SlideShare a Scribd company logo
Truckee Tahoe Airport District
Board Meeting
October 17, 2013
Preamble
Master Plan Topics
•
•
•
•
•
•

Community Process
Facility / Policy Inventory
Aviation Demand Forecasts
Facility Requirements
Alternatives Analysis
Implementation Plan
Preamble
Implementation Plan
•
•
•
•
•

Environmental Process / Scoping
Plan Adoption Process
Plan Consistency Review (ALUCP)
Grant / Funding Program Descriptions
Airport Capital Improvement Program
Preamble
Schedule
• Inventory, Forecasts, Facility Requirements
– October-November

• Implementation / Financial, Airport Layout Plan
– November-December

• FAA Circulation, Review, and Approval
– January-April 2014

• CEQA
– January-TBD (2014)
Current Objectives
• Assess alternatives for community benefit potential
• Recommend alternatives that will be assessed for
public support and implementation.
Runway Alternatives
GOALS
• Reduce Impacts on Community
– Visual (Over Flight)
– Noise
Runway 11-29

• Shift and displace landing thresholds
• Goal is to have aircraft at higher altitudes over
residences after departure on Runway 29,
Alternative 1A: Runway 11-29
Alternative 1B: Runway 11-29
Alternative 1B: Airspace Impacts
Alternative 1B: Airspace Impacts
Alternative 1B: Airspace Impacts

Looking East
Alternative 1: Runway 11-29

• Graphics help quantify differences in:
– Runway 11-29 Visual, Height, and Time
– Runway 11-29 Noise
Jet Departure Profile
Piaggio Departure Profile
RW 29, Jet Departure-Existing

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 29, Jet Departure-w/ Extension

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 29, Piaggio Departure-Existing

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 29, Piaggio Departure-w/ Extension

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 11, Jet Arrival- Existing

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 11, Jet Arrival- w/ Extension

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 11, Prop Arrival- Existing

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 11, Prop Arrival- w/ Extension

Olympic Heights

Martis Valley
Estates

Sierra Meadows
Alternative 1: Runway 11-29

OPINION
• No significant change to height or noise
• Remove from consideration
Runway 2-20

• Widen and/or extend Runway 2-20
– Greater dispersion of runway utilization
Alternative 2A: Runway 2-20
Alternative 2B: Runway 2-20

Widen Runway Only
CA-267 Eastbound View to NE

Existing
CA-267 Eastbound View to NE

With Extension
CA-267 Westbound View to NW

Existing
CA-267 Westbound View to NW

With Extension
CA-267 Elevated View to NW

Existing
CA-267 Elevated View to NW

With Extension
Runway 2-20 Utilization

•
•
•
•
•
•
•

Factors Affecting Utilization / Direction
Wind direction and velocity
Runway length (adequate strength assumed)
Local communication efforts
Taxi distance
On course / arrival direction
Glider activity
Runway width
Runway 2-20 Utilization
DEPARTURES

ARRIVALS

Existing

Alt 2B

4%

No Change

No Change

4%

No Change

No Change

Turboprop

4%

No Change

No Change

4%

No Change

No Change

3%

No Change

No Change

3%

No Change

No Change

77%

58% ↓

No Change

66%

47% ↓

No Change

Turboprop

88%

76% ↓

85.5%↓

82%

64% ↓

72% ↓

Turbo Jet

96%

88% ↓

95% ↓

94%

83% ↓

91.5%↓

Piston

8%

16% ↑

No Change

8%

16% ↑

No Change

Turboprop

2%

8% ↑

3% ↑

2%

8% ↑

3% ↑

Turbo Jet

0.5%

6% ↑

1% ↑

1%

4% ↑

1.5% ↑

Piston

20

Alt 2A

Piston

2

Existing

Turbo Jet

29

Alt 2B

Piston

11

Alt 2A

11%

22%↑

No Change

22%

33% ↑

No Change

Turboprop

6%

12% ↑

7.5% ↑

12%

24% ↑

15% ↑

Turbo Jet

0.5%

3% ↑

1% ↑

2%

10% ↑

4% ↑

Runway Utilization Splits
Alternative 2: Runway 2-20

•
•
•
•

OPINION
Widening alone will not significantly disperse
operations
Extending and widening will disperse operations more
effectively
Views of Martis Valley not impacted significantly
Retain for further analysis
Alternative 3: Off-Airport

