This document provides information about an upcoming conference on engineering procurement and construction project management for the oil and gas industry. The two-day conference will be held on April 20-21, 2017 in Amsterdam and will feature expert speakers from companies like Petrofac, Saipem, GE Power, SNC-Lavalin, and McKinsey. Topics to be covered include project controls, risk management, contract management, productivity, and lessons learned from large infrastructure projects. Attendees will gain practical insights on managing cost, schedule, and risks on mega construction projects in oil and gas. The conference aims to help professionals successfully deliver projects through effective commercial and contract strategies.
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionDBL Law
America’s commercial design and construction industry is fragmented, adversarial and inefficient. The industry that depends more than all others upon coordination, cooperation and teamwork among multiple participants is our most adversarial. It is the only major industry that is less productive today than it was in 1964, while other industries have doubled their productivity.
The conventional wisdom is that the way to secure the highest quality at the lowest price is to maximize completion pressure. This leads to selection based on a single criterion – price – which in turn requires that each competitor bid on the same scope and requirements.
Currently an architect prepares drawings and specifications in isolation. The assumption is that the architect will develop the best design absent a dialogue with those responsible for construction. Contractors then submit bids based on the design documents. This step assumes that those documents fully convey the building requirements in an understandable fashion.
Both assumptions are significantly flawed as this process sharply restricts the ability of the project team to communicate. Key decisions are made at the beginning of the project based on limited understanding. In contrast, integration of the project delivery team overcomes these shortcomings in the traditional delivery model, and paves the way for a dramatic elimination of waste.
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...marcus evans Network
Nilaksh Kothari, Manitowoc Public Utilities (MPU) - Speaker at the marcus evans Water & Wastewater Management Summit held in Summerlin, NV, May 3-4, 2012 delivered his presentation entitled Construction Projects Delivery Methods
Consensus Docs: Introduction to Integrated Project Delivery in ConstructionDBL Law
America’s commercial design and construction industry is fragmented, adversarial and inefficient. The industry that depends more than all others upon coordination, cooperation and teamwork among multiple participants is our most adversarial. It is the only major industry that is less productive today than it was in 1964, while other industries have doubled their productivity.
The conventional wisdom is that the way to secure the highest quality at the lowest price is to maximize completion pressure. This leads to selection based on a single criterion – price – which in turn requires that each competitor bid on the same scope and requirements.
Currently an architect prepares drawings and specifications in isolation. The assumption is that the architect will develop the best design absent a dialogue with those responsible for construction. Contractors then submit bids based on the design documents. This step assumes that those documents fully convey the building requirements in an understandable fashion.
Both assumptions are significantly flawed as this process sharply restricts the ability of the project team to communicate. Key decisions are made at the beginning of the project based on limited understanding. In contrast, integration of the project delivery team overcomes these shortcomings in the traditional delivery model, and paves the way for a dramatic elimination of waste.
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...marcus evans Network
Nilaksh Kothari, Manitowoc Public Utilities (MPU) - Speaker at the marcus evans Water & Wastewater Management Summit held in Summerlin, NV, May 3-4, 2012 delivered his presentation entitled Construction Projects Delivery Methods
Cómo reducir la fricción en el desarrollo de softwareSoftware Guru
Como sabemos, la fricción es "la resistencia que encuentra un objeto o superficie al intentar moverse sobre otra". Por analogía, en el desarrollo de software la fricción es el conjunto de factores que limitan el progreso y por lo tanto reducen la velocidad (productividad).
Los dos principales elementos de fricción que enfrentan los proyectos de software son la deuda técnica y la deuda social. En esta conferencia platicaremos sobre cómo reconocer ambos tipos de deuda y como lidiar con cada una, para lograr así reducir la fricción y aumentar la velocidad en nuestros proyectos de software.
