SlideShare a Scribd company logo
Curriculum Vitae
Tony Herceg
Contact Details
PO Box 941
Geelong Vic 3220
Mob: 0433464699
E-Mail: tony.herceg72@gmail.com
Personal Details
DOB: 28t h
December 1972
MARITAL STATUS: Married
NATIONALITY: Australian
Education
Gordon Institute of Technology
Geelong Victoria
C o mp l e ted M ec ha nic al Fi t ti ng T rad e C er ti fic a te
Box Hill Institute of Technology
Melbourne Victoria
Completed PMA30108 Certificate IV in Process Plant Operation
Swinburne University Tafe College
Melbourne Victoria
Current Assc. Dip Project Management
Fortior Global Pty Ltd
Melbourne Victoria
Project Management in Primavera P6
St Josephs College
Geelong Victoria
Victoria Certificate of Education (VCE), 1988
O.H.S. Certification
Australia – V406577
CLASS: LF HM HP CB RB
Completed Dogman /Rigger, Crane, Forklift, Senior First Aid, Breathing Apparatus Under Inert Entry, Rope
Access, Confined Spaces and Rescue, Working at Heights
OFFSHORE ACCREDITATION
BOSIET / TBOSIET/ HUET LICENCE OF COMPETENCY OFFSHORE
MSIC CARD HOLDER
Page 1 of 12
Curriculum Vitae
Objectives
Discharge experience with:
 Project Control & Management
 Contractor Safety, Control & Management
 Manufacture & Installation Technical Specifications, Tendering, and Award Process.
 Installation Planning, Scheduling & Project Implementation
Summary of Experience and Key Skills
Key Experiences have included:
 Project Management
 Contractor Safety Management
 Contract/Contractor Management
 Development and implementation of a QA system for Downer Engineering Pipe &
Mechanical in accordance with ISO9001:2000.
 Review of drawings, process technical specifications and procedures for installation
testing and commissioning.
 Writing process technical specifications and procedures for installation testing and
commissioning.
 Develop detailed work packages for tendering and installation.
 Detailed multi task scheduling of complete project scope using Primavera and
Microsoft Project software.
 Detailed Maintenance Service Programs SAP / Maximo
 Liaising with multi-discipline groups to ensure complete packages including
Structural, Mechanical, Electrical & Automation have all interfaces identified and
linked and implementation is coordinated.
 Ensuring all installations meet client specifications, meet all Statutory, State and
Local Government requirements and meet QA/QC requirements.
 Ensure handover of completed works is documented such that plant may be started in
a safe, controlled manner.
Page 2 of 12
Curriculum Vitae
Technical Areas of Expertise
 Mechanical Installations
 Rotating Equipment
 Project Engineering
 Pneumatic & Hydraulic Installations
 Piping Installation
 Structural Works
 Project Management
 Safety
 Client liaison
 Labour & supervision management
 Procurement
 Scheduling
 Cost control
 Quality control
 Project implementation:
 Demolition
 Installation ( Mechanical )
 Commissioning (Mechanical )
 Technical writing:
 Project work scope
 Tender documentation
 Work method statements
 Task specific work instruction
 Job Safety Analysis
 Hazard analysis
 Quality systems documentation
 Inspection & Test Plans
 Project Scheduling using Primavera and Micro Proj Software
 Use of MS Word, Excel, PowerPoint etc to prepare technical documentation, budgets,
estimates and expenditure control.
Page 3 of 12
Curriculum Vitae
PROFESSIONAL EXPERIENCE
CHEVRON GORGON PROJECT BARROW ISLAND JAN-2014
CB&I KENTZ JOINT VENTURE (CKJV)
LEAD CONSTRUCTION PLANER
Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction
requirements.
Responsible for establishing workface planning standards, procedures and adoption of best practices.
Assisting with the training and development of the Construction Planning organisation and its staff.
Maintaining the FIWP Development Log.
Providing daily direction, training and support to Construction Planners.
Organising and coordinating cross discipline planning & schedule reviews.
Facilitating a weekly scheduling and planning overview with construction and planning teams.
Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction
requirements.
Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction
requirements.
SEA DOWNER FABRICATION & MAINTENANCE OPERATIONS
JAN 2013-JAN 2014
DOWNER ENGINEERING
SOUTH EAST AUSTRALIA OPERATIONS MANAGER FABRICATION
Awarded into Downer Leadership Program, acknowledge as future potential leader of the Downer Australia
Business
Established systems and policies relating to the management of planning and cost control
Business Development and business relationships
Financial and progress reporting on a daily and monthly basis to senior project stakeholders
Projects Safety, Quality and other Project Management Plans
Reviewed all tender packages to be put forth to the client and making necessary changes if required
Established a strong Quality Management and Maintenance associated systems
Control of operational expenses to meet budget guidelines
Implementation Engineering
Management and Cost Control
BORAL CEMENT WAURN PONDS NOV2011-JAN2013
DOWNER ENGINEERING
PROJECT MANAGER
Established systems and policies relating to the management of planning and cost control
Financial and progress reporting on a daily and monthly basis to senior project stakeholders
Projects Safety, Quality and other Project Management Plans
Reviewed all tender packages to be put forth to the client and making necessary changes if required
Established a strong Quality Management and Maintenance associated systems
Control of operational expenses to meet budget guidelines
Implementation Engineering
Management and Cost Control of Plant Turnarounds
Page 4 of 12
Curriculum Vitae
ALCOA POINT HENRY JAN 2011
GREEN MILL FTS EXPANSION PROJECT
DOWNER ENGINEERING
PROJECT ENGINEER
Schedule preparation Primavera
Resource forecasting
Quality Controls Management
Review Tender Project Contracts
Management Plan and ITP documents
