About Impact Solutions:
Impact Solutions is one of the uniquely positioned engineering and safety solution provider serving
industrial customers around the world. Our Goal is to provide complete engineered systems from
start to finish.
Impact Solutions has operations in USA, Saudi Arabia, Philippines and India to support our customers
ever expanding operations worldwide.
With Engineering and Manufacturing support facilities in 4 countries; Saudi Arabia, India, United
States and Philippines with additional offices and manufacturing facilities being prepared in other
low cost locals we are aggressively building our organization to provide cost effective solutions to
our clients ever expanding need for value engineering support and cost effective manufacturing
solutions.
We go to great lengths to solidify our customer relations by focusing on a low cost, high quality
engineering model. Building our organization to support our customers’ wide array of engineering
and technical needs is our principal focus and we endeavour to be an essential resource for our
customer’
Impact Solutions provides Electrical, Control system and instrumentation consulting, project
management, engineering, application, and construction management for power plants,
petrochemical plants, upstream oil & gas and refineries. Specialized in retrofits and upgrade
projects.
Impact Solutions manufacturing is a manufacturer of Control Panels, Remote Instrument Enclosures,
MCC buildings, Marshalling Cabinets, Substations, Metering Panels and Remote Buildings. We also
provide networking services, fiber optic systems & layouts and construction services.
We specialize in design and manufacturing of facility safety products that originate in the Kingdom of
Saudi Arabia. All designs are cognizant of customer input from the outset; the designs are conceived
on the customers wish-list of ‘would like to have’s’ to implement as a safety management features.
In addition, Impact Solutions Bangalore office (Kyoto Engineering Services) has expertise that
includes (but not limited to) MEP Design and Drafting service, HVAC Design and Drafting service,
Structural Steel Design & Detailing, Piping Design service, Oil and Gas Pipeline, Isometric drawing
preparation. We have a Group of well qualified Engineers with a Vast Experience ranging up to 10+
years in these fields.
Services Focus:
(Engineering, Design and Start up)
Safety & Security Products: InPhiSA IT Programming Services
• Empasys – Plant Safety Management System
• PerTrax – On person RFID badge tracker
• EmergTrax – Emergency Personnel GPS Tracker
• AutoTrax – Vehicle GPS Tracker
• Personnel Muster Point Logger – Solar Powered Emergency Personnel Real-Time Reporter
• HealthTrax – Wearable Health Monitor w/GPS
HVAC Design and Drafting Services:
• Heating and cooling equipment selection and schematic design
• Heat loss and gain calculations
• Plant room layout design
• Fire protection system design
• Duct layout drawings
• Shop/ Fabrication Drawings
Oil & Gas, Process:
• Control system upgrade
• Database Development
• PLC/DCS programming
• Complex loop design
• Logic development
• Field survey & Design engineering
• Control room layout
• Cable trays, Cable schedules
• Electrical Design
• AutoCAD, Solidworks, Sketchup and Micro station
• HMI development
• Safety systems
• Batch applications
• Complex loops tuning and start up
• RIEs and Control room modernization
Figure 1 - Muster Point Logger
Various Structural Engineering Services we offer includes:
• Structural Design Services
• Structural Drafting Services
• Steel Detailing Services
• Structural Modeling Services
• Structural Analysis
• Construction Drawing Services
• Structural Shop Drawings
Impact Solutions Manufacturing:
(Manufacturing and Panel Fabrication)
• Project Engineering/ Project Management
• Sub Stations
• Marshalling Cabinets
• Junction Boxes and Control Panels
• Metering Panels
• IT and Fiber Optics architecture and layouts
• Construction Services
Impact Solutions India: Kyoto Engineering Services
OUR LOW COST ENGINEERING SOLUTIONS CENTER – Bangalore
Electrical Design and Drafting Services
• Design and Drafting of Lighting, Power Systems
• Electrical, Power and Lighting System plans
• Electrical Panel Schedules
• Electrical One Line Diagrams
• Electrical Power and Lighting System Plans
• BMS/Access Control/ CCTV/ Telecommunication/ System Integration/ PA Systems
• Layouts for lighting showing lighting fixtures, emergency lighting
Plumbing Design and Drafting Services
• Plumbing Design and Drafting Services
• Plumbing Cost and Material Estimation
• Plumbing Modeling
• Plumbing Shop and Section Drawings
• Piping Modeling and Drafting
• Piping 2D Drafting
• Pipe Fabrication Drawings
• Pipe Restoration Drawings
• Water Line Installation System Drawings
Contact Position Location Office Phone Mobile
Rick Olivarez Business
Development
Al Jubail +966563730141
Manila +63222557944 +639212842210
Houston, TX +007138448054
Jenifer Cabales InPhiSA
Division
Manager
Manila,
Philippines
+63222553399 +639167707361
Safeena Ara
Bathul
Kyoto Eng
Division
Manager
Bangalore,
India
+918042007798 +917847871847
Established Offices in the Kingdom of Saudi Arabia, India, USA and
Philippines
 Cost Effective means for project execution
 Savings on your overhead, manpower and management cost
 Savings can be realized on overall project cost
 Time-Zone Difference provides advantages when schedule is on critical path

Impact solutions 2015

  • 1.