Semblanza del conferencista:
Philippe Kruchten ha sido arquitecto de software por más de 35 años, primero en Alcatel y posteriormente en Rational Software (ahora IBM), trabajando principalmente en el desarrollo de grandes sistemas para los sectores aeroespacial, telecomunicación y transporte. Philippe dirigió el desarrollo del Rational Unified Process (RUP) de 1995 a 2003, y es autor del modelo arquitectónico de "4+1 vistas" que utilizaba el RUP. Actualmente es profesor de ingeniería de software en la Universidad de British Columbia en Vancouver, y su investigación de los últimos años se ha enfocado en los temas de deuda técnica, y administración del conocimiento arquitectónico. @pbpk
There is no “one size fits all” method to construction delivery. Each project faces a unique and often complex set of circumstances. That’s why McCarthy provides public owners with flexible and creative alternative delivery methods. Learn more about Design-Build-Finance, Public-Private Partnership, Job Order Contracting, Integrated Project Delivery, Design-Assist and Construction Management-at-Risk.
Click here for even more on construction delivery methods: www.mccarthy.com/work/delivery-methods
Comparison of Design Bid Build vs. Design Build Finance Operate & MaintainBob Prieto
Design Bid Build (DBB) and Design Build Finance Operate Maintain (DBFOM) project
delivery differ in significant ways. In simplest terms, under DBB, the owner retains significant interface risk between the designer and builder and in multi-prime projects also retains integration risk across the primes.
Effectively this is the “white space” risk between each of the contracting parties and is
often not adequately considered in project planning, budgeting and schedule development. Multiple parties create difficulties in effective partnering and project
performance is adversely impacted if these risks emerge. In all instances the owner is
warranting the completeness and accuracy of the design to the contractor thus directly
holding this interface risk.
The use of a DBFOM project delivery approach significantly modifies the risk profile of
the owner as the DBFOM contractor now assumes both this interface risk as well as the
integration risk across all project elements.
How we can implement Safety Barrier in Revit, what are the advantages of having an Add-In and what are the procedures to have a successful BIM project, hope you enjoy it
SE is rapidly growing consultancy, specialized in Geotechnology (pile & foundation) and Value Engineering. SE holds over 90 international patents regarding construction methods and recently SE’s SAP method recently certified NET (New Excellent Technology) by Ministry of Land, Infrastructure and Transport of Korea, and it's now the only finalist as construction area technology in ‘Korea Technology Awards’ by Ministry of Knowledge & Economy 2013.
As I take the responsibility of new market development, I am looking for partnership with global engineering & construction industry leaders for below patented methodologies.
- EXT pile method : Extended endpoint pile which significantly improve performance of PHC pile (Pretensioned spun High-strength Concrete pile)
- SAP pile method : Multi-purpose small diameter pile which is suitable for urban redevelopment and building reinforcement ('NET' certified)
- GCB methods : Eco-friendly & multi-purpose structure repair / reinforcement material & its application
- PF (Point Foundation) method : A perfect soft soil solution for buildings construction which optimize cost & bearing capacity
Real Estate Construction Proposal PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a Real Estate Construction Proposal PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/3fXQKbT
A brief paper exploring the contractual tools applied by framers of oil and gas contractors to allocate risks between and among parties to O&G undertakings
PG Diploma in Oil and Gas are offers a variety of careers for engineers. Engineer professionals in these and related industries, such as upstream oil and gas, often make higher salaries than all other engineering professionals in. Are you looking for PG Diploma in Oil & Gas Engineering Management. If yes, then you have come to the right place at SmartBrains. We are providing Oil & Gas Engineering Courses.
Cómo reducir la fricción en el desarrollo de softwareSoftware Guru
Como sabemos, la fricción es "la resistencia que encuentra un objeto o superficie al intentar moverse sobre otra". Por analogía, en el desarrollo de software la fricción es el conjunto de factores que limitan el progreso y por lo tanto reducen la velocidad (productividad).
Los dos principales elementos de fricción que enfrentan los proyectos de software son la deuda técnica y la deuda social. En esta conferencia platicaremos sobre cómo reconocer ambos tipos de deuda y como lidiar con cada una, para lograr así reducir la fricción y aumentar la velocidad en nuestros proyectos de software.
