Simulations Project
1/27/2024 Brij Consulting, LLC Jean Marshall 1
How Things
get BUILT in
the World
of Glass
Systems
V3 Overcome Agile Constraint
V2 Task Analytics
V1 Stakeholder Approach
= B
See our ADDENDUM: hyD reporting w/
Scrum Performance for Manufacturing
Interface…
HERE!
SOLVED
1
Summary of Comments on Simulations Project
Page: 1
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:13 PM
Glass Systems Branching and Partner Acclimations in Three Portal Arrangements. This is the Last of the Simulations Series.
ADDENDUM-1
β€’ Theoretical Production is used for this construction of the
Production Portal and so the interim production price as long as it
does not exceed the combined Production price before cost, is
acceptable. Note the same Union Vector shown on Slide 22.
β€’ The primary cost is the inestimable value of the glass mix which
varies in all weights, shapes and forms of its primary component.
β€’ No one has defeated glass engineering nor will they by re-
engineering its basic composition sometimes called its STONE.
β€’ This is what makes this replacement method of the atom with its
redundancy form the best means of defeating the adversary of
the Morning Star.
1/27/2024 Brij Consulting, LLC Jean Marshall 2
Differs by 9 to the
theoretical thruput and is
easily converted
The Glass production is like writing
your company a paycheck instead of
paying out a considerable investment.
Glass production/construction is
always BENEFICIAL to all participants.
Production Portal
Valuation Requirement
App. III
115
See slide 22, see Vector Union
1
Page: 2
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:14 PM
β€œWrite yourself a check,” they say, but there are many stringent conditions to make the reality of Glass Production a viable, valuable and sustainable way of
life. It is a Covenant Agreement that is long-lasting for reliable performance.
Addendum-2 Scrum Billing
1/27/2024 Brij Consulting, LLC Jean Marshall 3
hYD Production Concepts associated with Glass and its
economic circumstance require Morning
Star Oversight and Covenant Practices to
be achieved. Stringent guidelines need to
be observed until practices are well
beyond the Learning Curve
1604
APP III
App. III
115
.8360 - .82 = .0160 5.3693 - 5.2 = .1693
16.09709 -16.04 = .005709 x2 = .011418
See slide 4
See slide 18 See slide 2
See slide 17
Scrum Billing: See Scrum Performance
1
Page: 3
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:14 PM
Scrum Billing out of Glass Production is a way to measure the delivery mechanics that put new assets on the books. The Virtual Process builds Virtual
Assets that are subscription based. Dealer Licensing and Upgrades are sold.
Addendum-2A Scrum Performance
1/27/2024 Brij Consulting, LLC Jean Marshall 4
hYD Production
Glass: Sustainable, restorable, replicable,
Upgradable, predictable, reliable, re-sellable,
Employable, deployable, remote and resilient.
See slide 18 See slide 2
Scrum and Production Billing: Scrum and Production Performance
1.1 savings years to purchase car
Domain = [3.11 - .09] x 2 = 6.202 +Z
Related skills: portable, certifiable and long-
lasting, advancing in pursuant of certifications.
1
Page: 4
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:15 PM
Come to the Table, sustainable glass builds wealth in personal portfolios.
Best Practice Measures
β€’ These Risk Mitigation Practices need
to be followed in addition to the Normative Guidelines
1/27/2024 Brij Consulting, LLC Jean Marshall 5
Addendum-3
BIG SIMULATION
EVENTS LEAD TO
WIDE PARTICIPATION
AND LOWER COSTS
1
Page: 5
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:15 PM
Infrastructure requirements cause multiple simulations events gathering participation from all over the world. These simulations events lower the cost of
participation for multi-agency manufacturing and other requirements.
Scorecard Gear-Box
β€’ There are multiple parts to the
Scorecard Gear-Box and all of them are
complex
β€’ On a Project Basis they are more
manageable than on a large company
or large production assembly (now)
β€’ The theoretical approach to Scorecard
should be studied particularly during
the Split-Demand period of
hybridization. It is a least squares
method of deriving a Scrum basis or KPI
benefit of operations.