GOALS
• Adds consistency with FAA methodology for reducing
community noise exposure
• Advantages versus runway changes: lower total
cost, phased implementation, greater overall
success, and fewer construction impacts
• Inclusion may add credibility to the other alternatives
RW 29, Jet Departure- TRUCK

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 29, Piaggio Departure-TRUCK

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 29, Jet Departure Straight/I80

Olympic Heights

Martis Valley
Estates

Sierra Meadows
RW 29, C172 Departure-Bypass
Alternative 3: Off-Airport

OPINION
• Reduces residential impacts
• Retain for further analysis
Next Steps
Open House Meeting
• Determine level of support for finalist alternatives
• Master Plan comparison
• Finalize
Multi-Use Hangar Sites
Multi-Use Hangar Sites
Site 1:
• Provides ‘taxi-through’
capabilities
• Provides immediate access to
roads and parking
• Utilizes land near terminal apron

Site 2:
• Provides immediate access to
roads and parking
• Utilizes land near terminal apron
• Not able to accommodate taxithrough capabilities
Multi-Use Hangar Sites
Site 3:
• Provides ‘taxi-through’
capabilities
• Immediate access to roads
• Would displace existing tiedowns

Site 4:
• Provides ‘taxi-through’
capabilities
• Utilizes unused land near runway
intersection
• Poor access to roads and parking
Multi-Use Hangar Examples
Multi-Use Hangar Examples
Future Vision (1998)

1998 Master Plan
Future Vision (2013)

Current Master Plan
THANK YOU

More Related Content

What's hot

Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Hossam Shafiq I
 
Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...
Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...
Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...
Hossam Shafiq I
 
Optimizing precision final approach through gbas
Optimizing precision final approach through gbasOptimizing precision final approach through gbas
Optimizing precision final approach through gbas
Irfan iftekhar
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
ydmisra
 
EGNOS for aviation: How does it work?
EGNOS for aviation: How does it work?EGNOS for aviation: How does it work?
EGNOS for aviation: How does it work?
The European GNSS Agency (GSA)
 
UIUC Chainless Challenge - Final Presentation
UIUC Chainless Challenge - Final PresentationUIUC Chainless Challenge - Final Presentation
UIUC Chainless Challenge - Final Presentation
Wai Hong Lee
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signal
Bhavya Patel
 
Gps waas class 5 nov10
Gps waas class 5 nov10Gps waas class 5 nov10
Gps waas class 5 nov10
Clark Jay Wilson
 
SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816
Adina Levin
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation enginering
Sathik Mohamed
 
2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchange2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchange
Adina Levin
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnav
cochez
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 Update
Marcellus Drilling News
 

What's hot (13)

Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
 
Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...
Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...
Lecture 03 Intersection Control (Traffic Engineering هندسة المرور & Dr. Usama...
 
Optimizing precision final approach through gbas
Optimizing precision final approach through gbasOptimizing precision final approach through gbas
Optimizing precision final approach through gbas
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
 
EGNOS for aviation: How does it work?
EGNOS for aviation: How does it work?EGNOS for aviation: How does it work?
EGNOS for aviation: How does it work?
 
UIUC Chainless Challenge - Final Presentation
UIUC Chainless Challenge - Final PresentationUIUC Chainless Challenge - Final Presentation
UIUC Chainless Challenge - Final Presentation
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signal
 
Gps waas class 5 nov10
Gps waas class 5 nov10Gps waas class 5 nov10
Gps waas class 5 nov10
 
SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816SMCTA 101 Corridor Managed Lanes 092816
SMCTA 101 Corridor Managed Lanes 092816
 
Transportation enginering
Transportation engineringTransportation enginering
Transportation enginering
 
2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchange2016 11-03 ta bod highway-101-92 interchange
2016 11-03 ta bod highway-101-92 interchange
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnav
 
Access Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 UpdateAccess Northeast Pipeline Project - Dec 2016 Update
Access Northeast Pipeline Project - Dec 2016 Update
 