Authorise drawings for construction and dimension checks
Develop contracts and work packages for associated contractors
Materials & Equipment Control Document
RCCU COMPLEX TURAROUND 2011 DEC 2010
SHELL PETRO-CHEMICAL REFINERY GEELONG
PLANNER / ESTIMATOR
CONTRACT RESOURCES
Schedule preparation Primavera
Resource forecasting
Quality Controls Management
Tender Development
CONOCCOPHILLIPS BAYU UNDAN OFFSHORE NOV 2010
MOL SIEVE TURNAROUND
MECHANICAL SUPERVISOR
CONTRACT RESOURCES
Planned and Completed Mechanical Work Scope on Mol Sieve’s A + B
Fitted Blind Isolations to both A + B Mol Sieves as per P&ID Drawings
Removed both Top and Bottom Manways for Entry Confined Space
Replaced all Mechanical Hardware Including Studs on all Pipe Flanges
First Time Mol Sieve’s Change out Since Operations had Began
Implemented ConocoPhillips Safety Standards which made the job a Success
CALTEX LYTTON REFINERY BRISBANE OCT 2010
SAT GAS TURNAROUND
PROJECT MANAGER/PLANNER
CONTRACT RESOURCES
Planning Contract Resources work scope for Sat Gas Turnaround
Liaising with Caltex Turnaround Management team
Costing work scope
Progress reporting work scope on daily meetings
TEL PLANT DEMOLITION JULY 2010
SHELL PETRO-CHEMICAL REFINERY
GEELONG
CONTRACT RESOURCES
Demolition of TEL plant including four storage tanks, process plant spools, and ship to shore pipe work.
Oxy-cutting all pipe work
Qxy-cutting storage tanks
Flame washing
Rigging and dogging 50 tonne Crane
Page 5 of 12
Curriculum Vitae
CALTEX LYTTON REFINERY BRISBANE MAY-JULY 2010
ALKY AND FCCU TURNAROUND
MECHANICAL SUPERVISOR
CONTRACT RESOURCES
Mechanical Supervisor Contract Resources Mechanical Crew
Hydro testing, flushing and reinstating of pipe work and exchanges
Mechanical Hy-Torque bolts to designated torque specifications
Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping
Reading and Planning Isometric drawings
Internal repairs on the FCCU and Alky Columns
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
BHP BILLITON PYRENESS FPSO MODEC FEB-MAY 2010
RISER ARM INSTALLATIONS
MECHANICAL WORK SCOPE
RIGTECH ENERGY AUSTRALIA
Mechanical installation of risers on Tarrant arm
Removed and replaced modified riser clamps
Mechanical alignments
Heavy rigging involved
Replace hydraulic hoses on HPU unit
Set up of Solar Turbines and Alignment
Set up of Compressors and Alignment
Pump Alignments
Heat Exchangers Hydro and Removal and Replacement
BHP BILLITON STYBARROW FPSO MODEC JAN 2010
MECHANICAL WORK SCOPE
SAILED FROM EXMOUTH TO SINGAPORE
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Chemical clean of all process lines and vessel
Working with P&ID drawings following the process flow of designated plant areas
Setting up manifolds to tap into process lines
Using Steam and Zyme-flow in process of chemical clean
Regular samples and measurements for Hydrocarbons, LEL levels
Working with BHP process opening and closing certain valves for flow and temperature settings
Implemented all BHP/MODEC safety standards
BHP BILLITON OLYMPIC DAM JAN 2010
CATAYLST REACTOR CHANGE OUT
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Complete mechanical blinding of reactors for isolations and catalyst change out.
Complete reactor catalyst change out.
Complete de-blinding and reinstatement.
Implemented all BP safety standards
Page 6 of 12
Curriculum Vitae
BP BULWER REFINERY BRISBANE NOV-DEC 2009
CATAYLST REACTOR CHANGE OUT
CONTRACT RESOURCES
MECHANICAL WORK LEADER
Complete mechanical blinding of reactors for isolations and catalyst change out.
Complete reactor catalyst change out.
Complete de-blinding and reinstatement.
Implemented all BP safety standards
GRIFFIN VENTURE FPSO BHP OFFSHORE AUG-NOV 2009
NORTH WEST SHELF
DE COMISSIONING OF FPSO PLATFORM
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Complete mechanical de-commissioning of plant for sail away
Mechanical blinding of all vessels for clean out
Mechanical blinding of all cargo tanks for clean out
Mechanical de-commissioning of all pumps, compressors and turbines
Job completed in time required BHP happy with workmanship
Implemented all BHP safety standards
CALTEX LYTTON REFINERY BRISBANE JULY-AUG 2009
MECHANICAL SHUTDOWN TEXAS TOWER
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical overhaul and chemical clean Texas tower heat exchanger vertical standing
Isolated Texas tower followed Caltex blinding procedures
Stripped all major components of exchanger
Fitted specially engineered spool piece on inlet for chemical clean
Worked in co-operation with American company on chemical clean
Fitted piping and manifold specially designed for chem clean
Completed chem clean procedure with successful results
Refitted and Hydro tested Exchanger
Replaced all major components and gaskets
De-isolated exchanger
Successful start-up Caltex very happy with job
CALTEX KURNELL REFINERY SYDNEY JUN-JULY 2009
MECHANICAL DHTU SHUTDOWN EXCHANGERS
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical overhaul DHTU plant heat exchangers
Complete strip of heat exchangers
Completed Hydro tests on both tube and shell sides
Replaced all studs and gaskets
Reinstated all components and torque to specs
Implementing Caltex Kurnell Safety Awareness Regulations in Working Safely
Page 7 of 12
Curriculum Vitae
COREGAS BLUE SCOPE STEEL BHP MAY-JUN 2009
WOLLONGONG GAS PLANT
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Complete mechanical shutdown of Coregas plant in Wollongong
Removal and replacement of all valves and actuators
Complete strip of internal reactors, repair and reload
Complete strip of internal evap cooler and spray cooler columns, replace all internal components that need
repairing
Mechanical planning for shutdown in liaison with Core gas Mechanical Crew
Organisation of mechanical work packs and isolation procedures
Implementing Coregas Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE APR-MAY 2009
