Redevelopment of Tippo
International
David O’Malley - Dylan Casey - Richard Leonard - Bill Hutch
Hutch O’Malley Consulting Engineers
1
Background
Hutch O’Malley
Design
● New industrial buildings, housing estates and
large dwellings.
● Inspection and critique of existing buildings
and infrastructure.
● Surface water attenuation systems, potable
water supply design and road design and
analysis.
Consultancy
● Planning strategy, Site acquisition.
● Design team management.
● Technical advice applied to practical situations.
2
23th October 2016 - FIRE
3
23th October 2016 - FIRE
4
23th October 2016 - FIRE
Original Building “Demolished” by
Fire
5
November 2016 Initial actions
○ Safety
○ Demolition required.
○ Liaise with insurers and QS.
○ Planning history;
○ Implied permission to replace building.
○ Where planning was not granted for
elements these cannot be replaced.
○ Scope of new design and functional
requirements.
○ Re-location (Nenagh)
○ Fire safety concerns to be addressed.
○ Insurance Liaison.
6
December 2016 Re-location
● Temporary building acquired
○ Immediate survey and design of industrial
layout.
● New fire safety design required
○ Drawing up and auditing building as fit
out ongoing.
○ Strong liaison with Fire officer.
● Insurance
○ Ensuring certifications issued on an
ongoing basis.
○ Coordination of commissioning and
activation of areas.
7
January 2017 Planning
● Local Authority Engagement
○ Outstanding compliance issues.
○ Preference to relocate operations to
industrial estate.
○ Concerns regarding environmental issues.
● Insurance settlement
○ Design replacement building matching
original.
○ Modify and justify application of modern
standards etc.
● Infrastructural & Environmental
○ “Bunded” site required to retain potential
“Fire water”
○ Surface water attenuation required.
8
February 2017 Initial Works & Design
● Site levels Assessment
○ Balance cut-fill across entire site.
○ 3D model of roads and floor levels
● Underground Services
○ Balance depth of dig and flow
velocity.
○ Sizing SUDS systems.
● Fire Safety Certificate
● Disabled Access Certificate
● Macro M & E Design commences.
○ Production layouts
○ Meetings with M & E
Contractors/ESB 9
February 2017 Fire Safety Certificate
10
February 2017 Fire Safety Certificate
11
March 2017 Refine Design
● Nomination of Piling & Steel
Contractor
● Lighting design
○ Minimum Lux levels in all public areas.
○ Vast LED options.
● Legal Mapping
○ Definition of new legal boundaries
○ Land transfers and agreements 12
April 2017: Construction Timeline
2 Acres under the roof.
● 32 Shipping Containers full of flat
packed machines to arrive on site by
Sep. 1st. (ordered 6 months in
advance)
● In Production Target: October 31st,
● Showroom construction to follow.
N.B: 53 WEEKS FROM FIRE.
13
May 2017 Grant of planning
● Contractor appointed following
tendering process.
● Preliminary Site Setup begins.
● Commencement Notice lodged.
● Floor Slab Design. 14
June 2017-Construction PM
15
● Contractor Detail Signoff.
● Construction Commences above ground.
● “Big Picture” M & E Design continues.
● Office Area design begins.
16
July 2017 : M&E Layouts
July 2017
● Macro M & E Design continues.
● Production area construction continuing.
● Begin Micro M & E design.
● Timeline is adjusted & Tightens
17
August 2017
● Production area nears completion.
● Insurance Company M & E Reqs.
● Machinery Suppliers.
18
September 2017
● Machinery Delivery
● Exterior Groundworks
● Office/Showroom design finalisation.
● Rainwater storage system commences.
19
20
September 2017 Production area 1
October 2017
● M & E installation.
● Showroom Construction commences.
● Prepare for handover of Prod. Area.
21
22
October 2017 Production area 1 Machinery install
November 2017
● Handover of Production area
● Production Startup & issues
resolved.
● Completion of Production area.
● Showroom completion phase. 23
Construction Video
24
25
2018 Showroom & Reception
26
27
Completion Video
28
29
Hutch O’Malley
Consulting Civil and Structural Engineers
The Railway Station, Attyflin, Patrickswell, Co Limerick
T: 061 320260
E: admin@hutchomalley.ie
W: www.hutchomalley.ie
L: ihttps://ie.linkedin.com/company/hutch-o%27malley
F: www.facebook.com/hutchomalley

More Related Content

What's hot

Item # 4 - PPT 207 Abiso
Item # 4 - PPT 207 AbisoItem # 4 - PPT 207 Abiso
Item # 4 - PPT 207 Abiso
ahcitycouncil
 
Narrow Pavement Widening - San Angelo District
Narrow Pavement Widening - San Angelo DistrictNarrow Pavement Widening - San Angelo District
Narrow Pavement Widening - San Angelo District
Center for Transportation Research - UT Austin
 
Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018
Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018
Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018
Kathleen McDuff, B.A.
 
