Curriculum Vitae
Tony Herceg
Contact Details
PO Box 941
Geelong Vic 3220
Mob: 0433464699
E-Mail: tony.herceg72@gmail.com
Personal Details
DOB: 28t h
December 1972
MARITAL STATUS: Married
NATIONALITY: Australian
Education
Gordon Institute of Technology
Geelong Victoria
C o mp l e ted M ec ha nic al Fi t ti ng T rad e C er ti fic a te
Box Hill Institute of Technology
Melbourne Victoria
Completed PMA30108 Certificate IV in Process Plant Operation
Swinburne University Tafe College
Melbourne Victoria
Current Assc. Dip Project Management
Fortior Global Pty Ltd
Melbourne Victoria
Project Management in Primavera P6
St Josephs College
Geelong Victoria
Victoria Certificate of Education (VCE), 1988
O.H.S. Certification
Australia – V406577
CLASS: LF HM HP CB RB
Completed Dogman /Rigger, Crane, Forklift, Senior First Aid, Breathing Apparatus Under Inert Entry, Rope
Access, Confined Spaces and Rescue, Working at Heights
OFFSHORE ACCREDITATION
BOSIET / TBOSIET/ HUET LICENCE OF COMPETENCY OFFSHORE
MSIC CARD HOLDER
Page 1 of 12
Curriculum Vitae
Objectives
Discharge experience with:
 Project Control & Management
 Contractor Safety, Control & Management
 Manufacture & Installation Technical Specifications, Tendering, and Award Process.
 Installation Planning, Scheduling & Project Implementation
Summary of Experience and Key Skills
Key Experiences have included:
 Project Management
 Contractor Safety Management
 Contract/Contractor Management
 Development and implementation of a QA system for Downer Engineering Pipe &
Mechanical in accordance with ISO9001:2000.
 Review of drawings, process technical specifications and procedures for installation
testing and commissioning.
 Writing process technical specifications and procedures for installation testing and
commissioning.
 Develop detailed work packages for tendering and installation.
 Detailed multi task scheduling of complete project scope using Primavera and
Microsoft Project software.
 Detailed Maintenance Service Programs SAP / Maximo
 Liaising with multi-discipline groups to ensure complete packages including
Structural, Mechanical, Electrical & Automation have all interfaces identified and
linked and implementation is coordinated.
 Ensuring all installations meet client specifications, meet all Statutory, State and
Local Government requirements and meet QA/QC requirements.
 Ensure handover of completed works is documented such that plant may be started in
a safe, controlled manner.
Page 2 of 12
Curriculum Vitae
Technical Areas of Expertise
 Mechanical Installations
 Rotating Equipment
 Project Engineering
 Pneumatic & Hydraulic Installations
 Piping Installation
 Structural Works
 Project Management
 Safety
 Client liaison
 Labour & supervision management
 Procurement
 Scheduling
 Cost control
 Quality control
 Project implementation:
 Demolition
 Installation ( Mechanical )
 Commissioning (Mechanical )
 Technical writing:
 Project work scope
 Tender documentation
 Work method statements
 Task specific work instruction
 Job Safety Analysis
 Hazard analysis
 Quality systems documentation
 Inspection & Test Plans
 Project Scheduling using Primavera and Micro Proj Software
 Use of MS Word, Excel, PowerPoint etc to prepare technical documentation, budgets,
estimates and expenditure control.
Page 3 of 12
Curriculum Vitae
PROFESSIONAL EXPERIENCE
CHEVRON GORGON PROJECT BARROW ISLAND JAN-2014
CB&I KENTZ JOINT VENTURE (CKJV)
LEAD CONSTRUCTION PLANER
Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction
requirements.
Responsible for establishing workface planning standards, procedures and adoption of best practices.
Assisting with the training and development of the Construction Planning organisation and its staff.
Maintaining the FIWP Development Log.
Providing daily direction, training and support to Construction Planners.
Organising and coordinating cross discipline planning & schedule reviews.
Facilitating a weekly scheduling and planning overview with construction and planning teams.
Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction
requirements.
Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction
requirements.