Viewers also liked

The Real Impact of Mobile on the Corporate Travel Programme
The Real Impact of Mobile on the Corporate Travel ProgrammeThe Real Impact of Mobile on the Corporate Travel Programme
The Real Impact of Mobile on the Corporate Travel Programme
Corinne Wan
 
Winmate smart airport solution
Winmate smart airport solutionWinmate smart airport solution
Winmate smart airport solution
Allan (Yun-Chin) Lin
 
Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India
COLLABORATIVE ARCHITECTURE
 
ARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANOARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANO
Student
 
Literature review and case study of corporate architecture
Literature review and case study of corporate architectureLiterature review and case study of corporate architecture
Literature review and case study of corporate architecture
Kathmandu Engineering College
 
Office case study
Office case studyOffice case study
Office case study
Shourya Puri
 
Office Layout
Office LayoutOffice Layout
Office Layout
Marcus9000
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
Vinay M
 
Kaleo apps case study final
Kaleo apps case study finalKaleo apps case study final
Kaleo apps case study final
KT Apps
 

Viewers also liked (9)

The Real Impact of Mobile on the Corporate Travel Programme
The Real Impact of Mobile on the Corporate Travel ProgrammeThe Real Impact of Mobile on the Corporate Travel Programme
The Real Impact of Mobile on the Corporate Travel Programme
 
Winmate smart airport solution
Winmate smart airport solutionWinmate smart airport solution
Winmate smart airport solution
 
Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India
 
ARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANOARCHITECTURAL CASE STUDY RENZO PIANO
ARCHITECTURAL CASE STUDY RENZO PIANO
 
Literature review and case study of corporate architecture
Literature review and case study of corporate architectureLiterature review and case study of corporate architecture
Literature review and case study of corporate architecture
 
Office case study
Office case studyOffice case study
Office case study
 
Office Layout
Office LayoutOffice Layout
Office Layout
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
Kaleo apps case study final
Kaleo apps case study finalKaleo apps case study final
Kaleo apps case study final
 

Similar to Truckee Tahoe Airport Master Plan Update, 2013

Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
freshtrackscommunications
 
Airplane Noise over Mountain View
Airplane Noise over Mountain View Airplane Noise over Mountain View
Airplane Noise over Mountain View
Ella Gille
 
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential ApplicationsUAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
American Society of Civil Engineers, Orange County Branch
 
raptr_trr.pptx
raptr_trr.pptxraptr_trr.pptx
raptr_trr.pptx
TESTFALTU
 
2022 CalAPA Spring Educational Workshop presentation on local-government spec...
2022 CalAPA Spring Educational Workshop presentation on local-government spec...2022 CalAPA Spring Educational Workshop presentation on local-government spec...
2022 CalAPA Spring Educational Workshop presentation on local-government spec...
California Asphalt Pavement Association
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
TSSParatransit
 
Lease strategy project (lem)
Lease strategy project (lem)Lease strategy project (lem)
Lease strategy project (lem)
Michael Davies
 
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
Reuben Juster, EIT
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
SoKhit1
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
Malyar Talash
 
Airport Seminar - Federal Aviation Administration
Airport Seminar - Federal Aviation Administration Airport Seminar - Federal Aviation Administration
Airport Seminar - Federal Aviation Administration
Fiesp Federação das Indústrias do Estado de SP
 
Downey CHC 2015 Final
Downey CHC 2015 Final Downey CHC 2015 Final
Downey CHC 2015 Final
David (Dave) Downey
 
LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743
losangelesaep
 
Volume study (group 5)
Volume study (group  5)Volume study (group  5)
Volume study (group 5)
S M Rahat Rahman
 
DMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways AgencyDMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways Agency
IES / IAQM
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
2014 Florida Public Works Expo
 
Prelim final presentation
Prelim final presentationPrelim final presentation
Prelim final presentation
Zack White
 
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service ShortcomingsHow Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
TSSParatransit
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
holegajendra
 
20131002 presentation
20131002 presentation20131002 presentation
20131002 presentation
Rafat Ali
 