Semblanza del conferencista:
Philippe Kruchten ha sido arquitecto de software por más de 35 años, primero en Alcatel y posteriormente en Rational Software (ahora IBM), trabajando principalmente en el desarrollo de grandes sistemas para los sectores aeroespacial, telecomunicación y transporte. Philippe dirigió el desarrollo del Rational Unified Process (RUP) de 1995 a 2003, y es autor del modelo arquitectónico de "4+1 vistas" que utilizaba el RUP. Actualmente es profesor de ingeniería de software en la Universidad de British Columbia en Vancouver, y su investigación de los últimos años se ha enfocado en los temas de deuda técnica, y administración del conocimiento arquitectónico. @pbpk
There is no “one size fits all” method to construction delivery. Each project faces a unique and often complex set of circumstances. That’s why McCarthy provides public owners with flexible and creative alternative delivery methods. Learn more about Design-Build-Finance, Public-Private Partnership, Job Order Contracting, Integrated Project Delivery, Design-Assist and Construction Management-at-Risk.
Click here for even more on construction delivery methods: www.mccarthy.com/work/delivery-methods
Comparison of Design Bid Build vs. Design Build Finance Operate & MaintainBob Prieto
Design Bid Build (DBB) and Design Build Finance Operate Maintain (DBFOM) project
delivery differ in significant ways. In simplest terms, under DBB, the owner retains significant interface risk between the designer and builder and in multi-prime projects also retains integration risk across the primes.
Effectively this is the “white space” risk between each of the contracting parties and is
often not adequately considered in project planning, budgeting and schedule development. Multiple parties create difficulties in effective partnering and project
performance is adversely impacted if these risks emerge. In all instances the owner is
warranting the completeness and accuracy of the design to the contractor thus directly
holding this interface risk.
The use of a DBFOM project delivery approach significantly modifies the risk profile of
the owner as the DBFOM contractor now assumes both this interface risk as well as the
integration risk across all project elements.
How we can implement Safety Barrier in Revit, what are the advantages of having an Add-In and what are the procedures to have a successful BIM project, hope you enjoy it
SE is rapidly growing consultancy, specialized in Geotechnology (pile & foundation) and Value Engineering. SE holds over 90 international patents regarding construction methods and recently SE’s SAP method recently certified NET (New Excellent Technology) by Ministry of Land, Infrastructure and Transport of Korea, and it's now the only finalist as construction area technology in ‘Korea Technology Awards’ by Ministry of Knowledge & Economy 2013.
As I take the responsibility of new market development, I am looking for partnership with global engineering & construction industry leaders for below patented methodologies.
- EXT pile method : Extended endpoint pile which significantly improve performance of PHC pile (Pretensioned spun High-strength Concrete pile)
- SAP pile method : Multi-purpose small diameter pile which is suitable for urban redevelopment and building reinforcement ('NET' certified)
- GCB methods : Eco-friendly & multi-purpose structure repair / reinforcement material & its application
- PF (Point Foundation) method : A perfect soft soil solution for buildings construction which optimize cost & bearing capacity
Real Estate Construction Proposal PowerPoint Presentation SlidesSlideTeam
If your company needs to submit a Real Estate Construction Proposal PowerPoint Presentation Slides look no further. Our researchers have analyzed thousands of proposals on this topic for effectiveness and conversion. Just download our template, add your company data and submit to your client for a positive response. https://bit.ly/3fXQKbT
A brief paper exploring the contractual tools applied by framers of oil and gas contractors to allocate risks between and among parties to O&G undertakings
PG Diploma in Oil and Gas are offers a variety of careers for engineers. Engineer professionals in these and related industries, such as upstream oil and gas, often make higher salaries than all other engineering professionals in. Are you looking for PG Diploma in Oil & Gas Engineering Management. If yes, then you have come to the right place at SmartBrains. We are providing Oil & Gas Engineering Courses.
On 20 April 2010, the semi-submersible exploratory offshore drilling rig Deepwater Horizon exploded after a blowout; it sank two days later, killing 11 people. This blowout in the Macondo Prospect field in the Gulf of Mexico resulted in a partially capped oil well one mile below the surface of the water. Experts estimate the gusher to be flowing at 35,000 to 60,000 barrels per day (5,600 to 9,500 m3/d) of oil.
Engineering Procurement & Construction Making India Brick by Brickelithomas202
The EPC market in India has evolved over the last few years with increased project size and complexity. This has increased private clients and entry of several foreign players.