SEA DOWNER FABRICATION & MAINTENANCE OPERATIONS
JAN 2013-JAN 2014
DOWNER ENGINEERING
SOUTH EAST AUSTRALIA OPERATIONS MANAGER FABRICATION
Awarded into Downer Leadership Program, acknowledge as future potential leader of the Downer Australia
Business
Established systems and policies relating to the management of planning and cost control
Business Development and business relationships
Financial and progress reporting on a daily and monthly basis to senior project stakeholders
Projects Safety, Quality and other Project Management Plans
Reviewed all tender packages to be put forth to the client and making necessary changes if required
Established a strong Quality Management and Maintenance associated systems
Control of operational expenses to meet budget guidelines
Implementation Engineering
Management and Cost Control
BORAL CEMENT WAURN PONDS NOV2011-JAN2013
DOWNER ENGINEERING
PROJECT MANAGER
Established systems and policies relating to the management of planning and cost control
Financial and progress reporting on a daily and monthly basis to senior project stakeholders
Projects Safety, Quality and other Project Management Plans
Reviewed all tender packages to be put forth to the client and making necessary changes if required
Established a strong Quality Management and Maintenance associated systems
Control of operational expenses to meet budget guidelines
Implementation Engineering
Management and Cost Control of Plant Turnarounds
Page 4 of 12
Curriculum Vitae
ALCOA POINT HENRY JAN 2011
GREEN MILL FTS EXPANSION PROJECT
DOWNER ENGINEERING
PROJECT ENGINEER
Schedule preparation Primavera
Resource forecasting
Quality Controls Management
Review Tender Project Contracts
Management Plan and ITP documents
Authorise drawings for construction and dimension checks
Develop contracts and work packages for associated contractors
Materials & Equipment Control Document
RCCU COMPLEX TURAROUND 2011 DEC 2010
SHELL PETRO-CHEMICAL REFINERY GEELONG
PLANNER / ESTIMATOR
CONTRACT RESOURCES
Schedule preparation Primavera
Resource forecasting
Quality Controls Management
Tender Development
CONOCCOPHILLIPS BAYU UNDAN OFFSHORE NOV 2010
MOL SIEVE TURNAROUND
MECHANICAL SUPERVISOR
CONTRACT RESOURCES
Planned and Completed Mechanical Work Scope on Mol Sieve’s A + B
Fitted Blind Isolations to both A + B Mol Sieves as per P&ID Drawings
Removed both Top and Bottom Manways for Entry Confined Space
Replaced all Mechanical Hardware Including Studs on all Pipe Flanges
First Time Mol Sieve’s Change out Since Operations had Began
Implemented ConocoPhillips Safety Standards which made the job a Success
CALTEX LYTTON REFINERY BRISBANE OCT 2010
SAT GAS TURNAROUND
PROJECT MANAGER/PLANNER
CONTRACT RESOURCES
Planning Contract Resources work scope for Sat Gas Turnaround
Liaising with Caltex Turnaround Management team
Costing work scope
Progress reporting work scope on daily meetings
TEL PLANT DEMOLITION JULY 2010
SHELL PETRO-CHEMICAL REFINERY
GEELONG
CONTRACT RESOURCES
Demolition of TEL plant including four storage tanks, process plant spools, and ship to shore pipe work.
Oxy-cutting all pipe work
Qxy-cutting storage tanks
Flame washing
Rigging and dogging 50 tonne Crane
Page 5 of 12
Curriculum Vitae
CALTEX LYTTON REFINERY BRISBANE MAY-JULY 2010
ALKY AND FCCU TURNAROUND
MECHANICAL SUPERVISOR
CONTRACT RESOURCES
Mechanical Supervisor Contract Resources Mechanical Crew
Hydro testing, flushing and reinstating of pipe work and exchanges
Mechanical Hy-Torque bolts to designated torque specifications
Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping
Reading and Planning Isometric drawings
Internal repairs on the FCCU and Alky Columns
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
BHP BILLITON PYRENESS FPSO MODEC FEB-MAY 2010
RISER ARM INSTALLATIONS
MECHANICAL WORK SCOPE
RIGTECH ENERGY AUSTRALIA
Mechanical installation of risers on Tarrant arm
Removed and replaced modified riser clamps
Mechanical alignments
Heavy rigging involved
Replace hydraulic hoses on HPU unit
Set up of Solar Turbines and Alignment
Set up of Compressors and Alignment
Pump Alignments
Heat Exchangers Hydro and Removal and Replacement
BHP BILLITON STYBARROW FPSO MODEC JAN 2010
MECHANICAL WORK SCOPE
SAILED FROM EXMOUTH TO SINGAPORE
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Chemical clean of all process lines and vessel
Working with P&ID drawings following the process flow of designated plant areas
Setting up manifolds to tap into process lines
Using Steam and Zyme-flow in process of chemical clean
Regular samples and measurements for Hydrocarbons, LEL levels
Working with BHP process opening and closing certain valves for flow and temperature settings
Implemented all BHP/MODEC safety standards
BHP BILLITON OLYMPIC DAM JAN 2010
CATAYLST REACTOR CHANGE OUT
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Complete mechanical blinding of reactors for isolations and catalyst change out.
