PRESENTATION ON
1) TRANSFER OF TECHNOLOGY
2) PROJECT PLANNING AND MANAGEMENT
 Ajit Kumar Jha
 1st Sem. M.Pharm
(Pharmaceutics)
 School Of Pharmacy,
Apeejay Stya University,
Sohna, Haryana
 Dr. Swati Gupta
 Dept. Of Pharmaceutics
 School Of Pharmacy,
Apeejay Stya University,
Sohna, Haryana
Presented By: Presented To:
WHAT IS TECHNOLOGY TRANSFER ?
 Technology Transfer is the process by which
technology is disseminated.
 It involves communication of relevant knowledge
by the Transferor to the Recipient.
 It is in the form of technology transfer transaction
which way or may not be a legally binding
contract.
CONTD….
 WIPO says technology transfer (TOT) is:
 “defined as transfer of new technologies from
universities and research institutions to parties
capable of commercialization”
 or in the sense of transfer of technologies
across international borders, generally from
developed to developing countries.
 Generally TOT consists of knowledge or IP
rights that are:
 licensed in the form of intellectual property,
 the subject of formal consulting or training agreements,
 communicated in the work place or research settings
 diffused by publication or other means.
CONTD….
 Wikipedia says
 Technology transfer is the process of sharing of
 skills, knowledge, technologies, methods of
manufacturing, samples of manufacturing and
facilities
 among governments and other institutions
 to ensure that scientific and technological developments
are accessible to a wider range of users
 who can then further develop and exploit the technology
into
 new products, processes, applications, materials or
services.
 It is closely related to (and may arguably be considered
a subset of) knowledge transfer.
CONTD…..
 The reference to
 skills, knowledge, technologies, methods of
manufacturing, samples of manufacturing and facilities
is probably wide enough to refer to the subject of transfer
 But there are more locations of transfer.Transfer can be
 between Public Universities or Government Research
Institutes and private industry
 between the research and development (R&D)
departments and the other departments of a single
business
 between various entities or branches of a business group
 in a franchising operation from the franchisor to the
franchisee
 between international organisations and national
organisations
 between industrialised economies and developing
economies
WHAT IS TECHNOLOGY ACQUISITION ?
Twoterms technology transfer and technology are
normally used interchangeably.
The verb “Acquire” means
 To come into possesion of; get as one’s own
 To gain for oneself through one’s actions or
efforts
Technology Acquisition is the process of acquiring a
new technology, new product, process or service
; by efforts of an individual or an enterprise or
any other macro entity. This process can be
conducted either internally or externally to the
enterprise.
TYPES OF TECHNOLOGY TRANSFER
 Scientific Knowledge Transfer, Direct Technology
Transfer, Spin-off Technology Transfer
 Informal Technology Transfer & Formal
Technology Transfer
 Internal Technology Transfer & External
Technology Transfer
INTERNAL TECHNOLOGY TRANSFER
Internal Technology Transfer refer to such technology
transfers/investments where control on the
ownership & usage of technology resides with
the transferor.
It is a complex process involving following decisions:
 Timing : When to introduce new technology /
products in the market?
 Location : Where to transfer new technology /
products?
 Multi-functional teams --Which staff members
should be involved in transfer process ?
 Communication methods & procedures – What
type of Communication methods & procedures
be adopted to facilitate transfer ?
BARRIERS TO INTERNAL TECHNOLOGY
TRANSFER
 R & D goals are not known to Production
Department.
 Difficulties in stopping current production to test
new products / processes
 R&D Department does not understand needs &
capability of Production Department.
 In general, Production Department is resistant to
innovation and is bound by routine.
 Non-linkage of new technologies to marketing /
customer needs.
STEPS IN INTERNAL TECHNOLOGY
ACQUISITION BY A FIRM
1. Planning new products / services / processes to
be offered – planning must incorporate voice of
the customer & user needs
2. Screening new products, processes or services –
only viable / feasible items be offered as only one
out of 4/5 becomes a commercial success.
3. Initiating development process – must be properly
designed and carried out so that it facilitates
success. Enterprises should
a. Consist of temporary system capable of adapting
to dymanics of change
b. Organize the systems around problem solving
STEPS IN INTERNAL TECHNOLOGY
ACQUISITION BY A FIRM
c. Have flexible management system & replace rigid
management system
d. Use multi-functional teams.
e. Proper integration between R&D, Production &
Marketing sub-systems
f. Ensure effective communication
4. Carrying out trial production on small scale and
test marketing
5. Improving design & production processes based
on experiences / feedback
6. Commercialization i.e. mass production & sales
EXTERNAL TECHNOLOGY TRANSFER
 In these transfers, control on the ownership &
usage of technology usually does not remain with
transferor and it passes on to the recipient, like joint
venture with local control, licensing agreement etc.
EXTERNAL TECHNOLOGY TRANSFER
Successful external technology transfer depends
upon following factors:
 Type of the technology being transferred
 Complexity of the technology being transferred
 Transfer mechanism selected
 Relationships between the parties – building of
mutual trust
 Core competencies of the parties & compatibilty
thereof
 Organizational culture of the parties & mutual
understanding thereof
METHODS OF EXTERNAL TECHNOLOGY
TRANSFER
 Co-operative & collaborative ventures / strategic
alliances
 Licensing agreements
 Contracting agreements
 Enterprise acquisition.
WHY EXTERNAL TECHNOLOGY TRANSFER
 Technology already developed saves time & efforts
 Sometimes Growth objectives or competitive goals
cannot be reached through internal development
 Lack of risk taking ability for innovations
 Lack of internal resources (physical & human) for
innovation
 Firm does not have core competencies to deal with
complex technological developments.
