SlideShare a Scribd company logo
Services and Manufacturing
WELCOME TO
ViENERG RESOURCES PVT
LTD
INDIA
Engineering Services
Once an Oil & Gas Industry /Company/ Entrepreneur
decides to go ahead with a product, the next step is to
approach a professional engineering design service provider.
Engineering design Services are nothing but , transform the
Customer needs & requirements into complete new product
Products are visualized through 3D modelling before
manufacturing. New product development covers the
engineering disciplines like Process, Mechanical, Structural,
Instrumentation , Electrical , QA/QC and production in the
whole process.
Capturing the voice of Customer
Understanding and Knowing the customer
needs/request is the main scope for every
successful business.
By Focussing on your customer needs and
requirements ,and developing the culture of
excellence in responsive customer service
within the firm, you can increase customer
loyalty and also ensure that the customers
continue to comeback.
Identifying the design needs
This process begins
with feasibility study of
Customer inputs details
mainly pressure,
temperature and project
design data and
requirements.
Once the input has
been selected, assign
a project team, that
team will prepare
detail necessary to
develop the model.
Conceptual design
It is the initial phase of design, the
selected model is simulated using
softwares (i.e., Hysys, HTRI, etc based
upon the equipment).
This preliminary model showing the ideas
of the product and it is the method of
determining the performance guarantee of
the products.
Design Development
The
Engineering
Design
Services Team
begins with
Preparation of
detailed process
&
instrumentatio
n diagram.
Preparation of
PFD with
major control
system
Preparation of
GA drawing
Submission of
drawings for
approval of
scheme from
clients.
Documentation
Documentation is the most important
thing in Design service ,it obviously
explains the solutions to your design ,so
someone can easily understand what you
have done.
Documentation consists of reports like
design and Technical .
Generation of 3Dmodels and
manufacturing drawings undergo some
reviews for the approval.
Approval from Clients
After reviewing the
engineering drawings,
clients return the signed
agreement. An Engineer
is assigned to review the
documents.
Once all the items in the
proposal are received
correctly and mutually
agreed, we got approved
from our clients. We
proceeding with next level.
Product development process
Design Engineering is the main for the successful product. Our Skid
packages includes Vessel, Strctural skid, piping and instrumentation.
STEP 1 : Detailed engineering and development of fabrication drawing for
Vessel, structural skid and piping isometrics.
STEP 2 : Sharing of documents with client for any additional requirements
if any.
STEP 3 : Procurement of raw materials such as Plates, pipes, flanges,
fittings for manufacturing.
STEP 4 : Fabrication drawings will be issued to shop floor along with
project schedule.
STEP 5: Based upon project schedule , project engineers will allocate man
power and consumable requirements to meet the schedule.
Quality & Certification
The process of ensuring quality of the product.
•STEP 1 : Preparation of Inspection and Test plan.
•STEP 2 : Invite approved Quality engineer or Notify
body for material inspection to check material inline
with technical delivery condition from design.
•STEP 3 : Welder qualification and welding
prequalification.
•STEP 4 : Cutting, grinding and fit up as per approved
shop floor drawing received from engineering.
•STEP 5 : Welding of fit up materials and offering for
testing the welding quality for repairs if any.
•STEP 6 : Heat treatment.
•STEP 7 : Manufactured material is inspected and
witnessed by Notify body or client .
•This Quality mark demonstrates the products or
service meets the requirements of industry standards.
Product
•Certification is very essential for Quality system.
Testing & Painting
After quality passed
material is tested for
design pressure to ensure
equipment should not get
failed in field , same will be
witnessed by Notify body /
client.
After passing of
Hydrotest,
equipment is sent
for painting and
final assembly.
Equipment is
finally tested in
front of client in
assembled
condition for any
leak.
Dispatch
After completion of all the process , Packing
and preservation will be carried out as per
following procedures such as water in the
equipment is fully drained, placing moisture
absorbing packs, closing all open ends with
wooden blanks instruments are protected by
air bubble wrappers and ensuring equipment
is fully safe from damage during
transportation.
Now equipment is ready for Dispatch
with safety warning sign boards such
as how to lift and handle during
transportation.
Top 10 signs you should do in engineering

More Related Content

What's hot

I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelCCT International
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTmustafa hussain
 
AIRMAX Company Profile
AIRMAX Company ProfileAIRMAX Company Profile
AIRMAX Company ProfileShibu John
 
Temperature controller calibration
Temperature controller calibrationTemperature controller calibration
Temperature controller calibrationabhishekabhi123
 
How Quality Importance on Constructions
How Quality Importance on Constructions How Quality Importance on Constructions
How Quality Importance on Constructions Walid AlSarady
 