Complete reactor catalyst change out.
Complete de-blinding and reinstatement.
Implemented all BP safety standards
Page 6 of 12
Curriculum Vitae
BP BULWER REFINERY BRISBANE NOV-DEC 2009
CATAYLST REACTOR CHANGE OUT
CONTRACT RESOURCES
MECHANICAL WORK LEADER
Complete mechanical blinding of reactors for isolations and catalyst change out.
Complete reactor catalyst change out.
Complete de-blinding and reinstatement.
Implemented all BP safety standards
GRIFFIN VENTURE FPSO BHP OFFSHORE AUG-NOV 2009
NORTH WEST SHELF
DE COMISSIONING OF FPSO PLATFORM
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Complete mechanical de-commissioning of plant for sail away
Mechanical blinding of all vessels for clean out
Mechanical blinding of all cargo tanks for clean out
Mechanical de-commissioning of all pumps, compressors and turbines
Job completed in time required BHP happy with workmanship
Implemented all BHP safety standards
CALTEX LYTTON REFINERY BRISBANE JULY-AUG 2009
MECHANICAL SHUTDOWN TEXAS TOWER
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical overhaul and chemical clean Texas tower heat exchanger vertical standing
Isolated Texas tower followed Caltex blinding procedures
Stripped all major components of exchanger
Fitted specially engineered spool piece on inlet for chemical clean
Worked in co-operation with American company on chemical clean
Fitted piping and manifold specially designed for chem clean
Completed chem clean procedure with successful results
Refitted and Hydro tested Exchanger
Replaced all major components and gaskets
De-isolated exchanger
Successful start-up Caltex very happy with job
CALTEX KURNELL REFINERY SYDNEY JUN-JULY 2009
MECHANICAL DHTU SHUTDOWN EXCHANGERS
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical overhaul DHTU plant heat exchangers
Complete strip of heat exchangers
Completed Hydro tests on both tube and shell sides
Replaced all studs and gaskets
Reinstated all components and torque to specs
Implementing Caltex Kurnell Safety Awareness Regulations in Working Safely
Page 7 of 12
Curriculum Vitae
COREGAS BLUE SCOPE STEEL BHP MAY-JUN 2009
WOLLONGONG GAS PLANT
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Complete mechanical shutdown of Coregas plant in Wollongong
Removal and replacement of all valves and actuators
Complete strip of internal reactors, repair and reload
Complete strip of internal evap cooler and spray cooler columns, replace all internal components that need
repairing
Mechanical planning for shutdown in liaison with Core gas Mechanical Crew
Organisation of mechanical work packs and isolation procedures
Implementing Coregas Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE APR-MAY 2009
MECHANICAL DHTU CONSTRUCTION
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical Supervisor Contract Resources Mechanical Crew
Hired out to Downer Edi Engineering to help with Hydro testing, flushing and reinstating of pipe work and
exchanges
Mechanical Hy-Torque bolts to designated torque specifications
Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping
Reading and Planning Isometric drawings
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE MAR-APR 2009
MECHANICAL SHUTDOWN POLY REACTOR
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical Shutdown of 4C-2 Poly Reactor
Mechanical Planning for Shutdown
Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping
Mechanical Hydro Pressure testing of new pipe lines fitted and welded
Mechanical Hy-Torque bolts to designated Torque specifications
Reading and planning Isometric drawings
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
CALTEX KERNELL REFINERY SYDNEY MARCH 2009
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and Installation of Exchanges
Mechanical removal of Bundles
Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping
Mechanical Hydro Pressure Testing of new Pipe lines fitted and welded
Mechanical Hy-Torque Bolts to designated Torque specifications
Instillation of Mechanical components for internal columns
Reading and Planning Isometric Drawings
Implementing Caltex Kernell Safety Awareness Regulations in Working Safely
Page 8 of 12
Curriculum Vitae
NEW ZEALAND REFINING COMPANY FEB-MAR 2009
MASDON POINT NEW ZEALAND
NORTH ISLAND
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and installation of Exchanges
Mechanical removal of Bundles
Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds Spades, Spools and
Piping
Mechanical Hydro Pressure Testing of new pipe lines fitted and welded
Mechanical Hy-Torque bolts to designated torque specifications
Installation of Mechanical Components for internal columns
Reading and planning Isometric drawings
Implementing New Zealand Refining Company Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE JAN-FEB 2009
MECHANICAL DHTU CONSTRUCTION
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical Installation Haldor Topsoe Internal Reactor Components
Mechanical Supervision of installation crew
Installed Reactor, Salt-water dryer and salt water stripper column internals
Liaised with Haldor Topsoe Engineer with instillation procedures and guidelines
Mechanical Hy-Torque bolts to designated torque specifications
Usage of internal laser leveling, checked level of internal rings, trays and beams, all items fitted within
specifications.