 Need to keep up with competitors
 Need to cope up with acceleration of technological
change
BARRIERS TO EXTERNAL TECHNOLOGY
TRANSFER
 Associated costs – usually high prices are required
to be paid in the form of royalities, technical &
knowhow fees etc over medium to long term period
 Appropriatesness of technology i.e. its suitability to
core competencies and market needs is always a
point of discussion and investigation
 Heavy reliances on foreign technology- may make
transferee / recipient technologically dependent on
external technology providers / transferors even for
small issues
 Lack of mutual trust between two parties may
hinder full & timely transfer
BARRIERS TO EXTERNAL TECHNOLOGY
TRANSFER
 There is risk of loss of control over technology and
the transferee / recipient may use technology in an
arbitrary manner
 Transfer may render existing technology & its
related products / services / processes obsolete
 Transferee may turn a potential competitor in
future.
 Mismatch in core competencies of the transferor &
transferee may create difficulties in transfer
 Different organisation cultures may create
difficulties in transfer
 Lack of effective communication between the
parties may also create difficulties in transfer
STEPS IN EXTERNAL TECHNOLOGY
ACQUISITION BY A FIRM –
1. Identification of Need
2. Developing list of suitable technology providers
3. Short listing / selecting suitable technology
providers on the basis …. Cultural compatibility,
compatibility of core competences,
appropriateness of technology, technical
feasibility etc
4. Negotiation
5. Agreement
6. Payments as per agreement
7. Transfer of specifications, blueprints, designs,
documents, CDs to purchaser
8. Training of technical personnel of purchaser
MODES OF PAYMENT FOR TECHNOLOGY
TRANSFER
 Lumpsum payment or periodical instalments
 Royalities as a %age of sales over next few years
 Cross-licensing agreements
 Contracted supply of output
 Issue of equity shares in lieu of technology
transferred
WHY TECHNOLOGY TRANSFER TAKES PLACE?
 To elucidate necessary information to transfer technology from R&D to actual manufacturing by
sorting out various information obtained during R&D;
 To elucidate necessary information to transfer technology of existing products between various
manufacturing places; and
 To exemplify specific procedures and points of concern for the two types of technology transfer in
the above to contribute to smooth technology transfer.
 Generally it has been seen that an organization forms alliances with other organization to make
product viable and thus technology transfer occurs. These alliances may be:
 The developer of the technology might have the resources to take the technology to particular state
of development, such as up to animal studies and toxicology studies, but dose not have the
resources to take the technology through its clinical and regulatory phases, and must collaborate
with another organization to take it through these phases, and into the market.
 The developer of the technology may have taken the technology to a state of development so that
it is near market ready, but dose not have the clean room manufacturing capability or resources to
manufacture the product, and must partner with another organization that dose have that capability.
 Exploitation in a different field of application. Or the developer of technology has no commercial
capabilities. Like universities or research campus.
PROCESS OF TECHNOLOGY TRANSFER:
 Technology transfer consists of action taken in these flows of development to realize
through the quality as designed during the manufacture. Even if the production starts, the
technology transfer will take place in process such as changes in manufacturing places.
 The processes are classified into the three categories.
 1. Research Phase
 2. Development Phase
 3. Production Phase
 Research phase:
 This phase is concerned with the quality design of the product. For Drug Products, the
quality design corresponds to so called pharmaceuticals design-to-design properties and
functions such as elimination of adverse reactions, improvement of efficacy, assurance of
stability during distribution, and adding usefulness based on various data such as chemical
and physical properties, efficacy, safety and stability obtained form preclinical studies.
 For drug substance, the quality design is to determine starting materials and their reaction
paths, and basic specification of the drug.
CONTD….
 Development Phase
a. Research for Factory Production
b. Consistency between Quality and Specification
c. Assurance of consistency through development and manufacturing
d. Technology Transfer from R&D to Production
 Research for Factory Production
 To manufacture drugs with qualities as designed, it is required to establish appropriate
quality control method and manufacturing method, after detecting variability factors to
secure stable quality in the scale-up validation that is performed to realize factory
production of drug designed on the basis of result from small-scale experiments.
 Consistency between Quality and Specification:
 When product specification is established on the basis of the quality of product determined
in the above, it is required to verify that the specification adequately specifies the product
quality.
 In short, the consistency between quality and specification is to ensure in the products
specification that the quality predetermined in the quality design is assured as the
manufacture quality, and the product satisfies the quality of design.
CONTD….
 Assurance of consistency through development and manufacturing:
 To make developed product have indications as predetermined in clinical phases, the quality of design should be
reproducible as the quality of product (assurance of consistency).
 For this purpose, the transferring party in charge of development should fully understand what kind of technical
information is required by the transferred party in charge of manufacturing, and should establish an appropriate
evaluation method to determine whether a drug to be manufactured meets the quality of design.
 Technology Transfer from R&D to Production:
 Transfer of the technical information is necessary to realize manufacturing formula established in the above in the
actual production facility. Technical information to be transfer should be compiled as R&D report.
 Production Phase
a. Phase validation & Production
b. Feedback from production & technology transfer of marketed products
 Phase Validation & Production:
 Production is implemented after various validation studies verify that it is able to stably product based on
transferred manufacturing formula. While the manufacturing facility accepting technology is responsible for
validation, the research and development department transferring technology should take responsibility for
validation such as performance qualification, cleaning validation, and process validation unique to subject drugs.
CONTD….
Feed back from Production and Technology
Transfer of Marketed Products:
 Technical information of developed products are
obtained from data of a limited amount of batches,
various standards have been established from the limited
data, and quality evaluation method established in
development phase in not always sufficient for factory
production, it is highly desired to feed back and
accumulate technical information obtained from repeated
production, if necessary. In addition, it is important to
appropriately modify various standards established
before based on this information, and accountability and
responsibility for design and manufacturing should be
executed.
TECHNOLOGY TRANSFER DOCUMENTATION:
 Technology transfer documentation are generally interpreted as documents indicating contents
of technology transfer for transferring and transferred parties. The raw data of the documents
should be prepared and compiles according to purposed, and should be always readily
available and traceable. For successful technology transfer, task assignments and
responsibilities should be clarified, and acceptance criteria for the completion of technology
transfer concerning individual technology to be transferred.
 Quality assurance department should established conformation process for all kinds of
technology transfer documentation, and should check and approve the documentation.