TYPES OF PETROLEUM CONTRACTS AGREEMENT; Product Sharing Contract/Agreement (PSC/PSA); Concession (or Tax-and-Royalty) Contracts; STABILIZATION; EGYPTIAN HYDROCARBON FISCAL REGIME;; Main Differences Concessionary & Production Sharing Contracts (PSCs); Participation/Joint Venture/ Association (or Arrangements); Service Contracts; WHAT CHOICES OF LAW ARE POSSIBLE? Rule of Capture; Law of the Sea Act 77 & the Rule of Capture; KEY ISSUES IN UNITIZATION AGREEMENTS; UNITIZATION CLAUSES; Discretionary Unitization Clauses; Non-Discretionary Unitization Clauses; Cross-border or International Unitization; EGYPT PETROLEUM FUTURE; UNDERSTANDING EGYPT; PRODUCTION SHARING CONTRACTS AND TAX BARRELS; Egypt Production Sharing Contract (PSC); Typical Egypt Development Lease
For more content and questions refer (Copy and Paste this link)
https://clickuniv.com/introduction-to-accounting/
Follow me on: https://twitter.com/Afzalindian
Here in this slide fundamentals of accounting are discussed. After studying this slide you will be able to know
Meaning and Definition of Accounting
Attributes (Characteristics) of accounting
Functions of Accounting
Accounting Process
Bookkeeping
Objectives of Accounting
Advantages of Accounting
Limitations of Accounting
Users of Accounting Information
Systems of Accounting
Basis of Accounting
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
Author: Mohammad Obaidullah | Qatar Design Consortium
Content:
- Importance of client interests and involvements
- BIM – an adoption curve
- Case study – Walk through Qatar’s 2022 Al-Bayt Stadium (Al Khor)
About the Qatar BIM User Day: Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM.
35.م
مبادرة
#تواصل_تطوير
المحاضرة الخامسة والثلاثون من المبادرة مع
الدكتور/ مصطفى إسماعيل
بعنوان
التخفيف من مطالبات مشروعات التشييد
من خلال مشاركة المقاول المبكرة للمشروع
التاسعة مساء بتوقيت مكة المكرمة الإثنين20يوليو2020
وذلك عبر تطبيق زووم من خلال الرابط
https://us02web.zoom.us/meeting/register/tZUkdOCrqzksGtVth9CWe-pj5-zDaaMMKwiN
علما ان هناك بث مباشر للمحاضرة على صفحة فيس بوك
وقناة يوتيوب الخاصة بجمعية المهندسين المصريين
رابط قناة اليوتيوب
https://www.youtube.com/user/EEAchannal
للتواصل مع إدارة المبادرة عبر قناة التليجرام
https://t.me/EEAKSA
رابط اللينكدان والمكتبة الالكترونية
https://www.linkedin.com/company/eeaksa-egyptian-engineers-association/
رابط حساب تويتر
https://twitter.com/eeaksa
رابط التسجيل العام للمحاضرات
https://forms.gle/vVmw7L187tiATRPw9
2nd Qatar BIM User Day Document Control and Collaboration TechnologiesBIM User Day
Speaker: Jeremy Shulman, Aconex Qatar
-Which technologies are changing the way project data is managed and distributed?
-What challenges are faced in adopting?
About the Qatar BIM User Day:
Qatar University, HOCHTIEF ViCon and Teesside University proudly take the initiative to facilitate modern and innovative methods in the Gulf construction industry. The focus is Building Information Modeling (BIM), and our aim is to establish a knowledge platform with government, research and industry experts. The User Day aims to help people to share knowledge, discuss new technologies, and identify new potentials for BIM. More information: www.bimuserday.com Follow BUD on Twitter @bimuserday
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016Aconex
In this webinar, Chris Bunker of the UK’s Wellcome Trust and Mike Evans of Cambashi Research discussed why owners are increasingly adopting project-wide technology platforms for their projects. We also featured a live demo of Aconex to show how cross-organizational information management can streamline processes from design coordination to approval cycles and handover.