1/27/2024 Brij Consulting, LLC Jean Marshall 6
Portal Arrangements add
safety and precision to the
Method across the Plan
Working with
Square Pi
Arrangements
Funding
Economies of Scale
Addendum-4
1
Page: 6
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:16 PM
With the portal arrangement the gear-box methodology was smoother. But Scorecard needs to be streamlined with the overall development.
SIMULATIONS
PARTS I AND II
1
Page: 7
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:16 PM
Contents generally deliver a powerful and unique knowledge of the overall portal plan and capability to manage complex glass operations
Dividing Content with VRD
Portals
Ring Composition splits the Requirement
Lift X2 =Tan
#1
Portals Requirements Demand
#1
Short Term (EV)
vs. Long Term (PV)
Demand =
Uses of VRD: (see next)
1. Split Requirement for Price
2. Split Instances of Object Simulation
3. Split Motion of Car/Road Syncopation
4. Split Demand in Multiple Markets
5. Split Product in Ordinal Packaging
Β΅If you use the scope as the differential, you retain
motion in the remainder as in T&MM that needs to be
ended with a secant engineered response i.e., failsafe
1/27/2024 Brij Consulting, LLC Jean Marshall 8
Car/road sync
LIFT Manifold
V1 Stakeholder Approach
1
Page: 8
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:17 PM
Split Demand causes branching and bifurcation in glass to examine root associations.
Applying VRD across the Board
Portals Roles
Performance
Assimilation
Scope/Requirements Split Demand
β€’ The primary influence of price is the car & road
syncopation of the 5 β€˜car-associated’ portal requirements
Prototype
Manifold
Design
Approval
1/27/2024 Brij Consulting, LLC Jean Marshall 9
LIFT and DRIFT
STABILIZATION
Note that our VRD template was renumbered here
to fit a later model (subsequent knowledge)
V1 Stakeholder Approach
115 APP III
1
Page: 9
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:17 PM
The primary influence of price is examined within the 5 car-associated portal requirements. Mitigation of Risk is analyzed in this paper.
Other notable VRD facts
β€’ Componentization has events
that enable distribution to
the market.
β€’ Packaging becomes the
unitive facts between all
portal correspondence
1/27/2024 Brij Consulting, LLC Jean Marshall 10
Critical
Path
This data is moving data and
because it is not stationary
during the project its focus
can change; Project must be
parked for this snapshot.
VRD
STATS
1604
APP III
V1 Stakeholder Approach
~ B
1
Page: 10
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:17 PM
A snapshot of the signature processes for Simulations requires project to be parked. Three portal strength is brought to bear on the componentization
requirement.
Portals
Reconciliation
Brij
Consulting,
LLC
Jean
Marshall
1/27/2024 11
SCORECARD RELATIONAL
Future Cash Difference
SCORECARD RELATIONAL
Pass Thru Gain (EOP)
Financial Conversion
The Architectural Services Market Grows on Labor and
Scientifically applied building and tool techniques, virtual
machines and glass applications with Ark dimensional basis.
Because the
Portals secure
the investment
and Portal
Methods
mitigate the
risk.
= B
V1 Stakeholder Approach
See Growth Slide 14
See Scorecard Slide 22
See Scorecard Slide 22
See Scorecard Slide 22
21969.52 Γ· 21.22
= 35.32+1000
1035.32
^
See calculations on Slide 7
Bifurcation D-split of 135
.00135
1
Page: 11
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:18 PM
A phenomenal growth pattern is established in glass which does not rely on the meta world or on binary (slower) response to established building
requirements. Ark methods in glass raise up immediate transparent gains. Glass attributes exceeded risk and domain issues but not without deliberated
intervention and craftsmanship. It is notable that financial arguments follow the glass with threaded inferences for greater visibility.
Leading Questions
1/27/2024
Brij
Consulting,
LLC
Jean
Marshall
12
What other lower- level
tasks are there beside
prototype manifold and car
and road syncopation?
Tasks
Define Lower-Level Tasks
Using Best Case Find Portal Value
Compile Load and Production
Write Forward and Performance St’s.
Simulations
What Simulation Requirements
With Partners are required?
Instances, Moments, Markers
Recommended Dates
Pivots & Lifts
Can we suggest a portal valuation
equation? Or at least a method?