Technology transfer documentation are indicated as follows:
 1. Organization for Technology Transfer:
 One of the most significant elements for successful technology transfer is closed
communication between transferring and transferred parties. Therefore, organization for
technology transfer should be established and composed of both party members, roles, scope
of responsibilities of each party should be clarified and adequate communication, and feedback
of information should be ensured. It is desirable that this organization complies with GMP.
 2. Research and Development Report:
 To realize quality assurance at all stages from drug development to manufacturing, transfer to
manufacturing, transfer of technical documents concerning product development or
corresponding documents should be considered.
CONTD….
 The research and development report (development report) is a file of technical development, and the research
and development department is in charge of its documentation. Informations to be contained in the development
report are:
 a. Historical data of pharmaceutical development of new drug substances and drug products at
 stages from early development phase to final application of approval.
 b. Raw materials and components.
 c. Synthetic route.
 d. Rational for dosage form & formula designs and design of manufacturing methods.
 e. Rational and change histories of important processes and control parameters.
 f. Quality Profiles of manufacturing batches ( including stability data).
 g. Specifications and test methods of drug substances, intermediates, drug products, raw materials, and
components, and their rationale.
 3. Product Specification File:
 The product specification is to compile information, which enables the manufacture of the product, and to define
specification, manufacturing and evaluations method of the product and its quality, and the transferring party is
responsible for documenting the file. The product specification file should be reviewed at regular intervals, and
incorporate various information obtained after the start of production of the product, and be revised as
appropriate.
 For new products, the development report can be used as a part of product specification file.
CONTD….
 4. Technology Transfer Plan:
 The technology transfer plan is to describe items and contents of technology to be
transferred and detailed procedures of individual transfer and transfer schedule, and
establish judgment criteria for the completion of the transfer. The transferring party should
prepare the plan before the implementation of the transfer, and reach an agreement on its
contents with the transferred party.
 5. Technology Transfer Report:
 It is to report the completion of technology transfer after data of action taken according to
the technology plan is evaluated and the data is confirmed pursuant to the predetermined
judgment criteria. Both transferring and transferred parties can document the technology
transfer report; however, they should reach an agreement on its contents.
 6. Verification of Results of Technology Transfer:
 After the completion of technology transfer and before the start of manufacturing of the
product, the transferring party should verify with appropriate methods such as product
testing and audit that the product manufactured after the technology transfer meets the
predetermined quality and should maintain records of the results.

CONCLUSION:
 In pharmaceutical industry technology transfer means action
to transfer information and technologies necessary to realize
quality of design of drugs during manufacturing. Appropriate
technology transfer is important to upgrade the quality of
design to be the quality of product, and ensure stable and high
quality of the product. The technology transfer does not mean
one-time actions taken by the transferring party toward the
transferred party, but means continuous information exchange
between the both parties to maintain the product
manufacturing.
 The consistency in product quality, in this competitive
environment require the transfer of skills in personnel and the
transfer of process too. Current scenario demands the
technology transfer with in and out sourcing technology
transfer.
WHAT IS PROJECT?
 The word project comes from
the Latin word projectum from the Latin
verb proicere, "before an action" which in turn
comes from pro-, which denotes precedence,
something that comes before something else in
time (paralleling the Greek πρό) and iacere, "to do".
The word "project" thus actually originally meant
"before an action".
CONTD….
 In contemporary business and science a project is
defined as a collaborative enterprise, involving
research or design, that is carefully planned to
achieve a particular aim.
 Projects can be further defined as temporary rather
than permanent social systems or work
systems that are constituted by teams within or
across organizations to accomplish
particular tasks under time constraints. An on-going
project is usually called (or evolves into) a program.
WHAT IS PROJECT MANAGEMENT?
 Project management is the process and activity of
planning, organizing, motivating, and controlling
resources, procedures and protocols to achieve
specific goals in scientific or daily problems.
 A project is a temporary endeavor designed to
produce a unique product, service or result with a
defined beginning and end (usually time-
constrained, and often constrained by funding
or deliverables), undertaken to meet unique goals
and objectives, typically to bring about beneficial
change or added value.
CONTD….
 The primary challenge of project management is to
achieve all of the project goals and objectives while
honoring the preconceived constraints. The primary
constraints are scope, time, quality and budget. The
secondary — and more ambitious — challenge is
to optimize the allocation of necessary inputs and
integrate them to meet pre-defined objectives.
APPROACHES
 The traditional approach
 PRINCE2
 Critical chain project management
 Process-based management
 Agile project management
 Lean project management
 Extreme project management
 Benefits realization management
THE TRADITIONAL APPROACH
 A traditional phased approach identifies a sequence
of steps to be completed. In the "traditional
approach", five developmental components of a
project can be distinguished (four stages plus
control):
 initiation
 planning and design
 execution and construction
 monitoring and controlling systems
 completion
TYPICAL DEVELOPMENT PHASES OF AN
ENGINEERING PROJECT
PROJECTS IN CONTROLLED ENVIRONMENTS,
VERSION 2 (PRINCE2)
 PRINCE2 is a structured approach to project
management released in 1996 as a generic
project management method. It combines the
original PROMPT methodology (which evolved
into the PRINCE methodology) with IBM's MITP
(managing the implementation of the total
project) methodology. PRINCE2 provides a
method for managing projects within a clearly
defined framework.
CONTD….
 PRINCE2 focuses on the definition and delivery of
products, in particular their quality requirements. As such,
it defines a successful project as being output-oriented
(not activity- or task-oriented) through creating an agreed
set of products that define the scope of the project and
provides the basis for planning and control, that is, how
then to coordinate people and activities, how to design
and supervise product delivery, and what to do if
products and therefore the scope of the project has to be
adjusted if it does not develop as planned.
CONTD….
CRITICAL CHAIN PROJECT MANAGEMENT
 Critical chain project management (CCPM) is a
method of planning and managing project execution
designed to deal with uncertainties inherent in
managing projects, while taking into consideration
limited availability of resources (physical, human
skills, as well as management & support capacity)
needed to execute projects.
