SlideShare a Scribd company logo
0
TOP 10 MOST IMPORTANT
MANUFACTURING
PERFORMANCE INDICATORS
IN 2019
The goal of every manufacturing business is to be as efficient, innovative and
flexible as possible. An effective manufacturing operation can offer its
customers a wider range of services and products, thinks about its employees
wellbeing, has healthy financial indicators and is able to adapt to the changing
environment.
Different manufacturing companies have different objectives and targets. No
matter what they are, to understand whether the company is moving in the right
direction it crucial to be able to track all of the changes happening.
What are manufacturing performance
measures?
The best way to track whether the company is moving in the right direction is to
employ different types of manufacturing performance indicators, also known as
KPIs (Key Performance Indicator).
Manufacturing performance indicators help the manufacturer to reach its
strategic and tactical goals in the long and short run. The use of indicators helps
the manufacturer to better understand the current situation and help evaluate
the effectiveness of strategy implementation.
What are manufacturing performance
measures?
In general, the goal of manufacturing efficiency indicators is to track the
performance of operations in different areas. These areas can vary in different
companies, depending on the current circumstances at any given time. Another
thing to keep in mind is that effective indicators must be both measurable and
actionable – there should be a clear understanding what is measured, how it is
done and what actions can lead to the improvement of the indicator in the
future.
Manufacturing performance indicators are
always changing
KPIs are never constant. They are constantly changing. Some measures are more
important during one period of company developments when this period ends,
other become more important and need to be focused on.
For example, for a new manufacturing operation, it is important how fast it can
ramp up production volumes and keep this momentum going. In case of
increased number of customer complains the manufacturer has to turn extra
attention towards the quality of the products and its yield.
Manufacturing indicators research by
MESA
The situation for each manufacturer is unique and to find the list of metrics that
would be equally relevant and important for all companies is a difficult task.
One of the biggest studies in the area of manufacturing KPIs in recent years has
been ordered by MESA (Manufacturing Enterprise Solutions Association). During
this research, a total of 28 manufacturing performance indicators have been
identified as the most important by decision makers. All metrics were divided
into the following 7 categories:
Manufacturing indicators research by
MESA
• Customer Experience
• Supplier and Product Quality
• Operations Efficiency
• Ensuring Compliance
• Reducing Maintenance Spending
• Increasing Flexibility and Innovation
• Cost reduction and profitability increase
After carefully analyzing all of the measures in the study, we have chosen the
top 10, which in our opinion is must have for every manufacturing operation,
big or small.
Cost reduction and profitability increase
• Manufacturing Cost per Unit – calculated by dividing the total number of
units produced by their production cost, excluding material spending. The
number shows how effectively the current resources are utilized, whether
human resource and equipment usage cost is on track.
• Productivity in Revenue per Employee – Similar to the previous indicator,
productivity per employee is calculated by dividing all generated revenue by
the number of all employees. This can be calculated on several levels, on a
company level, on a department level and even production line level.
Revenue per employee shows areas with the lowest and biggest ROI.
Cost reduction and profitability increase
• Downtime in Proportion to Operating Time – calculated as the ratio
between the time production lines was stopped and time when they were
operating. This ratio is a direct indicator of asset availability for production.
The lower the number, the more efficiently manufacturing equipment is used.
If the ratio is 0.5 this means that the production lines were stopped half of the
time.
Supplier Quality
• Incoming Material Quality – the quality of materials usually determines the
quality of the end product. If the quality of materials supplied is low,
spending for product repairs is increased. This means extra cost to the
manufacturer. This can be calculated also in different ways: by supplier; by
product category; as a percentage of faulty materials vs good materials.
• On-Time supply – calculated as the difference between purchasing orders
delivered on time and late orders, then divided by the number of total orders.
Tracking this KPI helps to understand whether the supplier is reliable or not.
Customer Experience
• On-Time delivery – tracking this KPI helps to understand whether the
product is shipped as promised or with delays and helps to prevent
conditions where customers would leave unsatisfied with the service. It will
also help to identify possible issues in customer logistics.
• Yield – in simple terms, measures the level of product quality. It is the
number of good units without rework or scrap coming from the production
line. High yield means all elements of the manufacturing process are working
fine and there is no issue with material quality, workers qualification or
equipment. Low yield might mean that there are problems somewhere during
the manufacturing process. This is one of the key metrics that signal that
something is wrong and a closer investigation into the process is needed.
Operations Efficiency
• Capacity Utilization – shows at which rate manufacturing facility is using its
production capacity. In simple words, whether its production capacity is used
effectively or not. It is a relationship between actual output, that is actually
produced with installed equipment and potential maximum output, that can
be produced with the same equipment. The higher the rate, the more
efficiently equipment is used.
Operations Efficiency
• Schedule or Production Attainment – the ability of production to execute a
plan. In manufacturing, planning plays a very important role. The more
complex manufacturing processes are, the more important is the ability to
execute the plan, but also it is more difficult to achieve. Matching the
schedule of production to produce a certain amount of output according to
the plan is very important if the manufacturer wants to meet expectancies of
the customers and corporate strategy. This performance indicator can be
calculated as the difference between planned output and real output, divided
by planned output.
Operations Efficiency
• Inventory turnover control – extra inventory means tying up valuable
financial and real estate resources. The main idea of manufacturing is to use
its space for production, not for storing extra materials and components. The
higher inventory turnover rate is, the more efficiently supply chain is built.
Inventory turnover rate can be calculated as the number of days materials
haven’t moved from warehouse storage to production. The targets depend
largely on manufacturer specific needs, but as the general rule, the turnover
over 30 days could be considered as a long period.
Conclusion
• In manufacturing, where there are many outside influencing factors, tracking
the performance of an operation with KPI metrics means the difference
between success and failure.
• It is very important to keep in mind, that manufacturing metrics by
themselves can’t solve the ongoing issues. They act more like a roadmap and
a compass, showing whether the operation is developing in the right
direction. After identifying the problem and what causes it, it is very
important to start taking actions and continuing measuring the effectiveness
of these actions with performance indicators.
Conclusion
• These actions can be absolutely different – from implementing a just-in-time
material flow process to reduce inventory levels, to installing MRP software
that will let you have full overview and control over all steps of the
manufacturing process. The main thing that actions are taken and there is a
specific manufacturing metric it can influence.
• Read more about Manufacturing Software.
Top 10 most important manufacturing performance indicators in 2019