PRODUCTION
PORTAL LAYOUT
SUPPLY CHAIN
PORTAL
SIMULATIONS
PORTAL
Need to check on Strabo and Lens
What about Manifold and other
Technologies like Thread?
DEPTH AND ATTRIBUTION
OF PROJECT CONTENT
1
2
3
1
2 3
How do we cope with the Variable
Rate Demand of this project?
1
3
2
Portal Valuation
Accomplished
V1 Stakeholder Approach
3
= B
3.0688 βˆ’ 1.531646975 Γ— 2 = .000550606
See Scorecard Slide 22
^^Angular proof w/carriage burden
See Slide 7
1
Page: 12
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:19 PM
With one eye focused on the glass plan and the other on the means acquired, the growth in this advancing industry will be phenomenal.
hyD Best Case Tasking
Brij
Consulting,
LLC
Jean
Marshall
1/27/2024 13
Specify Role definition of lower-level tasking
Prototype
Manifold
Car/Road
Syncopation
Project
Dependencies
2 Table Ready
Next Prototype
Manifold Lens
Arrangement
Local Access
Window
Broad Dates
Overall and High-Level Tasking Best Case Tasking Data
Design
Approval
9753
48.5
30,974.68
2-Portal Valuation =
17741.6
Long Term Demand
3 Table Ready
1 Table Ready
z
V1 Stakeholder Approach
Cos(1589.17)=.858691671451 x 2 = 1.71738334-1.77416 = .056776651637098 x2 = .113553303^^ ^^Angular proof w/carriage burden
1
Page: 13
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:20 PM
It is necessary to specify role definitions of the lower-level tasking and to build up a scrum delivery of the product at its various stages. This of course is
primarily an engineering task and not a financial practice.
The broad dates help to gain an end-to-end delivery cycle of the whole plan but do not specify the product delivery except in its dependent parts. They
want the workable glass model by 2031 and the roadworthy car (distance) by 2034.
Variable Demand
Project Complexity
If ever there was a case of variable rate demand it certainly is the
glass project itself and its impact on the hyD division engaging in
the manufacturing of the first road-worthy glass car.
Up until the date 2037 the scale of the project is concerned with
componentization and the scale of the achievement is a price of
$400/unit with a cost of $300 for prototyping.
It is obvious that once Site Development (SD) and Scientific Assets
(SA) begin to be composed the scale changes to distribution of
the synthesized or solid state engineered product.
Primarily there is more than one portal attributed to this project
and also more than one market at work. So it is in this manner
that Variable Rate Demand Composition Application must be
applied.
Notice also the Theta branch is moving from Theta + 1 to Theta +2
to Theta + 3 in our notation.
Θ+
Θ+
Another aspect of the problem is to go from a
binary method such as industrial coatings to the
full ark method such as prototyping. This is part
of the learning curve to package and distribute a
green & glass product.
Project Scope
Ξ± rate
30,974,689,621-30,874,553,369.210 = 100,136,351.79= BIFURCATION
Hybrid methods
produce Bifurcations-
Adding dimensions
40.98
Forward Statistical Net
LENS MODIFICATIONS
View
35.58
1
1
3
40.98
30.00
35.58
1/27/2024
Brij
Consulting,
LLC
Jean
Marshall
14
V1 Stakeholder Approach
1
Page: 14
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:21 PM
Project Complexity and Scope supplies variable demand across lines of increasing development in glass systems infrastructure and architectural services,
as well as other industries specific to appliance and cars, conveyances.
Full Scope
β€’ The full scope of the project is completed with
partnering is considered a 50-year project and is
accomplished with a payback of 196. Partnering
will add an additional simulations scrum set.
β€’ Since the project is highly integrated with
advanced engineering, details are accomplished
with refined dates and scope by the engineers.
β€’ Secant Engineering and Glass Construction are
the means to more complex and highly scientific
virtual products and machines.