PROCESS-BASED MANAGEMENT
 Process-based management is a management
approach that views a business as a collection of
processes. The processes are managed and
improved by organization in purpose of achieving
their vision, mission and core value. A clear
correlation between processes and the vision
supports the company to plan strategies, build a
business structure and use sufficient resources that
require to achieve success in the long run.
AGILE PROJECT MANAGEMENT
 Agile project management approaches, based on
the principles of human interaction management,
are founded on a process view of human
collaboration. It is "most typically used in software,
website, technology, creative and marketing
industries." This contrasts sharply with the
traditional approach. In the agile software
development or flexible product
development approach, the project is seen as a
series of relatively small tasks conceived and
executed to conclusion as the situation demands in
an adaptive manner, rather than as a completely
pre-planned process
CONTD….
LEAN PROJECT MANAGEMENT
 Lean project management is the comprehensive
adoption of other lean concepts like lean
construction, lean manufacturing and lean thinking
into a project management context. Lean project
management has many ideas in common with other
lean concepts; however, the main principle of lean
project management is delivering more value with
less waste in a project context. Lean project
management has many techniques that can be
applied to projects and one of main methods
is standardization.
EXTREME PROJECT MANAGEMENT (XPM)
 Extreme project management (XPM) refers to
a method of managing very complex and very
uncertain projects.
 Extreme project management differs from
traditional project management mainly in its open,
elastic and undeterministic approach. The main
focus of XPM is on the human side of project
management (e.g. managing project stakeholders),
rather than on intricate scheduling techniques and
heavy formalism.
BENEFITS REALISATION MANAGEMENT (BRM)
 Benefits realisation management
(BRM) (also benefits management or benefits
realisation) is one of the many ways of managing how
time and resources are invested into making
desirable changes. The popularity of BRM grew in the
UK with the inclusion of BRM by the UK Government in
their standardised approach to programmes, Managing
Successful Programmes (MSP).
 In addition, BRM practices aim to ensure the alignment
between project outcomes and business strategies. The
effectiveness of these practices is supported by recent
research evidencing BRM practices influencing project
success from a strategic perspective across different
countries and industries.
PROCESSES
 Initiating
 Planning and design
 Executing
 Monitoring and Controlling
 Closing
 Project controlling and project control systems
CONTD….
INITIATING
 The initiating
processes determine
the nature and scope
of the project. If this
stage is not performed
well, it is unlikely that
the project will be
successful in meeting
the business’ needs.
CONTD….
The initiating stage should include a plan that
encompasses the following areas:
 analyzing the business needs/requirements in
measurable goals
 reviewing of the current operations
 financial analysis of the costs and benefits including
a budget
 stakeholder analysis, including users, and support
personnel for the project
 project charter including costs, tasks, deliverables,
and schedule
PLANNING AND DESIGN
 After the initiation stage, the project is planned to
an appropriate level of detail . The main purpose is
to plan time, cost and resources adequately to
estimate the work needed and to effectively
manage risk during project execution.
CONTD….
Project planning generally consists of
 determining how to plan (e.g. by level of detail or rolling
wave);
 developing the scope statement;
 selecting the planning team;
 identifying deliverables and creating the work breakdown
structure;
 identifying the activities needed to complete those
deliverables and networking the activities in their logical
sequence;
 estimating the resource requirements for the activities;
 estimating time and cost for activities;
 developing the schedule;
 developing the budget;
 risk planning;
 gaining formal approval to begin work.
EXECUTING
 Executing consists of the processes used to
complete the work defined in the project plan to
accomplish the project's requirements. Execution
process involves coordinating people and
resources, as well as integrating and performing the
activities of the project in accordance with the
project management plan.
CONTD….
CONTD….
Execution process group include:
 Direct and manage project execution
 Quality assurance of deliverables
 Acquire, develop and manage Project team
 Distribute information
 Manage stakeholder expectations
 Conduct procurement
 Test the deliverables against the initial design
MONITORING AND CONTROLLING
 Monitoring and controlling consists of those
processes performed to observe project execution
so that potential problems can be identified in a
timely manner and corrective action can be taken,
when necessary, to control the execution of the
project.
CONTD….
CONTD….
Monitoring and controlling includes:
 Measuring the ongoing project activities ('where we
are');
 Monitoring the project variables (cost, effort, scope,
etc.) against the project management plan and the
project performance baseline (where we should
be);
 Identify corrective actions to address issues and
risks properly (How can we get on track again);
 Influencing the factors that could circumvent
integrated change control so only approved
changes are implemented.
MONITORING AND CONTROLLING CYCLE
CLOSING
 Closing includes the formal acceptance of the
project and the ending thereof. Administrative
activities include the archiving of the files and
documenting lessons learned.
This phase consists of:
 Contract closure: Complete and settle each
contract (including the resolution of any open items)
and close each contract applicable to the project or
project phase.
 Project close: Finalize all activities across all of the
process groups to formally close the project or a
project phase
CONTD….
PROJECT CONTROLLING AND PROJECT
CONTROL SYSTEMS
 Project controlling should be established as an independent
function in project management. It implements verification and
controlling function during the processing of a project in order
to reinforce the defined performance and formal goals.
The tasks of project controlling are also:
 the creation of infrastructure for the supply of the right
information and its update
 the establishment of a way to communicate disparities of
project parameters
 the development of project information technology based on
an intranet or the determination of a project key performance
index system (KPI)
 divergence analyses and generation of proposals for potential
project regulations
 the establishment of methods to accomplish an appropriate
project structure, project workflow organization, project control
and governance
 creation of transparency among the project parameters
CONTD….
Fulfillment and implementation of these tasks can
be achieved by applying specific methods and
instruments of project controlling. The following methods
of project controlling can be applied:
 investment analysis
 cost–benefit analyses
 value benefit Analysis
 expert surveys
 simulation calculations
 risk-profile analyses
 surcharge calculations
 milestone trend analysis
 cost trend analysis
 target/actual-comparison
REFERENCES….
