First paper devoted solely to instance development V1 is to develop the position, plait and loading mechanics using a Kanban approach... V2 begins to show the Active Nature of Glass and its STREAM capability and in V3 we learn what the Nature of Events is in Glass and move into the Planning of Instances
1. The Digital
Plait Position
V3 INSTANCE PLANNING
BRIJ CONSULTING, LLC, JEAN MARSHALL 4/1/2021 1
Emulation Stage
MDIA
Project Kanban
2. Positioning the Instance
DETERMINE THE PLAIT
POSITION.
FIND ITS TARGET GOAL CORRELATE ITS MATRIX
TRANSLATION
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 2
Emulation Stage
Use a Kanban Approach to an Agile Project
3. Task Pages 1
a. Eliminate an Obstacle
1. Determine the Plait Position of the Data
2. Determine the Position Metrics
3. Change the Data Position to an Equity Position & Plait Down (Eliminate)
4. Variate, Foil and Plait Back to the Original
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 3
KANBAN LIST
Setting multiple targets for a
position, set up separate instances
to determine the best means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage bin
g. Move between instances
to create a series of
events
The Purpose of the First Task is not limited to the making of an
object, yet the various parts of the task lend themselves to
correlating the object to its dimensioning requirement. Obstacle
elimination is a technical way of describing the process of removing
some portion of a metric composition to derive a new plait object.
4. Determine The Plait Position of the Data
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 4
For the purpose of dimensioning an
object we created its obstacle path by
squaring the inside squares of its matrix
KANBAN LIST
Setting multiple targets for a
position, set up separate instances
to determine the best means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage bin
g. Move between instances
to create a series of
events
K-a.1
5. Determine the Position Metrics
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 5
For the purpose of
eliminating its
obstacle path we
created positioning
metrics
KANBAN LIST
Setting multiple targets for a
position, set up separate instances
to determine the best means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage bin
g. Move between instances
to create a series of
events
Using the Euler Value and Euler Formula Correlate the Metrics
K-a.2
6. Change the Data position
to an Equity position
Create the Position in order to Plait Down and
Eliminate it; for the purpose of dimensioning and
using in a product instance, for example.
BRIJ CONSULTING, LLC, JEAN MARSHALL 4/1/2021 6
Plait Out to the Load end
KANBAN LIST
Setting multiple targets for a
position, set up separate
instances to determine the best
means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile
Task
d. Increase the number
of Streams available
with inter-branching
e. Build a pipe
f. Create a glass storage
bin
g. Move between
instances to create a
series of events
K-a.3
Union
7. Variate, Foil and Plait
back to Original
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 7
Even though the data was variated and foiled
we were still able to plait back to the original
data but using a different method of plait
K-a.4
3.025 x 2 =
6.05* Up tic ‘e’
*603 +/- 2 T&M ‘e’ Plait Back to Original
Plaiting up to level 4 we
increased up tic to hit
data position and level a
Y-intercept =89
K-a.4
8. Task Pages 2
b. Convey a Package
c. Configure a Mobile Task
1. A sale is a Hamilton
2. A market inquiry is a Jefferson
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 8
KANBAN LIST
Setting multiple targets for a position,
set up separate instances to determine
the best means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of Streams
available with inter-branching
e. Build a pipe
f. Create a glass storage bin
g. Move between instances to
create a series of events
The Purpose of the Second Task is to both convey and configure
glass as a package and transact a conversion event such as a sale or
a market inquiry for new product viability
9. Conveyance Subtasks
Our task is to prepare a material load for two tasks:
1. Convey a material for sale to a specific
manufacturer at a subscriber price (S1)
2. Convey a material sample for market specs for
future product (S2) and return quotations
We must specify the load and test it to see if the
material meets the load spec.
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 9
We are using
templates from
our prior papers
K-b.1
These are
instances
from prior
papers
10. BRIJ CONSULTING, LLC, JEAN MARSHALL 4/1/2021 10
Conveyance Load
From our
prior papers,
template
S1
S2
Material specs not likely to be
affected by samples
K-b.2
11. Instance
Dynamics in V2
In V2 we will work in a more
deliberated way with Hamilton
and Jefferson
Using Instances to Convey and
produce Sales Conversion in
Hamilton and to
Interpolate Demand In Jefferson.
