SlideShare a Scribd company logo
CURRICULLUM VITAE
Certification Engineer Oil & Gas Field
Umang Tailor (Diploma & B.Tech Instrumentation & Control)
Opp. Bank of Baroda, PH.NO-09833300847, +971565835515
Vill. Talwara Dist. Banswara, umang.tailor123@gmail.com
Rajasthan India 327025
Objective
Seeking a suitable Engineering position in a growth-oriented organization that provides a congenial
work and growth environment, with adequate opportunities to develop technical expertise in recent
technologies, to widen business domain horizons and to enrich by sharpening management skills
crucial in the course of an Engineering lifecycle
Total Experience – 10+ year
Present Job
Working with PETROFAC INTERNATIONAL UAE. Abu Dhabi/ Indonesia/ Singapore
ZADCO PROJECT as a Certification turnover Engineer (Commissioning & Completions)
from 03June 2015 to Till Now
Over All Job Profile
• Ensure That details of any agreed exceptions to the handover have been added to the
PetroPCS, punch list prior to the Tri-party review of the Work Pack, System Handover
Certification Dossier
• Ensure PetroPCS mapped with the correct functional code and the check sheets.
• Ensures Check Sheets are filled in and handed over to the Turnover (PetroPCS) team
immediately after the physical inspection, test or check was executed in the field.
• Ensures Punch list items, site queries and Field Trouble Reports are entered into the
database and are continuously updated.
• Ensures the PetroPCS database updated with “as-built” information.
• Ensures Check Sheets have been allocated to correct equipment / instruments tag numbers.
• Ensures all system-commissioning test procedures have been assigned to the correct system.
• Prepares System Completion Dossier and associated documentation.
• Maintains daily liaison with discipline construction and commissioning engineers for timely
input of progress.
• Produces and issues completion status reports from PetroPCS.
• Maintain on a continuous basis the “Handover Change Log”.
• Liaison with Project Document Controller and update the Technical Document Register.
• In the period of Turnover Coordinator leave cycle, PetroPCS Certification Engineer shall be
responsible for Turnover Coordinator duties.
Page 1 of 6
• Turnover Certificate Engineer shall continuously maintain a log of sequentially numbered
Handover Change Requests to prevent duplication, which log will be continuously available
for “viewing” on the Site LAN.
Present Job
Working with CAIRN ENERGY INDIA LTD. Mangla Process Terminal & Rageshwari
Gas Terminal, Rajasthan (Barmer) as a Certification Engineer (Project Commissioning)
From April 2009 to May 2015.
Over All Job Profile
• Maintenance and update of the PCMS completions database including daily updates as the
construction getting complete.
• Prepare of Instrumentation completion, pre-commissioning & commissioning check lists.
• Complete and verify a PCMS Data Base for the construction, Pre-Commissioning &
commissioning and Start up Phases of the project.
• Coordinate the completion of Electronic & Instrumentation Completion and Pre
Commissioning certification.
• Marking the System and Sub- systems limits on Layout, P&ID & Cable Schedule for
Construction Completion and Pre-Commissioning phase.
• Identifying the tags in the marked System and Sub-System of all discipline for technical
integrity.
• Issuing the ITR (Inspection Testing Reports), DAC, CCC, FTC, MC, SAC and RSU for the
ongoing System- Subsystem Project work.
• Provide guidance on the Certification requirements, to Team members.
• Provide onsite training in the operation of the Completions system.
• Assist with Systemization Mnemonics, and Drawing mark-ups.
• Management of the Completions system including administration of the change control
procedure.
• Develop the project Completions System in line with project philosophies.
• Promote the functions, abilities and philosophy of the Completions System throughout the
project team.
• Production of mechanical completion, pre-commissioning & commissioning check lists.
• Review Vendor documentation to enable population of Completions database.
• Interface with Construction & Commissioning Managers/Engineers regarding Certification
matters.
• Monitor Completions with regards to the completion status and organize joint party punch
listing between Construction, Commissioning and Operations.
• Worked on pro-safe system used for Fire & Gas system & Emergency Shutdown
system, PCS Control system, understand the concept for safety logic as with SIS block
Structure & also SIL3 logic in HIPPS package.
• Pressure Transmitter, Flow Transmitter, Level Transmitter, Level Troll, Level Switch, And
Temp Transmitter, Temp. Gauge, Temp. Switch, Temp. Indicator, Temp. Controller, RTD,
Thermocouple, Temp. Bath, Millimeter, Pressure Gauge, Pressure Switch, DP Gauge, Ph