 Y. Anjaneyulu, R. Marayya “ Quality Assurance and
Quality Management in Pharmaceutical Industry ”
Published by: PharmaMed Press, Hydrabad,2013
 Wikipedia/Project Management
 Wikipedia/Transfer of Technology
 Wikipedia/Project Planning
Transfer of technology and project planning and management

Transfer of technology and project planning and management

  • 1.
    PRESENTATION ON 1) TRANSFEROF TECHNOLOGY 2) PROJECT PLANNING AND MANAGEMENT  Ajit Kumar Jha  1st Sem. M.Pharm (Pharmaceutics)  School Of Pharmacy, Apeejay Stya University, Sohna, Haryana  Dr. Swati Gupta  Dept. Of Pharmaceutics  School Of Pharmacy, Apeejay Stya University, Sohna, Haryana Presented By: Presented To:
  • 2.
    WHAT IS TECHNOLOGYTRANSFER ?  Technology Transfer is the process by which technology is disseminated.  It involves communication of relevant knowledge by the Transferor to the Recipient.  It is in the form of technology transfer transaction which way or may not be a legally binding contract.
  • 3.
    CONTD….  WIPO saystechnology transfer (TOT) is:  “defined as transfer of new technologies from universities and research institutions to parties capable of commercialization”  or in the sense of transfer of technologies across international borders, generally from developed to developing countries.  Generally TOT consists of knowledge or IP rights that are:  licensed in the form of intellectual property,  the subject of formal consulting or training agreements,  communicated in the work place or research settings  diffused by publication or other means.
  • 4.
    CONTD….  Wikipedia says Technology transfer is the process of sharing of  skills, knowledge, technologies, methods of manufacturing, samples of manufacturing and facilities  among governments and other institutions  to ensure that scientific and technological developments are accessible to a wider range of users  who can then further develop and exploit the technology into  new products, processes, applications, materials or services.  It is closely related to (and may arguably be considered a subset of) knowledge transfer.
  • 5.
    CONTD…..  The referenceto  skills, knowledge, technologies, methods of manufacturing, samples of manufacturing and facilities is probably wide enough to refer to the subject of transfer  But there are more locations of transfer.Transfer can be  between Public Universities or Government Research Institutes and private industry  between the research and development (R&D) departments and the other departments of a single business  between various entities or branches of a business group  in a franchising operation from the franchisor to the franchisee  between international organisations and national organisations  between industrialised economies and developing economies
  • 6.
    WHAT IS TECHNOLOGYACQUISITION ? Twoterms technology transfer and technology are normally used interchangeably. The verb “Acquire” means  To come into possesion of; get as one’s own  To gain for oneself through one’s actions or efforts Technology Acquisition is the process of acquiring a new technology, new product, process or service ; by efforts of an individual or an enterprise or any other macro entity. This process can be conducted either internally or externally to the enterprise.
  • 7.
    TYPES OF TECHNOLOGYTRANSFER  Scientific Knowledge Transfer, Direct Technology Transfer, Spin-off Technology Transfer  Informal Technology Transfer & Formal Technology Transfer  Internal Technology Transfer & External Technology Transfer
  • 8.
    INTERNAL TECHNOLOGY TRANSFER InternalTechnology Transfer refer to such technology transfers/investments where control on the ownership & usage of technology resides with the transferor. It is a complex process involving following decisions:  Timing : When to introduce new technology / products in the market?  Location : Where to transfer new technology / products?  Multi-functional teams --Which staff members should be involved in transfer process ?  Communication methods & procedures – What type of Communication methods & procedures be adopted to facilitate transfer ?
  • 9.
    BARRIERS TO INTERNALTECHNOLOGY TRANSFER  R & D goals are not known to Production Department.  Difficulties in stopping current production to test new products / processes  R&D Department does not understand needs & capability of Production Department.  In general, Production Department is resistant to innovation and is bound by routine.  Non-linkage of new technologies to marketing / customer needs.
  • 10.
    STEPS IN INTERNALTECHNOLOGY ACQUISITION BY A FIRM 1. Planning new products / services / processes to be offered – planning must incorporate voice of the customer & user needs 2. Screening new products, processes or services – only viable / feasible items be offered as only one out of 4/5 becomes a commercial success. 3. Initiating development process – must be properly designed and carried out so that it facilitates success. Enterprises should a. Consist of temporary system capable of adapting to dymanics of change b. Organize the systems around problem solving
  • 11.
    STEPS IN INTERNALTECHNOLOGY ACQUISITION BY A FIRM c. Have flexible management system & replace rigid management system d. Use multi-functional teams. e. Proper integration between R&D, Production & Marketing sub-systems f. Ensure effective communication 4. Carrying out trial production on small scale and test marketing 5. Improving design & production processes based on experiences / feedback 6. Commercialization i.e. mass production & sales
  • 12.
    EXTERNAL TECHNOLOGY TRANSFER In these transfers, control on the ownership & usage of technology usually does not remain with transferor and it passes on to the recipient, like joint venture with local control, licensing agreement etc.
  • 13.
    EXTERNAL TECHNOLOGY TRANSFER Successfulexternal technology transfer depends upon following factors:  Type of the technology being transferred  Complexity of the technology being transferred  Transfer mechanism selected  Relationships between the parties – building of mutual trust  Core competencies of the parties & compatibilty thereof  Organizational culture of the parties & mutual understanding thereof
  • 14.
    METHODS OF EXTERNALTECHNOLOGY TRANSFER  Co-operative & collaborative ventures / strategic alliances  Licensing agreements  Contracting agreements  Enterprise acquisition.
  • 15.
    WHY EXTERNAL TECHNOLOGYTRANSFER  Technology already developed saves time & efforts  Sometimes Growth objectives or competitive goals cannot be reached through internal development  Lack of risk taking ability for innovations  Lack of internal resources (physical & human) for innovation  Firm does not have core competencies to deal with complex technological developments.  Need to keep up with competitors  Need to cope up with acceleration of technological change
  • 16.