1/27/2024
Brij
Consulting,
LLC
Jean
Marshall
15
BAC + Asset Conversion .0003082= .00275082
BAC
Long Term Demand
75833 = 275.377922
Leveraging STRABO @ Gate
πŸ“πŸ“πŸ“πŸ“πŸ“πŸ“. πŸ•πŸ•πŸ•πŸ•πŸ•πŸ•πŸ•πŸ• Γ— 𝟐𝟐 = 𝟏𝟏𝟏𝟏𝟏𝟏. πŸ“πŸ“
Best Case Tasking Data
115
196
APP III
APP III
X2 = 544 Value-Add
+10^3
PROOF of 2-PORTALS
SCORECARD
V1 Stakeholder Approach
There is an upgrade on the
Scorecard not part of the Task
List, perhaps a last-minute
requirement
.5582734 x 2 =
1.164 which is
a labor metric
If a low-level task it should be added in a
non-attributed period to avoid date shift
Added task
increases
burden
558.2734-
550.7558 =
7.51
The payback
on the
Scorecard is
lower due to
unbillable
Asset upgrade
WATCH!
3.0688 βˆ’ 1.531646975 Γ— 2 = .000550606
1-PORTAL
550.606-550.868= .262 +Θ
1
Page: 15
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:21 PM
The full scope of the project is accomplished although not compiled in the full partnering scope of activity. Specific markers milestone accomplishments
were indicated by an agile metric application from the compilation of the IF or Impact Factor. The 2 Portal arrangement is found to be compliant with the
Project Management Metric associated with Planned Value plus Earned Value or Budget at Completion. You may notice that there could occur impact
from an unplanned task on the Scorecard to upgrade assets. This may be a redundancy and could be eliminated as part of pre- constructions.
Brij
Consulting,
LLC
Jean
Marshall
1/27/2024 16
Simulations make the drill down
technique in Power BI helpful in
seeing relevant parties to tasking
arrangements and their progress
markers.
The Glass Project creates many
multi-agencies related to supply
chain efforts
It is not difficult to imagine 1000
such Simulations across the
world with many different glass
associative industries at work.
This is what makes the
replacement economy so viable.
Power BI
Empowering media
18L
6L
Insight: T3M4 Supply Chain = 1/cosine = Secant of 9.33/3 = 3.11 Perimeter all phases
Supply chain
is the Area Graph
that describes
the Process
Short Term Demand
121
V1 Stakeholder Approach
1
Page: 16
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:22 PM
Power BI Media is moving into the idea of empowering projects with the new forms that media may take in the advancing glass age. We have indicated
the key agile date for the first functional glass car model (called β€œO”.)
Short Term Demand
Reconciling in this difficult
corner of the manufacturing
requirement, we now turn to
see if we have adequate lens
deliberation for the Strabo
requirement coming up.
When do the Lens
arrive variegated for
this requirement?
1/27/2024
Brij Consulting, LLC Jean Marshall
17
This glass concept
overcame all scale, mass
and hybrid conditions.
135.4
EV = 13.5
Adj
Both m and M dates of the
first two requirements are
within the scope of this
All 4 Lens dates should be set
up in STRABO for Simulations,
but the first lens can precede
the start of the project; Also,
thread and manifold delivery.
Thread and Manifold requirement
ROLES
Receivable = 8.774 B
Assets = 39.749 B
𝒔𝒔𝒔𝒔𝒔𝒔 𝟏𝟏𝟏𝟏𝟏𝟏 Γ— 𝟐𝟐 = 𝟏𝟏. πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’ = 𝟐𝟐
135.4
^Product Basis
^As shown in Simulations Watch
Master
Builder
Roles
V2 Task Analytics
1
Page: 17
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:23 PM
Short Term Demand made use of data preparation for the use case of the pre-crossover period. All previous compilations have supported the cases of
data presented in this emulation.
1/27/2024 Brij Consulting, LLC Jean Marshall 18
Price associated with
Prototyping (Standard)
The Prototyping Task is the
beginning of the Teams process
V2 Task Analytics
Prototyping is
one of the most
significant and
labor-intensive
new tasks
1
Page: 18
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:23 PM
Task Analytics provide for various views and considerations of the task deliberations. We call attention to the most significant of starting glass tasks,
prototyping, which supplies the basis for all future works.