MECHANICAL DHTU CONSTRUCTION
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical Supervisor Contract Resources Mechanical Crew
Hired out to Downer Edi Engineering to help with Hydro testing, flushing and reinstating of pipe work and
exchanges
Mechanical Hy-Torque bolts to designated torque specifications
Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping
Reading and Planning Isometric drawings
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE MAR-APR 2009
MECHANICAL SHUTDOWN POLY REACTOR
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical Shutdown of 4C-2 Poly Reactor
Mechanical Planning for Shutdown
Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping
Mechanical Hydro Pressure testing of new pipe lines fitted and welded
Mechanical Hy-Torque bolts to designated Torque specifications
Reading and planning Isometric drawings
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
CALTEX KERNELL REFINERY SYDNEY MARCH 2009
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and Installation of Exchanges
Mechanical removal of Bundles
Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping
Mechanical Hydro Pressure Testing of new Pipe lines fitted and welded
Mechanical Hy-Torque Bolts to designated Torque specifications
Instillation of Mechanical components for internal columns
Reading and Planning Isometric Drawings
Implementing Caltex Kernell Safety Awareness Regulations in Working Safely
Page 8 of 12
Curriculum Vitae
NEW ZEALAND REFINING COMPANY FEB-MAR 2009
MASDON POINT NEW ZEALAND
NORTH ISLAND
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and installation of Exchanges
Mechanical removal of Bundles
Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds Spades, Spools and
Piping
Mechanical Hydro Pressure Testing of new pipe lines fitted and welded
Mechanical Hy-Torque bolts to designated torque specifications
Installation of Mechanical Components for internal columns
Reading and planning Isometric drawings
Implementing New Zealand Refining Company Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE JAN-FEB 2009
MECHANICAL DHTU CONSTRUCTION
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical Installation Haldor Topsoe Internal Reactor Components
Mechanical Supervision of installation crew
Installed Reactor, Salt-water dryer and salt water stripper column internals
Liaised with Haldor Topsoe Engineer with instillation procedures and guidelines
Mechanical Hy-Torque bolts to designated torque specifications
Usage of internal laser leveling, checked level of internal rings, trays and beams, all items fitted within
specifications.
Reading and planning isometric drawings
Job completed within time designated, Caltex and Haldor Topsoe impressed with workmanship
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE DEC 2008
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Installation of Mechanical Components for internal columns.
Reading and planning Isometric Drawings
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely.
Page 9 of 12
Curriculum Vitae
EXXON MOBIL ALTONA REFINERY 2008
CRACKER MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds, Spades, Spools
and Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Installation of Mechanical Components for internal columns.
Reading and planning Isometric Drawings
Implementing Exxon Mobil Safety Awareness Regulations in Working Safely
MOGAS MECHANICAL SHUTDOWN 2008
SHELL PETRO-CHEM REFINERY
GEELONG
SAVA ENGINEERING
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Reading and planning Isometric Drawings
Implementing Shell Refinery Safety Awareness Regulations in Working Safely.
BMC MECHANICAL SHUTDOWN 2008
SHELL PETRO-CHEMICAL REFINERY
GEELONG
SAVA ENGINEERING
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Reading and planning Isometric Drawings
Implementing Shell Refinery Safety Awareness Regulations in Working Safely.
Page 10 of 12
Curriculum Vitae
WOODSIDE LNG PHASE V GAS TRAIN PLANT 2007-2008
CB&I CONTRACTORS KARRATHA W.A.
MECHANICAL SUPERVISOR
Mechanical Hydro-Testing crew Foreman
Setting up Mechanical work packs for tradesman in Hydro test crew
Installation of Mechanical Components for internal vessels, foreman Sulzer Products from Switzerland
Complete the mechanical section of this plant and in charge of the Mechanical Fitters, Welders and
Boilermakers in this section of the plant.
Working closely with Mechanical Superintendent, in relation to Isometric drawings, manufacturing issues,
Mechanical Engineering issues.
Organised meetings for this section of the plant and drawings for completion of jobs.
Organising tradesman’s work tasks and planning for each Mechanical section of the plant
United Construction, Pt.Hedland, WA, Australia 1997-1998
MECHANICAL FITTER / FOREMAN
Installation of Mechanical Pumps, Gearboxes, Conveyer Systems, Gantry Crane Assembly. Alignments and
adjustments according to manufacture specifications.
Crane maintenance repair and servicing, in charge of repairs on all types of cranes in service around work site,
breakdown service and repairs, hydraulics, alimak hoist and lifts servicing, maintenance and repair.
Organised meetings for this section of the plant and drawings for completion of jobs.
Mechanical fitting and repairs.
Diagnostic analysis and fault-finding
Condition Monitoring – Preventative and reactive maintenance.
Installation and service.
Page 11 of 12
Curriculum Vitae
REFEREES
Alfred Quadrio | Projects and Services Manager | Downer Australia
T +61 3 9644 9240 |M 0402 856 006
Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207
Sue Marley | Resource Team Leader | Downer Australia
T +61 3 9644 9100 |M 0408 122 327
Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207
Branko Matijevic | General Manager | Sava Engineering
T +61 3 5278 6122
5 Seabreeze Pde, North Shore, Victoria, 3214
Page 12 of 12
TONY  HERCEGl resume