The Reconstruction Of Jimmy Adams
The Reconstruction Of Jimmy AdamsThe Reconstruction Of Jimmy Adams
The Reconstruction Of Jimmy Adams
J1MM1
 
Presentation goldlay 13 12 17
Presentation goldlay 13 12 17Presentation goldlay 13 12 17
Presentation goldlay 13 12 17
Les Bicknell
 
Profile Pathways Constructions.
Profile Pathways Constructions.Profile Pathways Constructions.
Profile Pathways Constructions.Pankaj Kumar
 
News from Bricker - October 2014
News from Bricker - October 2014News from Bricker - October 2014
News from Bricker - October 2014
BRICKERProject
 
Manni Green Tech _Building the future
Manni Green Tech _Building the futureManni Green Tech _Building the future
Manni Green Tech _Building the future
Claudia Chiti
 
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facadeCLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL
 
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit FeesAlamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
ahcitycouncil
 
Land development Ukraine
Land development UkraineLand development Ukraine
Land development Ukraine
Svyatoslav Zhmutskyy
 
Alec French on Green Retrofit
Alec French on Green RetrofitAlec French on Green Retrofit
Alec French on Green Retrofit
Go Green
 

What's hot (14)

Item # 4 - PPT 207 Abiso
Item # 4 - PPT 207 AbisoItem # 4 - PPT 207 Abiso
Item # 4 - PPT 207 Abiso
 
Narrow Pavement Widening - San Angelo District
Narrow Pavement Widening - San Angelo DistrictNarrow Pavement Widening - San Angelo District
Narrow Pavement Widening - San Angelo District
 
Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018
Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018
Good Neighbourly Relations Commitee - Jacques Cartier Bridge - February 6th 2018
 
The Reconstruction Of Jimmy Adams
The Reconstruction Of Jimmy AdamsThe Reconstruction Of Jimmy Adams
The Reconstruction Of Jimmy Adams
 
Presentation goldlay 13 12 17
Presentation goldlay 13 12 17Presentation goldlay 13 12 17
Presentation goldlay 13 12 17
 
rgb up to date cv
rgb up to date cvrgb up to date cv
rgb up to date cv
 
Profile Pathways Constructions.
Profile Pathways Constructions.Profile Pathways Constructions.
Profile Pathways Constructions.
 
News from Bricker - October 2014
News from Bricker - October 2014News from Bricker - October 2014
News from Bricker - October 2014
 
june'15
june'15june'15
june'15
 
Manni Green Tech _Building the future
Manni Green Tech _Building the futureManni Green Tech _Building the future
Manni Green Tech _Building the future
 
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facadeCLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
CLICKNL DRIVE 2018 | 25 OCT | Circular Building - Starting at the facade
 
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit FeesAlamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
Alamo Heights Council Meeting 06.10.19 - Item #4 Permit Fees
 
Land development Ukraine
Land development UkraineLand development Ukraine
Land development Ukraine
 
Alec French on Green Retrofit
Alec French on Green RetrofitAlec French on Green Retrofit
Alec French on Green Retrofit
 

Similar to Tippo International

Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
DC Department of General Services
 
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Tehmas Saeed
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)
DC Department of General Services
 
25 years of Projects in a Nutshell
25 years of Projects in a Nutshell25 years of Projects in a Nutshell
25 years of Projects in a Nutshell
YusufDawood4
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
Toronto Public Consultation Unit
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
masonsth
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
Shariful Haque Robin
 
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docxBUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
Sudas Duddey
 
BIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 ProjectBIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 Project
Hung Lam Vu Ngo
 
Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016JESUS MENDOZA
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Wael Nafad
 
Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design
 
Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdf
MOHDFIRRDHAUSBINMOHD
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
Sithick Mohamed .
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectAllen Green
 

Similar to Tippo International (20)

Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)
 
Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
 
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...Steel building Graded Unit  Civil Engineering Project HND Project Glasgow Kel...
Steel building Graded Unit Civil Engineering Project HND Project Glasgow Kel...
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)
 