Brij
Consulting,
LLC
Jean
Marshall
1/27/2024 19
Branch Partner and Larger Domain
Production Supply Chain
IF=772
Branch Yi-Assets + Gate
SC=121
V2 Task Analytics
1
Page: 19
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:23 PM
The Crossover period provides Lift for various higher level building practices and dramatic change in the infrastructure considerations of the process.
Branch Partnering begins to accentuate the continuous nature of processes.
Study of Ark Sciences in Building and Design
1/27/2024 Brij Consulting, LLC Jean Marshall 20
The Supply Chain keeps moving toward the
Architectural Services Market
Complex Portals deliver multiple instance
management to the solution of VRD
V2 Task Analytics
The Market will double largely
due to later projects Portable Assets
1
Page: 20
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:24 PM
The Market doubles within the solid-state engineering spectrum when projects are capable of being performed remotely. Remote building is an example
of ultra-ark Media capability and lens variegation. HyD will likely merge into the Glass Community and find roles such as special conveyances. Portable
assets also supply a subscription consideration that is Revenue Producing. Another important feature of glass is the ability to produce in instances, the
complex arrangements. As one piece of solid-state engineering with no moving parts.
Configuring the Job Match in Portal Relationship
Brij Consulting, LLC Jean Marshall 21
We are comparing a generic book stacking
problem with job matching across portals.
Our remainder in the stack is 135 or like EV.
𝒔𝒔𝒔𝒔𝒔𝒔 𝟏𝟏𝟏𝟏𝟏𝟏 Γ— 𝟐𝟐 = 𝟏𝟏. πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’ = 𝟐𝟐
1
2
3
1
2 3
Market Position
= B
Task, Date & Time Stamp
REQUIREMENT: All Portal Tasks
The Risk for not achieving domain
order is in the Supply Chain, the Split
Risk is in the Production
1/27/2024
121
Alternative
Method
A
P
P
L
Y
FORMS
121
= B
= B
164
2
V3 Overcome Agile Constraint
Squaring up
113.553303 – (55.0606 x2)= 3.432103x2 = 6.8||64206 analog to digital conversion~~64.206/8=8.02 x 2 = 16.04||.00575 x 2 = .00115 App. III
^
1604 115
1
Page: 21
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:25 PM
The stacking problem and solid model table allowed us to consider the first of many issues related to achieving a proper domain order and table
arrangement. Instances within the products themselves can be just as cumbersome.
VALUATION PROBLEM (SCORECARD)
1/27/2024 Brij Consulting, LLC Jean Marshall 22
Portals reduce risk and
modify outcomes
Mitigated
V3 Overcome Agile Constraint
The blend-over creates
scalable economies
Mitigated
1
Page: 22
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:25 PM
The Valuation problem associated with this Binary Scorecard has been settled out by the bifurcation capability of plait glass and its portal arrangements.
We have reconciled with the Union Vector in the production and eliminated all variances.
Summary:
the Last of the Series
When the Process begins to take on its continuous
nature it can move into cloud confluency. No one
can describe how that occurs now but suffice it to say
that the building process has become a fluent score.
Instances and Moments of what used to be
considered dramatic change become part of the flow
of a masterful arrangement.
Creation is driven by circumspection of pillars and
their cloud driven capabilities that become Ark
delivered in a STREAM composition. [50+ Years]
1/27/2024 Brij Consulting, LLC Jean Marshall 23
Master Builder
Certifications in Glass
1
Page: 23
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:25 PM
It is quite notable to desire Master Builder Credentials that will keep evolving within the Advancing Plan. The Confluency of the arrangement is more
upscale and notable than all previous discussions combined but we are ill-equipped at this point in the learning curve to add any more assembly to the
page. We will have to wait to see how such things are arranged.
Milestone Dates of
Origination
These are Supply Chain shifts for the
Milestone Dates that built the
product cartography. The product
dates are likely to shift with re-
specification, so we are initiating the
project with tentative finish dates
for the lens and lead times.
