RESUME
NAME : R.D.POOLEY
ADDRESS : 5 THE PIPPINS
WOLVISTON
CLEVELAND
TS22 5QB
E-MAIL ADDRESS : bjpooley1@gmail.com
TELEPHONE : 01740 601015 ( HOME )
07870 877625 ( MOBILE )
NATIONALITY : BRITISH
EDUCATION : HENRY SMITH GRAMMAR
WEST PARK COLLEGE OF F.E.
OPEN UNIVERSITY
QUALIFICATIONS : G.C.E. ‘O’ LEVEL
C & G PART 1 & 2 ( SHIP ENGINEERG )
B.Sc ( MATHS & TECHNOLOGY )
POSITION : PLANNING COORDINATOR
INSTITUTIONS : INSTITUTE OF PETROLEUM
MARITAL STATUS : MARRIED WITH 2 CHILDREN
DATE OF BIRTH : 28TH DECEMBER 1948
EXPERIENCE SUMMARY
OVER 40 YEARS EXPERIENCE IN PROJECT PLANNING, PRIMARILY ON BEHALF OF THE
OWNER. HELD PRINCIPAL / LEAD / SENIOR PLANNING POSITIONS IN DESIGN,
CONSTRUCTION AND OFFSHORE HOOK UP & COMMISSIONING PHASES OF PROJECT
DEVELOPMENT.
RECENT EXPERIENCES HAVE BEEN ON THE LITIGATION SIDE OF CLAIMS IN THE OIL &
GAS INDUSTRY AS A PROJECT PLANNING TECHNICAL EXPERT, WHICH INVOLVED
DELAY ANALYSIS, PREPARING FORENSIC PLANNING REPORTS AND CARRYING OUT
RISK ANALYSIS. THIS COVERED CRADLE TO GRAVE ASPECTS ON PROJECTS FROM
CONCEPTUAL DESIGN THROUGH FEED, CONSTRUCTION, COMMISSIONING &
OPERATIONS SUPPORT.
EXPERIENCED IN THE USE OF PRIMAVERA P6, P3 VERSION 3.0, ARTEMIS 7000
AUTOPLAN ( DEVELOPED BY AOC ), ALSO ARTEMIS 5000, 6000 AND 9000 MAINFRAME,
LOTUS APPLICATIONS, MILESTONES PROFESSIONAL, MICROSOFT PROJECT AND ALL
OTHER MICROSOFT OFFICE SOFTWARE. PERTMASTER RISK 8.1
REFERENCES :
LAST MAJOR PROJECTS
BOB BREEZE - MANAGING DIRECTOR STAPLETON INTERNATIONAL - +447798 778679.
rb@robertbreeze.co.uk
ARNE SIEWERTSEN ( PROJECT CONTROLS MANAGER – FLUOR ) – +316270 78865
arne.siewertsen@fluor.com
PREVIOUS PROJECTS
PETER WILLIAMS ( PROJECT MANAGER – BLUEWATER ) – +4523658659
peter.john.williams@maersk.com
DON GILLIES ( PROJECT SERVICES MANAGER PDP) – gillies.don@gmail.com
JOHN OATES ( SITE MANAGER MARATHON ) – 0780 858 7005
CHRIS PLATT ( OVERHAULS MANAGER PETROPLUS) – 07720 411791
LANGUAGES :
BASIC FRENCH
BASIC DUTCH
Aug 2014 to Present LIRAREED LIMITED (R D POOLEY LTD COMPANY)
SENIOR CONSULTANT –
Driver Trett - Delay Analysis for Cofely/Fabricom/IREM joint venture at
the Total Refinery at Antwerp on the Optara upgrade Project.
Premier Oil - Offshore Delay report for Premier Oil Solan Project.
Fluor - Preparing Tender documents for Refinery upgrades Projects in
Kuwait and Abu Dhabi.
Jan 2006 to July 2014 STAPLETON INTERNATIONAL
SENIOR CONSULTANT – Involved in Oil & Gas Litigation cases as a
Project Planning Technical expert, preparing Delay analysis Reports,
Forensic planning evaluation, Risk analysis and all other Project controls
involving ‘cradle to grave’ aspects from Conceptual, FEED, Construction,
Commissioning & Operations support.The clients involved were:
Premier Oil - Project status analysis - Solan Project @ Bifab yard in Fife
Statoil – Chinese built Semisubs Norwegian compliance scope reviews in
Westcon Yard Olenswag in Norway.