    BARRIERS TO EXTERNALTECHNOLOGY TRANSFER  Associated costs – usually high prices are required to be paid in the form of royalities, technical & knowhow fees etc over medium to long term period  Appropriatesness of technology i.e. its suitability to core competencies and market needs is always a point of discussion and investigation  Heavy reliances on foreign technology- may make transferee / recipient technologically dependent on external technology providers / transferors even for small issues  Lack of mutual trust between two parties may hinder full & timely transfer
  • 17.
    BARRIERS TO EXTERNALTECHNOLOGY TRANSFER  There is risk of loss of control over technology and the transferee / recipient may use technology in an arbitrary manner  Transfer may render existing technology & its related products / services / processes obsolete  Transferee may turn a potential competitor in future.  Mismatch in core competencies of the transferor & transferee may create difficulties in transfer  Different organisation cultures may create difficulties in transfer  Lack of effective communication between the parties may also create difficulties in transfer
  • 18.
    STEPS IN EXTERNALTECHNOLOGY ACQUISITION BY A FIRM – 1. Identification of Need 2. Developing list of suitable technology providers 3. Short listing / selecting suitable technology providers on the basis …. Cultural compatibility, compatibility of core competences, appropriateness of technology, technical feasibility etc 4. Negotiation 5. Agreement 6. Payments as per agreement 7. Transfer of specifications, blueprints, designs, documents, CDs to purchaser 8. Training of technical personnel of purchaser
  • 19.
    MODES OF PAYMENTFOR TECHNOLOGY TRANSFER  Lumpsum payment or periodical instalments  Royalities as a %age of sales over next few years  Cross-licensing agreements  Contracted supply of output  Issue of equity shares in lieu of technology transferred
  • 20.
    WHY TECHNOLOGY TRANSFERTAKES PLACE?  To elucidate necessary information to transfer technology from R&D to actual manufacturing by sorting out various information obtained during R&D;  To elucidate necessary information to transfer technology of existing products between various manufacturing places; and  To exemplify specific procedures and points of concern for the two types of technology transfer in the above to contribute to smooth technology transfer.  Generally it has been seen that an organization forms alliances with other organization to make product viable and thus technology transfer occurs. These alliances may be:  The developer of the technology might have the resources to take the technology to particular state of development, such as up to animal studies and toxicology studies, but dose not have the resources to take the technology through its clinical and regulatory phases, and must collaborate with another organization to take it through these phases, and into the market.  The developer of the technology may have taken the technology to a state of development so that it is near market ready, but dose not have the clean room manufacturing capability or resources to manufacture the product, and must partner with another organization that dose have that capability.  Exploitation in a different field of application. Or the developer of technology has no commercial capabilities. Like universities or research campus.
  • 21.
    PROCESS OF TECHNOLOGYTRANSFER:  Technology transfer consists of action taken in these flows of development to realize through the quality as designed during the manufacture. Even if the production starts, the technology transfer will take place in process such as changes in manufacturing places.  The processes are classified into the three categories.  1. Research Phase  2. Development Phase  3. Production Phase  Research phase:  This phase is concerned with the quality design of the product. For Drug Products, the quality design corresponds to so called pharmaceuticals design-to-design properties and functions such as elimination of adverse reactions, improvement of efficacy, assurance of stability during distribution, and adding usefulness based on various data such as chemical and physical properties, efficacy, safety and stability obtained form preclinical studies.  For drug substance, the quality design is to determine starting materials and their reaction paths, and basic specification of the drug.
  • 22.
    CONTD….  Development Phase a.Research for Factory Production b. Consistency between Quality and Specification c. Assurance of consistency through development and manufacturing d. Technology Transfer from R&D to Production  Research for Factory Production  To manufacture drugs with qualities as designed, it is required to establish appropriate quality control method and manufacturing method, after detecting variability factors to secure stable quality in the scale-up validation that is performed to realize factory production of drug designed on the basis of result from small-scale experiments.  Consistency between Quality and Specification:  When product specification is established on the basis of the quality of product determined in the above, it is required to verify that the specification adequately specifies the product quality.  In short, the consistency between quality and specification is to ensure in the products specification that the quality predetermined in the quality design is assured as the manufacture quality, and the product satisfies the quality of design.
  • 23.
    CONTD….  Assurance ofconsistency through development and manufacturing:  To make developed product have indications as predetermined in clinical phases, the quality of design should be reproducible as the quality of product (assurance of consistency).  For this purpose, the transferring party in charge of development should fully understand what kind of technical information is required by the transferred party in charge of manufacturing, and should establish an appropriate evaluation method to determine whether a drug to be manufactured meets the quality of design.  Technology Transfer from R&D to Production:  Transfer of the technical information is necessary to realize manufacturing formula established in the above in the actual production facility. Technical information to be transfer should be compiled as R&D report.  Production Phase a. Phase validation & Production b. Feedback from production & technology transfer of marketed products  Phase Validation & Production:  Production is implemented after various validation studies verify that it is able to stably product based on transferred manufacturing formula. While the manufacturing facility accepting technology is responsible for validation, the research and development department transferring technology should take responsibility for validation such as performance qualification, cleaning validation, and process validation unique to subject drugs.
  • 24.
    CONTD…. Feed back fromProduction and Technology Transfer of Marketed Products:  Technical information of developed products are obtained from data of a limited amount of batches, various standards have been established from the limited data, and quality evaluation method established in development phase in not always sufficient for factory production, it is highly desired to feed back and accumulate technical information obtained from repeated production, if necessary. In addition, it is important to appropriately modify various standards established before based on this information, and accountability and responsibility for design and manufacturing should be executed.
  • 25.
