CURRICULUM VITAE
Name : Renato Bebanco Casinillo
Nationality : Filipino (Singapore Permanent Residence PR
Date of Birth : 18th May 1962
Address : Blk. 154 Bukit Batok St.11 #02-308
Singapore 650154
Tel. Mobile : +65 - 81264529
Tel. Residence : +65 – 69012281
E-mail : reniecasinillo@hotmail.com
Academic Qualifications:
Graduate BSME Bachelor of Science in Mechanical Engineering
University Of Cebu (UC) Cebu City, Philippines
Registered Mechanical Engineer: License No. 00026578- 1984
Cebu City, Philippines Chapter.
Member of Philippine Society of Mechanical Engineers (PSME)
Training as Mechanical and Pipe Fitting: Engineering and Equipment Incorporated (EEI)
Pasig Metro Manila Philippines
Career Summary:
With Twenty (28) years of cumulative experienced in oil and gas, more familiar on construction, Commissioning, Top side process module
integration, piping, mechanical equipment, structural fabrication, installation, testing, inspection, validation, start-up, commissioning and related
activities. Well experienced on piping, mechanical, structural, pressure vessel, various rotating equipment involving oil/gas, petrochemical,
refineries, Production Platforms, Jack- up Barge, FPSO & Power Plant. Familiar with the application of quality system administration based to ISO
9000 series.
Well versed in interpretation and implementation of ASME, ANSI, and ASTM, AWS, ABS & DNV rules, codes and standards. Well organized with
flexibility in dealing with work related issues. Normally achieved the superiors and project expectations can deliver and given task independently with
confident under pressure and adaptable to work with multinational personnel. Have been working as Client representative, Main contractor and
Project Management Team staff.
Computer Skills:
Microsoft Words, Excel and Power Point.
Singapore Polytechnic Auto Cad and Modeling Basic Training.
Carrier Objectives:
Seeking a challenging and rewarding career in a diverse environment where my strong work ethic, education, and expertise can be used to help
promote the mission and exceed team goals.
Work Experience Summary:
Period Position Duties and Responsibilities
February 2015 ~ Up to Present Piping Superintendent
SAIPEM SINGAPORE
FPSO KAOMBO CONVERSION
PROJECT
• Area In charge of piping fabrication and installation from
Marine side, Main deck and topside facilities.
• Provide hands on technical assistant to all contractors
whatever problems arises during engineering design stage &
construction phase of the project.
• Evaluate discrepancies and provide proposal to resolve the
issue on site to avoid any delayed.
Page 1
• Site survey of Existing piping system and Equipment for
marine and top side process.
• Review Piping and Mechanical Equipment Drawings from the
contractors for comment and approval.
• To implement construction standard and codes as per
company specifications during construction phase.
• Monitor piping fabrication & installation progress; verify piping
material and fittings status to ensure delivery will be on time
as per schedule.
• Assist and giving feedback to the engineering group whatever
problems on site such clashing, modification of piping during
fabrication and installation.
• Site survey of existing piping system, create isometric 3d
drawing and submit to PDS Engineering group for modeling
and as built drawing.
• Site visit and hands on inspection of package equipment,
rotating and static to ensure everything is in company
requirements.
• Counter check mechanical equipment approved drawing lay
out, equipment foundation support installation to insure all
piping tie in points coordinates are correct as per drawing
requirements.
Period Position Duties and Responsibilities
April 2013 ~ December 2014 Commissioning Specialist
Mechanical / Piping
EJ JOINT VENTURE SDN BHD.
Seconded to EXXON MOBIL
MALAYSIA (EOR) PROJECT
BROWNFIELD TAPIS FIELD
• Witness Mechanical completion activities performed by the
Construction Contractor including approval of punch lists for
Mechanical Discipline.
• Execute all Mechanical & Piping pre-commissioning,
commissioning and start-up activities for assigned sub-
• System.This includes preparatory activities, coordinating
resources (technicians, equipment, and other departments),
and expediting documentation – in particular handover
dossiers.
• Participating in walk-downs from construction to
commissioning and from commissioning to operations and
formally agreeing and categorizing punch-list items.
• Commission systems/subsystems in accordance with the
commissioning procedures and commissioning and start-up
schedule.
• Assist Vendor servicemen with their commissioning activities.
• Raised site materials requests (SMR’s), technical queries
(TQ’s) field instructions (FI’s) for activities where necessary
and livening up notices (LUN’s) where piping / Mechanical
equipment or lines require energizing.
• Compile relevant documentation to support handover and
acceptance of systems to Operations Group.
• Check that Mechanical and Piping content of the dossiers is
Page 2
accurate and complete before they are accepted from
construction and before they are submitted to operations
department.
May 2012 ~ March 2013 Mechanical / Piping
Superintendent
NES GLOBAL PTE. LTD.
Singapore seconded to
BC PETROLIUM (EVP BALAI
MUTIARA FPSO CONVERSION
Project
• Provide hands on technical assistant to all contractors
whatever problems arises during engineering design stage &
construction phase of the project.
• Evaluate discrepancies and provide proposal to resolve the
issue on site to avoid any delayed.
• Site survey of Existing piping system and Equipment for
marine and top side process.
• Review Piping and Mechanical Equipment Drawings from the
contractors for comment and approval.
• To implement construction standard and codes as per
company specifications during construction phase.
• Monitor piping fabrication & installation progress; verify piping
material and fittings status to ensure delivery will be on time
as per schedule.