Apache – Ningaloo Vision FPSO Schedule audit review in Perth, Australia
Transocean Project status evaluation @ KFELS Singapore for 2 new build
Jack up rigs B326 & B327. Arctic III rig update in Astican yard Las Palmas
Maersk – Schedule review of Peregrino SSR Project scope in Rio, Brazil.
Bluewater BV Hoofddorp, ENI Kitan FPSO at Sembawang Singapore +
Aoka Mizu FPSO for Nexen Ettrick field at Keppel Rotterdam + HUC
support in Aberdeen + proposals for Golden Eagle FPSO + Glas Dowr
Huntington FPSO + Petrobas Munin FPSO + ENI Bouri FSO, developing
Conceptual + FEED design + Tenders.
Darlington office based assisting in Forensic planning for the Taweelah
Time extension claim + Site assistance at the Sabic LDPE site at Wilton +
DSME Thunderhorse claim ( with visits to DSME yard South Korea ).
Oct 2001 to Dec 2005 SAKHALIN ENERGY INVESTMENT COMPANY ( SEIC )
ONSHORE PIPELINES SENIOR COST PLANNING ENGINEER
Involved in the preparation of an Integrated Pipelines schedule for a 48” Gas
+ 24” Oil pipeline approx 800 km in length. Other duties involved Technical
Bid Evaluation, development of a CMS + % + VOWD + Cash Call curves.
( Based on SAKHALIN then MOSCOW with visits to Samara and Paris ).
PRINCIPAL PLANNING ENGINEER involved in the Conceptual
studies for the ‘Best fit’ Integrated schedule for the SEIC Phase II Project.
Covering TEOC approvals, IUP, OPF, LNG Plant, OET, PA-B + LUN-A
Offshore facilities, Offshore and Onshore Pipelines.Other duties included a
Peer Audit Review on Sakhalin Island on the Molkpaq Phase I Project, the
preparation of Bid packages, preparing Project scenario’s and the
coordination of a Project Risk Analysis. ( BASED IN RIJSWIJK )
Feb 2000 to Oct 2001 PETROPLUS NORTH TEES REFINERY
PLANNING COORDINATOR as part of the Alliance Overhaul team
involved in the preps and execution of the 2001 Overhaul. Duties involved
chairing the Worklist meetings, producing Worklist procedures and
proforma’s, preparation of Bid package deliverables and evaluation of
contractorsystems,preparing the Overhaul schedule, reporting progress and
advising Management of the critical activities during the Overhaul
Jan 1996 to Feb’2000 BROWN & ROOT / AOC
OVERHAULS PLANNING COORDINATOR for 4 Overhauls in the NE
of England on ICI plants at Cassell works,Aro1 at North Tees and
Surfactants at Wilton. Conversant with the TOG methodology and PICS.
Duties involved the preparation of worklists and workpacks, advising
Management of budget requirements, preparing Schedules and reporting %
progress completions including productivity reports.
1994 to January 1996 MARATHON INTERNATIONAL PETROLEUM TLD.
SENIOR PLANNING ENGINEER in the Aberdeen Office involved in :
SHUTDOWN – Preparation of the 1995 Brae Field Shutdown plan for all 3
platforms in the Brae Field. Based Offshore, producing 4 day lookaheads
and informing Platform management of the changing critical items and
manpower requirements to maintain the end date.
PLATFORM CONSTRUCTION - Involved in the ‘Cullen Report’
requirements for a TEMPORARY REFUGE for all platforms, producing
schedules and Prioritising Design & procurement deliverables and reporting
% completions. Developed a schedule for the WEST BRAE subsea tie in &
involved in the FEED requirements for partners in the Sedgewick
field.Involved with B&R/AOC on the Risk & Reward contract to install
Blast Relief walls for the RISK REDUCTION PROJECT on Brae ‘A’ & ‘B’
1980 to 1994 MARATHON OIL U.K.LTD.
PLANNING SUPERVISOR during the BRAE FIELD DEVELOPMENT
involved at the following locations :
LONDON OFFICE – Involved in the Conceptual Studies for 3 Major North
Sea Projects, Preparing Bid evaluation data, developing estimating norms &
manhour/cost rates per tonne used in the evaluation process.
Preparation of Planning procedures for Onshore & Offshore Project control.
Developed an effective Planning/Cost interface systemfor payment on site.
