Umang Tailor is an instrumentation and controls engineer seeking a suitable engineering position. He has over 10 years of experience working in oil and gas fields in the United Arab Emirates, Indonesia, Singapore, and India. His experience includes commissioning, completions engineering, and ensuring systems are properly mapped, checked, and handed over. He is proficient in various software programs and has strong communication, problem-solving, and teamwork skills.
1. CURRICULLUM VITAE
Certification Engineer Oil & Gas Field
Umang Tailor (Diploma & B.Tech Instrumentation & Control)
Opp. Bank of Baroda, PH.NO-09833300847, +971565835515
Vill. Talwara Dist. Banswara, umang.tailor123@gmail.com
Rajasthan India 327025
Objective
Seeking a suitable Engineering position in a growth-oriented organization that provides a congenial
work and growth environment, with adequate opportunities to develop technical expertise in recent
technologies, to widen business domain horizons and to enrich by sharpening management skills
crucial in the course of an Engineering lifecycle
Total Experience – 10+ year
Present Job
Working with PETROFAC INTERNATIONAL UAE. Abu Dhabi/ Indonesia/ Singapore
ZADCO PROJECT as a Certification turnover Engineer (Commissioning & Completions)
from 03June 2015 to Till Now
Over All Job Profile
• Ensure That details of any agreed exceptions to the handover have been added to the
PetroPCS, punch list prior to the Tri-party review of the Work Pack, System Handover
Certification Dossier
• Ensure PetroPCS mapped with the correct functional code and the check sheets.
• Ensures Check Sheets are filled in and handed over to the Turnover (PetroPCS) team
immediately after the physical inspection, test or check was executed in the field.
• Ensures Punch list items, site queries and Field Trouble Reports are entered into the
database and are continuously updated.
• Ensures the PetroPCS database updated with “as-built” information.
• Ensures Check Sheets have been allocated to correct equipment / instruments tag numbers.
• Ensures all system-commissioning test procedures have been assigned to the correct system.
• Prepares System Completion Dossier and associated documentation.
• Maintains daily liaison with discipline construction and commissioning engineers for timely
input of progress.
• Produces and issues completion status reports from PetroPCS.
• Maintain on a continuous basis the “Handover Change Log”.
• Liaison with Project Document Controller and update the Technical Document Register.
• In the period of Turnover Coordinator leave cycle, PetroPCS Certification Engineer shall be
responsible for Turnover Coordinator duties.
Page 1 of 6
2. • Turnover Certificate Engineer shall continuously maintain a log of sequentially numbered
Handover Change Requests to prevent duplication, which log will be continuously available
for “viewing” on the Site LAN.
Present Job
Working with CAIRN ENERGY INDIA LTD. Mangla Process Terminal & Rageshwari
Gas Terminal, Rajasthan (Barmer) as a Certification Engineer (Project Commissioning)
From April 2009 to May 2015.
Over All Job Profile
• Maintenance and update of the PCMS completions database including daily updates as the
construction getting complete.
• Prepare of Instrumentation completion, pre-commissioning & commissioning check lists.
• Complete and verify a PCMS Data Base for the construction, Pre-Commissioning &
commissioning and Start up Phases of the project.
• Coordinate the completion of Electronic & Instrumentation Completion and Pre
Commissioning certification.
• Marking the System and Sub- systems limits on Layout, P&ID & Cable Schedule for
Construction Completion and Pre-Commissioning phase.
• Identifying the tags in the marked System and Sub-System of all discipline for technical
integrity.
• Issuing the ITR (Inspection Testing Reports), DAC, CCC, FTC, MC, SAC and RSU for the
ongoing System- Subsystem Project work.
• Provide guidance on the Certification requirements, to Team members.
• Provide onsite training in the operation of the Completions system.
• Assist with Systemization Mnemonics, and Drawing mark-ups.
• Management of the Completions system including administration of the change control
procedure.
• Develop the project Completions System in line with project philosophies.
• Promote the functions, abilities and philosophy of the Completions System throughout the
project team.
• Production of mechanical completion, pre-commissioning & commissioning check lists.
• Review Vendor documentation to enable population of Completions database.
• Interface with Construction & Commissioning Managers/Engineers regarding Certification
matters.
• Monitor Completions with regards to the completion status and organize joint party punch
listing between Construction, Commissioning and Operations.
• Worked on pro-safe system used for Fire & Gas system & Emergency Shutdown
system, PCS Control system, understand the concept for safety logic as with SIS block
Structure & also SIL3 logic in HIPPS package.