25 years of Projects in a Nutshell
25 years of Projects in a Nutshell25 years of Projects in a Nutshell
25 years of Projects in a Nutshell
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
ITD Presentation
ITD PresentationITD Presentation
ITD Presentation
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docxBUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
BUILDING CONSTRUCTION PROCESS FROM START TO FINISH 1.docx
 
Ray Tang CV
Ray Tang CVRay Tang CV
Ray Tang CV
 
BIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 ProjectBIM on Project Site - Estella Heights Phase 2 Project
BIM on Project Site - Estella Heights Phase 2 Project
 
Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
 
Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples
 
Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdf
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 
Pm final
Pm finalPm final
Pm final
 

Recently uploaded

Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
veerababupersonal22
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 

Recently uploaded (20)

Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERSCW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
CW RADAR, FMCW RADAR, FMCW ALTIMETER, AND THEIR PARAMETERS
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 

Tippo International

  • 1. Redevelopment of Tippo International David O’Malley - Dylan Casey - Richard Leonard - Bill Hutch Hutch O’Malley Consulting Engineers 1
  • 2. Background Hutch O’Malley Design ● New industrial buildings, housing estates and large dwellings. ● Inspection and critique of existing buildings and infrastructure. ● Surface water attenuation systems, potable water supply design and road design and analysis. Consultancy ● Planning strategy, Site acquisition. ● Design team management. ● Technical advice applied to practical situations. 2
  • 3. 23th October 2016 - FIRE 3
  • 4. 23th October 2016 - FIRE 4
  • 5. 23th October 2016 - FIRE Original Building “Demolished” by Fire 5
  • 6. November 2016 Initial actions ○ Safety ○ Demolition required. ○ Liaise with insurers and QS. ○ Planning history; ○ Implied permission to replace building. ○ Where planning was not granted for elements these cannot be replaced. ○ Scope of new design and functional requirements. ○ Re-location (Nenagh) ○ Fire safety concerns to be addressed. ○ Insurance Liaison. 6
  • 7. December 2016 Re-location ● Temporary building acquired ○ Immediate survey and design of industrial layout. ● New fire safety design required ○ Drawing up and auditing building as fit out ongoing. ○ Strong liaison with Fire officer. ● Insurance ○ Ensuring certifications issued on an ongoing basis. ○ Coordination of commissioning and activation of areas. 7
  • 8. January 2017 Planning ● Local Authority Engagement ○ Outstanding compliance issues. ○ Preference to relocate operations to industrial estate. ○ Concerns regarding environmental issues. ● Insurance settlement ○ Design replacement building matching original. ○ Modify and justify application of modern standards etc. ● Infrastructural & Environmental ○ “Bunded” site required to retain potential “Fire water” ○ Surface water attenuation required. 8
  • 9. February 2017 Initial Works & Design ● Site levels Assessment ○ Balance cut-fill across entire site. ○ 3D model of roads and floor levels ● Underground Services ○ Balance depth of dig and flow velocity. ○ Sizing SUDS systems. ● Fire Safety Certificate ● Disabled Access Certificate ● Macro M & E Design commences. ○ Production layouts ○ Meetings with M & E Contractors/ESB 9
  • 10. February 2017 Fire Safety Certificate 10
  • 11. February 2017 Fire Safety Certificate 11
  • 12. March 2017 Refine Design ● Nomination of Piling & Steel Contractor ● Lighting design ○ Minimum Lux levels in all public areas. ○ Vast LED options. ● Legal Mapping ○ Definition of new legal boundaries ○ Land transfers and agreements 12
  • 13. April 2017: Construction Timeline 2 Acres under the roof. ● 32 Shipping Containers full of flat packed machines to arrive on site by Sep. 1st. (ordered 6 months in advance) ● In Production Target: October 31st, ● Showroom construction to follow. N.B: 53 WEEKS FROM FIRE. 13
  • 14. May 2017 Grant of planning ● Contractor appointed following tendering process. ● Preliminary Site Setup begins. ● Commencement Notice lodged. ● Floor Slab Design. 14
  • 15. June 2017-Construction PM 15 ● Contractor Detail Signoff. ● Construction Commences above ground. ● “Big Picture” M & E Design continues. ● Office Area design begins.
  • 16. 16 July 2017 : M&E Layouts
  • 17. July 2017 ● Macro M & E Design continues. ● Production area construction continuing. ● Begin Micro M & E design. ● Timeline is adjusted & Tightens 17
  • 18. August 2017 ● Production area nears completion. ● Insurance Company M & E Reqs. ● Machinery Suppliers. 18
  • 19. September 2017 ● Machinery Delivery ● Exterior Groundworks ● Office/Showroom design finalisation. ● Rainwater storage system commences. 19
  • 21. October 2017 ● M & E installation. ● Showroom Construction commences. ● Prepare for handover of Prod. Area. 21
  • 22. 22 October 2017 Production area 1 Machinery install
  • 23. November 2017 ● Handover of Production area ● Production Startup & issues resolved. ● Completion of Production area. ● Showroom completion phase. 23
  • 25. 25 2018 Showroom & Reception
  • 26. 26
  • 27. 27
  • 29. 29 Hutch O’Malley Consulting Civil and Structural Engineers The Railway Station, Attyflin, Patrickswell, Co Limerick T: 061 320260 E: admin@hutchomalley.ie W: www.hutchomalley.ie L: ihttps://ie.linkedin.com/company/hutch-o%27malley F: www.facebook.com/hutchomalley