• Assist and giving feedback to the engineering group whatever
problems on site such clashing, modification of piping during
fabrication and installation.
• Site survey of existing piping system, create isometric 3d
drawing and submit to PDS Engineering group for modeling
and as built drawing.
• Site visit and hands on inspection of package equipment,
rotating and static to ensure everything is in company
requirements.
• Counter check mechanical equipment approved drawing lay
out, equipment foundation support installation to insure all
piping tie in points coordinates are correct as per drawing
requirements.
August 2011~ January 2012 Mechanical / Piping Field
Engineer
AIR ENERGI Singapore
seconded to
DPS BRISTOL LTD.
BIRANTAI FPSO CONVERSION
(PETROPAC) Project
• Assist and giving feedback to the engineering group whatever
problems on site such clashing, modification of piping during
fabrication and installation. Site survey of existing piping
system, create isometric 3d drawing and submit to PDS
Engineering group for modeling and as built drawing.
• Site visit and hands on inspection of package equipment,
rotating and static to ensure everything is in company
requirements.
• Counter check mechanical equipment approved drawing lay
out, equipment foundation support installation to insure all
piping tie in points coordinates are correct as per drawing
requirements.
• Provide hands on technical assistant to all contractors
whatever problems arises during construction phase of the
project. Evaluate discrepancies and provide proposal to
resolve the issue on site to avoid any delayed.
• Monitor piping fabrication & installation progress; verify piping
material and fittings status to ensure delivery will be on time
Page 3
to avoid any delayed.
June 2010 ~ June 2011
December 2009 ~ June 2010
June 2009 ~ November 2009
Mechanical Field Engineer
NES GLOBAL PTE. LTD.
Singapore seconded to
HOANG LONG JOINT
OPERATING COMPANY
(CLIENT)
TGT FPSO CONVERSION
Project
Mechanical / Piping Field
Engineer
RESOURCES UNLIMITED PTE.
LTD. Singapore seconded to
MAERSK FPSO PERIGRENO
CONVERSION Project
Mechanical /Piping Field
Engineer
PTT Engineering and Consultants
(S) PTE. LTD. Singapore
seconded to
FPSO FOUR VANGAURD
CONVERSION Project
• Managed Suppliers with excellent negotiation, communication
and interpersonal skills to achieve substantial cost savings.
• Managed Bill of Material’s and extensive experience in
managing and tracking Engineering changes.
• Extensive experience in execution of programs and projects
that meet On Time & Order to Delivery Quality and Cost
Review and recommend or approve contracts and cost
estimates and present and explain proposals, reports, and
findings to clients. Targets.
• Specify or direct modification of products to ensure
conformance with engineering design and performance
specification
• Closely monitor piping fabrication & installation progress;
verify piping material and fittings status to ensure delivery will
be on time to avoid any delayed.
• Assist the contractor to resolve whatever technical issues
arise during fabrication, answering all mechanical/piping
technical queries raised by the contractor.
• Site visit and hands on inspection of package equipment,
rotating and static to ensure everything is in company
requirements.
• Planned and Schedule all piping and equipment activities
basing on target schedule required by the company, prepare
daily progress report actual versus planned.
• Coordinate Vendor Assistance and Site Vendor Call Up
during Critical Phase of Machinery Packages Installation
• Witness for inspection as a client representative during
installation of rotating and static equipment such as pumps,
pressure vessels, turbo generator, coolers, exchangers and
compressors.
• Conduct spot check and site surveillance as a daily routine if
the contractors followed the company specification,
procedures and requirements.
• Monitor job status and daily progress report.
July 2006 ~ February 2007 Mechanical / Piping Field
Engineer
OAG Engineering SDN. Berhad.
Kualalumpor Malaysia Seconded
to CHOC Carigali Hess Operating
Company SDN Berhad.
CAKRAWALA Brown Field &
Green Field Gas Development
EPC Project Offshore/Onshore.
• Involved in EPC Engineering, procurement and construction
as a discipline Engineer, to review and approve drawings for
construction, work specification, construction procedure
against company standard requirement & Evaluate and
qualify Bed Tender for Material and equipment supply for the
project.
• Prepare data sheets / specifications for Equipment package
items like DM Water Plant, Chemical Injection Skid, Glycol
Package, Fuel Dehydration Package, Fuel Gas Treating
Package, Nitrogen Unit, RO plant unit and Heat Exchangers.
• Prepare Requisition for Quotation (RFQ’S) and Purchase
specification.
• Evaluate Technical Offers provide by vendor.
• Review work responsibilities of the Mechanical discipline /
Package Equipment personnel and the manpower
requirements for the project.
• Monitor piping fabrication progress; verify piping material and
fittings status to ensure delivery will be on time to avoid any
Page 4
delayed.
• Assist the contractor to resolve whatever technical issues
arise during fabrication, answering all mechanical/piping
technical queries raised by the contractor.
• Site visit and hands on inspection of package equipment,
rotating and static to ensure everything is in company
requirements.
• Planned and Schedule all piping and equipment activities
basing on target schedule required by the company, prepare
daily progress report actual versus planned.
December 2005 ~ February
2006
Mechanical / Piping Supervisor
PTT Engineering Consultants (S)
PTE. LTD. Singapore seconded
to
SBM – Single Buoy Mooring
CAFIXABA FPSO Project Brazil
• Closely monitor piping fabrication & installation progress;
verify piping material and fittings status to ensure delivery will
be on time to avoid any delayed.