    About Impact Solutions: ImpactSolutions is one of the uniquely positioned engineering and safety solution provider serving industrial customers around the world. Our Goal is to provide complete engineered systems from start to finish. Impact Solutions has operations in USA, Saudi Arabia, Philippines and India to support our customers ever expanding operations worldwide. With Engineering and Manufacturing support facilities in 4 countries; Saudi Arabia, India, United States and Philippines with additional offices and manufacturing facilities being prepared in other low cost locals we are aggressively building our organization to provide cost effective solutions to our clients ever expanding need for value engineering support and cost effective manufacturing solutions. We go to great lengths to solidify our customer relations by focusing on a low cost, high quality engineering model. Building our organization to support our customers’ wide array of engineering and technical needs is our principal focus and we endeavour to be an essential resource for our customer’ Impact Solutions provides Electrical, Control system and instrumentation consulting, project management, engineering, application, and construction management for power plants, petrochemical plants, upstream oil & gas and refineries. Specialized in retrofits and upgrade projects. Impact Solutions manufacturing is a manufacturer of Control Panels, Remote Instrument Enclosures, MCC buildings, Marshalling Cabinets, Substations, Metering Panels and Remote Buildings. We also provide networking services, fiber optic systems & layouts and construction services. We specialize in design and manufacturing of facility safety products that originate in the Kingdom of Saudi Arabia. All designs are cognizant of customer input from the outset; the designs are conceived on the customers wish-list of ‘would like to have’s’ to implement as a safety management features. In addition, Impact Solutions Bangalore office (Kyoto Engineering Services) has expertise that includes (but not limited to) MEP Design and Drafting service, HVAC Design and Drafting service, Structural Steel Design & Detailing, Piping Design service, Oil and Gas Pipeline, Isometric drawing preparation. We have a Group of well qualified Engineers with a Vast Experience ranging up to 10+ years in these fields.
  • 2.
    Services Focus: (Engineering, Designand Start up) Safety & Security Products: InPhiSA IT Programming Services • Empasys – Plant Safety Management System • PerTrax – On person RFID badge tracker • EmergTrax – Emergency Personnel GPS Tracker • AutoTrax – Vehicle GPS Tracker • Personnel Muster Point Logger – Solar Powered Emergency Personnel Real-Time Reporter • HealthTrax – Wearable Health Monitor w/GPS HVAC Design and Drafting Services: • Heating and cooling equipment selection and schematic design • Heat loss and gain calculations • Plant room layout design • Fire protection system design • Duct layout drawings • Shop/ Fabrication Drawings Oil & Gas, Process: • Control system upgrade • Database Development • PLC/DCS programming • Complex loop design • Logic development • Field survey & Design engineering • Control room layout • Cable trays, Cable schedules • Electrical Design • AutoCAD, Solidworks, Sketchup and Micro station • HMI development • Safety systems • Batch applications • Complex loops tuning and start up • RIEs and Control room modernization Figure 1 - Muster Point Logger
  • 3.
    Various Structural EngineeringServices we offer includes: • Structural Design Services • Structural Drafting Services • Steel Detailing Services • Structural Modeling Services • Structural Analysis • Construction Drawing Services • Structural Shop Drawings Impact Solutions Manufacturing: (Manufacturing and Panel Fabrication) • Project Engineering/ Project Management • Sub Stations • Marshalling Cabinets • Junction Boxes and Control Panels • Metering Panels • IT and Fiber Optics architecture and layouts • Construction Services Impact Solutions India: Kyoto Engineering Services OUR LOW COST ENGINEERING SOLUTIONS CENTER – Bangalore Electrical Design and Drafting Services • Design and Drafting of Lighting, Power Systems • Electrical, Power and Lighting System plans • Electrical Panel Schedules • Electrical One Line Diagrams • Electrical Power and Lighting System Plans • BMS/Access Control/ CCTV/ Telecommunication/ System Integration/ PA Systems • Layouts for lighting showing lighting fixtures, emergency lighting Plumbing Design and Drafting Services • Plumbing Design and Drafting Services • Plumbing Cost and Material Estimation • Plumbing Modeling • Plumbing Shop and Section Drawings • Piping Modeling and Drafting • Piping 2D Drafting • Pipe Fabrication Drawings • Pipe Restoration Drawings • Water Line Installation System Drawings
  • 4.
    Contact Position LocationOffice Phone Mobile Rick Olivarez Business Development Al Jubail +966563730141 Manila +63222557944 +639212842210 Houston, TX +007138448054 Jenifer Cabales InPhiSA Division Manager Manila, Philippines +63222553399 +639167707361 Safeena Ara Bathul Kyoto Eng Division Manager Bangalore, India +918042007798 +917847871847 Established Offices in the Kingdom of Saudi Arabia, India, USA and Philippines  Cost Effective means for project execution  Savings on your overhead, manpower and management cost  Savings can be realized on overall project cost  Time-Zone Difference provides advantages when schedule is on critical path