More Related Content

What's hot

QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
James Ct
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
Edwin Aguinaldo
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
Siow Chon Wah
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
Mohamed Hashim
 
NM SM
NM SMNM SM
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
Renie Casinillo
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
Adnan Rehmat
 
My Resume
My ResumeMy Resume
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
Bùi Minh Hải
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
Umang Tailor
 
Update Resume November 2016 - Faheem
Update Resume November 2016 - Faheem Update Resume November 2016 - Faheem
Update Resume November 2016 - Faheem
Faheem Siddique
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
jim matthews
 
CV for linkedin
CV for linkedinCV for linkedin
CV for linkedin
Nelly Susilawati
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
NASIM NEZAM
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
bannichensavier savier
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
proactives
 
BoyleCV
BoyleCVBoyleCV
BoyleCV
Dennis Boyle
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
Harvey Sarda
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015
JOHANNES JACOBUS PEENS
 

What's hot (20)

QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
NM SM
NM SMNM SM
NM SM
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
My Resume
My ResumeMy Resume
My Resume
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
 
Update Resume November 2016 - Faheem
Update Resume November 2016 - Faheem Update Resume November 2016 - Faheem
Update Resume November 2016 - Faheem
 
Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15Jim Matthews CV - Nov. 15
Jim Matthews CV - Nov. 15
 
CV for linkedin
CV for linkedinCV for linkedin
CV for linkedin
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
Jordan Cv
Jordan CvJordan Cv
Jordan Cv
 
BoyleCV
BoyleCVBoyleCV
BoyleCV
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015
 

Viewers also liked

CV Ahmed Elsayad
CV Ahmed ElsayadCV Ahmed Elsayad
CV Ahmed Elsayad
ahmed elsayad
 
Afroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OGAfroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OG
Sayed Afroz Alam
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
Veenu Sharma
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
pritam thakore
 
Resume.
Resume.Resume.
Resume.
AJIT THORAT
 
Ska5
Ska5Ska5
CV Vinod Kumar Technip
CV Vinod Kumar TechnipCV Vinod Kumar Technip
CV Vinod Kumar Technip
VINOD KUMAR
 
Ejb cv.resume jan16
Ejb cv.resume jan16Ejb cv.resume jan16
Ejb cv.resume jan16
Eric Backus
 
CV_e_06211595 (1) (1) (1) (1)
CV_e_06211595 (1) (1) (1) (1)CV_e_06211595 (1) (1) (1) (1)
CV_e_06211595 (1) (1) (1) (1)
kamel akermi
 
Mohammed ali othman cv
Mohammed ali othman cvMohammed ali othman cv
Mohammed ali othman cv
Mohammed Ali Othman
 
Bahman Othman _CV
Bahman Othman  _CVBahman Othman  _CV
Bahman Othman _CV
Bahman Othman
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016
Raed Ramahi
 
السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015
السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015
السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015
Dr Mousa
 
CV - Hari Krishan - UAE
CV - Hari Krishan - UAECV - Hari Krishan - UAE
CV - Hari Krishan - UAE
N.Hari Krishan
 
CV Mahrez Trimech
CV Mahrez TrimechCV Mahrez Trimech
CV Mahrez Trimech
mahrez1986
 
Vijay gadde ba cv
Vijay gadde  ba cvVijay gadde  ba cv
Vijay gadde ba cv
gijvaygadde
 
The CV of Saber Salah
The CV of Saber SalahThe CV of Saber Salah
The CV of Saber Salah
Saber Salah
 
Cv abed hamza
Cv abed hamzaCv abed hamza
Cv abed hamza
Hamza Abed
 
Cv
CvCv

Viewers also liked (20)

CV Ahmed Elsayad
CV Ahmed ElsayadCV Ahmed Elsayad
CV Ahmed Elsayad
 
Afroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OGAfroz Resume - Civil Engr- .doc OG
Afroz Resume - Civil Engr- .doc OG
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
PK_Thakore_New_CV
PK_Thakore_New_CVPK_Thakore_New_CV
PK_Thakore_New_CV
 
Resume.
Resume.Resume.
Resume.
 