Similar to Truckee Tahoe Airport Master Plan Update, 2013 (20)

Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
 
Airplane Noise over Mountain View
Airplane Noise over Mountain View Airplane Noise over Mountain View
Airplane Noise over Mountain View
 
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential ApplicationsUAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
UAVs: Understanding Unmanned Aerial Systems (UAS) and Potential Applications
 
raptr_trr.pptx
raptr_trr.pptxraptr_trr.pptx
raptr_trr.pptx
 
2022 CalAPA Spring Educational Workshop presentation on local-government spec...
2022 CalAPA Spring Educational Workshop presentation on local-government spec...2022 CalAPA Spring Educational Workshop presentation on local-government spec...
2022 CalAPA Spring Educational Workshop presentation on local-government spec...
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
 
Lease strategy project (lem)
Lease strategy project (lem)Lease strategy project (lem)
Lease strategy project (lem)
 
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
MEASURING PERFORMANCE ON INTERRUPTED FLOW FACILITIES WITH GPS V2
 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
 
Airport Seminar - Federal Aviation Administration
Airport Seminar - Federal Aviation Administration Airport Seminar - Federal Aviation Administration
Airport Seminar - Federal Aviation Administration
 
Downey CHC 2015 Final
Downey CHC 2015 Final Downey CHC 2015 Final
Downey CHC 2015 Final
 
LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743LAAEP CEQA Seminar: Impacts Under SB 743
LAAEP CEQA Seminar: Impacts Under SB 743
 
Volume study (group 5)
Volume study (group  5)Volume study (group  5)
Volume study (group 5)
 
DMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways AgencyDMUG 2016 - Nigel Bellamy, Highways Agency
DMUG 2016 - Nigel Bellamy, Highways Agency
 
City of Edgewater CNG Presentation
City of Edgewater CNG PresentationCity of Edgewater CNG Presentation
City of Edgewater CNG Presentation
 
Prelim final presentation
Prelim final presentationPrelim final presentation
Prelim final presentation
 
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service ShortcomingsHow Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
How Analytic Reporting Can Identify and Solve Paratransit Service Shortcomings
 
4. traffic engineering
4. traffic engineering4. traffic engineering
4. traffic engineering
 
20131002 presentation
20131002 presentation20131002 presentation
20131002 presentation
 

More from freshtrackscommunications

Examples of Successful Uses of Aquatic Herbicides
Examples of Successful Uses of Aquatic HerbicidesExamples of Successful Uses of Aquatic Herbicides
Examples of Successful Uses of Aquatic Herbicides
freshtrackscommunications
 
June 17 presentation - Tahoe Expedition Academy New Campus public workshop
June 17 presentation - Tahoe Expedition Academy New Campus public workshopJune 17 presentation - Tahoe Expedition Academy New Campus public workshop
June 17 presentation - Tahoe Expedition Academy New Campus public workshop
freshtrackscommunications
 
June 1 TEA New Campus Meetings with Architects Detailed Feedback
June 1 TEA New Campus Meetings with Architects Detailed FeedbackJune 1 TEA New Campus Meetings with Architects Detailed Feedback
June 1 TEA New Campus Meetings with Architects Detailed Feedback
freshtrackscommunications
 
June 1 TEA New Campus Meetings with Architects Feedback
June 1 TEA New Campus Meetings with Architects FeedbackJune 1 TEA New Campus Meetings with Architects Feedback
June 1 TEA New Campus Meetings with Architects Feedback
freshtrackscommunications
 
Tahoe Expedition Acadamy Campus Feedback
Tahoe Expedition Acadamy Campus FeedbackTahoe Expedition Acadamy Campus Feedback
Tahoe Expedition Acadamy Campus Feedback
freshtrackscommunications
 
May 8th CommuniTEA Event | Family Feedback Summary
May 8th CommuniTEA Event | Family Feedback SummaryMay 8th CommuniTEA Event | Family Feedback Summary
May 8th CommuniTEA Event | Family Feedback Summary
freshtrackscommunications
 