Annual european electricity ancillary and balancing forum 23rd 24th november...Lenka Larson
Annual european electricity ancillary and balancing forum 23rd 24th november 2017 Berlin, Germany
http://www.electricity-ancillary.oil-professional-events.com/
European Electricity Ancillary and Balancing Forum 23rd-24th November 2017 Be...Lenka Larson
European Electricity Ancillary and Balancing Forum 23rd-24th November 2017 Berlin, Germany
http://www.electricity-ancillary.oil-professional-events.com/
Global EPC Project Management Forum 20-21 APRIL 2017 AMSTERDAM Lenka Larson
Don't miss this opportunity to join the top Oil&Gas and Energy Operators & solutions Provider For Engineering Procurement & Construction Project Management .
Arema Group's first Engineering , Procurement & Construction Project Management Summit held in Europe .
Confirmed Speakers from: SNC-Lavalin, Kuwait Oil Company (KOC), GE Power , Saipem, PETRONAS, Petrofac, Total, Lukoil, Fluor , Amec Foster Wheeler , EDF ,McKinsey & Company, University of Leeds, Mammoet ...
We have only 50 seats . For more details or registration please check the last page of the agenda .
GLOBAL ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMITLenka Larson
• Prioritising asset integrity activities at a time of softening oil prices
• Next generation inspection and maintenance methods and strategies for more efficient and safer production
• Case studies focusing upon asset life span extension
• Corrosion and erosion detection and treatment strategies
• Risk mitigation and management through analysis and performance indicators
• Back to the Future of Asset Management
The Global Asset Integrity Management O&G and Energy Forum, 2nd - 3rd May , ...Lenka Larson
GLOBAL OIL & GAS ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT 2nd- 3rd May 2016 Frankfurt Germany
The Global Asset Integrity Management O&G
and Energy Forum
GLOBAL OIL & GAS ASSET INTEGRITY, MAINTENANCE & INSPECTION MANAGEMENT SUMMIT
The Global Asset Integrity Management O&G
and Energy Forum 2nd- 3rd May 2016 Frankfurt Germany
Unveiling the Secrets How Does Generative AI Work.pdfSam H
At its core, generative artificial intelligence relies on the concept of generative models, which serve as engines that churn out entirely new data resembling their training data. It is like a sculptor who has studied so many forms found in nature and then uses this knowledge to create sculptures from his imagination that have never been seen before anywhere else. If taken to cyberspace, gans work almost the same way.
Kseniya Leshchenko: Shared development support service model as the way to ma...Lviv Startup Club
Kseniya Leshchenko: Shared development support service model as the way to make small projects with small budgets profitable for the company (UA)
Kyiv PMDay 2024 Summer
Website – www.pmday.org
Youtube – https://www.youtube.com/startuplviv
FB – https://www.facebook.com/pmdayconference
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Discover the innovative and creative projects that highlight my journey throu...dylandmeas
Discover the innovative and creative projects that highlight my journey through Full Sail University. Below, you’ll find a collection of my work showcasing my skills and expertise in digital marketing, event planning, and media production.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...BBPMedia1
Grote partijen zijn al een tijdje onderweg met retail media. Ondertussen worden in dit domein ook de kansen zichtbaar voor andere spelers in de markt. Maar met die kansen ontstaan ook vragen: Zelf retail media worden of erop adverteren? In welke fase van de funnel past het en hoe integreer je het in een mediaplan? Wat is nu precies het verschil met marketplaces en Programmatic ads? In dit half uur beslechten we de dilemma's en krijg je antwoorden op wanneer het voor jou tijd is om de volgende stap te zetten.
Enterprise Excellence is Inclusive Excellence.pdfKaiNexus
Enterprise excellence and inclusive excellence are closely linked, and real-world challenges have shown that both are essential to the success of any organization. To achieve enterprise excellence, organizations must focus on improving their operations and processes while creating an inclusive environment that engages everyone. In this interactive session, the facilitator will highlight commonly established business practices and how they limit our ability to engage everyone every day. More importantly, though, participants will likely gain increased awareness of what we can do differently to maximize enterprise excellence through deliberate inclusion.
What is Enterprise Excellence?
Enterprise Excellence is a holistic approach that's aimed at achieving world-class performance across all aspects of the organization.
What might I learn?