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 11
KANBAN LIST
Setting multiple targets for a
position, set up separate
instances to determine the best
means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage
bin
g. Move between instances
to create a series of
events
S1 S2
Hamilton and Jefferson
instances need to be
Plait in Glass since we
changed methods We will complete task list
Glass Material is folded,
compressed and
conveyed
Emulation
12. Plaiting the Instances
We can eliminate
flags using the Plait
Gate and the watch
over funding if we
secure a fully funded
Plan with immediate
credentials. This
requires a bridged
system with oversight
and Covenant banking
in ONE SYSTEM
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 12
If cash lags it throws off
the whole cycle
Reserve
13. Basis of Working
Instances
Since Hamilton and Jefferson on the older
basis of Scorecard-Portfolio are too unwieldy
to work with as advancing Instances, we are
going to apply our thruput to them on the
Plait Gate Basis and use them to work in the
remainder of this task and in the future.
BRIJ CONSULTING, LLC, JEAN MARSHALL 4/1/2021 13
15. 3 Streams and a Pipe
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 15
KANBAN LIST
Setting multiple targets for a
position, set up separate
instances to determine the best
means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage
bin
g. Move between instances
to create a series of
events
-40,000,000,000
-20,000,000,000
0
20,000,000,000
40,000,000,000
60,000,000,000
80,000,000,000
0 1 2 3 4 5 6 7
Stream 1
Series3 Series4 Series1
Linear (Series3) Linear (Series4) Linear (Series1)
-10,000,000,000,000
0
10,000,000,000,000
0 1 2 3 4 5 6 7
Stream 2
Series3 Series4 Series1
Linear (Series3) Linear (Series4) Linear (Series1)
-1,000,000,000,000,000,000
0
1,000,000,000,000,000,000
0 1 2 3 4 5 6 7
Stream 3
Series3 Series4 Series1
Linear (Series3) Linear (Series4) Linear (Series1)
Each Stream acting as part of the conveyance
structure carries glass to its destination without
being impeded by any other objects and based on
configurations, holds its own tenant properties.
The two separate pipes can be used one for sales
portal and the other for market demand portal
and able to share outcomes as well as
customer/vendor information.
K-d.1&K-e.1
16. Storage
Each element is stored
according to its own
encryption and conveyed
changes are immediately
imaged to the object
container.
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 16
KANBAN LIST
Setting multiple targets for a
position, set up separate
instances to determine the best
means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage
bin
g. Move between instances
to create a series of
events
K-f.1
17. V3: Planning
The Events
BRIJ CONSULTING, LLC, JEAN MARSHALL 4/1/2021 17
KANBAN LIST
Setting multiple targets for a
position, set up separate
instances to determine the best
means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage
bin
g. Move between instances
to create a series of
events
K-g.1
18. Plotting the Events
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 18
Hamilton and
Jefferson are
Integral
Convey and
produce Sales
Conversion in
Hamilton
Interpolate
Demand in
Jefferson.
S1 S2
To Produce Products, Sell
and find new Product
Streams, Assign
Streams in
Pipe
Notations
in Bin
19. Nature of Events Selected
In selecting a glass material or product for conveyance it must be determined the nature of the events that need to take
place from each stream via the specified Pipe menu:
Hamilton: Sales Event
1. Select Customers/Vendors as agreed Subscribers
2. Select Specifications for the Product, requiring finishing costs
3. Fold and Compress or use Product Packaging
4. Convey the Object in Packet to Materials Team
5. The specific Demand Product will require an additional series of Engineering Specifications arranged by the Materials
Team
6. Follow up Events Widow
Jefferson: Demand Event
1. Select the Prototype Team for a Meeting Event
2. Select the Rough Specifications for the Product in order to elicit quotations
3. Package and Convey as an unfinished Material for Mark-up
4. The event will either culminate in a Sale or a Dialogue with Materials Managers
5. Follow up Events Widow
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 19
20. Plotting Between Instances
4/1/2021
BRIJ CONSULTING, LLC, JEAN MARSHALL 20
How do we keep
the project cost in
line with its
value?