North Tahoe Tourism Master Plan Public Workshop Presentation
North Tahoe Tourism Master Plan Public Workshop PresentationNorth Tahoe Tourism Master Plan Public Workshop Presentation
North Tahoe Tourism Master Plan Public Workshop Presentation
freshtrackscommunications
 
Final Outreach Presentation - August 31
Final Outreach Presentation - August 31Final Outreach Presentation - August 31
Final Outreach Presentation - August 31
freshtrackscommunications
 
Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13
freshtrackscommunications
 
Trail Construction and Use-Conflict Minimization Overview
Trail Construction and Use-Conflict Minimization OverviewTrail Construction and Use-Conflict Minimization Overview
Trail Construction and Use-Conflict Minimization Overview
freshtrackscommunications
 
Royal Gorge Public Outreach Summary (not final)
Royal Gorge Public Outreach Summary (not final)Royal Gorge Public Outreach Summary (not final)
Royal Gorge Public Outreach Summary (not final)
freshtrackscommunications
 
Long Term Forest Management at Royal Gorge
Long Term Forest Management at Royal GorgeLong Term Forest Management at Royal Gorge
Long Term Forest Management at Royal Gorge
freshtrackscommunications
 
Truckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary ReportTruckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary Report
freshtrackscommunications
 

More from freshtrackscommunications (13)

Examples of Successful Uses of Aquatic Herbicides
Examples of Successful Uses of Aquatic HerbicidesExamples of Successful Uses of Aquatic Herbicides
Examples of Successful Uses of Aquatic Herbicides
 
June 17 presentation - Tahoe Expedition Academy New Campus public workshop
June 17 presentation - Tahoe Expedition Academy New Campus public workshopJune 17 presentation - Tahoe Expedition Academy New Campus public workshop
June 17 presentation - Tahoe Expedition Academy New Campus public workshop
 
June 1 TEA New Campus Meetings with Architects Detailed Feedback
June 1 TEA New Campus Meetings with Architects Detailed FeedbackJune 1 TEA New Campus Meetings with Architects Detailed Feedback
June 1 TEA New Campus Meetings with Architects Detailed Feedback
 
June 1 TEA New Campus Meetings with Architects Feedback
June 1 TEA New Campus Meetings with Architects FeedbackJune 1 TEA New Campus Meetings with Architects Feedback
June 1 TEA New Campus Meetings with Architects Feedback
 
Tahoe Expedition Acadamy Campus Feedback
Tahoe Expedition Acadamy Campus FeedbackTahoe Expedition Acadamy Campus Feedback
Tahoe Expedition Acadamy Campus Feedback
 
May 8th CommuniTEA Event | Family Feedback Summary
May 8th CommuniTEA Event | Family Feedback SummaryMay 8th CommuniTEA Event | Family Feedback Summary
May 8th CommuniTEA Event | Family Feedback Summary
 
North Tahoe Tourism Master Plan Public Workshop Presentation
North Tahoe Tourism Master Plan Public Workshop PresentationNorth Tahoe Tourism Master Plan Public Workshop Presentation
North Tahoe Tourism Master Plan Public Workshop Presentation
 
Final Outreach Presentation - August 31
Final Outreach Presentation - August 31Final Outreach Presentation - August 31
Final Outreach Presentation - August 31
 
Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13
 
Trail Construction and Use-Conflict Minimization Overview
Trail Construction and Use-Conflict Minimization OverviewTrail Construction and Use-Conflict Minimization Overview
Trail Construction and Use-Conflict Minimization Overview
 
Royal Gorge Public Outreach Summary (not final)
Royal Gorge Public Outreach Summary (not final)Royal Gorge Public Outreach Summary (not final)
Royal Gorge Public Outreach Summary (not final)
 
Long Term Forest Management at Royal Gorge
Long Term Forest Management at Royal GorgeLong Term Forest Management at Royal Gorge
Long Term Forest Management at Royal Gorge
 
Truckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary ReportTruckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary Report
 

Recently uploaded

2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
Arijit Dutta
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
concepsionchomo153
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
thesiliconleaders
 
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
valvereliz227
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Niswey
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
APCO
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
msthrill
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
timesbpobusiness
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
HajeJanKamps
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
ZevinAttisha
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
Ksquare Energy Pvt. Ltd.
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
dazzjoker
 