Meter, Rota Meter, Lever Indicator, Recorder, Controllers, All Types Of Control Valves,
Valve Positioned, Regulator, Pneumatic Transmitter Gas Sensor, Break Glass Unite (Bgu),
Smoke Detector all Type Instrument Installation.
Page 2 of 6
Promote the functions, abilities and philosophy of the PCMS and GOCCMS
completions System throughout the project team lead. A member of the Project
management team for the Cairn India Mangala Rajasthan Project.
Responsibilities included:
 Complete and verify a GOCCMS Data Base for the construction, Pre-
Commissioning & commissioning and Start up Phases of the project
 Coordinate the completion of Electronic & Instrumentation Completion and Pre
Commissioning certification
 Supervise & train a completions team of 5 member under my command
 Provide a positive role in promoting good HSSE culture and meeting Cairn
expectations.
 Management of the GOCCMS completions system including administration of
the change control procedure.
 Maintenance and update of the GOCCMC completions database including daily
updates as the construction getting complete
 Prepare of Instrumentation completion, pre-commissioning & commissioning
check lists.
 Review Vendor documentation to enable population of GOCCMS completions
database.
 The completion of all Sub-Systems and the respective handover to
Commissioning.
 Interface with Construction & Commissioning engineers regarding Certification
matters.
 Monitor GOCCMS completions with regards to the completion status and
organize joint party punch listing between Construction and Commissioning.
 Maintain as-built documentation and red-line change records.
 Maintain register of certified test equipment.
 Maintain register of Authorized Signatures.
 Maintain register of Engineering Queries.
 Priorities Sub-System completion for early Commissioning.
 Inform Project Management Team of multi-discipline percentage completions
for Instrumentation Completion, Pre-Commissioning & Commissioning.
Previous Job
Worked with Larsen & Toubro Limited ECC Division Mangla Processing Terminal &
Rajeshwari (Oil Exploration Site) Barmer from Jun 2006 to March 2009
Company Profile :-
Larsen & Toubro Limited (L&T) is a technology, engineering, construction and
manufacturing company. It is one of the largest and most respected companies in India's
private sector. ECC – the Engineering Construction and Contracts Division of L&T is
India’s largest.
Page 3 of 6
Worked as an Engineer involved in the following work:
 MIS (Management Information System)
 Cable Laying and Routing Plan
 Follow Up Material availability in site
 DPR (Daily Progress Report)
 Knowledge and familiar in P&ID, Junction box layout, Instrument Location
Layout drawing, Cable schedule etc…
 Experience in Installation of Junction Box and frame fabrication as per the drawing and
suite at site.
 Experience in installation of cable trays and all other accessories related to cable tray
work.
 Installation Of all field instruments as per the Instrumentation Layout drawing.
 Installation of Impulse tubing as per the hookup drawing.
 Hands on experience in Loop checking.
 Installation of Panel and base frame fabrication as per the control room panel layout.
 Interpanel cable laying glanding & Termination.
 The checking of process engineering flow schemes, utility engineering flow schemes,
Functional logic diagrams and flow charts (functional description).Preparing and
Updating instrument data sheets. The calculations for flow measuring instruments and
Control valves. The requisitioning of all instruments, accessories and installation
Materials.
Industrial Training
 Key end user training for GOC guidance of certification BY QEDI.
 GOC Data Management
 PCMS Data Management
 GOCCMS Web Based completions data base course
Certification Educational Background
 Diploma & B.Tech (Instrumentation & Control Engineer)
IT Proficiency
 Operating Systems : MS-DOS, Windows NT/95/98
 Languages : C, C++
 GUI : Visual Basic 6.0
Page 4 of 6
 Packages : MS OFFICE, MS EXCEL& MS POWER POINT.
Passport Details
PASSPORT NO : G3125037
DATE OF ISSUE : 01/06/2007
DATE OF EXPIRY : 31/05/2017
PLACE OF ISSUE : JAIPUR
Strengths
 Keen to Learn And A Strong Believer In Teamwork And Integrity.
 Hard Work and Enthusiastic.
 Seek To Excel In The Task At Hand.
 Sense of Responsibility.
 Creative and Resourceful.
Personal Profile
Date Of Birth : 22,Sep.1986
Father’s Name : Shri Naresh Kumar Tailor
Marital Status : Married
Nationality : Indian
Languages : English , Hindi & Gujrati
Hobbies : Cricket, Painting, Drawing.
Email : Umang.tailor123@gmail.com
Mob No. : +6585857527
: +919602284842
: +919833300847
Declaration:
I Hereby Declare That The Information Furnished Above Is True To The Best Of My
Knowledge And Belief.
Page 5 of 6
Date:
Place: (Umang Tailor)
Page 6 of 6
Date:
Place: (Umang Tailor)
Page 6 of 6