Brij Consulting, LLC Jean Marshall
1/27/2024 24
mM Lens Positions
Milestone Related
m
m M
M
M
10 yrs. ending 8/22/2035
8 yrs. ending 11/26/2051
8 yrs. ending 2/1/2062
4 yrs. ending 6/3/2027 m
M
M
M
- 4 Agile years
Lens Commitment Dates
Appendix I
Table <or> SA Associations
1
Page: 24
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:26 PM
The two time-critical notifications are the lead time arrangements for the lens and the agile dates for the three substantial product models. A shift in
these milestone arrangements could cost the project 12 years, so these must be mitigated continuously. Morning Star oversight promises full delivery in
spite of human learning curve. For example, if the Green Energy Wall were not compliant in time, the Morning Star would supply it and give people time
to acquire necessary skills.
1/27/2024 Brij Consulting, LLC Jean Marshall 25
Appendix II
Thread
makers use
powerful Lens
but not
variegated
19
1
Page: 25
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:26 PM
We have raised up once again the requirement for making and testing for car, road and home building arrangements and continue to point back to our
earlier work.
Full Scope
The full scope of the project is completed with partnering is
considered a 50-year project and is accomplished with a
payback of 196. Partnering will add an additional
simulations scrum set.
β€’ Since the project is highly integrated
with advanced engineering details are
accomplished with refined dates and
scope by the engineers.
β€’ Secant Engineering and Glass
Construction are the means to more
complex and highly scientific virtual
products and machines.
1/27/2024 Brij Consulting, LLC Jean Marshall 26
BAC
Long Term Demand
PV = 13.8
75833 = 275.377922
Leveraging STRABO @ Gate
550.7558 Γ— 2 = 111.5
Best Case Tasking Data
115
1604
196
196
Appendix III
Slide 6
Slide 8
How do Ark Metrics from the Bible Stack up?
75.833 Γ— 2 = 151.67 βˆ’ 150.21 = 1.46 βˆ’ 1.445 = .015
Note
196,
115,
57,
1604
1
Page: 26
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:27 PM
Here we have added Ark metrics from the Bible to show that these metrics do in fact apply to this project. (Four metrics were used for simplicity.)
TIMELINE OF PRODUCT
1/27/2024 Brij Consulting, LLC Jean Marshall 27
βˆ† Ξ± Ο‰
Glass Cars
Architectural Builds
Remote Development
Solid State Engineering
Complex Builds
Wireless Energy
Product Media
3D Ark Media
V-A
From Cartography Appendix IV
Value added is
comparable to
asset turns
increasing equity
performance
1
Page: 27
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:28 PM
We have included the outline of the Product timeline so that the periods of attribution can be seen. The Value Added becomes a continuous STREAM in
the epic proportions of the BUILD ECONOMY.
β€’ Captive Engineering of the Glass Plan allows for a market free of price
uncertainty and a modeled frequency expectation. Without regulation of
choice, the adaptation of glass to model various compositional upgrades
allows the producer to enjoy a market that exploits positive change.
1/27/2024 Brij Consulting, LLC Jean Marshall 28
Appendix V
From earlier work
Domain = 31.1
Captive Engineering
Proof of Domain
1
Page: 28
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:28 PM
We have commented on what makes the MARKET different from the material world we have been associated with. The Advancing Age delivers a
continuous Plan from the Morning Star and creates a captive engineering capability that is free of various types of uncertainty usual to the conditions
experienced in the material world and driven by a political climate. There are no politics involved and only positive change can occur moving forward
with the Glass Plan.
Ark Certifications include
LIFT, LIFE and T&MM
Must be Prototype and
Production Book Certified
23
1
Page: 29
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:28 PM
This older diagram of the Supply chain is once again pertinent to the discussion and was recognized early in the process of the learning series.
Brij Consulting, LLC Jean Marshall
1/27/2024 30
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green Wall and
the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance mined and
delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
7. Simulations: Synergy Modifications: Mitigation in Risk Analysis
8. Simulations: Marking the Contingent Outcome: Marking Pivots and Lifts
9. Simulations: Making a Watch Case Window: Fielding the Position
10. Simulations: Branching with Partners: Partner Branching for Remote Position
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
SIMULATIONS
P a p e rs i n D e s ign Se ri e s
Part I, II, III
Part I, II
1
Page: 30
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:30 PM
Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to
highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations
reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come. We
continued our Simulations Project with mitigation of Risk in the crossover period through the use of Gap Data.