Reading and planning isometric drawings
Job completed within time designated, Caltex and Haldor Topsoe impressed with workmanship
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely
CALTEX LYTTON REFINERY BRISBANE DEC 2008
MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Installation of Mechanical Components for internal columns.
Reading and planning Isometric Drawings
Implementing Caltex Lytton Safety Awareness Regulations in Working Safely.
Page 9 of 12
Curriculum Vitae
EXXON MOBIL ALTONA REFINERY 2008
CRACKER MECHANICAL SHUTDOWN
CONTRACT RESOURCES
MECHANICAL SUPERVISOR
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds, Spades, Spools
and Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Installation of Mechanical Components for internal columns.
Reading and planning Isometric Drawings
Implementing Exxon Mobil Safety Awareness Regulations in Working Safely
MOGAS MECHANICAL SHUTDOWN 2008
SHELL PETRO-CHEM REFINERY
GEELONG
SAVA ENGINEERING
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Reading and planning Isometric Drawings
Implementing Shell Refinery Safety Awareness Regulations in Working Safely.
BMC MECHANICAL SHUTDOWN 2008
SHELL PETRO-CHEMICAL REFINERY
GEELONG
SAVA ENGINEERING
Mechanical removal and installation of Exchanges
Mechanical Removal of Bundles.
Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and
Piping.
Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded
Mechanical Hy-torque Bolts to designated Torque specifications
Reading and planning Isometric Drawings
Implementing Shell Refinery Safety Awareness Regulations in Working Safely.
Page 10 of 12
Curriculum Vitae
WOODSIDE LNG PHASE V GAS TRAIN PLANT 2007-2008
CB&I CONTRACTORS KARRATHA W.A.
MECHANICAL SUPERVISOR
Mechanical Hydro-Testing crew Foreman
Setting up Mechanical work packs for tradesman in Hydro test crew
Installation of Mechanical Components for internal vessels, foreman Sulzer Products from Switzerland
Complete the mechanical section of this plant and in charge of the Mechanical Fitters, Welders and
Boilermakers in this section of the plant.
Working closely with Mechanical Superintendent, in relation to Isometric drawings, manufacturing issues,
Mechanical Engineering issues.
Organised meetings for this section of the plant and drawings for completion of jobs.
Organising tradesman’s work tasks and planning for each Mechanical section of the plant
United Construction, Pt.Hedland, WA, Australia 1997-1998
MECHANICAL FITTER / FOREMAN
Installation of Mechanical Pumps, Gearboxes, Conveyer Systems, Gantry Crane Assembly. Alignments and
adjustments according to manufacture specifications.
Crane maintenance repair and servicing, in charge of repairs on all types of cranes in service around work site,
breakdown service and repairs, hydraulics, alimak hoist and lifts servicing, maintenance and repair.
Organised meetings for this section of the plant and drawings for completion of jobs.
Mechanical fitting and repairs.
Diagnostic analysis and fault-finding
Condition Monitoring – Preventative and reactive maintenance.
Installation and service.
Page 11 of 12
Curriculum Vitae
REFEREES
Alfred Quadrio | Projects and Services Manager | Downer Australia
T +61 3 9644 9240 |M 0402 856 006
Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207
Sue Marley | Resource Team Leader | Downer Australia
T +61 3 9644 9100 |M 0408 122 327
Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207
Branko Matijevic | General Manager | Sava Engineering
T +61 3 5278 6122
5 Seabreeze Pde, North Shore, Victoria, 3214
Page 12 of 12
TONY  HERCEGl resume

TONY HERCEGl resume

  • 1.