• Assist the contractor to resolve whatever technical issues
arise during fabrication, answering all mechanical/piping
technical queries raised by the contractor.
• Site visit and hands on inspection of package equipment,
rotating and static to ensure everything is in company
requirements.
• Planned and Schedule all piping and equipment activities
basing on target schedule required by the company, prepare
daily progress report actual versus planned.
• Coordinate Vendor Assistance and Site Vendor Call Up
during Critical Phase of Machinery Packages Installation
• Witness for inspection as a client representative during
installation of rotating and static equipment such as pumps,
pressure vessels, turbo generator, coolers, exchangers and
compressors.
• Conduct spot check and site surveillance as a daily routine if
the contractors followed the company specification,
procedures and requirements.
• Monitor job status and daily progress report. .
March 2004 ~ October 2005 Mechanical Inspector
Brunel International South East
Asia Pte. Ltd. Singapore
Seconded to
EXXON MOBIL FPSO ERHA
Deep Water Lagos Nigeria
Project
• Witness for inspection as a client representative during
installation of rotating and static equipment such as pumps,
pressure vessels, turbo generator, coolers, exchangers and
compressors.
• Conduct spot check and site surveillance as a daily routine if
the contractors followed the company specification,
procedures and requirements.
• Issued NCR report for corrective action.
Monitor job status and daily progress.
• Auditing documentation, drawings, and specification as per
latest revision.
• During mechanical completion as a part of project team
involved in piping line walk, punch listing, Witness hydro
testing, flushing, chemical cleaning, hot oil flushing & air
blowing.
• Witness final acceptance of rotating equipment shaft
alignment, levelness and preservation, internal inspection of
Pressure vessels cooler& exchanger.
• Attending Try party walk down inspection for the system/sub
system for final acceptance.
Page 5
February 2003 ~ September
2003
Mechanical Commissioning
Senior Technician (Offshore)
PTT Engineering Consultants (S)
PTE. LTD. Singapore seconded
to
MODEC INTERNATIONAL LLC
FPSO FLUMINENSI
CONVERTION Project
• Assist the lead mechanical engineer to commission all
system in Engine room and topside process module.
• Involved on line checking as per P & ID system by system of
missing item.
• Inspect all rotating equipment if everything is ready and
especially shaft alignment, soft foot clearance, and lubrication
oil prior to start and commission the system.
• Clearing outstanding punch list item.
• Monitoring status of job carried out inspection as per the
commissioning specification.
• Line checking as per P & ID,
• Pre commissioning witness all testing, flushing, chemical
cleaning and final commissioning till handing over the system
to operation team.
February 2000 ~ February 2003
July 1999 ~ February 2000
Mechanical/Piping Supervisor
PTT Engineering Consultants (S)
PTE. LTD. Singapore seconded
to
SBM – Single Buoy Mooring
FPSO FALCON & FPSO EAGLE
CONVERTION Project
Mechanical/Piping Supervisor
PTT Engineering Consultants (S)
PTE. LTD. Singapore seconded
to
SBM – Single Buoy Mooring
FPSO ESPEDARTE
CONVERTION Project
• Prepare all approved construction drawings required such as
plan drawing key plan, equipment lay out drawings, isometric
drawings, and P & ID.
• Review all the drawing as per latest rev. prior for fabrication
and installation.
• Study and planned how to execute the job smoothly as per
construction target schedule.
• Monitor the status of material availability base on the original
bill of materials and base on approval drawings, Witness and
check, alignment, levelness, tolerance as per construction
standard & co-ordinate with the contractor’s representative.
• Ensure full compliance on quality and safety requirements by
the contractors.
• Monitor daily progress and giving fully supports to all
contractor regarding technical matters and mark up all those
drawings for revision on site and report directly to the
construction manager.
• Planned and Schedule all piping activities basing on target
schedule required by the company.
• Prepare daily progress report actual versus planned.
• Witness for inspection as a client representative during
installation of rotating and static equipment such as pumps,
pressure vessels, turbo generator, coolers, exchangers and
compressors.
• Conduct spot check and site surveillance as a daily routine if
the contractors followed the company specification,
procedures and requirements.
• Attending Try party walk down inspection for the system/sub
system for final acceptance.
Page 6
September 1998 ~ July 1999 Mechanical/Piping
Superintendent
GSI – Gas Services International
FPSO Project P-59 PETRO
BRASS Keppel Shipyard
(Singapore)
• Reporting to project manager and project superintendent. In-
charge of supervisors for the Gas compressor skid, Gas
Turbine and Utilities Skid,
• Preparation of construction drawing and review prior for
assembly. Material take-off. Monitoring status of the
materials, anchorage of mechanical/piping erection, counter
check the location, elevation as per drawing, plan and
schedule for next Activities for the following day.
• Attending weekly/monthly meeting with clients.
• Supervise daily mechanical activities.
• Conducting inspection, erection of equipment, steel structure,
line checking if all the line is being installed as per approved
P&ID, counter check material used.
• Punch lists all outstanding items as per approved P&ID.
• Witness hydro testing, water Flushing, oil flushing, hydro
jetting, chemical cleaning, insulation, painting and re-
instatement.
• Update all as built drawing and review test package by its
own system.
• Assist, preparation of document for hand over.