Editor's Notes

  1. David O'Malley
  2. David O'Malley
  3. Mark Quinn
  4. David O'Malley / Simon Clear Alterations are acceptable where theses are deemed to be required by modern regulations or requirements.
  5. David O'Malley
  6. Dylan Casey Alterations are acceptable where theses are deemed to be required by modern regulations or requirements.
  7. Define production requirements, machinery, and workflow Define production zones, segregation, traffic flow, high risk areas Opportunity to improve production capabilities and output. Machinery, quality
  8. Dylan Casey Alterations are acceptable where theses are deemed to be required by modern regulations or requirements.
  9. Dylan Casey Over 100 piles Infilled site - piles in poor areas Columns strapped to floor slab everywhere else
  10. Dylan
  11. Richard Leonard Contractor Detail Signoff. Finalising Foundation/Floor structure Signoff of Structural detailing from Suppliers. Construction Commences above ground. Ducting/Services layouts completed. Floor pours commence. Steel structure follows on with 2 week lead. (Lead for Concrete Strength) Roof structure follows Steel with 2 week lead. (lead needed for logistics/Space for contractors) “Big Picture” M & E Design continues. First meetings with machinery suppliers. First meetings with Extraction Ducting & Heating suppliers. Office Area design begins.
  12. Macro M & E Design continues. More Meetings with Machinery suppliers. Heating unit supplier finalised. Production layout changes to suit. Office Area design internal layouts. Production area construction continuing. Construction of project on track. Begin Micro M & E design. Broadband & Internal Network layout design. Meetings with ESB re: network issues. Fire & Security Design. Plant Extraction system. Timeline is adjusted & Tightens Plant Delivery finalised. M & E contractors move into phase 1.
  13. Richard Leonard Production area nears completion. M & E contractors move in to phase 2. Construction of Internal Walls. Production offices construction commences. Insurance Company M & E Reqs. Sprinkler system requirements agreed. Boiler house changes/Sprinkler system design/Storage Tanks locations. Machinery Suppliers. LOGISTICS: Micro requirements for machines. Extraction/Electrical/Lighting/Air/Water/ Network/Heating system layouts & clashes. Heating system changes.
  14. Richard Leonard. Machinery Delivery Logistics issues. Ducting/Extraction systems commence Electrical layouts adjusted. Heating system commences. Exterior Groundworks Drainage layouts, ducting runs. Office/Showroom design finalisation. Structural analysis & design. M & E Design Rainwater storage system commences.
  15. Richard Leonard M & E installation. Minor clash issues due to incorrect/extra machinery. Knock on effects to Prod layout & issues. Showroom Construction commences. Design team additions. Lighting design/Interior design. Structure for “Unique” Feature Stairs & Steel from burnt building. Prepare for handover of Prod. Area. Car Park, Retaining walls, Fencing. External Groundwork completions.
  16. Beginning of construction of the Robotic Stock storage unit. A lot of machines being assembled.
  17. Richard Leonard Handover of Production area Logistics/Legal/Insurance issues of handover. Production Startup & issues involved: Health & Safety/Inductions etc. Plant requirement issues. Training of staff. Dealing with heating system runup, FUEL Completion of Production area works. Showroom ramps into completion phase.
  18. Bill Hutch
  19. Bill Hutch
  20. Bill Hutch
  21. ALL