk
Construction of Curb Ramp & Sidewalk
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
6. Franconia Road Sidewalk
Construction of Drainage Pipe
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
7. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Franconia Road Sidewalk
Completion of Sidewalk
8. Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Franconia Road Sidewalk
Completion of Curb Ramp & Sidewalk
9. Before After
Franconia Road Sidewalk
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
10. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
Fort Hunt Road Walkway
Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch
Matthew Kaiser, Public Information Officer