Preparation of detailed Build sequence studies to determine module sizes
and weights, including extensive construction/cost exercises.
Preparation of Design/Construction Interface schedules.
Preparation of Budget Forecasts for CAPEX & OPEX Expenditures.
ONSHORE FABRICATION YARDS – Development of a CMS with Const
+ Design + Procurement, monitoring Contractors performance. Preparation
of an Onshore Commissioning schedule reflecting the Offshore priorities.
Recording historical data used for Claim minimisation.
Acting as Hook up Interface Coordinator between the London Office & the
sites for the preparation of Incomplete yardwork Offshore jobpacks.
(Located at the following yards building the following modules :
SLP @ LOWESTOFT – PROCESS,NGL & SELEXOL FOR BRAE ‘A’
HI-FAB – INTEGRATED DECK, FLARE JKT +TOWER FOR BRAE ‘B’
REDPATH OFFSHORE SOUTH – ACCOMMODATION,
COMPRESSION AND DRILLING MODULES FOR EAST BRAE).
OFFSHORE – Involved in the HUC for the 3 Brae field platforms.
1979 to 1980 OCEANIC MAINTENANCE SERVICES
OFFSHORE PLANNING ENGINEER Ninian Field based in Aberdeen
preparing 3 year Maintenance schedules,then Offshore for implementation
1976 to 1979 SELTRUST OFFSHORE SERVICES
SENIOR PLANNING ENGINEER on Claymore ‘A’ and Chevron Ninian
South preparing job packs Onshore, then Offshore implementation etc
1975 to 1976 DANISLINKS LTD
PLANNING ENGINEER on the Shell Brent ‘B’ Hook up, based Offshore,
producing 4 week lookaheads, reporting progress etc.
1974 to 1975 DE GROOT ZWIJNDRECHT B.V.
PLANNING ENGINEER/COORDINATOR on the BP Forties ‘D’
Process,Drilling & Utilities modules, reporting progress etc to B&R.
1973 to 1974 WHESSOE DOCK POINT
FIELD ENGINEER on the BP Forties ‘B’ process modules.
Apprenticeship SWAN HUNTER SHIPBUILDERS
DRAUGHTSMAN/FIELD ENGINEER on ships ranging from 4000
tonne survey ships to 175000 tonne OBO carriers.

RESUME-RDP

  • 1.
    RESUME NAME : R.D.POOLEY ADDRESS: 5 THE PIPPINS WOLVISTON CLEVELAND TS22 5QB E-MAIL ADDRESS : bjpooley1@gmail.com TELEPHONE : 01740 601015 ( HOME ) 07870 877625 ( MOBILE ) NATIONALITY : BRITISH EDUCATION : HENRY SMITH GRAMMAR WEST PARK COLLEGE OF F.E. OPEN UNIVERSITY QUALIFICATIONS : G.C.E. ‘O’ LEVEL C & G PART 1 & 2 ( SHIP ENGINEERG ) B.Sc ( MATHS & TECHNOLOGY ) POSITION : PLANNING COORDINATOR INSTITUTIONS : INSTITUTE OF PETROLEUM MARITAL STATUS : MARRIED WITH 2 CHILDREN DATE OF BIRTH : 28TH DECEMBER 1948
  • 2.