A way to engage all in creating Inclusive Excellence. Lessons from the US military and their parallels to the story of Harry Potter. How belt systems and CI teams can destroy inclusive practices. How leadership language invites people to the party. There are three things leaders can do to engage everyone every day: maximizing psychological safety to create environments where folks learn, contribute, and challenge the status quo.
Who might benefit? Anyone and everyone leading folks from the shop floor to top floor.
Dr. William Harvey is a seasoned Operations Leader with extensive experience in chemical processing, manufacturing, and operations management. At Michelman, he currently oversees multiple sites, leading teams in strategic planning and coaching/practicing continuous improvement. William is set to start his eighth year of teaching at the University of Cincinnati where he teaches marketing, finance, and management. William holds various certifications in change management, quality, leadership, operational excellence, team building, and DiSC, among others.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
LA HUG - Video Testimonials with Chynna Morgan - June 2024Lital Barkan
Have you ever heard that user-generated content or video testimonials can take your brand to the next level? We will explore how you can effectively use video testimonials to leverage and boost your sales, content strategy, and increase your CRM data.🤯
We will dig deeper into:
1. How to capture video testimonials that convert from your audience 🎥
2. How to leverage your testimonials to boost your sales 💲
3. How you can capture more CRM data to understand your audience better through video testimonials. 📊
Exploring Patterns of Connection with Social Dreaming
THE GLOBAL ENGINEERING PROCUREMENT & CONSTRUCTION PROJECT MANAGEMENT FOR THE OIL & GAS/ ENERGY INDUSTRY 20-21 APRIL 2017 AMSTERDAM
1. cee
steli.brown@aremagroup.com | 00420 777 682 120
Key Practical Learning Points of the Forum:
The Global Engineering Procurement &
Construction Project Management for The
Oil & Gas/ Energy Industry
20th-21st April 2017 Amsterdam Netherlands
Expert Speakers Included:
AHMED IBRAHIM,
Project Management Consultant
(Team Leader-CSA) ,
Amec Foster Wheeler
Ahmed El-Sharkawy, MBA,
CCMA, CPM-IPMA, Arbitrator,
Kuwait Oil Company (KOC)
ANGELA PAMMENTER,
Project Services Manager,
Petrofac
Armando Bianco,
Project Engineering Manager,
Saipem
Dr Giorgio Locatelli,
Lecturer in Infrastructure
Procurement and Management,
University of Leeds
Dr. Winfried Notter,
Project Director,
GE Power
Gastón Bilder,
Legal Division - Industrial and
Commercial Contracts,
Total
Kumar Saurabh,
Project Management, Contract &
Governance Specialist,
PETRONAS
Madhu Pillai,
Projects Director,
SNC-Lavalin
Robert Roest,
Offshore / Special Projects
Account Manager,
Mammoet
Scott Fotheringham,
Contracts & Procurement Manager,
EDF Energy Renewables
Media Partner:
www.engineering-procurement-construction.com
Koen Vermeltfoort,
Partner,
McKinsey & Company, Inc
Vladislav Kulakovsky,
Asset Planning & Control,
Lukoil, UAE
Effective time management in construction projects
Effective Contract & Commercial Management for Successful Project Delivery
Monitoring Negotiations to Mitigate Risk in Multiple Party Contracts
Megaproject cost Action & Management of large infrastructure projects .
EPC Revamping Projects: a balance strategy between Operators and Contractors
JAN WILLEMS,
Director Project Controls,
FLUOR
Mohammed Hammad,
General Manager,
Jacob engineering
2. CONFERENCE DAY ONE:usdaEEE THURSDAY 20th APRIL 2017
08:30 Registration and Coffee
09:00 Opening Address from the Chair
09:10 The Art and Science of Project Control
• Understanding the need for control
•
• Productivity and Earned Value
•
ANGELA PAMMENTER, Project Services Manager,
Petrofac
09:50 Management of large infrastructure projects
• Introduction
• Specific characteristics s of large infrastructure
projects
• Public influences and circumstances
• Possible impact on a project by external influences
Dr. Winfried Notter, Project Director, GE Power
10:30 Morning Coffee and Networking Break
11:00 Avoiding Cost Overruns on Mega Projects –
Estimating to Close Out”
• Most of the EPC Projects get into Time and Cost
over-runs
• Causes may be Internal to Client/Contractor or
external
• Some of these causes happen even before the
project kick off with/without the knowledge of the
project team.