    Curriculum Vitae Tony Herceg ContactDetails PO Box 941 Geelong Vic 3220 Mob: 0433464699 E-Mail: tony.herceg72@gmail.com Personal Details DOB: 28t h December 1972 MARITAL STATUS: Married NATIONALITY: Australian Education Gordon Institute of Technology Geelong Victoria C o mp l e ted M ec ha nic al Fi t ti ng T rad e C er ti fic a te Box Hill Institute of Technology Melbourne Victoria Completed PMA30108 Certificate IV in Process Plant Operation Swinburne University Tafe College Melbourne Victoria Current Assc. Dip Project Management Fortior Global Pty Ltd Melbourne Victoria Project Management in Primavera P6 St Josephs College Geelong Victoria Victoria Certificate of Education (VCE), 1988 O.H.S. Certification Australia – V406577 CLASS: LF HM HP CB RB Completed Dogman /Rigger, Crane, Forklift, Senior First Aid, Breathing Apparatus Under Inert Entry, Rope Access, Confined Spaces and Rescue, Working at Heights OFFSHORE ACCREDITATION BOSIET / TBOSIET/ HUET LICENCE OF COMPETENCY OFFSHORE MSIC CARD HOLDER Page 1 of 12
  • 2.
    Curriculum Vitae Objectives Discharge experiencewith:  Project Control & Management  Contractor Safety, Control & Management  Manufacture & Installation Technical Specifications, Tendering, and Award Process.  Installation Planning, Scheduling & Project Implementation Summary of Experience and Key Skills Key Experiences have included:  Project Management  Contractor Safety Management  Contract/Contractor Management  Development and implementation of a QA system for Downer Engineering Pipe & Mechanical in accordance with ISO9001:2000.  Review of drawings, process technical specifications and procedures for installation testing and commissioning.  Writing process technical specifications and procedures for installation testing and commissioning.  Develop detailed work packages for tendering and installation.  Detailed multi task scheduling of complete project scope using Primavera and Microsoft Project software.  Detailed Maintenance Service Programs SAP / Maximo  Liaising with multi-discipline groups to ensure complete packages including Structural, Mechanical, Electrical & Automation have all interfaces identified and linked and implementation is coordinated.  Ensuring all installations meet client specifications, meet all Statutory, State and Local Government requirements and meet QA/QC requirements.  Ensure handover of completed works is documented such that plant may be started in a safe, controlled manner. Page 2 of 12
  • 3.
    Curriculum Vitae Technical Areasof Expertise  Mechanical Installations  Rotating Equipment  Project Engineering  Pneumatic & Hydraulic Installations  Piping Installation  Structural Works  Project Management  Safety  Client liaison  Labour & supervision management  Procurement  Scheduling  Cost control  Quality control  Project implementation:  Demolition  Installation ( Mechanical )  Commissioning (Mechanical )  Technical writing:  Project work scope  Tender documentation  Work method statements  Task specific work instruction  Job Safety Analysis  Hazard analysis  Quality systems documentation  Inspection & Test Plans  Project Scheduling using Primavera and Micro Proj Software  Use of MS Word, Excel, PowerPoint etc to prepare technical documentation, budgets, estimates and expenditure control. Page 3 of 12
  • 4.
    Curriculum Vitae PROFESSIONAL EXPERIENCE CHEVRONGORGON PROJECT BARROW ISLAND JAN-2014 CB&I KENTZ JOINT VENTURE (CKJV) LEAD CONSTRUCTION PLANER Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction requirements. Responsible for establishing workface planning standards, procedures and adoption of best practices. Assisting with the training and development of the Construction Planning organisation and its staff. Maintaining the FIWP Development Log. Providing daily direction, training and support to Construction Planners. Organising and coordinating cross discipline planning & schedule reviews. Facilitating a weekly scheduling and planning overview with construction and planning teams. Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction requirements. Reviewing, approving, issuing and releasing work packages in line with schedule, procurement and construction requirements. SEA DOWNER FABRICATION & MAINTENANCE OPERATIONS JAN 2013-JAN 2014 DOWNER ENGINEERING SOUTH EAST AUSTRALIA OPERATIONS MANAGER FABRICATION Awarded into Downer Leadership Program, acknowledge as future potential leader of the Downer Australia Business Established systems and policies relating to the management of planning and cost control Business Development and business relationships Financial and progress reporting on a daily and monthly basis to senior project stakeholders Projects Safety, Quality and other Project Management Plans Reviewed all tender packages to be put forth to the client and making necessary changes if required Established a strong Quality Management and Maintenance associated systems Control of operational expenses to meet budget guidelines Implementation Engineering Management and Cost Control BORAL CEMENT WAURN PONDS NOV2011-JAN2013 DOWNER ENGINEERING PROJECT MANAGER Established systems and policies relating to the management of planning and cost control Financial and progress reporting on a daily and monthly basis to senior project stakeholders Projects Safety, Quality and other Project Management Plans Reviewed all tender packages to be put forth to the client and making necessary changes if required Established a strong Quality Management and Maintenance associated systems Control of operational expenses to meet budget guidelines Implementation Engineering Management and Cost Control of Plant Turnarounds Page 4 of 12
  • 5.