• Pressure Transmitter, Flow Transmitter, Level Transmitter, Level Troll, Level Switch, And
Temp Transmitter, Temp. Gauge, Temp. Switch, Temp. Indicator, Temp. Controller, RTD,
Thermocouple, Temp. Bath, Millimeter, Pressure Gauge, Pressure Switch, DP Gauge, Ph
Meter, Rota Meter, Lever Indicator, Recorder, Controllers, All Types Of Control Valves,
Valve Positioned, Regulator, Pneumatic Transmitter Gas Sensor, Break Glass Unite (Bgu),
Smoke Detector all Type Instrument Installation.
Page 2 of 6
3. Promote the functions, abilities and philosophy of the PCMS and GOCCMS
completions System throughout the project team lead. A member of the Project
management team for the Cairn India Mangala Rajasthan Project.
Responsibilities included:
Complete and verify a GOCCMS Data Base for the construction, Pre-
Commissioning & commissioning and Start up Phases of the project
Coordinate the completion of Electronic & Instrumentation Completion and Pre
Commissioning certification
Supervise & train a completions team of 5 member under my command
Provide a positive role in promoting good HSSE culture and meeting Cairn
expectations.
Management of the GOCCMS completions system including administration of
the change control procedure.
Maintenance and update of the GOCCMC completions database including daily
updates as the construction getting complete
Prepare of Instrumentation completion, pre-commissioning & commissioning
check lists.
Review Vendor documentation to enable population of GOCCMS completions
database.
The completion of all Sub-Systems and the respective handover to
Commissioning.
Interface with Construction & Commissioning engineers regarding Certification
matters.
Monitor GOCCMS completions with regards to the completion status and
organize joint party punch listing between Construction and Commissioning.
Maintain as-built documentation and red-line change records.
Maintain register of certified test equipment.
Maintain register of Authorized Signatures.
Maintain register of Engineering Queries.
Priorities Sub-System completion for early Commissioning.
Inform Project Management Team of multi-discipline percentage completions
for Instrumentation Completion, Pre-Commissioning & Commissioning.
Previous Job
Worked with Larsen & Toubro Limited ECC Division Mangla Processing Terminal &
Rajeshwari (Oil Exploration Site) Barmer from Jun 2006 to March 2009
Company Profile :-
Larsen & Toubro Limited (L&T) is a technology, engineering, construction and
manufacturing company. It is one of the largest and most respected companies in India's
private sector. ECC – the Engineering Construction and Contracts Division of L&T is
India’s largest.
Page 3 of 6
4. Worked as an Engineer involved in the following work:
MIS (Management Information System)
Cable Laying and Routing Plan
Follow Up Material availability in site
DPR (Daily Progress Report)
Knowledge and familiar in P&ID, Junction box layout, Instrument Location
Layout drawing, Cable schedule etc…
Experience in Installation of Junction Box and frame fabrication as per the drawing and
suite at site.
Experience in installation of cable trays and all other accessories related to cable tray
work.
Installation Of all field instruments as per the Instrumentation Layout drawing.
Installation of Impulse tubing as per the hookup drawing.
Hands on experience in Loop checking.
Installation of Panel and base frame fabrication as per the control room panel layout.
Interpanel cable laying glanding & Termination.
The checking of process engineering flow schemes, utility engineering flow schemes,
Functional logic diagrams and flow charts (functional description).Preparing and
Updating instrument data sheets. The calculations for flow measuring instruments and
Control valves. The requisitioning of all instruments, accessories and installation
Materials.
Industrial Training
Key end user training for GOC guidance of certification BY QEDI.
GOC Data Management
PCMS Data Management
GOCCMS Web Based completions data base course
Certification Educational Background
Diploma & B.Tech (Instrumentation & Control Engineer)
IT Proficiency
Operating Systems : MS-DOS, Windows NT/95/98
Languages : C, C++
GUI : Visual Basic 6.0
Page 4 of 6
5. Packages : MS OFFICE, MS EXCEL& MS POWER POINT.
Passport Details
PASSPORT NO : G3125037
DATE OF ISSUE : 01/06/2007
DATE OF EXPIRY : 31/05/2017
PLACE OF ISSUE : JAIPUR
Strengths
Keen to Learn And A Strong Believer In Teamwork And Integrity.
Hard Work and Enthusiastic.
Seek To Excel In The Task At Hand.
Sense of Responsibility.
Creative and Resourceful.
Personal Profile
Date Of Birth : 22,Sep.1986
Father’s Name : Shri Naresh Kumar Tailor
Marital Status : Married
Nationality : Indian
Languages : English , Hindi & Gujrati
Hobbies : Cricket, Painting, Drawing.
Email : Umang.tailor123@gmail.com
Mob No. : +6585857527
: +919602284842
: +919833300847
Declaration:
I Hereby Declare That The Information Furnished Above Is True To The Best Of My
Knowledge And Belief.
Page 5 of 6