See our next paper…
Imposition of Value
Engineering in Plait
Glass Composition
NATURE OF
EVENTS APPLIES
21. Instance
Emulation
Setting multiple targets for a position, set up separate instances to determine
the best means to:
a. Eliminate an obstacle -March 23, 2021- 3 hours*
b. Convey a package- March 25, 2021
c. Configure a Mobile Task – March 25, 2021
d. Increase the number of Streams available with inter-branching March 30,
2021
e. Build a pipe March 30, 2021
f. Create a glass storage bin March 30, 2021
g. Move between instances to create a series of events March 31, 2021
*Preliminary work was performed earlier
4/1/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 21
(200,000,000,000.00)
(150,000,000,000.00)
(100,000,000,000.00)
(50,000,000,000.00)
-
50,000,000,000.00
100,000,000,000.00
150,000,000,000.00
200,000,000,000.00
0 2 4 6 8 10 12
Original Data Plait
wall brace thread
annex1 annex2 annex3
wall brace thread
annex1 annex2 annex3
Linear (wall) Linear (brace) Linear (thread)
Linear ( annex1 ) Linear ( annex2 ) Linear ( annex3 )
Linear (wall)
Project Kanban
KANBAN LIST
Setting multiple targets for a
position, set up separate instances
to determine the best means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage bin
g. Move between instances
to create a series of
events
22. Using Euler as a Ruler
BRIJ CONSULTING, LLC, JEAN MARSHALL 4/1/2021 22
• P is proper to the distribution of the plot shown
as R^2
• 2 is both the intercept and the mode in the
binary set
• The clock underlies the traverse of time and
distance
• The appropriate scale of 9.85+.027 also has at
its beta the Chi value of 1.28
• Number Theory demonstrates that the time to
traverse the hypotenuse is the square root of 2
in a right triangle, this is the zero-sum rate. It
has no layer of Gain in it.
• Added Notes…A position is not prospered without
gains and not capital without value added. The
up tic of ‘e’ is the curve of 201 x 3 or the
transform of 402. When it takes on the form it
becomes Value Added.
y = 2.89ln(x) - 0.2419
R² = 0.6931
y = 0.9877ln(x) + 1.2803
R² = 0.0694
-1
0
1
2
3
4
5
6
E C FRACTION E FACTOR
fact double Log. (fact) Log. (double)
*603 +/- 2 T&M ‘e’
23. What did we learn
about Creation?
The New Heaven and the New Earth.
1a Then I saw a new heaven and a new earth. The former heaven and the former earth had passed away, and the sea was no more.*
2I also saw the holy city, a new Jerusalem,* coming down out of heaven from God, prepared as a bride adorned for her husband.b
3I heard a loud voice from the throne saying, “Behold, God’s dwelling is with the humanrace.c He will dwell with them and they will be his
people* and God himself will always be with them [as their God].*
4He will wipe every tear from their eyes, and there shall be no more death or mourning, wailing or pain, [for] the old order has passed
away.”d
5The one who sat on the throne* said, “Behold, I make all things new.” Then he said, “Write these words down, for they are trustworthy
and true.”e
6He said to me, “They are accomplished.* I [am] the Alpha and the Omega, the beginning and the end. To the thirsty I will give a gift from
the spring of life-giving water.f
7The victor* will inherit these gifts, and I shall be his God, and he will be my son.gR
Revelations
We will write some new and
interesting facts about both the old
and the upcoming new Creation
4/1/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 23
About Evolution in Intelligent Design
Today on the Feast of the Annunciation
we are reminded that the Lord said in
the Poem of the Man-God and implied
also at Fatima with the angels and the
crystal cup, That He will change us
with the most beautiful Light and
Crystal Arrangement, and that this is
done in the Soul
Her cousin Elizabeth exclaimed: who am I
that the Mother of my Lord should come
to me? Elizabeth had supplied her
wedding trousseau, (little known fact.)
Jesus+ is working with
Crystal Elements in
Uncreated Light
Deep
Encryption
25. Other papers
1. Mu Sic in the Advancing Age
2. Engineering Objects
3. Instancing at the Gate
4. Interpolative Scope
5. Functional Glass
6. The Glass Wall
7. The Glass Wave
8. Scrum Costing w/notes (Book It Daniel)
9. Gate Plait Green (Mark It Mark)
10. Scorecard Integration (Map It Ralph)
(Comprehensive of Plait Glass Theory, the V3 or V4 papers have complete
content)
https://www.slideshare.net/Marshallja/presentations
The Digital Plait Position…
The latest paper