    Curriculum Vitae ALCOA POINTHENRY JAN 2011 GREEN MILL FTS EXPANSION PROJECT DOWNER ENGINEERING PROJECT ENGINEER Schedule preparation Primavera Resource forecasting Quality Controls Management Review Tender Project Contracts Management Plan and ITP documents Authorise drawings for construction and dimension checks Develop contracts and work packages for associated contractors Materials & Equipment Control Document RCCU COMPLEX TURAROUND 2011 DEC 2010 SHELL PETRO-CHEMICAL REFINERY GEELONG PLANNER / ESTIMATOR CONTRACT RESOURCES Schedule preparation Primavera Resource forecasting Quality Controls Management Tender Development CONOCCOPHILLIPS BAYU UNDAN OFFSHORE NOV 2010 MOL SIEVE TURNAROUND MECHANICAL SUPERVISOR CONTRACT RESOURCES Planned and Completed Mechanical Work Scope on Mol Sieve’s A + B Fitted Blind Isolations to both A + B Mol Sieves as per P&ID Drawings Removed both Top and Bottom Manways for Entry Confined Space Replaced all Mechanical Hardware Including Studs on all Pipe Flanges First Time Mol Sieve’s Change out Since Operations had Began Implemented ConocoPhillips Safety Standards which made the job a Success CALTEX LYTTON REFINERY BRISBANE OCT 2010 SAT GAS TURNAROUND PROJECT MANAGER/PLANNER CONTRACT RESOURCES Planning Contract Resources work scope for Sat Gas Turnaround Liaising with Caltex Turnaround Management team Costing work scope Progress reporting work scope on daily meetings TEL PLANT DEMOLITION JULY 2010 SHELL PETRO-CHEMICAL REFINERY GEELONG CONTRACT RESOURCES Demolition of TEL plant including four storage tanks, process plant spools, and ship to shore pipe work. Oxy-cutting all pipe work Qxy-cutting storage tanks Flame washing Rigging and dogging 50 tonne Crane Page 5 of 12
  • 6.
    Curriculum Vitae CALTEX LYTTONREFINERY BRISBANE MAY-JULY 2010 ALKY AND FCCU TURNAROUND MECHANICAL SUPERVISOR CONTRACT RESOURCES Mechanical Supervisor Contract Resources Mechanical Crew Hydro testing, flushing and reinstating of pipe work and exchanges Mechanical Hy-Torque bolts to designated torque specifications Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping Reading and Planning Isometric drawings Internal repairs on the FCCU and Alky Columns Implementing Caltex Lytton Safety Awareness Regulations in Working Safely BHP BILLITON PYRENESS FPSO MODEC FEB-MAY 2010 RISER ARM INSTALLATIONS MECHANICAL WORK SCOPE RIGTECH ENERGY AUSTRALIA Mechanical installation of risers on Tarrant arm Removed and replaced modified riser clamps Mechanical alignments Heavy rigging involved Replace hydraulic hoses on HPU unit Set up of Solar Turbines and Alignment Set up of Compressors and Alignment Pump Alignments Heat Exchangers Hydro and Removal and Replacement BHP BILLITON STYBARROW FPSO MODEC JAN 2010 MECHANICAL WORK SCOPE SAILED FROM EXMOUTH TO SINGAPORE CONTRACT RESOURCES MECHANICAL SUPERVISOR Chemical clean of all process lines and vessel Working with P&ID drawings following the process flow of designated plant areas Setting up manifolds to tap into process lines Using Steam and Zyme-flow in process of chemical clean Regular samples and measurements for Hydrocarbons, LEL levels Working with BHP process opening and closing certain valves for flow and temperature settings Implemented all BHP/MODEC safety standards BHP BILLITON OLYMPIC DAM JAN 2010 CATAYLST REACTOR CHANGE OUT CONTRACT RESOURCES MECHANICAL SUPERVISOR Complete mechanical blinding of reactors for isolations and catalyst change out. Complete reactor catalyst change out. Complete de-blinding and reinstatement. Implemented all BP safety standards Page 6 of 12
  • 7.