Ska5
Ska5Ska5
Ska5
 
CV Vinod Kumar Technip
CV Vinod Kumar TechnipCV Vinod Kumar Technip
CV Vinod Kumar Technip
 
Ejb cv.resume jan16
Ejb cv.resume jan16Ejb cv.resume jan16
Ejb cv.resume jan16
 
CV_e_06211595 (1) (1) (1) (1)
CV_e_06211595 (1) (1) (1) (1)CV_e_06211595 (1) (1) (1) (1)
CV_e_06211595 (1) (1) (1) (1)
 
Mohammed ali othman cv
Mohammed ali othman cvMohammed ali othman cv
Mohammed ali othman cv
 
Bahman Othman _CV
Bahman Othman  _CVBahman Othman  _CV
Bahman Othman _CV
 
CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016CV Raed Al Ramahi 2016
CV Raed Al Ramahi 2016
 
السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015
السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015
السيرة الذاتية باللغة الانجليزية د موسى القضاة 3-2015
 
CV - Hari Krishan - UAE
CV - Hari Krishan - UAECV - Hari Krishan - UAE
CV - Hari Krishan - UAE
 
CV Mahrez Trimech
CV Mahrez TrimechCV Mahrez Trimech
CV Mahrez Trimech
 
Cv francais
Cv francaisCv francais
Cv francais
 
Vijay gadde ba cv
Vijay gadde  ba cvVijay gadde  ba cv
Vijay gadde ba cv
 
The CV of Saber Salah
The CV of Saber SalahThe CV of Saber Salah
The CV of Saber Salah
 
Cv abed hamza
Cv abed hamzaCv abed hamza
Cv abed hamza
 
Cv
CvCv
Cv
 

Similar to TONY HERCEGl resume

EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
Obinna Ezeifedi
 
OJB Resume 2016
OJB Resume 2016OJB Resume 2016
OJB Resume 2016
Oscar Brown
 
QA.QC E&I feb
QA.QC E&I febQA.QC E&I feb
QA.QC E&I feb
Mohsin Ali Siyal
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
Rashid Faruqi
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
Rajandran Thaiman
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
sathish kumar
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
Fikruddien YusoF
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
Shiraz khan
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
Jack Milligan
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Robert Dimanawa
 
T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015
Terry Pearce
 
Resume_Omkar Palit
Resume_Omkar PalitResume_Omkar Palit
Resume_Omkar Palit
Omkar Palit
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
Dale Crowe
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
randy san andres
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
Sayan Ml
 
Wayne Burton 28 april 2016
Wayne Burton  28 april 2016Wayne Burton  28 april 2016
Wayne Burton 28 april 2016
Wayne Burton
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
Nailesh Patel
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
Austin Mattson II
 
TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1
Chief Tatira Tatira
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
Nixon Das
 

Similar to TONY HERCEGl resume (20)

EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
OJB Resume 2016
OJB Resume 2016OJB Resume 2016
OJB Resume 2016
 
QA.QC E&I feb
QA.QC E&I febQA.QC E&I feb
QA.QC E&I feb
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)Rajandran Thaiman CV(2015)
Rajandran Thaiman CV(2015)
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
 
CV 2016.doc
CV 2016.docCV 2016.doc
CV 2016.doc
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015
 
Resume_Omkar Palit
Resume_Omkar PalitResume_Omkar Palit
Resume_Omkar Palit
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
 
Wayne Burton 28 april 2016
Wayne Burton  28 april 2016Wayne Burton  28 april 2016
Wayne Burton 28 april 2016
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 
TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 