September 1996 ~ May 1997 Piping Supervisor
DAILEM ENGINEERING &
CONTRACTORS PPSC-11 LPE
Petrochemical Project Jurong
Island Singapore
• Ensure full compliance on quality and safety requirements by
contractors and sub-contractors.
• Ensure all mechanical rotating equipment, machinery and
static equipment during material handling; preservation and
protection from damage are carried out as per company
specification.
• Ensure all equipment installation such as pumps,
compressors, turbine, coolers, exchangers; pressure vessels
are in place as per construction and company specification.
• Conduct spot check as a daily routine.
• Witness for Inspection of pipe fabrication and assembly;
rotating shaft alignment, soft foot, both side motor and pumps
if carried out as per company procedure.
• Witness levelness of skid mounting equipment vertically and
horizontally aligned and all static mechanical equipment as
well.
• Witness pre commissioning activities such as hydro testing of
pipes spool, water flushing, hydro jetting, chemical cleaning,
lube oil flushing performed verification and prepared
inspection report.
February 1991 ~ March 1993 Fabrication Supervisor
Mechanical / Piping
KSRC – KUWAIT
SHIPBUILDING & REPAIR YARD
SAK. SAFAT STATE OF
KUWAIT
• Familiarization and understanding of Construction drawing,
specification, testing requirements & other related to
construction standard.
• Schedule preparation, showing target date of every project on
the workshop make sure job going on as per schedule.
• Conduct material inspection availability, items are available
as material will not be a problem when fabrication go on.
• Make sure all drawings being used are latest revision.
• Check fit works done by fitters, items such as alignment,
levelness, straightness, material used and dimension.
Page 7
• Prepare daily progress report.
• Do punch list especially tanks before hydro test be sure every
items are installed before testing start.
• Liaise with clients for the status of project by giving them
firsthand information on accomplishment percentage.
September 1988 ~ September
1990
Mechanical Engineer
MS ALSUWAIDI GENERAL
CONTRACTING CO. JUBAIL
SAUDI ARABIA.
• Involved in EPC Engineering, procurement and construction
as a discipline Engineer, to review and approve drawings for
construction, work specification, construction procedure
against company standard requirement & Evaluate and
qualify Bed Tender for Material and equipment supply for the
project.
• Prepare data sheets / specifications for Equipment package
items like DM Water Plant, Chemical Injection Skid, Glycol
Package, Fuel Dehydration Package, Fuel Gas Treating
Package, Nitrogen Unit, RO plant unit and Heat Exchangers.
• Prepare Requisition for Quotation (RFQ’S) and Purchase
specification.
• Evaluate Technical Offers provide by vendor.
• Review work responsibilities of the Mechanical discipline /
Package Equipment personnel and the manpower
requirements for the project.
• Monitor piping fabrication progress; verify piping material and
fittings status to ensure delivery will be on time to avoid any
delayed.
• Assist the contractor to resolve whatever technical issues
arise during fabrication, answering all mechanical/piping
technical queries raised by the contractor.
• Site visit and hands on inspection of package equipment,
rotating and static to ensure everything is in company
requirements.
• Planned and Schedule all piping and equipment activities
basing on target schedule required by the company, prepare
daily progress report actual versus planned.
Page 8
July 1986 ~ January 1988 Piping Supervisor
EEI – ENGINEERING &
EQUIPMENT INC. MHI Power
Plant Project General Contractor
Alzour Kuwait.
• Able to interpret drawings and specifications.
• Ensure full compliance on quality and safety requirements by
contractors and sub-contractors.
• Ensure all mechanical rotating equipment, machinery and
static equipment during material handling; preservation and
protection from damage are carried out as per company
specification.
• Ensure all equipment installation such as pumps,
compressors, turbine, coolers, exchangers; pressure vessels
are in place as per construction and company specification.
• Conduct spot check as a daily routine.
• Witness for Inspection of pipe fabrication and assembly;
rotating shaft alignment, soft foot, both side motor and pumps
if carried out as per company procedure.
• Witness pre commissioning activities such as hydro testing of
pipes spool, water flushing, hydro jetting, chemical cleaning,
lube oil flushing performed verification and prepared
inspection report.
July 1984 ~ October1984 Junior Engineer
ACI FIBER GLASS
CORPORATION PHILPOS
FIRTILIZER PROJOCT ISABEL
LYTE PHILIPPINES
• Assisting piping engineer for fabrication and erection/ piping
job.
• Monitoring daily accomplishment, making report/submission,
inspection of all fit up joints follow the standard tolerance as
per client requirements and controlling daily man power.
Language: Proficient in English, both spoken and written. Moderate in Tagalog and Cebuano.
Page 9
July 1986 ~ January 1988 Piping Supervisor
EEI – ENGINEERING &
EQUIPMENT INC. MHI Power
Plant Project General Contractor
Alzour Kuwait.
• Able to interpret drawings and specifications.
• Ensure full compliance on quality and safety requirements by
contractors and sub-contractors.
• Ensure all mechanical rotating equipment, machinery and
static equipment during material handling; preservation and
protection from damage are carried out as per company
specification.
• Ensure all equipment installation such as pumps,
compressors, turbine, coolers, exchangers; pressure vessels
are in place as per construction and company specification.
• Conduct spot check as a daily routine.
• Witness for Inspection of pipe fabrication and assembly;
rotating shaft alignment, soft foot, both side motor and pumps
if carried out as per company procedure.
• Witness pre commissioning activities such as hydro testing of
pipes spool, water flushing, hydro jetting, chemical cleaning,
lube oil flushing performed verification and prepared
inspection report.