    Curriculum Vitae BP BULWERREFINERY BRISBANE NOV-DEC 2009 CATAYLST REACTOR CHANGE OUT CONTRACT RESOURCES MECHANICAL WORK LEADER Complete mechanical blinding of reactors for isolations and catalyst change out. Complete reactor catalyst change out. Complete de-blinding and reinstatement. Implemented all BP safety standards GRIFFIN VENTURE FPSO BHP OFFSHORE AUG-NOV 2009 NORTH WEST SHELF DE COMISSIONING OF FPSO PLATFORM CONTRACT RESOURCES MECHANICAL SUPERVISOR Complete mechanical de-commissioning of plant for sail away Mechanical blinding of all vessels for clean out Mechanical blinding of all cargo tanks for clean out Mechanical de-commissioning of all pumps, compressors and turbines Job completed in time required BHP happy with workmanship Implemented all BHP safety standards CALTEX LYTTON REFINERY BRISBANE JULY-AUG 2009 MECHANICAL SHUTDOWN TEXAS TOWER CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical overhaul and chemical clean Texas tower heat exchanger vertical standing Isolated Texas tower followed Caltex blinding procedures Stripped all major components of exchanger Fitted specially engineered spool piece on inlet for chemical clean Worked in co-operation with American company on chemical clean Fitted piping and manifold specially designed for chem clean Completed chem clean procedure with successful results Refitted and Hydro tested Exchanger Replaced all major components and gaskets De-isolated exchanger Successful start-up Caltex very happy with job CALTEX KURNELL REFINERY SYDNEY JUN-JULY 2009 MECHANICAL DHTU SHUTDOWN EXCHANGERS CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical overhaul DHTU plant heat exchangers Complete strip of heat exchangers Completed Hydro tests on both tube and shell sides Replaced all studs and gaskets Reinstated all components and torque to specs Implementing Caltex Kurnell Safety Awareness Regulations in Working Safely Page 7 of 12
  • 8.
    Curriculum Vitae COREGAS BLUESCOPE STEEL BHP MAY-JUN 2009 WOLLONGONG GAS PLANT MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Complete mechanical shutdown of Coregas plant in Wollongong Removal and replacement of all valves and actuators Complete strip of internal reactors, repair and reload Complete strip of internal evap cooler and spray cooler columns, replace all internal components that need repairing Mechanical planning for shutdown in liaison with Core gas Mechanical Crew Organisation of mechanical work packs and isolation procedures Implementing Coregas Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE APR-MAY 2009 MECHANICAL DHTU CONSTRUCTION CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical Supervisor Contract Resources Mechanical Crew Hired out to Downer Edi Engineering to help with Hydro testing, flushing and reinstating of pipe work and exchanges Mechanical Hy-Torque bolts to designated torque specifications Mechanical removal of Control valves, Relief valves, Blinds and Spades, spools and Piping Reading and Planning Isometric drawings Implementing Caltex Lytton Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE MAR-APR 2009 MECHANICAL SHUTDOWN POLY REACTOR CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical Shutdown of 4C-2 Poly Reactor Mechanical Planning for Shutdown Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping Mechanical Hydro Pressure testing of new pipe lines fitted and welded Mechanical Hy-Torque bolts to designated Torque specifications Reading and planning Isometric drawings Implementing Caltex Lytton Safety Awareness Regulations in Working Safely CALTEX KERNELL REFINERY SYDNEY MARCH 2009 MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and Installation of Exchanges Mechanical removal of Bundles Mechanical removal, replacement and instillations of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping Mechanical Hydro Pressure Testing of new Pipe lines fitted and welded Mechanical Hy-Torque Bolts to designated Torque specifications Instillation of Mechanical components for internal columns Reading and Planning Isometric Drawings Implementing Caltex Kernell Safety Awareness Regulations in Working Safely Page 8 of 12
  • 9.