More Related Content

What's hot

E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,InspEZAZ ALAM
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)VINOTH S
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerSrivenkatesh Padmanaban
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016D Venkatesh
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CVAhmed Samir
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrGovinda Raman
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio datakalathil716
 
Resume for Metering or Instrumentation Engineer
Resume for Metering or Instrumentation EngineerResume for Metering or Instrumentation Engineer
Resume for Metering or Instrumentation EngineerJaydeep patel
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resumearnel moncada
 

What's hot (19)

E&I QAQC Sup,Insp
E&I QAQC Sup,InspE&I QAQC Sup,Insp
E&I QAQC Sup,Insp
 
Vinoth.s qa qc-ims (qms&ehs)
Vinoth.s   qa qc-ims (qms&ehs)Vinoth.s   qa qc-ims (qms&ehs)
Vinoth.s qa qc-ims (qms&ehs)
 
Resume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineerResume srivenkatesh instrumentation engineer
Resume srivenkatesh instrumentation engineer
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
Ali Raza CV(Final)
Ali Raza CV(Final)Ali Raza CV(Final)
Ali Raza CV(Final)
 
DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016DVenkatesh Rotating Equip cv 2016
DVenkatesh Rotating Equip cv 2016
 
Control Engineer-CV
Control Engineer-CVControl Engineer-CV
Control Engineer-CV
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
 
adrian cv
adrian cvadrian cv
adrian cv
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
QC
QCQC
QC
 
Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)Efren Molina Updated CV.new(Civil Engineer)
Efren Molina Updated CV.new(Civil Engineer)
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
Jose Joseph Bio data
Jose Joseph Bio dataJose Joseph Bio data
Jose Joseph Bio data
 
Resume for Metering or Instrumentation Engineer
Resume for Metering or Instrumentation EngineerResume for Metering or Instrumentation Engineer
Resume for Metering or Instrumentation Engineer
 
Resume Jun-2015
Resume Jun-2015Resume Jun-2015
Resume Jun-2015
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
D. Medina's CV (01)
D. Medina's CV (01)D. Medina's CV (01)
D. Medina's CV (01)
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
 

Similar to Updated Umang resume

Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsSanjeeth Thekkada
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceDHRUVA MISHRA
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument EngineerKamran Saeed
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completionRonie Chu
 
Suman Professional
Suman ProfessionalSuman Professional
Suman ProfessionalSuman Das
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qcvipin joy
 
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASUAmit Basu
 
Akshay Resume 17.06.16
Akshay Resume 17.06.16Akshay Resume 17.06.16
Akshay Resume 17.06.16akshay chauhan
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.prabu s
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar
 

Similar to Updated Umang resume (20)

Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Rangga Kadarusman - CV
Rangga Kadarusman - CVRangga Kadarusman - CV
Rangga Kadarusman - CV
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Ram resume
Ram resumeRam resume
Ram resume
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
Pre commissioning Instrument Engineer
Pre commissioning Instrument EngineerPre commissioning Instrument Engineer
Pre commissioning Instrument Engineer
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
Cv (2). kh
Cv (2). kh Cv (2). kh
Cv (2). kh
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
CV
CVCV
CV
 
Imran_CV
Imran_CV Imran_CV
Imran_CV
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
AMIT KR BASU
AMIT KR BASUAMIT KR BASU
AMIT KR BASU
 
Akshay Resume 17.06.16
Akshay Resume 17.06.16Akshay Resume 17.06.16
Akshay Resume 17.06.16
 
Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.Mechanical engg-- 8+Yrs. Exp.
Mechanical engg-- 8+Yrs. Exp.
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 