July 1984 ~ October1984 Junior Engineer
ACI FIBER GLASS
CORPORATION PHILPOS
FIRTILIZER PROJOCT ISABEL
LYTE PHILIPPINES
• Assisting piping engineer for fabrication and erection/ piping
job.
• Monitoring daily accomplishment, making report/submission,
inspection of all fit up joints follow the standard tolerance as
per client requirements and controlling daily man power.
Language: Proficient in English, both spoken and written. Moderate in Tagalog and Cebuano.
Page 9

Renie CV Mechanical and Piping

  • 1.
    CURRICULUM VITAE Name :Renato Bebanco Casinillo Nationality : Filipino (Singapore Permanent Residence PR Date of Birth : 18th May 1962 Address : Blk. 154 Bukit Batok St.11 #02-308 Singapore 650154 Tel. Mobile : +65 - 81264529 Tel. Residence : +65 – 69012281 E-mail : reniecasinillo@hotmail.com Academic Qualifications: Graduate BSME Bachelor of Science in Mechanical Engineering University Of Cebu (UC) Cebu City, Philippines Registered Mechanical Engineer: License No. 00026578- 1984 Cebu City, Philippines Chapter. Member of Philippine Society of Mechanical Engineers (PSME) Training as Mechanical and Pipe Fitting: Engineering and Equipment Incorporated (EEI) Pasig Metro Manila Philippines Career Summary: With Twenty (28) years of cumulative experienced in oil and gas, more familiar on construction, Commissioning, Top side process module integration, piping, mechanical equipment, structural fabrication, installation, testing, inspection, validation, start-up, commissioning and related activities. Well experienced on piping, mechanical, structural, pressure vessel, various rotating equipment involving oil/gas, petrochemical, refineries, Production Platforms, Jack- up Barge, FPSO & Power Plant. Familiar with the application of quality system administration based to ISO 9000 series. Well versed in interpretation and implementation of ASME, ANSI, and ASTM, AWS, ABS & DNV rules, codes and standards. Well organized with flexibility in dealing with work related issues. Normally achieved the superiors and project expectations can deliver and given task independently with confident under pressure and adaptable to work with multinational personnel. Have been working as Client representative, Main contractor and Project Management Team staff. Computer Skills: Microsoft Words, Excel and Power Point. Singapore Polytechnic Auto Cad and Modeling Basic Training. Carrier Objectives: Seeking a challenging and rewarding career in a diverse environment where my strong work ethic, education, and expertise can be used to help promote the mission and exceed team goals. Work Experience Summary: Period Position Duties and Responsibilities February 2015 ~ Up to Present Piping Superintendent SAIPEM SINGAPORE FPSO KAOMBO CONVERSION PROJECT • Area In charge of piping fabrication and installation from Marine side, Main deck and topside facilities. • Provide hands on technical assistant to all contractors whatever problems arises during engineering design stage & construction phase of the project. • Evaluate discrepancies and provide proposal to resolve the issue on site to avoid any delayed. Page 1
  • 2.
    • Site surveyof Existing piping system and Equipment for marine and top side process. • Review Piping and Mechanical Equipment Drawings from the contractors for comment and approval. • To implement construction standard and codes as per company specifications during construction phase. • Monitor piping fabrication & installation progress; verify piping material and fittings status to ensure delivery will be on time as per schedule. • Assist and giving feedback to the engineering group whatever problems on site such clashing, modification of piping during fabrication and installation. • Site survey of existing piping system, create isometric 3d drawing and submit to PDS Engineering group for modeling and as built drawing. • Site visit and hands on inspection of package equipment, rotating and static to ensure everything is in company requirements. • Counter check mechanical equipment approved drawing lay out, equipment foundation support installation to insure all piping tie in points coordinates are correct as per drawing requirements. Period Position Duties and Responsibilities April 2013 ~ December 2014 Commissioning Specialist Mechanical / Piping EJ JOINT VENTURE SDN BHD. Seconded to EXXON MOBIL MALAYSIA (EOR) PROJECT BROWNFIELD TAPIS FIELD • Witness Mechanical completion activities performed by the Construction Contractor including approval of punch lists for Mechanical Discipline. • Execute all Mechanical & Piping pre-commissioning, commissioning and start-up activities for assigned sub- • System.This includes preparatory activities, coordinating resources (technicians, equipment, and other departments), and expediting documentation – in particular handover dossiers. • Participating in walk-downs from construction to commissioning and from commissioning to operations and formally agreeing and categorizing punch-list items. • Commission systems/subsystems in accordance with the commissioning procedures and commissioning and start-up schedule. • Assist Vendor servicemen with their commissioning activities. • Raised site materials requests (SMR’s), technical queries (TQ’s) field instructions (FI’s) for activities where necessary and livening up notices (LUN’s) where piping / Mechanical equipment or lines require energizing. • Compile relevant documentation to support handover and acceptance of systems to Operations Group. • Check that Mechanical and Piping content of the dossiers is Page 2
  • 3.