More Related Content

What's hot

Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
Pruek Pinyo
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
KunalJagtap5
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
Lean for U
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
Muhammad Mueez Nazakat
 
Kanban
KanbanKanban
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
Frank-G. Adler
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturingPrasad Bidwai
 
8 Wastes in Lean
8 Wastes in Lean8 Wastes in Lean
8 Wastes in Lean
Marysmith401
 
Procurement kpi's and strategic sourcing
Procurement kpi's  and strategic sourcingProcurement kpi's  and strategic sourcing
Procurement kpi's and strategic sourcing
Paco Rodríguez de Molina
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
Hriday Bora
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Sanjeev Deshmukh
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
Anand Subramaniam
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
Ankit Gupta
 
Just in time
Just in timeJust in time
Just in time
Kushagra Pandey
 
S&OP Implementation Roadmap
S&OP Implementation RoadmapS&OP Implementation Roadmap
S&OP Implementation Roadmap
Anand Subramaniam
 
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnbanTQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnbanAkansha Jha
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
Marico Ltd.
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
W3 Group Canada Inc.
 

What's hot (20)

Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Kanban
KanbanKanban
Kanban
 
Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
world-class-manufacturing
world-class-manufacturingworld-class-manufacturing
world-class-manufacturing
 
8 Wastes in Lean
8 Wastes in Lean8 Wastes in Lean
8 Wastes in Lean
 
Procurement kpi's and strategic sourcing
Procurement kpi's  and strategic sourcingProcurement kpi's  and strategic sourcing
Procurement kpi's and strategic sourcing
 
Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
Wcm
WcmWcm
Wcm
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Just in time
Just in timeJust in time
Just in time
 
S&OP Implementation Roadmap
S&OP Implementation RoadmapS&OP Implementation Roadmap
S&OP Implementation Roadmap
 
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnbanTQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
TQM, 5S, Kaizen, Poka-yoke, JIT, KAnban
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
 

Similar to Top 10 most important manufacturing performance indicators in 2019

Cant track 28 kp is focus on these top 10
Cant track 28 kp is focus on these top 10Cant track 28 kp is focus on these top 10
Cant track 28 kp is focus on these top 10
MRPeasy
 
operation Performance & Operation stategy
operation Performance & Operation stategyoperation Performance & Operation stategy
operation Performance & Operation stategy
Qamar Farooq
 
Key Performance Indicators
Key Performance IndicatorsKey Performance Indicators
Key Performance Indicators
CIToolkit
 
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdfPPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
Suhas Agawane
 
Agile metrics.pdf
Agile metrics.pdfAgile metrics.pdf
Agile metrics.pdf
Forte Group
 
Pom unit 1
Pom unit 1Pom unit 1
Pom unit 1
Shivani Sharma
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
pavani valiveti
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
shyaminfo00
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
shyaminfo00
 