    TECHNOLOGY TRANSFER DOCUMENTATION: Technology transfer documentation are generally interpreted as documents indicating contents of technology transfer for transferring and transferred parties. The raw data of the documents should be prepared and compiles according to purposed, and should be always readily available and traceable. For successful technology transfer, task assignments and responsibilities should be clarified, and acceptance criteria for the completion of technology transfer concerning individual technology to be transferred.  Quality assurance department should established conformation process for all kinds of technology transfer documentation, and should check and approve the documentation. Technology transfer documentation are indicated as follows:  1. Organization for Technology Transfer:  One of the most significant elements for successful technology transfer is closed communication between transferring and transferred parties. Therefore, organization for technology transfer should be established and composed of both party members, roles, scope of responsibilities of each party should be clarified and adequate communication, and feedback of information should be ensured. It is desirable that this organization complies with GMP.  2. Research and Development Report:  To realize quality assurance at all stages from drug development to manufacturing, transfer to manufacturing, transfer of technical documents concerning product development or corresponding documents should be considered.
  • 26.
    CONTD….  The researchand development report (development report) is a file of technical development, and the research and development department is in charge of its documentation. Informations to be contained in the development report are:  a. Historical data of pharmaceutical development of new drug substances and drug products at  stages from early development phase to final application of approval.  b. Raw materials and components.  c. Synthetic route.  d. Rational for dosage form & formula designs and design of manufacturing methods.  e. Rational and change histories of important processes and control parameters.  f. Quality Profiles of manufacturing batches ( including stability data).  g. Specifications and test methods of drug substances, intermediates, drug products, raw materials, and components, and their rationale.  3. Product Specification File:  The product specification is to compile information, which enables the manufacture of the product, and to define specification, manufacturing and evaluations method of the product and its quality, and the transferring party is responsible for documenting the file. The product specification file should be reviewed at regular intervals, and incorporate various information obtained after the start of production of the product, and be revised as appropriate.  For new products, the development report can be used as a part of product specification file.
  • 27.
    CONTD….  4. TechnologyTransfer Plan:  The technology transfer plan is to describe items and contents of technology to be transferred and detailed procedures of individual transfer and transfer schedule, and establish judgment criteria for the completion of the transfer. The transferring party should prepare the plan before the implementation of the transfer, and reach an agreement on its contents with the transferred party.  5. Technology Transfer Report:  It is to report the completion of technology transfer after data of action taken according to the technology plan is evaluated and the data is confirmed pursuant to the predetermined judgment criteria. Both transferring and transferred parties can document the technology transfer report; however, they should reach an agreement on its contents.  6. Verification of Results of Technology Transfer:  After the completion of technology transfer and before the start of manufacturing of the product, the transferring party should verify with appropriate methods such as product testing and audit that the product manufactured after the technology transfer meets the predetermined quality and should maintain records of the results. 
  • 28.
    CONCLUSION:  In pharmaceuticalindustry technology transfer means action to transfer information and technologies necessary to realize quality of design of drugs during manufacturing. Appropriate technology transfer is important to upgrade the quality of design to be the quality of product, and ensure stable and high quality of the product. The technology transfer does not mean one-time actions taken by the transferring party toward the transferred party, but means continuous information exchange between the both parties to maintain the product manufacturing.  The consistency in product quality, in this competitive environment require the transfer of skills in personnel and the transfer of process too. Current scenario demands the technology transfer with in and out sourcing technology transfer.
  • 30.
    WHAT IS PROJECT? The word project comes from the Latin word projectum from the Latin verb proicere, "before an action" which in turn comes from pro-, which denotes precedence, something that comes before something else in time (paralleling the Greek πρό) and iacere, "to do". The word "project" thus actually originally meant "before an action".
  • 31.
    CONTD….  In contemporarybusiness and science a project is defined as a collaborative enterprise, involving research or design, that is carefully planned to achieve a particular aim.  Projects can be further defined as temporary rather than permanent social systems or work systems that are constituted by teams within or across organizations to accomplish particular tasks under time constraints. An on-going project is usually called (or evolves into) a program.
  • 32.
    WHAT IS PROJECTMANAGEMENT?  Project management is the process and activity of planning, organizing, motivating, and controlling resources, procedures and protocols to achieve specific goals in scientific or daily problems.  A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time- constrained, and often constrained by funding or deliverables), undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value.
  • 33.
    CONTD….  The primarychallenge of project management is to achieve all of the project goals and objectives while honoring the preconceived constraints. The primary constraints are scope, time, quality and budget. The secondary — and more ambitious — challenge is to optimize the allocation of necessary inputs and integrate them to meet pre-defined objectives.
  • 34.
    APPROACHES  The traditionalapproach  PRINCE2  Critical chain project management  Process-based management  Agile project management  Lean project management  Extreme project management  Benefits realization management
  • 35.
    THE TRADITIONAL APPROACH A traditional phased approach identifies a sequence of steps to be completed. In the "traditional approach", five developmental components of a project can be distinguished (four stages plus control):  initiation  planning and design  execution and construction  monitoring and controlling systems  completion
  • 36.
    TYPICAL DEVELOPMENT PHASESOF AN ENGINEERING PROJECT
  • 37.
    PROJECTS IN CONTROLLEDENVIRONMENTS, VERSION 2 (PRINCE2)  PRINCE2 is a structured approach to project management released in 1996 as a generic project management method. It combines the original PROMPT methodology (which evolved into the PRINCE methodology) with IBM's MITP (managing the implementation of the total project) methodology. PRINCE2 provides a method for managing projects within a clearly defined framework.
  • 38.
    CONTD….  PRINCE2 focuseson the definition and delivery of products, in particular their quality requirements. As such, it defines a successful project as being output-oriented (not activity- or task-oriented) through creating an agreed set of products that define the scope of the project and provides the basis for planning and control, that is, how then to coordinate people and activities, how to design and supervise product delivery, and what to do if products and therefore the scope of the project has to be adjusted if it does not develop as planned.
  • 39.
  • 40.
    CRITICAL CHAIN PROJECTMANAGEMENT  Critical chain project management (CCPM) is a method of planning and managing project execution designed to deal with uncertainties inherent in managing projects, while taking into consideration limited availability of resources (physical, human skills, as well as management & support capacity) needed to execute projects.
  • 41.