    accurate and completebefore they are accepted from construction and before they are submitted to operations department. May 2012 ~ March 2013 Mechanical / Piping Superintendent NES GLOBAL PTE. LTD. Singapore seconded to BC PETROLIUM (EVP BALAI MUTIARA FPSO CONVERSION Project • Provide hands on technical assistant to all contractors whatever problems arises during engineering design stage & construction phase of the project. • Evaluate discrepancies and provide proposal to resolve the issue on site to avoid any delayed. • Site survey of Existing piping system and Equipment for marine and top side process. • Review Piping and Mechanical Equipment Drawings from the contractors for comment and approval. • To implement construction standard and codes as per company specifications during construction phase. • Monitor piping fabrication & installation progress; verify piping material and fittings status to ensure delivery will be on time as per schedule. • Assist and giving feedback to the engineering group whatever problems on site such clashing, modification of piping during fabrication and installation. • Site survey of existing piping system, create isometric 3d drawing and submit to PDS Engineering group for modeling and as built drawing. • Site visit and hands on inspection of package equipment, rotating and static to ensure everything is in company requirements. • Counter check mechanical equipment approved drawing lay out, equipment foundation support installation to insure all piping tie in points coordinates are correct as per drawing requirements. August 2011~ January 2012 Mechanical / Piping Field Engineer AIR ENERGI Singapore seconded to DPS BRISTOL LTD. BIRANTAI FPSO CONVERSION (PETROPAC) Project • Assist and giving feedback to the engineering group whatever problems on site such clashing, modification of piping during fabrication and installation. Site survey of existing piping system, create isometric 3d drawing and submit to PDS Engineering group for modeling and as built drawing. • Site visit and hands on inspection of package equipment, rotating and static to ensure everything is in company requirements. • Counter check mechanical equipment approved drawing lay out, equipment foundation support installation to insure all piping tie in points coordinates are correct as per drawing requirements. • Provide hands on technical assistant to all contractors whatever problems arises during construction phase of the project. Evaluate discrepancies and provide proposal to resolve the issue on site to avoid any delayed. • Monitor piping fabrication & installation progress; verify piping material and fittings status to ensure delivery will be on time Page 3
  • 4.
    to avoid anydelayed. June 2010 ~ June 2011 December 2009 ~ June 2010 June 2009 ~ November 2009 Mechanical Field Engineer NES GLOBAL PTE. LTD. Singapore seconded to HOANG LONG JOINT OPERATING COMPANY (CLIENT) TGT FPSO CONVERSION Project Mechanical / Piping Field Engineer RESOURCES UNLIMITED PTE. LTD. Singapore seconded to MAERSK FPSO PERIGRENO CONVERSION Project Mechanical /Piping Field Engineer PTT Engineering and Consultants (S) PTE. LTD. Singapore seconded to FPSO FOUR VANGAURD CONVERSION Project • Managed Suppliers with excellent negotiation, communication and interpersonal skills to achieve substantial cost savings. • Managed Bill of Material’s and extensive experience in managing and tracking Engineering changes. • Extensive experience in execution of programs and projects that meet On Time & Order to Delivery Quality and Cost Review and recommend or approve contracts and cost estimates and present and explain proposals, reports, and findings to clients. Targets. • Specify or direct modification of products to ensure conformance with engineering design and performance specification • Closely monitor piping fabrication & installation progress; verify piping material and fittings status to ensure delivery will be on time to avoid any delayed. • Assist the contractor to resolve whatever technical issues arise during fabrication, answering all mechanical/piping technical queries raised by the contractor. • Site visit and hands on inspection of package equipment, rotating and static to ensure everything is in company requirements. • Planned and Schedule all piping and equipment activities basing on target schedule required by the company, prepare daily progress report actual versus planned. • Coordinate Vendor Assistance and Site Vendor Call Up during Critical Phase of Machinery Packages Installation • Witness for inspection as a client representative during installation of rotating and static equipment such as pumps, pressure vessels, turbo generator, coolers, exchangers and compressors. • Conduct spot check and site surveillance as a daily routine if the contractors followed the company specification, procedures and requirements. • Monitor job status and daily progress report. July 2006 ~ February 2007 Mechanical / Piping Field Engineer OAG Engineering SDN. Berhad. Kualalumpor Malaysia Seconded to CHOC Carigali Hess Operating Company SDN Berhad. CAKRAWALA Brown Field & Green Field Gas Development EPC Project Offshore/Onshore. • Involved in EPC Engineering, procurement and construction as a discipline Engineer, to review and approve drawings for construction, work specification, construction procedure against company standard requirement & Evaluate and qualify Bed Tender for Material and equipment supply for the project. • Prepare data sheets / specifications for Equipment package items like DM Water Plant, Chemical Injection Skid, Glycol Package, Fuel Dehydration Package, Fuel Gas Treating Package, Nitrogen Unit, RO plant unit and Heat Exchangers. • Prepare Requisition for Quotation (RFQ’S) and Purchase specification. • Evaluate Technical Offers provide by vendor. • Review work responsibilities of the Mechanical discipline / Package Equipment personnel and the manpower requirements for the project. • Monitor piping fabrication progress; verify piping material and fittings status to ensure delivery will be on time to avoid any Page 4
  • 5.