    EXPERIENCE SUMMARY OVER 40YEARS EXPERIENCE IN PROJECT PLANNING, PRIMARILY ON BEHALF OF THE OWNER. HELD PRINCIPAL / LEAD / SENIOR PLANNING POSITIONS IN DESIGN, CONSTRUCTION AND OFFSHORE HOOK UP & COMMISSIONING PHASES OF PROJECT DEVELOPMENT. RECENT EXPERIENCES HAVE BEEN ON THE LITIGATION SIDE OF CLAIMS IN THE OIL & GAS INDUSTRY AS A PROJECT PLANNING TECHNICAL EXPERT, WHICH INVOLVED DELAY ANALYSIS, PREPARING FORENSIC PLANNING REPORTS AND CARRYING OUT RISK ANALYSIS. THIS COVERED CRADLE TO GRAVE ASPECTS ON PROJECTS FROM CONCEPTUAL DESIGN THROUGH FEED, CONSTRUCTION, COMMISSIONING & OPERATIONS SUPPORT. EXPERIENCED IN THE USE OF PRIMAVERA P6, P3 VERSION 3.0, ARTEMIS 7000 AUTOPLAN ( DEVELOPED BY AOC ), ALSO ARTEMIS 5000, 6000 AND 9000 MAINFRAME, LOTUS APPLICATIONS, MILESTONES PROFESSIONAL, MICROSOFT PROJECT AND ALL OTHER MICROSOFT OFFICE SOFTWARE. PERTMASTER RISK 8.1 REFERENCES : LAST MAJOR PROJECTS BOB BREEZE - MANAGING DIRECTOR STAPLETON INTERNATIONAL - +447798 778679. rb@robertbreeze.co.uk ARNE SIEWERTSEN ( PROJECT CONTROLS MANAGER – FLUOR ) – +316270 78865 arne.siewertsen@fluor.com PREVIOUS PROJECTS PETER WILLIAMS ( PROJECT MANAGER – BLUEWATER ) – +4523658659 peter.john.williams@maersk.com DON GILLIES ( PROJECT SERVICES MANAGER PDP) – gillies.don@gmail.com JOHN OATES ( SITE MANAGER MARATHON ) – 0780 858 7005 CHRIS PLATT ( OVERHAULS MANAGER PETROPLUS) – 07720 411791 LANGUAGES : BASIC FRENCH BASIC DUTCH
  • 3.
    Aug 2014 toPresent LIRAREED LIMITED (R D POOLEY LTD COMPANY) SENIOR CONSULTANT – Driver Trett - Delay Analysis for Cofely/Fabricom/IREM joint venture at the Total Refinery at Antwerp on the Optara upgrade Project. Premier Oil - Offshore Delay report for Premier Oil Solan Project. Fluor - Preparing Tender documents for Refinery upgrades Projects in Kuwait and Abu Dhabi. Jan 2006 to July 2014 STAPLETON INTERNATIONAL SENIOR CONSULTANT – Involved in Oil & Gas Litigation cases as a Project Planning Technical expert, preparing Delay analysis Reports, Forensic planning evaluation, Risk analysis and all other Project controls involving ‘cradle to grave’ aspects from Conceptual, FEED, Construction, Commissioning & Operations support.The clients involved were: Premier Oil - Project status analysis - Solan Project @ Bifab yard in Fife Statoil – Chinese built Semisubs Norwegian compliance scope reviews in Westcon Yard Olenswag in Norway. Apache – Ningaloo Vision FPSO Schedule audit review in Perth, Australia Transocean Project status evaluation @ KFELS Singapore for 2 new build Jack up rigs B326 & B327. Arctic III rig update in Astican yard Las Palmas Maersk – Schedule review of Peregrino SSR Project scope in Rio, Brazil. Bluewater BV Hoofddorp, ENI Kitan FPSO at Sembawang Singapore + Aoka Mizu FPSO for Nexen Ettrick field at Keppel Rotterdam + HUC support in Aberdeen + proposals for Golden Eagle FPSO + Glas Dowr Huntington FPSO + Petrobas Munin FPSO + ENI Bouri FSO, developing Conceptual + FEED design + Tenders. Darlington office based assisting in Forensic planning for the Taweelah Time extension claim + Site assistance at the Sabic LDPE site at Wilton + DSME Thunderhorse claim ( with visits to DSME yard South Korea ). Oct 2001 to Dec 2005 SAKHALIN ENERGY INVESTMENT COMPANY ( SEIC ) ONSHORE PIPELINES SENIOR COST PLANNING ENGINEER Involved in the preparation of an Integrated Pipelines schedule for a 48” Gas + 24” Oil pipeline approx 800 km in length. Other duties involved Technical Bid Evaluation, development of a CMS + % + VOWD + Cash Call curves. ( Based on SAKHALIN then MOSCOW with visits to Samara and Paris ). PRINCIPAL PLANNING ENGINEER involved in the Conceptual studies for the ‘Best fit’ Integrated schedule for the SEIC Phase II Project. Covering TEOC approvals, IUP, OPF, LNG Plant, OET, PA-B + LUN-A Offshore facilities, Offshore and Onshore Pipelines.Other duties included a Peer Audit Review on Sakhalin Island on the Molkpaq Phase I Project, the preparation of Bid packages, preparing Project scenario’s and the coordination of a Project Risk Analysis. ( BASED IN RIJSWIJK ) Feb 2000 to Oct 2001 PETROPLUS NORTH TEES REFINERY PLANNING COORDINATOR as part of the Alliance Overhaul team involved in the preps and execution of the 2001 Overhaul. Duties involved chairing the Worklist meetings, producing Worklist procedures and proforma’s, preparation of Bid package deliverables and evaluation of contractorsystems,preparing the Overhaul schedule, reporting progress and advising Management of the critical activities during the Overhaul Jan 1996 to Feb’2000 BROWN & ROOT / AOC OVERHAULS PLANNING COORDINATOR for 4 Overhauls in the NE of England on ICI plants at Cassell works,Aro1 at North Tees and Surfactants at Wilton. Conversant with the TOG methodology and PICS. Duties involved the preparation of worklists and workpacks, advising Management of budget requirements, preparing Schedules and reporting % progress completions including productivity reports.