Updated Umang resume

  • 1. CURRICULLUM VITAE Certification Engineer Oil & Gas Field Umang Tailor (Diploma & B.Tech Instrumentation & Control) Opp. Bank of Baroda, PH.NO-09833300847, +971565835515 Vill. Talwara Dist. Banswara, umang.tailor123@gmail.com Rajasthan India 327025 Objective Seeking a suitable Engineering position in a growth-oriented organization that provides a congenial work and growth environment, with adequate opportunities to develop technical expertise in recent technologies, to widen business domain horizons and to enrich by sharpening management skills crucial in the course of an Engineering lifecycle Total Experience – 10+ year Present Job Working with PETROFAC INTERNATIONAL UAE. Abu Dhabi/ Indonesia/ Singapore ZADCO PROJECT as a Certification turnover Engineer (Commissioning & Completions) from 03June 2015 to Till Now Over All Job Profile • Ensure That details of any agreed exceptions to the handover have been added to the PetroPCS, punch list prior to the Tri-party review of the Work Pack, System Handover Certification Dossier • Ensure PetroPCS mapped with the correct functional code and the check sheets. • Ensures Check Sheets are filled in and handed over to the Turnover (PetroPCS) team immediately after the physical inspection, test or check was executed in the field. • Ensures Punch list items, site queries and Field Trouble Reports are entered into the database and are continuously updated. • Ensures the PetroPCS database updated with “as-built” information. • Ensures Check Sheets have been allocated to correct equipment / instruments tag numbers. • Ensures all system-commissioning test procedures have been assigned to the correct system. • Prepares System Completion Dossier and associated documentation. • Maintains daily liaison with discipline construction and commissioning engineers for timely input of progress. • Produces and issues completion status reports from PetroPCS. • Maintain on a continuous basis the “Handover Change Log”. • Liaison with Project Document Controller and update the Technical Document Register. • In the period of Turnover Coordinator leave cycle, PetroPCS Certification Engineer shall be responsible for Turnover Coordinator duties. Page 1 of 6
  • 2. • Turnover Certificate Engineer shall continuously maintain a log of sequentially numbered Handover Change Requests to prevent duplication, which log will be continuously available for “viewing” on the Site LAN. Present Job Working with CAIRN ENERGY INDIA LTD. Mangla Process Terminal & Rageshwari Gas Terminal, Rajasthan (Barmer) as a Certification Engineer (Project Commissioning) From April 2009 to May 2015. Over All Job Profile • Maintenance and update of the PCMS completions database including daily updates as the construction getting complete. • Prepare of Instrumentation completion, pre-commissioning & commissioning check lists. • Complete and verify a PCMS Data Base for the construction, Pre-Commissioning & commissioning and Start up Phases of the project. • Coordinate the completion of Electronic & Instrumentation Completion and Pre Commissioning certification. • Marking the System and Sub- systems limits on Layout, P&ID & Cable Schedule for Construction Completion and Pre-Commissioning phase. • Identifying the tags in the marked System and Sub-System of all discipline for technical integrity. • Issuing the ITR (Inspection Testing Reports), DAC, CCC, FTC, MC, SAC and RSU for the ongoing System- Subsystem Project work. • Provide guidance on the Certification requirements, to Team members. • Provide onsite training in the operation of the Completions system. • Assist with Systemization Mnemonics, and Drawing mark-ups. • Management of the Completions system including administration of the change control procedure. • Develop the project Completions System in line with project philosophies. • Promote the functions, abilities and philosophy of the Completions System throughout the project team. • Production of mechanical completion, pre-commissioning & commissioning check lists. • Review Vendor documentation to enable population of Completions database. • Interface with Construction & Commissioning Managers/Engineers regarding Certification matters. • Monitor Completions with regards to the completion status and organize joint party punch listing between Construction, Commissioning and Operations. • Worked on pro-safe system used for Fire & Gas system & Emergency Shutdown system, PCS Control system, understand the concept for safety logic as with SIS block Structure & also SIL3 logic in HIPPS package. • Pressure Transmitter, Flow Transmitter, Level Transmitter, Level Troll, Level Switch, And Temp Transmitter, Temp. Gauge, Temp. Switch, Temp. Indicator, Temp. Controller, RTD, Thermocouple, Temp. Bath, Millimeter, Pressure Gauge, Pressure Switch, DP Gauge, Ph Meter, Rota Meter, Lever Indicator, Recorder, Controllers, All Types Of Control Valves, Valve Positioned, Regulator, Pneumatic Transmitter Gas Sensor, Break Glass Unite (Bgu), Smoke Detector all Type Instrument Installation. Page 2 of 6