    delayed. • Assist thecontractor to resolve whatever technical issues arise during fabrication, answering all mechanical/piping technical queries raised by the contractor. • Site visit and hands on inspection of package equipment, rotating and static to ensure everything is in company requirements. • Planned and Schedule all piping and equipment activities basing on target schedule required by the company, prepare daily progress report actual versus planned. December 2005 ~ February 2006 Mechanical / Piping Supervisor PTT Engineering Consultants (S) PTE. LTD. Singapore seconded to SBM – Single Buoy Mooring CAFIXABA FPSO Project Brazil • Closely monitor piping fabrication & installation progress; verify piping material and fittings status to ensure delivery will be on time to avoid any delayed. • Assist the contractor to resolve whatever technical issues arise during fabrication, answering all mechanical/piping technical queries raised by the contractor. • Site visit and hands on inspection of package equipment, rotating and static to ensure everything is in company requirements. • Planned and Schedule all piping and equipment activities basing on target schedule required by the company, prepare daily progress report actual versus planned. • Coordinate Vendor Assistance and Site Vendor Call Up during Critical Phase of Machinery Packages Installation • Witness for inspection as a client representative during installation of rotating and static equipment such as pumps, pressure vessels, turbo generator, coolers, exchangers and compressors. • Conduct spot check and site surveillance as a daily routine if the contractors followed the company specification, procedures and requirements. • Monitor job status and daily progress report. . March 2004 ~ October 2005 Mechanical Inspector Brunel International South East Asia Pte. Ltd. Singapore Seconded to EXXON MOBIL FPSO ERHA Deep Water Lagos Nigeria Project • Witness for inspection as a client representative during installation of rotating and static equipment such as pumps, pressure vessels, turbo generator, coolers, exchangers and compressors. • Conduct spot check and site surveillance as a daily routine if the contractors followed the company specification, procedures and requirements. • Issued NCR report for corrective action. Monitor job status and daily progress. • Auditing documentation, drawings, and specification as per latest revision. • During mechanical completion as a part of project team involved in piping line walk, punch listing, Witness hydro testing, flushing, chemical cleaning, hot oil flushing & air blowing. • Witness final acceptance of rotating equipment shaft alignment, levelness and preservation, internal inspection of Pressure vessels cooler& exchanger. • Attending Try party walk down inspection for the system/sub system for final acceptance. Page 5
  • 6.
    February 2003 ~September 2003 Mechanical Commissioning Senior Technician (Offshore) PTT Engineering Consultants (S) PTE. LTD. Singapore seconded to MODEC INTERNATIONAL LLC FPSO FLUMINENSI CONVERTION Project • Assist the lead mechanical engineer to commission all system in Engine room and topside process module. • Involved on line checking as per P & ID system by system of missing item. • Inspect all rotating equipment if everything is ready and especially shaft alignment, soft foot clearance, and lubrication oil prior to start and commission the system. • Clearing outstanding punch list item. • Monitoring status of job carried out inspection as per the commissioning specification. • Line checking as per P & ID, • Pre commissioning witness all testing, flushing, chemical cleaning and final commissioning till handing over the system to operation team. February 2000 ~ February 2003 July 1999 ~ February 2000 Mechanical/Piping Supervisor PTT Engineering Consultants (S) PTE. LTD. Singapore seconded to SBM – Single Buoy Mooring FPSO FALCON & FPSO EAGLE CONVERTION Project Mechanical/Piping Supervisor PTT Engineering Consultants (S) PTE. LTD. Singapore seconded to SBM – Single Buoy Mooring FPSO ESPEDARTE CONVERTION Project • Prepare all approved construction drawings required such as plan drawing key plan, equipment lay out drawings, isometric drawings, and P & ID. • Review all the drawing as per latest rev. prior for fabrication and installation. • Study and planned how to execute the job smoothly as per construction target schedule. • Monitor the status of material availability base on the original bill of materials and base on approval drawings, Witness and check, alignment, levelness, tolerance as per construction standard & co-ordinate with the contractor’s representative. • Ensure full compliance on quality and safety requirements by the contractors. • Monitor daily progress and giving fully supports to all contractor regarding technical matters and mark up all those drawings for revision on site and report directly to the construction manager. • Planned and Schedule all piping activities basing on target schedule required by the company. • Prepare daily progress report actual versus planned. • Witness for inspection as a client representative during installation of rotating and static equipment such as pumps, pressure vessels, turbo generator, coolers, exchangers and compressors. • Conduct spot check and site surveillance as a daily routine if the contractors followed the company specification, procedures and requirements. • Attending Try party walk down inspection for the system/sub system for final acceptance. Page 6
  • 7.
    September 1998 ~July 1999 Mechanical/Piping Superintendent GSI – Gas Services International FPSO Project P-59 PETRO BRASS Keppel Shipyard (Singapore) • Reporting to project manager and project superintendent. In- charge of supervisors for the Gas compressor skid, Gas Turbine and Utilities Skid, • Preparation of construction drawing and review prior for assembly. Material take-off. Monitoring status of the materials, anchorage of mechanical/piping erection, counter check the location, elevation as per drawing, plan and schedule for next Activities for the following day. • Attending weekly/monthly meeting with clients. • Supervise daily mechanical activities. • Conducting inspection, erection of equipment, steel structure, line checking if all the line is being installed as per approved P&ID, counter check material used. • Punch lists all outstanding items as per approved P&ID. • Witness hydro testing, water Flushing, oil flushing, hydro jetting, chemical cleaning, insulation, painting and re- instatement. • Update all as built drawing and review test package by its own system. • Assist, preparation of document for hand over. September 1996 ~ May 1997 Piping Supervisor DAILEM ENGINEERING & CONTRACTORS PPSC-11 LPE Petrochemical Project Jurong Island Singapore • Ensure full compliance on quality and safety requirements by contractors and sub-contractors. • Ensure all mechanical rotating equipment, machinery and static equipment during material handling; preservation and protection from damage are carried out as per company specification. • Ensure all equipment installation such as pumps, compressors, turbine, coolers, exchangers; pressure vessels are in place as per construction and company specification. • Conduct spot check as a daily routine. • Witness for Inspection of pipe fabrication and assembly; rotating shaft alignment, soft foot, both side motor and pumps if carried out as per company procedure. • Witness levelness of skid mounting equipment vertically and horizontally aligned and all static mechanical equipment as well. • Witness pre commissioning activities such as hydro testing of pipes spool, water flushing, hydro jetting, chemical cleaning, lube oil flushing performed verification and prepared inspection report. February 1991 ~ March 1993 Fabrication Supervisor Mechanical / Piping KSRC – KUWAIT SHIPBUILDING & REPAIR YARD SAK. SAFAT STATE OF KUWAIT • Familiarization and understanding of Construction drawing, specification, testing requirements & other related to construction standard. • Schedule preparation, showing target date of every project on the workshop make sure job going on as per schedule. • Conduct material inspection availability, items are available as material will not be a problem when fabrication go on. • Make sure all drawings being used are latest revision. • Check fit works done by fitters, items such as alignment, levelness, straightness, material used and dimension. Page 7
  • 8.