Construction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesConstruction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesSlideTeam
 

What's hot (11)

I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation ModelI3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
I3M 2013 – EMSS Conference - Pipe Spool Fabrication Simulation Model
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
 
AIRMAX Company Profile
AIRMAX Company ProfileAIRMAX Company Profile
AIRMAX Company Profile
 
1. CV Ferly 2016
1. CV Ferly 20161. CV Ferly 2016
1. CV Ferly 2016
 
Temperature controller calibration
Temperature controller calibrationTemperature controller calibration
Temperature controller calibration
 
Quality application
Quality applicationQuality application
Quality application
 
How Quality Importance on Constructions
How Quality Importance on Constructions How Quality Importance on Constructions
How Quality Importance on Constructions
 
OmexEngBrochure
OmexEngBrochureOmexEngBrochure
OmexEngBrochure
 
Hvac services
Hvac servicesHvac services
Hvac services
 
Techno_Brochure
Techno_BrochureTechno_Brochure
Techno_Brochure
 
Construction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesConstruction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation Slides
 

Similar to Top 10 signs you should do in engineering

The ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process FlowThe ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process FlowKaysun Corporation
 
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesThe ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesKaysun Corporation
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerCHETAN SHARMA
 
TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and ProcessesTechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and ProcessesKabeed Mansur
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERjaved hazari
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionJayavendhanJ
 
RESUME LEKHRAM PATEL
RESUME LEKHRAM PATELRESUME LEKHRAM PATEL
RESUME LEKHRAM PATELlekhram patel
 
C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.Suhail Khan
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerOmer Mohammed
 

Similar to Top 10 signs you should do in engineering (20)

The ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process FlowThe ROI of Improved Injection Molding Process Flow
The ROI of Improved Injection Molding Process Flow
 
Husains CV
Husains CVHusains CV
Husains CV
 
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact OutcomesThe ROI of Improved Project Flow: How Injection Molders Impact Outcomes
The ROI of Improved Project Flow: How Injection Molders Impact Outcomes
 
RADIX Presentation
RADIX PresentationRADIX Presentation
RADIX Presentation
 
Chetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical EngineerChetan Sharma - Mechanical Engineer
Chetan Sharma - Mechanical Engineer
 
Work Background and Activities
Work Background and ActivitiesWork Background and Activities
Work Background and Activities
 
TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and ProcessesTechOut Solutions, LLC - A Short Introduction to Our Services and Processes
TechOut Solutions, LLC - A Short Introduction to Our Services and Processes
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I Introduction
 
Pranav.Varshney
Pranav.VarshneyPranav.Varshney
Pranav.Varshney
 
InHand's Project Developement Process
InHand's Project Developement Process InHand's Project Developement Process
InHand's Project Developement Process
 
Resume
ResumeResume
Resume
 
RESUME LEKHRAM PATEL
RESUME LEKHRAM PATELRESUME LEKHRAM PATEL
RESUME LEKHRAM PATEL
 
C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
 
Vijay_C-CV
Vijay_C-CVVijay_C-CV
Vijay_C-CV
 
Mechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed OmerMechanical Engineer-Mohammed Omer
Mechanical Engineer-Mohammed Omer
 
sounder
soundersounder
sounder
 
SUFIYAN HVAC CV
SUFIYAN HVAC CVSUFIYAN HVAC CV
SUFIYAN HVAC CV
 

More from vijaya Lakshmi

Chemical injection skid by Vienerg Resources Private Limited
Chemical injection skid by Vienerg Resources Private LimitedChemical injection skid by Vienerg Resources Private Limited
Chemical injection skid by Vienerg Resources Private Limitedvijaya Lakshmi
 
5 effective principles
5 effective principles5 effective principles
5 effective principlesvijaya Lakshmi
 
5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESS
5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESS5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESS
5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESSvijaya Lakshmi
 

More from vijaya Lakshmi (7)

Chemical injection skid by Vienerg Resources Private Limited
Chemical injection skid by Vienerg Resources Private LimitedChemical injection skid by Vienerg Resources Private Limited
Chemical injection skid by Vienerg Resources Private Limited
 
New year 2015
New year  2015New year  2015
New year 2015
 
5 effective principles
5 effective principles5 effective principles
5 effective principles
 
5 'i' 1
5 'i' 15 'i' 1
5 'i' 1
 
5 'i' 2
5 'i' 25 'i' 2
5 'i' 2
 
INITIATION
INITIATIONINITIATION
INITIATION
 
5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESS
5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESS5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESS
5 EFFECTIVE WAYS FOR SUCCESSFUL BUSINESS
 