TONY HERCEGl resume

  • 1. Curriculum Vitae Tony Herceg Contact Details PO Box 941 Geelong Vic 3220 Mob: 0433464699 E-Mail: tony.herceg72@gmail.com Personal Details DOB: 28t h December 1972 MARITAL STATUS: Married NATIONALITY: Australian Education Gordon Institute of Technology Geelong Victoria C o mp l e ted M ec ha nic al Fi t ti ng T rad e C er ti fic a te Box Hill Institute of Technology Melbourne Victoria Completed PMA30108 Certificate IV in Process Plant Operation Swinburne University Tafe College Melbourne Victoria Current Assc. Dip Project Management Fortior Global Pty Ltd Melbourne Victoria Project Management in Primavera P6 St Josephs College Geelong Victoria Victoria Certificate of Education (VCE), 1988 O.H.S. Certification Australia – V406577 CLASS: LF HM HP CB RB Completed Dogman /Rigger, Crane, Forklift, Senior First Aid, Breathing Apparatus Under Inert Entry, Rope Access, Confined Spaces and Rescue, Working at Heights OFFSHORE ACCREDITATION BOSIET / TBOSIET/ HUET LICENCE OF COMPETENCY OFFSHORE MSIC CARD HOLDER Page 1 of 12
  • 2. Curriculum Vitae Objectives Discharge experience with:  Project Control & Management  Contractor Safety, Control & Management  Manufacture & Installation Technical Specifications, Tendering, and Award Process.  Installation Planning, Scheduling & Project Implementation Summary of Experience and Key Skills Key Experiences have included:  Project Management  Contractor Safety Management  Contract/Contractor Management  Development and implementation of a QA system for Downer Engineering Pipe & Mechanical in accordance with ISO9001:2000.  Review of drawings, process technical specifications and procedures for installation testing and commissioning.  Writing process technical specifications and procedures for installation testing and commissioning.  Develop detailed work packages for tendering and installation.  Detailed multi task scheduling of complete project scope using Primavera and Microsoft Project software.  Detailed Maintenance Service Programs SAP / Maximo  Liaising with multi-discipline groups to ensure complete packages including Structural, Mechanical, Electrical & Automation have all interfaces identified and linked and implementation is coordinated.  Ensuring all installations meet client specifications, meet all Statutory, State and Local Government requirements and meet QA/QC requirements.  Ensure handover of completed works is documented such that plant may be started in a safe, controlled manner. Page 2 of 12
  • 3. Curriculum Vitae Technical Areas of Expertise  Mechanical Installations  Rotating Equipment  Project Engineering  Pneumatic & Hydraulic Installations  Piping Installation  Structural Works  Project Management  Safety  Client liaison  Labour & supervision management  Procurement  Scheduling  Cost control  Quality control  Project implementation:  Demolition  Installation ( Mechanical )  Commissioning (Mechanical )  Technical writing:  Project work scope  Tender documentation  Work method statements  Task specific work instruction  Job Safety Analysis  Hazard analysis  Quality systems documentation  Inspection & Test Plans  Project Scheduling using Primavera and Micro Proj Software  Use of MS Word, Excel, PowerPoint etc to prepare technical documentation, budgets, estimates and expenditure control. Page 3 of 12
  • 4. Curriculum Vitae PROFESSIONAL EXPERIENCE CHEVRON GORGON PROJECT BARROW ISLAND JAN-2014 CB&I KENTZ JOINT VENTURE (CKJV) LEAD CONSTRUCTION PLANER Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction requirements. Responsible for establishing workface planning standards, procedures and adoption of best practices. Assisting with the training and development of the Construction Planning organisation and its staff. Maintaining the FIWP Development Log. Providing daily direction, training and support to Construction Planners. Organising and coordinating cross discipline planning & schedule reviews. Facilitating a weekly scheduling and planning overview with construction and planning teams. Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction requirements. Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction requirements. SEA DOWNER FABRICATION & MAINTENANCE OPERATIONS JAN 2013-JAN 2014 DOWNER ENGINEERING SOUTH EAST AUSTRALIA OPERATIONS MANAGER FABRICATION Awarded into Downer Leadership Program, acknowledge as future potential leader of the Downer Australia Business Established systems and policies relating to the management of planning and cost control Business Development and business relationships Financial and progress reporting on a daily and monthly basis to senior project stakeholders Projects Safety, Quality and other Project Management Plans Reviewed all tender packages to be put forth to the client and making necessary changes if required Established a strong Quality Management and Maintenance associated systems Control of operational expenses to meet budget guidelines Implementation Engineering Management and Cost Control BORAL CEMENT WAURN PONDS NOV2011-JAN2013 DOWNER ENGINEERING PROJECT MANAGER Established systems and policies relating to the management of planning and cost control Financial and progress reporting on a daily and monthly basis to senior project stakeholders Projects Safety, Quality and other Project Management Plans Reviewed all tender packages to be put forth to the client and making necessary changes if required Established a strong Quality Management and Maintenance associated systems Control of operational expenses to meet budget guidelines Implementation Engineering Management and Cost Control of Plant Turnarounds Page 4 of 12