Madhu Pillai, Projects Director, SNC-Lavalin
11:40 CONSTRUCTION CLAIM’S RESOLUTION
• Construction legal principals
•
Elements of Binding Contract
• Contracting Strategy and Types of Construction
Contracts
• Standard Forms of Construction Contracts
• Arresting or minimizing these over-runs require
efforts right from the FEED Stage at Client's end and
from the Bid development stage at contractor's end.
AHMED IBRAHIM, Project Management
Consultant (Team Leader-CSA), Amec Foster
Wheeler
Business Lunch
13:30 Megaproject cost action
• The successful transfer of learning across
projects has been a long-held desire by project
professionals.
•
The Human Factor
•
The Data Myth
•
Key Performance Indicators: what you need to
know and when you need to know it
Dr Giorgio Locatelli, Lecturer in Infrastructure
Procurement and Management, University of Leeds
14:10 EPC Revamping Projects: a balance strategy
between Operators and Contractors
•
Revamping Philosophy: tailored design for the
existing plants
•
Risks, mitigation and opportunities
•
Local supplier base
Armando Bianco, Project Engineering Manager,
Saipem
15:00 Afternoon Tea and Networking Break
15:30 Construction Productivity
Koen Vermeltfoort, Partner,
McKinsey Company, Inc
www.engineering-procurement-construction.com
CaseStudy:
PanelDiscussion:
• The difficulties in achieving this activity are
created by the very nature of projects
themselves: their separation from a „permanent‟
organization and their uniqueness.
• In the context of megaprojects, the ability to
learn across megaprojects becomes even more
difficult (because of uniqueness, stakeholders
involved etc.)
• No rigorous attempt is made to discover if
characteristics ascribed to the project's
performance were actually associated with the
ensuing project performance
• The presentation show how is possible to link
project characteristics trough project
performance with a rigorus methodology
leveraging companies' data.
• Case studies related to power plant construction
and infrastructure decommissioning are
presented and discusses
steli.brown@aremagroup.com | 00420 777 682 120
• Basics of Dispute Resolution
• Binding Nonbinding Dispute Resolution
13:20 Coffee and Networking Break
17:00
Interdependency Schedule: EPC Project
baseline integrated in Operation plan
• Countdown to shut-down: practical solutions
to minimize production loss
• How did productivity develop over the years in different
countries
• What are the reasons
• How to bend the trend
3. CONFERENCE DAY TWO:dsdaEEE FRIDAY 21ST April 2017
08:30 Registration and Coffee
09:00 Opening Address from the Chair
09:10 Risk Reduction by Contract and Scope
Development - the art of the specific and the
general
• Seeking the correct contract terms for the sector -
use the contract terms contractors and employers are
used to
• The cross matching of contract terms with the scope
of supply
• Development of the scope of supply - be specific if
you cannot then be general
Scott Fotheringham, Contracts Procurement
Manager, EDF Energy Renewables
09:40 How to manage the EPC contract so that it
becomes more relational and less claims
oriented?
• Where are you in the Project Life Cycle? and which
stakeholder are you?
• Setting up the project, running the project
• Usual « sins » of EPC projects: proximate causes
and root causes
10:30 Morning Coffee and Networking Break
11:00 Challenges in Greenfield and Brownfield EPC
Projects
• Seamless Execution adhering to Triple Constraints
• Managing Stakeholders
Kumar Saurabh, PMP Specialist – Project
Management Governance
Project Management Department Technical Services
Department Gas Processing Utilities (GPU),
Petronas
11:40 MANAGING RISK IN MEGA-EPC PROJECT
• Brief overview of West Qurna 2 project history
• Risk profile of Iraq from both Operator's and
Contractor's view
Vladislav Kulakovsky, Asset Planning Control,
Lukoil, UAE
13:30 Effective time management in construction
projects
• Concept of Effective Time Management
• Avoid Scope Creep by accurately defining the
Contractual Scope Of Work
• Developing a Project Plan to produce a Defensible
Baseline based on realistic Work Breakdown Structure
(WBS)
• Developing a Consolidated Reporting System for
Critical and Non-Critical Path(s)
Ahmed El-Sharkawy,CCMA, CPM-IPMA, Arbitrator,Kuwait
Oil Company
14:10 Topic TBA
15:30 Mega EPCC projects in KSA - a local
perspective)
www.engineering-procurement-construction.comaneliscussion
PanelDiscussion:oundtableiscussion
• Making the engineers and the lawyers talk the same
language - educate both sides
• Consistency of contract terms
• Managing change, preventing disputes
• Managing relationships
• Simpler contracts, performance-based contracts,
technology (automation), relational contracting,
competencies of the future.