  • 4.
    1994 to January1996 MARATHON INTERNATIONAL PETROLEUM TLD. SENIOR PLANNING ENGINEER in the Aberdeen Office involved in : SHUTDOWN – Preparation of the 1995 Brae Field Shutdown plan for all 3 platforms in the Brae Field. Based Offshore, producing 4 day lookaheads and informing Platform management of the changing critical items and manpower requirements to maintain the end date. PLATFORM CONSTRUCTION - Involved in the ‘Cullen Report’ requirements for a TEMPORARY REFUGE for all platforms, producing schedules and Prioritising Design & procurement deliverables and reporting % completions. Developed a schedule for the WEST BRAE subsea tie in & involved in the FEED requirements for partners in the Sedgewick field.Involved with B&R/AOC on the Risk & Reward contract to install Blast Relief walls for the RISK REDUCTION PROJECT on Brae ‘A’ & ‘B’ 1980 to 1994 MARATHON OIL U.K.LTD. PLANNING SUPERVISOR during the BRAE FIELD DEVELOPMENT involved at the following locations : LONDON OFFICE – Involved in the Conceptual Studies for 3 Major North Sea Projects, Preparing Bid evaluation data, developing estimating norms & manhour/cost rates per tonne used in the evaluation process. Preparation of Planning procedures for Onshore & Offshore Project control. Developed an effective Planning/Cost interface systemfor payment on site. Preparation of detailed Build sequence studies to determine module sizes and weights, including extensive construction/cost exercises. Preparation of Design/Construction Interface schedules. Preparation of Budget Forecasts for CAPEX & OPEX Expenditures. ONSHORE FABRICATION YARDS – Development of a CMS with Const + Design + Procurement, monitoring Contractors performance. Preparation of an Onshore Commissioning schedule reflecting the Offshore priorities. Recording historical data used for Claim minimisation. Acting as Hook up Interface Coordinator between the London Office & the sites for the preparation of Incomplete yardwork Offshore jobpacks. (Located at the following yards building the following modules : SLP @ LOWESTOFT – PROCESS,NGL & SELEXOL FOR BRAE ‘A’ HI-FAB – INTEGRATED DECK, FLARE JKT +TOWER FOR BRAE ‘B’ REDPATH OFFSHORE SOUTH – ACCOMMODATION, COMPRESSION AND DRILLING MODULES FOR EAST BRAE). OFFSHORE – Involved in the HUC for the 3 Brae field platforms. 1979 to 1980 OCEANIC MAINTENANCE SERVICES OFFSHORE PLANNING ENGINEER Ninian Field based in Aberdeen preparing 3 year Maintenance schedules,then Offshore for implementation 1976 to 1979 SELTRUST OFFSHORE SERVICES SENIOR PLANNING ENGINEER on Claymore ‘A’ and Chevron Ninian South preparing job packs Onshore, then Offshore implementation etc 1975 to 1976 DANISLINKS LTD PLANNING ENGINEER on the Shell Brent ‘B’ Hook up, based Offshore, producing 4 week lookaheads, reporting progress etc. 1974 to 1975 DE GROOT ZWIJNDRECHT B.V. PLANNING ENGINEER/COORDINATOR on the BP Forties ‘D’ Process,Drilling & Utilities modules, reporting progress etc to B&R. 1973 to 1974 WHESSOE DOCK POINT FIELD ENGINEER on the BP Forties ‘B’ process modules. Apprenticeship SWAN HUNTER SHIPBUILDERS DRAUGHTSMAN/FIELD ENGINEER on ships ranging from 4000 tonne survey ships to 175000 tonne OBO carriers.