  • 5. Curriculum Vitae ALCOA POINT HENRY JAN 2011 GREEN MILL FTS EXPANSION PROJECT DOWNER ENGINEERING PROJECT ENGINEER Schedule preparation Primavera Resource forecasting Quality Controls Management Review Tender Project Contracts Management Plan and ITP documents Authorise drawings for construction and dimension checks Develop contracts and work packages for associated contractors Materials & Equipment Control Document RCCU COMPLEX TURAROUND 2011 DEC 2010 SHELL PETRO-CHEMICAL REFINERY GEELONG PLANNER / ESTIMATOR CONTRACT RESOURCES Schedule preparation Primavera Resource forecasting Quality Controls Management Tender Development CONOCCOPHILLIPS BAYU UNDAN OFFSHORE NOV 2010 MOL SIEVE TURNAROUND MECHANICAL SUPERVISOR CONTRACT RESOURCES Planned and Completed Mechanical Work Scope on Mol Sieve’s A + B Fitted Blind Isolations to both A + B Mol Sieves as per P&ID Drawings Removed both Top and Bottom Manways for Entry Confined Space Replaced all Mechanical Hardware Including Studs on all Pipe Flanges First Time Mol Sieve’s Change out Since Operations had Began Implemented ConocoPhillips Safety Standards which made the job a Success CALTEX LYTTON REFINERY BRISBANE OCT 2010 SAT GAS TURNAROUND PROJECT MANAGER/PLANNER CONTRACT RESOURCES Planning Contract Resources work scope for Sat Gas Turnaround Liaising with Caltex Turnaround Management team Costing work scope Progress reporting work scope on daily meetings TEL PLANT DEMOLITION JULY 2010 SHELL PETRO-CHEMICAL REFINERY GEELONG CONTRACT RESOURCES Demolition of TEL plant including four storage tanks, process plant spools, and ship to shore pipe work. Oxy-cutting all pipe work Qxy-cutting storage tanks Flame washing Rigging and dogging 50 tonne Crane Page 5 of 12
  • 6. Curriculum Vitae CALTEX LYTTON REFINERY BRISBANE MAY-JULY 2010 ALKY AND FCCU TURNAROUND MECHANICAL SUPERVISOR CONTRACT RESOURCES Mechanical Supervisor Contract Resources Mechanical Crew Hydro testing, flushing and reinstating of pipe work and exchanges Mechanical Hy-Torque bolts to designated torque specifications Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping Reading and Planning Isometric drawings Internal repairs on the FCCU and Alky Columns Implementing Caltex Lytton Safety Awareness Regulations in Working Safely BHP BILLITON PYRENESS FPSO MODEC FEB-MAY 2010 RISER ARM INSTALLATIONS MECHANICAL WORK SCOPE RIGTECH ENERGY AUSTRALIA Mechanical installation of risers on Tarrant arm Removed and replaced modified riser clamps Mechanical alignments Heavy rigging involved Replace hydraulic hoses on HPU unit Set up of Solar Turbines and Alignment Set up of Compressors and Alignment Pump Alignments Heat Exchangers Hydro and Removal and Replacement BHP BILLITON STYBARROW FPSO MODEC JAN 2010 MECHANICAL WORK SCOPE SAILED FROM EXMOUTH TO SINGAPORE CONTRACT RESOURCES MECHANICAL SUPERVISOR Chemical clean of all process lines and vessel Working with P&ID drawings following the process flow of designated plant areas Setting up manifolds to tap into process lines Using Steam and Zyme-flow in process of chemical clean Regular samples and measurements for Hydrocarbons, LEL levels Working with BHP process opening and closing certain valves for flow and temperature settings Implemented all BHP/MODEC safety standards BHP BILLITON OLYMPIC DAM JAN 2010 CATAYLST REACTOR CHANGE OUT CONTRACT RESOURCES MECHANICAL SUPERVISOR Complete mechanical blinding of reactors for isolations and catalyst change out. Complete reactor catalyst change out. Complete de-blinding and reinstatement. Implemented all BP safety standards Page 6 of 12
  • 7. Curriculum Vitae BP BULWER REFINERY BRISBANE NOV-DEC 2009 CATAYLST REACTOR CHANGE OUT CONTRACT RESOURCES MECHANICAL WORK LEADER Complete mechanical blinding of reactors for isolations and catalyst change out. Complete reactor catalyst change out. Complete de-blinding and reinstatement. Implemented all BP safety standards GRIFFIN VENTURE FPSO BHP OFFSHORE AUG-NOV 2009 NORTH WEST SHELF DE COMISSIONING OF FPSO PLATFORM CONTRACT RESOURCES MECHANICAL SUPERVISOR Complete mechanical de-commissioning of plant for sail away Mechanical blinding of all vessels for clean out Mechanical blinding of all cargo tanks for clean out Mechanical de-commissioning of all pumps, compressors and turbines Job completed in time required BHP happy with workmanship Implemented all BHP safety standards CALTEX LYTTON REFINERY BRISBANE JULY-AUG 2009 MECHANICAL SHUTDOWN TEXAS TOWER CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical overhaul and chemical clean Texas tower heat exchanger vertical standing Isolated Texas tower followed Caltex blinding procedures Stripped all major components of exchanger Fitted specially engineered spool piece on inlet for chemical clean Worked in co-operation with American company on chemical clean Fitted piping and manifold specially designed for chem clean Completed chem clean procedure with successful results Refitted and Hydro tested Exchanger Replaced all major components and gaskets De-isolated exchanger Successful start-up Caltex very happy with job CALTEX KURNELL REFINERY SYDNEY JUN-JULY 2009 MECHANICAL DHTU SHUTDOWN EXCHANGERS CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical overhaul DHTU plant heat exchangers Complete strip of heat exchangers Completed Hydro tests on both tube and shell sides Replaced all studs and gaskets Reinstated all components and torque to specs Implementing Caltex Kurnell Safety Awareness Regulations in Working Safely Page 7 of 12