    PROCESS-BASED MANAGEMENT  Process-basedmanagement is a management approach that views a business as a collection of processes. The processes are managed and improved by organization in purpose of achieving their vision, mission and core value. A clear correlation between processes and the vision supports the company to plan strategies, build a business structure and use sufficient resources that require to achieve success in the long run.
  • 42.
    AGILE PROJECT MANAGEMENT Agile project management approaches, based on the principles of human interaction management, are founded on a process view of human collaboration. It is "most typically used in software, website, technology, creative and marketing industries." This contrasts sharply with the traditional approach. In the agile software development or flexible product development approach, the project is seen as a series of relatively small tasks conceived and executed to conclusion as the situation demands in an adaptive manner, rather than as a completely pre-planned process
  • 43.
  • 44.
    LEAN PROJECT MANAGEMENT Lean project management is the comprehensive adoption of other lean concepts like lean construction, lean manufacturing and lean thinking into a project management context. Lean project management has many ideas in common with other lean concepts; however, the main principle of lean project management is delivering more value with less waste in a project context. Lean project management has many techniques that can be applied to projects and one of main methods is standardization.
  • 45.
    EXTREME PROJECT MANAGEMENT(XPM)  Extreme project management (XPM) refers to a method of managing very complex and very uncertain projects.  Extreme project management differs from traditional project management mainly in its open, elastic and undeterministic approach. The main focus of XPM is on the human side of project management (e.g. managing project stakeholders), rather than on intricate scheduling techniques and heavy formalism.
  • 46.
    BENEFITS REALISATION MANAGEMENT(BRM)  Benefits realisation management (BRM) (also benefits management or benefits realisation) is one of the many ways of managing how time and resources are invested into making desirable changes. The popularity of BRM grew in the UK with the inclusion of BRM by the UK Government in their standardised approach to programmes, Managing Successful Programmes (MSP).  In addition, BRM practices aim to ensure the alignment between project outcomes and business strategies. The effectiveness of these practices is supported by recent research evidencing BRM practices influencing project success from a strategic perspective across different countries and industries.
  • 47.
    PROCESSES  Initiating  Planningand design  Executing  Monitoring and Controlling  Closing  Project controlling and project control systems
  • 48.
  • 49.
    INITIATING  The initiating processesdetermine the nature and scope of the project. If this stage is not performed well, it is unlikely that the project will be successful in meeting the business’ needs.
  • 50.
    CONTD…. The initiating stageshould include a plan that encompasses the following areas:  analyzing the business needs/requirements in measurable goals  reviewing of the current operations  financial analysis of the costs and benefits including a budget  stakeholder analysis, including users, and support personnel for the project  project charter including costs, tasks, deliverables, and schedule
  • 51.
    PLANNING AND DESIGN After the initiation stage, the project is planned to an appropriate level of detail . The main purpose is to plan time, cost and resources adequately to estimate the work needed and to effectively manage risk during project execution.
  • 52.
    CONTD…. Project planning generallyconsists of  determining how to plan (e.g. by level of detail or rolling wave);  developing the scope statement;  selecting the planning team;  identifying deliverables and creating the work breakdown structure;  identifying the activities needed to complete those deliverables and networking the activities in their logical sequence;  estimating the resource requirements for the activities;  estimating time and cost for activities;  developing the schedule;  developing the budget;  risk planning;  gaining formal approval to begin work.
  • 53.
    EXECUTING  Executing consistsof the processes used to complete the work defined in the project plan to accomplish the project's requirements. Execution process involves coordinating people and resources, as well as integrating and performing the activities of the project in accordance with the project management plan.
  • 54.
  • 55.
    CONTD…. Execution process groupinclude:  Direct and manage project execution  Quality assurance of deliverables  Acquire, develop and manage Project team  Distribute information  Manage stakeholder expectations  Conduct procurement  Test the deliverables against the initial design
  • 56.
    MONITORING AND CONTROLLING Monitoring and controlling consists of those processes performed to observe project execution so that potential problems can be identified in a timely manner and corrective action can be taken, when necessary, to control the execution of the project.
  • 57.
  • 58.
    CONTD…. Monitoring and controllingincludes:  Measuring the ongoing project activities ('where we are');  Monitoring the project variables (cost, effort, scope, etc.) against the project management plan and the project performance baseline (where we should be);  Identify corrective actions to address issues and risks properly (How can we get on track again);  Influencing the factors that could circumvent integrated change control so only approved changes are implemented.
  • 59.
  • 60.
    CLOSING  Closing includesthe formal acceptance of the project and the ending thereof. Administrative activities include the archiving of the files and documenting lessons learned. This phase consists of:  Contract closure: Complete and settle each contract (including the resolution of any open items) and close each contract applicable to the project or project phase.  Project close: Finalize all activities across all of the process groups to formally close the project or a project phase
  • 61.
  • 62.
    PROJECT CONTROLLING ANDPROJECT CONTROL SYSTEMS  Project controlling should be established as an independent function in project management. It implements verification and controlling function during the processing of a project in order to reinforce the defined performance and formal goals. The tasks of project controlling are also:  the creation of infrastructure for the supply of the right information and its update  the establishment of a way to communicate disparities of project parameters  the development of project information technology based on an intranet or the determination of a project key performance index system (KPI)  divergence analyses and generation of proposals for potential project regulations  the establishment of methods to accomplish an appropriate project structure, project workflow organization, project control and governance  creation of transparency among the project parameters
  • 63.
    CONTD…. Fulfillment and implementationof these tasks can be achieved by applying specific methods and instruments of project controlling. The following methods of project controlling can be applied:  investment analysis  cost–benefit analyses  value benefit Analysis  expert surveys  simulation calculations  risk-profile analyses  surcharge calculations  milestone trend analysis  cost trend analysis  target/actual-comparison
  • 64.
    REFERENCES….  Y. Anjaneyulu,R. Marayya “ Quality Assurance and Quality Management in Pharmaceutical Industry ” Published by: PharmaMed Press, Hydrabad,2013  Wikipedia/Project Management  Wikipedia/Transfer of Technology  Wikipedia/Project Planning