Recently uploaded

Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisDr. Radhey Shyam
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxCenterEnamel
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdfKamal Acharya
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageRCC Institute of Information Technology
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfKamal Acharya
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 

Recently uploaded (20)

Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data AnalysisIT-601 Lecture Notes-UNIT-2.pdf Data Analysis
IT-601 Lecture Notes-UNIT-2.pdf Data Analysis
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docxThe Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
The Ultimate Guide to External Floating Roofs for Oil Storage Tanks.docx
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Toll tax management system project report..pdf
Toll tax management system project report..pdfToll tax management system project report..pdf
Toll tax management system project report..pdf
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Scaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltageScaling in conventional MOSFET for constant electric field and constant voltage
Scaling in conventional MOSFET for constant electric field and constant voltage
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 

Top 10 signs you should do in engineering

  • 1. Services and Manufacturing WELCOME TO ViENERG RESOURCES PVT LTD INDIA
  • 2. Engineering Services Once an Oil & Gas Industry /Company/ Entrepreneur decides to go ahead with a product, the next step is to approach a professional engineering design service provider. Engineering design Services are nothing but , transform the Customer needs & requirements into complete new product Products are visualized through 3D modelling before manufacturing. New product development covers the engineering disciplines like Process, Mechanical, Structural, Instrumentation , Electrical , QA/QC and production in the whole process.
  • 3. Capturing the voice of Customer Understanding and Knowing the customer needs/request is the main scope for every successful business. By Focussing on your customer needs and requirements ,and developing the culture of excellence in responsive customer service within the firm, you can increase customer loyalty and also ensure that the customers continue to comeback.
  • 4. Identifying the design needs This process begins with feasibility study of Customer inputs details mainly pressure, temperature and project design data and requirements. Once the input has been selected, assign a project team, that team will prepare detail necessary to develop the model.
  • 5. Conceptual design It is the initial phase of design, the selected model is simulated using softwares (i.e., Hysys, HTRI, etc based upon the equipment). This preliminary model showing the ideas of the product and it is the method of determining the performance guarantee of the products.
  • 6. Design Development The Engineering Design Services Team begins with Preparation of detailed process & instrumentatio n diagram. Preparation of PFD with major control system Preparation of GA drawing Submission of drawings for approval of scheme from clients.
  • 7. Documentation Documentation is the most important thing in Design service ,it obviously explains the solutions to your design ,so someone can easily understand what you have done. Documentation consists of reports like design and Technical . Generation of 3Dmodels and manufacturing drawings undergo some reviews for the approval.
  • 8. Approval from Clients After reviewing the engineering drawings, clients return the signed agreement. An Engineer is assigned to review the documents. Once all the items in the proposal are received correctly and mutually agreed, we got approved from our clients. We proceeding with next level.
  • 9. Product development process Design Engineering is the main for the successful product. Our Skid packages includes Vessel, Strctural skid, piping and instrumentation. STEP 1 : Detailed engineering and development of fabrication drawing for Vessel, structural skid and piping isometrics. STEP 2 : Sharing of documents with client for any additional requirements if any. STEP 3 : Procurement of raw materials such as Plates, pipes, flanges, fittings for manufacturing. STEP 4 : Fabrication drawings will be issued to shop floor along with project schedule. STEP 5: Based upon project schedule , project engineers will allocate man power and consumable requirements to meet the schedule.
  • 10. Quality & Certification The process of ensuring quality of the product. •STEP 1 : Preparation of Inspection and Test plan. •STEP 2 : Invite approved Quality engineer or Notify body for material inspection to check material inline with technical delivery condition from design. •STEP 3 : Welder qualification and welding prequalification. •STEP 4 : Cutting, grinding and fit up as per approved shop floor drawing received from engineering. •STEP 5 : Welding of fit up materials and offering for testing the welding quality for repairs if any. •STEP 6 : Heat treatment. •STEP 7 : Manufactured material is inspected and witnessed by Notify body or client . •This Quality mark demonstrates the products or service meets the requirements of industry standards. Product •Certification is very essential for Quality system.
  • 11. Testing & Painting After quality passed material is tested for design pressure to ensure equipment should not get failed in field , same will be witnessed by Notify body / client. After passing of Hydrotest, equipment is sent for painting and final assembly. Equipment is finally tested in front of client in assembled condition for any leak.
  • 12. Dispatch After completion of all the process , Packing and preservation will be carried out as per following procedures such as water in the equipment is fully drained, placing moisture absorbing packs, closing all open ends with wooden blanks instruments are protected by air bubble wrappers and ensuring equipment is fully safe from damage during transportation. Now equipment is ready for Dispatch with safety warning sign boards such as how to lift and handle during transportation.