  • 8. Curriculum Vitae COREGAS BLUE SCOPE STEEL BHP MAY-JUN 2009 WOLLONGONG GAS PLANT MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Complete mechanical shutdown of Coregas plant in Wollongong Removal and replacement of all valves and actuators Complete strip of internal reactors, repair and reload Complete strip of internal evap cooler and spray cooler columns, replace all internal components that need repairing Mechanical planning for shutdown in liaison with Core gas Mechanical Crew Organisation of mechanical work packs and isolation procedures Implementing Coregas Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE APR-MAY 2009 MECHANICAL DHTU CONSTRUCTION CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical Supervisor Contract Resources Mechanical Crew Hired out to Downer Edi Engineering to help with Hydro testing, flushing and reinstating of pipe work and exchanges Mechanical Hy-Torque bolts to designated torque specifications Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping Reading and Planning Isometric drawings Implementing Caltex Lytton Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE MAR-APR 2009 MECHANICAL SHUTDOWN POLY REACTOR CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical Shutdown of 4C-2 Poly Reactor Mechanical Planning for Shutdown Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping Mechanical Hydro Pressure testing of new pipe lines fitted and welded Mechanical Hy-Torque bolts to designated Torque specifications Reading and planning Isometric drawings Implementing Caltex Lytton Safety Awareness Regulations in Working Safely CALTEX KERNELL REFINERY SYDNEY MARCH 2009 MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and Installation of Exchanges Mechanical removal of Bundles Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping Mechanical Hydro Pressure Testing of new Pipe lines fitted and welded Mechanical Hy-Torque Bolts to designated Torque specifications Instillation of Mechanical components for internal columns Reading and Planning Isometric Drawings Implementing Caltex Kernell Safety Awareness Regulations in Working Safely Page 8 of 12
  • 9. Curriculum Vitae NEW ZEALAND REFINING COMPANY FEB-MAR 2009 MASDON POINT NEW ZEALAND NORTH ISLAND MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and installation of Exchanges Mechanical removal of Bundles Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds Spades, Spools and Piping Mechanical Hydro Pressure Testing of new pipe lines fitted and welded Mechanical Hy-Torque bolts to designated torque specifications Installation of Mechanical Components for internal columns Reading and planning Isometric drawings Implementing New Zealand Refining Company Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE JAN-FEB 2009 MECHANICAL DHTU CONSTRUCTION CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical Installation Haldor Topsoe Internal Reactor Components Mechanical Supervision of installation crew Installed Reactor, Salt-water dryer and salt water stripper column internals Liaised with Haldor Topsoe Engineer with instillation procedures and guidelines Mechanical Hy-Torque bolts to designated torque specifications Usage of internal laser leveling, checked level of internal rings, trays and beams, all items fitted within specifications. Reading and planning isometric drawings Job completed within time designated, Caltex and Haldor Topsoe impressed with workmanship Implementing Caltex Lytton Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE DEC 2008 MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Installation of Mechanical Components for internal columns. Reading and planning Isometric Drawings Implementing Caltex Lytton Safety Awareness Regulations in Working Safely. Page 9 of 12
  • 10. Curriculum Vitae EXXON MOBIL ALTONA REFINERY 2008 CRACKER MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Installation of Mechanical Components for internal columns. Reading and planning Isometric Drawings Implementing Exxon Mobil Safety Awareness Regulations in Working Safely MOGAS MECHANICAL SHUTDOWN 2008 SHELL PETRO-CHEM REFINERY GEELONG SAVA ENGINEERING Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Reading and planning Isometric Drawings Implementing Shell Refinery Safety Awareness Regulations in Working Safely. BMC MECHANICAL SHUTDOWN 2008 SHELL PETRO-CHEMICAL REFINERY GEELONG SAVA ENGINEERING Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Reading and planning Isometric Drawings Implementing Shell Refinery Safety Awareness Regulations in Working Safely. Page 10 of 12
  • 11. Curriculum Vitae WOODSIDE LNG PHASE V GAS TRAIN PLANT 2007-2008 CB&I CONTRACTORS KARRATHA W.A. MECHANICAL SUPERVISOR Mechanical Hydro-Testing crew Foreman Setting up Mechanical work packs for tradesman in Hydro test crew Installation of Mechanical Components for internal vessels, foreman Sulzer Products from Switzerland Complete the mechanical section of this plant and in charge of the Mechanical Fitters, Welders and Boilermakers in this section of the plant. Working closely with Mechanical Superintendent, in relation to Isometric drawings, manufacturing issues, Mechanical Engineering issues. Organised meetings for this section of the plant and drawings for completion of jobs. Organising tradesman’s work tasks and planning for each Mechanical section of the plant United Construction, Pt.Hedland, WA, Australia 1997-1998 MECHANICAL FITTER / FOREMAN Installation of Mechanical Pumps, Gearboxes, Conveyer Systems, Gantry Crane Assembly. Alignments and adjustments according to manufacture specifications. Crane maintenance repair and servicing, in charge of repairs on all types of cranes in service around work site, breakdown service and repairs, hydraulics, alimak hoist and lifts servicing, maintenance and repair. Organised meetings for this section of the plant and drawings for completion of jobs. Mechanical fitting and repairs. Diagnostic analysis and fault-finding Condition Monitoring – Preventative and reactive maintenance. Installation and service. Page 11 of 12
  • 12. Curriculum Vitae REFEREES Alfred Quadrio | Projects and Services Manager | Downer Australia T +61 3 9644 9240 |M 0402 856 006 Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207 Sue Marley | Resource Team Leader | Downer Australia T +61 3 9644 9100 |M 0408 122 327 Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207 Branko Matijevic | General Manager | Sava Engineering T +61 3 5278 6122 5 Seabreeze Pde, North Shore, Victoria, 3214 Page 12 of 12