  • 3. Promote the functions, abilities and philosophy of the PCMS and GOCCMS completions System throughout the project team lead. A member of the Project management team for the Cairn India Mangala Rajasthan Project. Responsibilities included:  Complete and verify a GOCCMS Data Base for the construction, Pre- Commissioning & commissioning and Start up Phases of the project  Coordinate the completion of Electronic & Instrumentation Completion and Pre Commissioning certification  Supervise & train a completions team of 5 member under my command  Provide a positive role in promoting good HSSE culture and meeting Cairn expectations.  Management of the GOCCMS completions system including administration of the change control procedure.  Maintenance and update of the GOCCMC completions database including daily updates as the construction getting complete  Prepare of Instrumentation completion, pre-commissioning & commissioning check lists.  Review Vendor documentation to enable population of GOCCMS completions database.  The completion of all Sub-Systems and the respective handover to Commissioning.  Interface with Construction & Commissioning engineers regarding Certification matters.  Monitor GOCCMS completions with regards to the completion status and organize joint party punch listing between Construction and Commissioning.  Maintain as-built documentation and red-line change records.  Maintain register of certified test equipment.  Maintain register of Authorized Signatures.  Maintain register of Engineering Queries.  Priorities Sub-System completion for early Commissioning.  Inform Project Management Team of multi-discipline percentage completions for Instrumentation Completion, Pre-Commissioning & Commissioning. Previous Job Worked with Larsen & Toubro Limited ECC Division Mangla Processing Terminal & Rajeshwari (Oil Exploration Site) Barmer from Jun 2006 to March 2009 Company Profile :- Larsen & Toubro Limited (L&T) is a technology, engineering, construction and manufacturing company. It is one of the largest and most respected companies in India's private sector. ECC – the Engineering Construction and Contracts Division of L&T is India’s largest. Page 3 of 6
  • 4. Worked as an Engineer involved in the following work:  MIS (Management Information System)  Cable Laying and Routing Plan  Follow Up Material availability in site  DPR (Daily Progress Report)  Knowledge and familiar in P&ID, Junction box layout, Instrument Location Layout drawing, Cable schedule etc…  Experience in Installation of Junction Box and frame fabrication as per the drawing and suite at site.  Experience in installation of cable trays and all other accessories related to cable tray work.  Installation Of all field instruments as per the Instrumentation Layout drawing.  Installation of Impulse tubing as per the hookup drawing.  Hands on experience in Loop checking.  Installation of Panel and base frame fabrication as per the control room panel layout.  Interpanel cable laying glanding & Termination.  The checking of process engineering flow schemes, utility engineering flow schemes, Functional logic diagrams and flow charts (functional description).Preparing and Updating instrument data sheets. The calculations for flow measuring instruments and Control valves. The requisitioning of all instruments, accessories and installation Materials. Industrial Training  Key end user training for GOC guidance of certification BY QEDI.  GOC Data Management  PCMS Data Management  GOCCMS Web Based completions data base course Certification Educational Background  Diploma & B.Tech (Instrumentation & Control Engineer) IT Proficiency  Operating Systems : MS-DOS, Windows NT/95/98  Languages : C, C++  GUI : Visual Basic 6.0 Page 4 of 6
  • 5.  Packages : MS OFFICE, MS EXCEL& MS POWER POINT. Passport Details PASSPORT NO : G3125037 DATE OF ISSUE : 01/06/2007 DATE OF EXPIRY : 31/05/2017 PLACE OF ISSUE : JAIPUR Strengths  Keen to Learn And A Strong Believer In Teamwork And Integrity.  Hard Work and Enthusiastic.  Seek To Excel In The Task At Hand.  Sense of Responsibility.  Creative and Resourceful. Personal Profile Date Of Birth : 22,Sep.1986 Father’s Name : Shri Naresh Kumar Tailor Marital Status : Married Nationality : Indian Languages : English , Hindi & Gujrati Hobbies : Cricket, Painting, Drawing. Email : Umang.tailor123@gmail.com Mob No. : +6585857527 : +919602284842 : +919833300847 Declaration: I Hereby Declare That The Information Furnished Above Is True To The Best Of My Knowledge And Belief. Page 5 of 6