Gastón Bilder, Legal Division - Industrial and
Commercial Contracts, Total
• Concept of Contingency Plan for Potential Risks
• Realistic Best-Practices lessons learned to avoid
project overruns and to Improve the Project Outcomes
steli.brown@aremagroup.com | 00420 777 682 120
• Judicious and Regular Safety Reviews
12:20 Business Lunch
13:20 Coffee and Networking Break
15:00 Afternoon Tea and Networking Break
• Recurring EPC contract risks and planning of
effective response
• Contract's look back analysis: risks, causes
and undertaken actions
JAN WILLEMS, Director Project Controls,FLUOR
Mohammed Hammad, General Manager,Jacob engineering
4. For Registration please fill
out the form with full
details and send it back to
us via Fax or Email to:
WEB:
Email:
steli.brown@aremagroup.com
Phone:
00420 777 682 120
Terms anD conDiTions
ceiVeD
PaymenT musT Be re
Package Options Our Price
Full Standard Pack
2 days conference + online documentation + Gala
Dinner.
€ 2,499
One Day Standard Pack
1 day conference + online documentation + Gala
Dinner.
€ 1,799
Doc Pack
Unlimited online access to all presentations of the
conference.
€ 799
Conference: 20 – 21 April 2017
Location: Amsterdam, The Netherlands
The Global Engineering Procurement
Construction Project Management
for The Oil Gas/ Energy Industry
300 euro applicable discount when you book before 30 December
Conference Fee
Company Details
Company name: _________________________________
VAT Number: ___________________________________
(VAT NO for EU members / TAX NO for non EU members)
Contact person: _________________________________
Postal code: ____________________________________
Address: _______________________________________
City:___________________________________________
Country:________________________________________
Email: _________________________________________
Phone: ________________________________________
Registration Details Please write in CAPITAL LETTERS!
Ms Mrs Mr Surname: ____________________
Name: ________________________________________
Job Title: ______________________________________
E-mail: ________________________________________
Ms Mrs Mr Surname: ____________________
Name: _________________________________________
Job Title: ______________________________________
E-mail: ________________________________________
Ms Mrs Mr Surname: ____________________
Name: ________________________________________
Job Title: _______________________________________
E-mail: ________________________________________
conditions detailed below.
the delegate will receive and invoice within 24hrs of
sending the signed form. The hotel details will be sending
two to three weeks before the date of the conference.
Cancellations:
Made one month prior to the start of the conference will be
refunded less a 50% administration charge.Refunds will be
made after the conference. Cancellations made within one
month of start date of the conference will receive no fund.
Substitutes are accepted till 3days before the conference.
Force Majeure:
While every reasonable effort will be made to adhere to the
advertised package, Arema Group reserves the right to
change event dates, sites or location or omit event features,
or merge the event with another event, as it deems
necessary without penalty and in such situations no refunds
part refunds or alternative offers shall be made. In the event
that Arema Group permanently cancels the event for any
reason whatsoever,
(including, but not limited to any force majeure occurrence)
and provided that the event is not postponed to a later date
nor is merged with another event, the Client shall receive a
credit note for the amount that the Client has paid to such
permanently canceled event. No refunds, part refunds or
alternative offers shall be made.
Copyright etc:
All Intellectual Property rights in all materials produced or
distributed by Arema Group in connection with this event
is expressly reserved and any unauthorized duplication,
publication or distribution is prohibited.
Full Name:
Steli Brown
Jobtitle:
Project Manager
For The Full SFor The Full Summit Program!ummit Program!
Signature:
Date:
This registration is not valid without signature
www.engineering-procurement-construction.com