Recently uploaded (20)

2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
AI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your BusinessAI Transformation Playbook: Thinking AI-First for Your Business
AI Transformation Playbook: Thinking AI-First for Your Business
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
 
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdfThe Most Inspiring Entrepreneurs to Follow in 2024.pdf
The Most Inspiring Entrepreneurs to Follow in 2024.pdf
 
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
欧洲杯赌球-欧洲杯赌球买球官方官网-欧洲杯赌球比赛投注官网|【​网址​🎉ac55.net🎉​】
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
Unlocking WhatsApp Marketing with HubSpot: Integrating Messaging into Your Ma...
 
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
The APCO Geopolitical Radar - Q3 2024 The Global Operating Environment for Bu...
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
Cover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SUCover Story - China's Investment Leader - Dr. Alyce SU
Cover Story - China's Investment Leader - Dr. Alyce SU
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
TIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup IndustryTIMES BPO: Business Plan For Startup Industry
TIMES BPO: Business Plan For Startup Industry
 
Pitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deckPitch Deck Teardown: Kinnect's $250k Angel deck
Pitch Deck Teardown: Kinnect's $250k Angel deck
 
CULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for dukeCULR Spring 2024 Journal.pdf testing for duke
CULR Spring 2024 Journal.pdf testing for duke
 
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
PM Surya Ghar Muft Bijli Yojana: Online Application, Eligibility, Subsidies &...
 
Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdfRegistered-Establishment-List-in-Uttarakhand-pdf.pdf
Registered-Establishment-List-in-Uttarakhand-pdf.pdf
 

Truckee Tahoe Airport Master Plan Update, 2013

Editor's Notes

  1. Add graphic from end of runway view
  2. Add graphic from end of runway view
  3. Add graphic from end of runway view
  4. All Sites:225’ x 110’Able to accommodate Global Express / Gulf VSite 1: Provides ‘taxi through’ with pavement in backProvides access to parkingUtilizes prime land near terminal apronSite 2A (not filled): Original site proposed by M&H.Would require relocation of fuel farmProvides direct access to Terminal and parkingSite 2B:Rotates Site 2A to allow for taxi through operations
  5. All Sites:225’ x 110’Able to accommodate Global Express / Gulf VSite 1: Provides ‘taxi through’ with pavement in backProvides access to parkingUtilizes prime land near terminal apronSite 2A (not filled): Original site proposed by M&H.Would require relocation of fuel farmProvides direct access to Terminal and parkingSite 2B:Rotates Site 2A to allow for taxi through operations
  6. All Sites:225’ x 110’Able to accommodate Global Express / Gulf VSite 1: Provides ‘taxi through’ with pavement in backProvides access to parkingUtilizes prime land near terminal apronSite 2A (not filled): Original site proposed by M&H.Would require relocation of fuel farmProvides direct access to Terminal and parkingSite 2B:Rotates Site 2A to allow for taxi through operations
  7. All Sites:225’ x 110’Able to accommodate Global Express / Gulf VSite 1: Provides ‘taxi through’ with pavement in backProvides access to parkingUtilizes prime land near terminal apronSite 2A (not filled): Original site proposed by M&H.Would require relocation of fuel farmProvides direct access to Terminal and parkingSite 2B:Rotates Site 2A to allow for taxi through operations
  8. All Sites:225’ x 110’Able to accommodate Global Express / Gulf VSite 1: Provides ‘taxi through’ with pavement in backProvides access to parkingUtilizes prime land near terminal apronSite 2A (not filled): Original site proposed by M&H.Would require relocation of fuel farmProvides direct access to Terminal and parkingSite 2B:Rotates Site 2A to allow for taxi through operations
  9. Parallel Runway Justification: 2-20 Parallel Turf: For landings of gliders. When gliders land on existing 2-20, they may remain on runway until people go out and physically remove the glider from the runway. 11-29 Parallel: “Not identified as a need during the planning period, consideration should be given to reserving land north of Runway (11-29)For the future development of a parallel runway. This provides the ‘highest and best use’ for this property due to limited access potential and limited developable area.”