    • Prepare dailyprogress report. • Do punch list especially tanks before hydro test be sure every items are installed before testing start. • Liaise with clients for the status of project by giving them firsthand information on accomplishment percentage. September 1988 ~ September 1990 Mechanical Engineer MS ALSUWAIDI GENERAL CONTRACTING CO. JUBAIL SAUDI ARABIA. • Involved in EPC Engineering, procurement and construction as a discipline Engineer, to review and approve drawings for construction, work specification, construction procedure against company standard requirement & Evaluate and qualify Bed Tender for Material and equipment supply for the project. • Prepare data sheets / specifications for Equipment package items like DM Water Plant, Chemical Injection Skid, Glycol Package, Fuel Dehydration Package, Fuel Gas Treating Package, Nitrogen Unit, RO plant unit and Heat Exchangers. • Prepare Requisition for Quotation (RFQ’S) and Purchase specification. • Evaluate Technical Offers provide by vendor. • Review work responsibilities of the Mechanical discipline / Package Equipment personnel and the manpower requirements for the project. • Monitor piping fabrication progress; verify piping material and fittings status to ensure delivery will be on time to avoid any delayed. • Assist the contractor to resolve whatever technical issues arise during fabrication, answering all mechanical/piping technical queries raised by the contractor. • Site visit and hands on inspection of package equipment, rotating and static to ensure everything is in company requirements. • Planned and Schedule all piping and equipment activities basing on target schedule required by the company, prepare daily progress report actual versus planned. Page 8
  • 9.
    July 1986 ~January 1988 Piping Supervisor EEI – ENGINEERING & EQUIPMENT INC. MHI Power Plant Project General Contractor Alzour Kuwait. • Able to interpret drawings and specifications. • Ensure full compliance on quality and safety requirements by contractors and sub-contractors. • Ensure all mechanical rotating equipment, machinery and static equipment during material handling; preservation and protection from damage are carried out as per company specification. • Ensure all equipment installation such as pumps, compressors, turbine, coolers, exchangers; pressure vessels are in place as per construction and company specification. • Conduct spot check as a daily routine. • Witness for Inspection of pipe fabrication and assembly; rotating shaft alignment, soft foot, both side motor and pumps if carried out as per company procedure. • Witness pre commissioning activities such as hydro testing of pipes spool, water flushing, hydro jetting, chemical cleaning, lube oil flushing performed verification and prepared inspection report. July 1984 ~ October1984 Junior Engineer ACI FIBER GLASS CORPORATION PHILPOS FIRTILIZER PROJOCT ISABEL LYTE PHILIPPINES • Assisting piping engineer for fabrication and erection/ piping job. • Monitoring daily accomplishment, making report/submission, inspection of all fit up joints follow the standard tolerance as per client requirements and controlling daily man power. Language: Proficient in English, both spoken and written. Moderate in Tagalog and Cebuano. Page 9
  • 10.
    July 1986 ~January 1988 Piping Supervisor EEI – ENGINEERING & EQUIPMENT INC. MHI Power Plant Project General Contractor Alzour Kuwait. • Able to interpret drawings and specifications. • Ensure full compliance on quality and safety requirements by contractors and sub-contractors. • Ensure all mechanical rotating equipment, machinery and static equipment during material handling; preservation and protection from damage are carried out as per company specification. • Ensure all equipment installation such as pumps, compressors, turbine, coolers, exchangers; pressure vessels are in place as per construction and company specification. • Conduct spot check as a daily routine. • Witness for Inspection of pipe fabrication and assembly; rotating shaft alignment, soft foot, both side motor and pumps if carried out as per company procedure. • Witness pre commissioning activities such as hydro testing of pipes spool, water flushing, hydro jetting, chemical cleaning, lube oil flushing performed verification and prepared inspection report. July 1984 ~ October1984 Junior Engineer ACI FIBER GLASS CORPORATION PHILPOS FIRTILIZER PROJOCT ISABEL LYTE PHILIPPINES • Assisting piping engineer for fabrication and erection/ piping job. • Monitoring daily accomplishment, making report/submission, inspection of all fit up joints follow the standard tolerance as per client requirements and controlling daily man power. Language: Proficient in English, both spoken and written. Moderate in Tagalog and Cebuano. Page 9