    Curriculum Vitae NEW ZEALANDREFINING COMPANY FEB-MAR 2009 MASDON POINT NEW ZEALAND NORTH ISLAND MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and installation of Exchanges Mechanical removal of Bundles Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds Spades, Spools and Piping Mechanical Hydro Pressure Testing of new pipe lines fitted and welded Mechanical Hy-Torque bolts to designated torque specifications Installation of Mechanical Components for internal columns Reading and planning Isometric drawings Implementing New Zealand Refining Company Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE JAN-FEB 2009 MECHANICAL DHTU CONSTRUCTION CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical Installation Haldor Topsoe Internal Reactor Components Mechanical Supervision of installation crew Installed Reactor, Salt-water dryer and salt water stripper column internals Liaised with Haldor Topsoe Engineer with instillation procedures and guidelines Mechanical Hy-Torque bolts to designated torque specifications Usage of internal laser leveling, checked level of internal rings, trays and beams, all items fitted within specifications. Reading and planning isometric drawings Job completed within time designated, Caltex and Haldor Topsoe impressed with workmanship Implementing Caltex Lytton Safety Awareness Regulations in Working Safely CALTEX LYTTON REFINERY BRISBANE DEC 2008 MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Installation of Mechanical Components for internal columns. Reading and planning Isometric Drawings Implementing Caltex Lytton Safety Awareness Regulations in Working Safely. Page 9 of 12
  • 10.
    Curriculum Vitae EXXON MOBILALTONA REFINERY 2008 CRACKER MECHANICAL SHUTDOWN CONTRACT RESOURCES MECHANICAL SUPERVISOR Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installations of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Installation of Mechanical Components for internal columns. Reading and planning Isometric Drawings Implementing Exxon Mobil Safety Awareness Regulations in Working Safely MOGAS MECHANICAL SHUTDOWN 2008 SHELL PETRO-CHEM REFINERY GEELONG SAVA ENGINEERING Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Reading and planning Isometric Drawings Implementing Shell Refinery Safety Awareness Regulations in Working Safely. BMC MECHANICAL SHUTDOWN 2008 SHELL PETRO-CHEMICAL REFINERY GEELONG SAVA ENGINEERING Mechanical removal and installation of Exchanges Mechanical Removal of Bundles. Mechanical removal, replacement and installation of Control Valves, Relief Valves, Blinds, Spades, Spools and Piping. Mechanical Hydro Pressure testing of new Pipe Lines fitted and welded Mechanical Hy-torque Bolts to designated Torque specifications Reading and planning Isometric Drawings Implementing Shell Refinery Safety Awareness Regulations in Working Safely. Page 10 of 12
  • 11.
    Curriculum Vitae WOODSIDE LNGPHASE V GAS TRAIN PLANT 2007-2008 CB&I CONTRACTORS KARRATHA W.A. MECHANICAL SUPERVISOR Mechanical Hydro-Testing crew Foreman Setting up Mechanical work packs for tradesman in Hydro test crew Installation of Mechanical Components for internal vessels, foreman Sulzer Products from Switzerland Complete the mechanical section of this plant and in charge of the Mechanical Fitters, Welders and Boilermakers in this section of the plant. Working closely with Mechanical Superintendent, in relation to Isometric drawings, manufacturing issues, Mechanical Engineering issues. Organised meetings for this section of the plant and drawings for completion of jobs. Organising tradesman’s work tasks and planning for each Mechanical section of the plant United Construction, Pt.Hedland, WA, Australia 1997-1998 MECHANICAL FITTER / FOREMAN Installation of Mechanical Pumps, Gearboxes, Conveyer Systems, Gantry Crane Assembly. Alignments and adjustments according to manufacture specifications. Crane maintenance repair and servicing, in charge of repairs on all types of cranes in service around work site, breakdown service and repairs, hydraulics, alimak hoist and lifts servicing, maintenance and repair. Organised meetings for this section of the plant and drawings for completion of jobs. Mechanical fitting and repairs. Diagnostic analysis and fault-finding Condition Monitoring – Preventative and reactive maintenance. Installation and service. Page 11 of 12
  • 12.
    Curriculum Vitae REFEREES Alfred Quadrio| Projects and Services Manager | Downer Australia T +61 3 9644 9240 |M 0402 856 006 Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207 Sue Marley | Resource Team Leader | Downer Australia T +61 3 9644 9100 |M 0408 122 327 Citiport Business Centre, Level 2, 650 Lorimer Street, Port Melbourne VIC 3207 Branko Matijevic | General Manager | Sava Engineering T +61 3 5278 6122 5 Seabreeze Pde, North Shore, Victoria, 3214 Page 12 of 12