POM UNIT 1.pptx
POM UNIT 1.pptxPOM UNIT 1.pptx
POM UNIT 1.pptx
ssuserd3982b1
 
Production Planning In Manufacturing Industry
Production Planning In Manufacturing IndustryProduction Planning In Manufacturing Industry
Production Planning In Manufacturing Industry
Polestarsolutions
 
Pm performance and_value_list_of_measures
Pm performance and_value_list_of_measuresPm performance and_value_list_of_measures
Pm performance and_value_list_of_measures
Omair Mustafa
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
shyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
shyaminfo00
 
1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester
GIEDEEAM SOLAR and Gajanana Publications, LIC
 
Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Corealanlund
 
Mel751 pms-sgd-2014
Mel751 pms-sgd-2014Mel751 pms-sgd-2014
Mel751 pms-sgd-2014
Sanjeev Deshmukh
 
Process of Operation management
Process of Operation management Process of Operation management
Process of Operation management
Nevedida
 

Similar to Top 10 most important manufacturing performance indicators in 2019 (20)

Cant track 28 kp is focus on these top 10
Cant track 28 kp is focus on these top 10Cant track 28 kp is focus on these top 10
Cant track 28 kp is focus on these top 10
 
operation Performance & Operation stategy
operation Performance & Operation stategyoperation Performance & Operation stategy
operation Performance & Operation stategy
 
Key Performance Indicators
Key Performance IndicatorsKey Performance Indicators
Key Performance Indicators
 
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdfPPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
PPT %GenMngmnt^Improvement - KPIs Complete Presentation.pdf
 
Agile metrics.pdf
Agile metrics.pdfAgile metrics.pdf
Agile metrics.pdf
 
Pom unit 1
Pom unit 1Pom unit 1
Pom unit 1
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
 
Om ibs-2
Om ibs-2Om ibs-2
Om ibs-2
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
POM UNIT 1.pptx
POM UNIT 1.pptxPOM UNIT 1.pptx
POM UNIT 1.pptx
 
Production Planning In Manufacturing Industry
Production Planning In Manufacturing IndustryProduction Planning In Manufacturing Industry
Production Planning In Manufacturing Industry
 
Pm performance and_value_list_of_measures
Pm performance and_value_list_of_measuresPm performance and_value_list_of_measures
Pm performance and_value_list_of_measures
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester1. mba 201 production and operation management assignment 2nd semester
1. mba 201 production and operation management assignment 2nd semester
 
Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Core
 
Mel751 pms-sgd-2014
Mel751 pms-sgd-2014Mel751 pms-sgd-2014
Mel751 pms-sgd-2014
 
Process of Operation management
Process of Operation management Process of Operation management
Process of Operation management
 
Traditional & Abc
Traditional & AbcTraditional & Abc
Traditional & Abc
 

More from MRPeasy

Qr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingQr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory tracking
MRPeasy
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp system
MRPeasy
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planning
MRPeasy
 
What is cellular manufacturing?
What is cellular manufacturing?What is cellular manufacturing?
What is cellular manufacturing?
MRPeasy
 
Warehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseWarehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouse
MRPeasy
 
Case study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyCase study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasy
MRPeasy
 
How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?
MRPeasy
 
Case study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyCase study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasy
MRPeasy
 
Week 3 in manufacturing news
Week 3 in manufacturing newsWeek 3 in manufacturing news
Week 3 in manufacturing news
MRPeasy
 
How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?
MRPeasy
 
Week 1 in manufacturing news
Week 1 in manufacturing newsWeek 1 in manufacturing news
Week 1 in manufacturing news
MRPeasy
 
Week 51 in manufacturing news
Week 51 in manufacturing newsWeek 51 in manufacturing news
Week 51 in manufacturing news
MRPeasy
 
Week 50 in manufacturing news
Week 50 in manufacturing newsWeek 50 in manufacturing news
Week 50 in manufacturing news
MRPeasy
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing process
MRPeasy
 
Week 49 in manufacturing news
Week 49 in manufacturing newsWeek 49 in manufacturing news
Week 49 in manufacturing news
MRPeasy
 
Week 48 in manufacturing news
Week 48 in manufacturing newsWeek 48 in manufacturing news
Week 48 in manufacturing news
MRPeasy
 
What is cost of quality and how to calculate it
What is cost of quality and how to calculate itWhat is cost of quality and how to calculate it
What is cost of quality and how to calculate it
MRPeasy
 
Week 47 in manufacturing news
Week 47 in manufacturing newsWeek 47 in manufacturing news
Week 47 in manufacturing news
MRPeasy
 
Advanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryAdvanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the Industry
MRPeasy
 
Week 44 in manufacturing news
Week 44 in manufacturing newsWeek 44 in manufacturing news
Week 44 in manufacturing news
MRPeasy
 

More from MRPeasy (20)

Qr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory trackingQr codes vs. barcodes in inventory tracking
Qr codes vs. barcodes in inventory tracking
 
Change management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp systemChange management in manufacturing implementing an erp system
Change management in manufacturing implementing an erp system
 
Forward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planningForward scheduling vs. backward scheduling in production planning
Forward scheduling vs. backward scheduling in production planning
 
What is cellular manufacturing?
What is cellular manufacturing?What is cellular manufacturing?
What is cellular manufacturing?
 
Warehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouseWarehouse organization how to set up a smooth running warehouse
Warehouse organization how to set up a smooth running warehouse
 
Case study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasyCase study A Wrate Engineering gets organized with MRPeasy
Case study A Wrate Engineering gets organized with MRPeasy
 
How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?How to achieve traceability in manufacturing?
How to achieve traceability in manufacturing?
 
Case study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasyCase study how exacta technologies improved productivity with mr peasy
Case study how exacta technologies improved productivity with mr peasy
 
Week 3 in manufacturing news
Week 3 in manufacturing newsWeek 3 in manufacturing news
Week 3 in manufacturing news
 
How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?How to calculate the cost of goods manufactured (COGM)?
How to calculate the cost of goods manufactured (COGM)?
 
Week 1 in manufacturing news
Week 1 in manufacturing newsWeek 1 in manufacturing news
Week 1 in manufacturing news
 
Week 51 in manufacturing news
Week 51 in manufacturing newsWeek 51 in manufacturing news
Week 51 in manufacturing news
 
Week 50 in manufacturing news
Week 50 in manufacturing newsWeek 50 in manufacturing news
Week 50 in manufacturing news
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing process
 
Week 49 in manufacturing news
Week 49 in manufacturing newsWeek 49 in manufacturing news
Week 49 in manufacturing news
 
Week 48 in manufacturing news
Week 48 in manufacturing newsWeek 48 in manufacturing news
Week 48 in manufacturing news
 
What is cost of quality and how to calculate it
What is cost of quality and how to calculate itWhat is cost of quality and how to calculate it
What is cost of quality and how to calculate it
 
Week 47 in manufacturing news
Week 47 in manufacturing newsWeek 47 in manufacturing news
Week 47 in manufacturing news
 
Advanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the IndustryAdvanced Manufacturing – Solutions That Are Transforming the Industry
Advanced Manufacturing – Solutions That Are Transforming the Industry
 
Week 44 in manufacturing news
Week 44 in manufacturing newsWeek 44 in manufacturing news
Week 44 in manufacturing news
 

Recently uploaded

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 

Recently uploaded (20)

LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 

Top 10 most important manufacturing performance indicators in 2019

  • 1. 0 TOP 10 MOST IMPORTANT MANUFACTURING PERFORMANCE INDICATORS IN 2019
  • 2. The goal of every manufacturing business is to be as efficient, innovative and flexible as possible. An effective manufacturing operation can offer its customers a wider range of services and products, thinks about its employees wellbeing, has healthy financial indicators and is able to adapt to the changing environment. Different manufacturing companies have different objectives and targets. No matter what they are, to understand whether the company is moving in the right direction it crucial to be able to track all of the changes happening.
  • 3. What are manufacturing performance measures? The best way to track whether the company is moving in the right direction is to employ different types of manufacturing performance indicators, also known as KPIs (Key Performance Indicator). Manufacturing performance indicators help the manufacturer to reach its strategic and tactical goals in the long and short run. The use of indicators helps the manufacturer to better understand the current situation and help evaluate the effectiveness of strategy implementation.
  • 4. What are manufacturing performance measures? In general, the goal of manufacturing efficiency indicators is to track the performance of operations in different areas. These areas can vary in different companies, depending on the current circumstances at any given time. Another thing to keep in mind is that effective indicators must be both measurable and actionable – there should be a clear understanding what is measured, how it is done and what actions can lead to the improvement of the indicator in the future.
  • 5. Manufacturing performance indicators are always changing KPIs are never constant. They are constantly changing. Some measures are more important during one period of company developments when this period ends, other become more important and need to be focused on. For example, for a new manufacturing operation, it is important how fast it can ramp up production volumes and keep this momentum going. In case of increased number of customer complains the manufacturer has to turn extra attention towards the quality of the products and its yield.
  • 6. Manufacturing indicators research by MESA The situation for each manufacturer is unique and to find the list of metrics that would be equally relevant and important for all companies is a difficult task. One of the biggest studies in the area of manufacturing KPIs in recent years has been ordered by MESA (Manufacturing Enterprise Solutions Association). During this research, a total of 28 manufacturing performance indicators have been identified as the most important by decision makers. All metrics were divided into the following 7 categories:
  • 7. Manufacturing indicators research by MESA • Customer Experience • Supplier and Product Quality • Operations Efficiency • Ensuring Compliance • Reducing Maintenance Spending • Increasing Flexibility and Innovation • Cost reduction and profitability increase After carefully analyzing all of the measures in the study, we have chosen the top 10, which in our opinion is must have for every manufacturing operation, big or small.
  • 8. Cost reduction and profitability increase • Manufacturing Cost per Unit – calculated by dividing the total number of units produced by their production cost, excluding material spending. The number shows how effectively the current resources are utilized, whether human resource and equipment usage cost is on track. • Productivity in Revenue per Employee – Similar to the previous indicator, productivity per employee is calculated by dividing all generated revenue by the number of all employees. This can be calculated on several levels, on a company level, on a department level and even production line level. Revenue per employee shows areas with the lowest and biggest ROI.
  • 9. Cost reduction and profitability increase • Downtime in Proportion to Operating Time – calculated as the ratio between the time production lines was stopped and time when they were operating. This ratio is a direct indicator of asset availability for production. The lower the number, the more efficiently manufacturing equipment is used. If the ratio is 0.5 this means that the production lines were stopped half of the time.
  • 10. Supplier Quality • Incoming Material Quality – the quality of materials usually determines the quality of the end product. If the quality of materials supplied is low, spending for product repairs is increased. This means extra cost to the manufacturer. This can be calculated also in different ways: by supplier; by product category; as a percentage of faulty materials vs good materials. • On-Time supply – calculated as the difference between purchasing orders delivered on time and late orders, then divided by the number of total orders. Tracking this KPI helps to understand whether the supplier is reliable or not.
  • 11. Customer Experience • On-Time delivery – tracking this KPI helps to understand whether the product is shipped as promised or with delays and helps to prevent conditions where customers would leave unsatisfied with the service. It will also help to identify possible issues in customer logistics. • Yield – in simple terms, measures the level of product quality. It is the number of good units without rework or scrap coming from the production line. High yield means all elements of the manufacturing process are working fine and there is no issue with material quality, workers qualification or equipment. Low yield might mean that there are problems somewhere during the manufacturing process. This is one of the key metrics that signal that something is wrong and a closer investigation into the process is needed.
  • 12. Operations Efficiency • Capacity Utilization – shows at which rate manufacturing facility is using its production capacity. In simple words, whether its production capacity is used effectively or not. It is a relationship between actual output, that is actually produced with installed equipment and potential maximum output, that can be produced with the same equipment. The higher the rate, the more efficiently equipment is used.
  • 13. Operations Efficiency • Schedule or Production Attainment – the ability of production to execute a plan. In manufacturing, planning plays a very important role. The more complex manufacturing processes are, the more important is the ability to execute the plan, but also it is more difficult to achieve. Matching the schedule of production to produce a certain amount of output according to the plan is very important if the manufacturer wants to meet expectancies of the customers and corporate strategy. This performance indicator can be calculated as the difference between planned output and real output, divided by planned output.
  • 14. Operations Efficiency • Inventory turnover control – extra inventory means tying up valuable financial and real estate resources. The main idea of manufacturing is to use its space for production, not for storing extra materials and components. The higher inventory turnover rate is, the more efficiently supply chain is built. Inventory turnover rate can be calculated as the number of days materials haven’t moved from warehouse storage to production. The targets depend largely on manufacturer specific needs, but as the general rule, the turnover over 30 days could be considered as a long period.
  • 15. Conclusion • In manufacturing, where there are many outside influencing factors, tracking the performance of an operation with KPI metrics means the difference between success and failure. • It is very important to keep in mind, that manufacturing metrics by themselves can’t solve the ongoing issues. They act more like a roadmap and a compass, showing whether the operation is developing in the right direction. After identifying the problem and what causes it, it is very important to start taking actions and continuing measuring the effectiveness of these actions with performance indicators.
  • 16. Conclusion • These actions can be absolutely different – from implementing a just-in-time material flow process to reduce inventory levels, to installing MRP software that will let you have full overview and control over all steps of the manufacturing process. The main thing that actions are taken and there is a specific manufacturing metric it can influence. • Read more about Manufacturing Software.