Brij Consulting, LLC Jean Marshall
1/27/2024 31
P a p e rs i n T e s t Se ri es
1. The Car and Road Test: Simulating Glass Cars and Candle stone Roads
Brij Consulting, LLC | SlideShare
V3 Glass Package
V2 Synergy Modifications
V1 Digital Testing
Strabo
Tying projects back to the Strabo Omega
allows for Simulations Cloud to orchestrate
outcomes
Part I,
From Slide 13
2. Home and Foundation Test: Simulating Glass Instances of Candle stone
and Thread in Componentizations utilizing a legacy form of Glass
3. Glass Big Push: Legacy Glass gives way to Solid State Engineering,
Instancing and Building with remote synchronization Parts I, and II/III
Of Pillars and Pipes, Portals and Plaits
Part I:
Part II Simulations Marking
1
Page: 31
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:31 PM
We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of
car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for
the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid-
state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the
types of events or changes that impact the Simulation of the Project Performance.
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
1/27/2024
Brij Consulting, LLC Jean Marshall
32
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story β€œEru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the β€œcube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
1
Page: 32
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:34 PM
The Learning Series
Simulations Project 1
2 3
1/27/2024 Brij Consulting, LLC Jean Marshall 33
Branching with Partners
BUILDING in
the World
of Glass
Systems
3110/MTh
1- Supply Chain
2. Productions
3. Simulations
= B
1
Page: 33
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:35 PM
A larger view of the Concept Car helps to see how Events attract customers and vendors to the supply chain and how new features are added to glass cars
and other products. We mention that the lease cost originally devised has not failed in the larger graphically attained price parameters but only as related
to the Model O version.
Simulations Project
Glass Systems| Brij Consulting, LLC |
Jean A. Marshall
Branching with Portals
1/27/2024 Brij Consulting, LLC Jean Marshall 34
Stored
Notes
1
Page: 34
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:35 PM
We have stored notes here for future reference. Only one partner was discussed in this paper because the discussion is quite detailed.

More Related Content

Similar to Comments on Simulations Partners Addendum.pdf

Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
Β 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
Β 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdfBrij Consulting, LLC
Β 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfBrij Consulting, LLC
Β 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfBrij Consulting, LLC
Β 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
Β 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
Β 
Scope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfScope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfBrij Consulting, LLC
Β 
The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait Brij Consulting, LLC
Β 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfBrij Consulting, LLC
Β 
Portal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part IIPortal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part IIBrij Consulting, LLC
Β 
Portal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIPortal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIBrij Consulting, LLC
Β 
Glass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfGlass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfBrij Consulting, LLC
Β 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfJeanMarshall8
Β 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfJeanMarshall8
Β 
Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfGlass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfBrij Consulting, LLC
Β 
Boddington Modelling Services
Boddington Modelling ServicesBoddington Modelling Services
Boddington Modelling ServicesBoddingt
Β 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfJeanMarshall8
Β 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBrij Consulting, LLC
Β 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfBrij Consulting, LLC
Β 

Similar to Comments on Simulations Partners Addendum.pdf (20)

Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
Β 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
Β 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
Β 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdf
Β 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Β 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
Β 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
Β 
Scope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdfScope of Glass Projects (V1) Load Arrays.pdf
Scope of Glass Projects (V1) Load Arrays.pdf
Β 
The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait
Β 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdf
Β 
Portal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part IIPortal Prosperity: An Overview Part I and Part II
Portal Prosperity: An Overview Part I and Part II
Β 
Portal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIPortal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part III
Β 
Glass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfGlass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdf
Β 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdf
Β 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdf
Β 
Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfGlass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
Β 
Boddington Modelling Services
Boddington Modelling ServicesBoddington Modelling Services
Boddington Modelling Services
Β 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
Β 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
Β 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdf
Β 

More from Brij Consulting, LLC

Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
Β 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
Β 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
Β 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
Β 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
Β 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
Β 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
Β 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
Β 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
Β 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
Β 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
Β 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfBrij Consulting, LLC
Β 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfBrij Consulting, LLC
Β 

More from Brij Consulting, LLC (15)

Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
Β 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
Β 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
Β 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
Β 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
Β 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Β 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
Β 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
Β 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
Β 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
Β 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
Β 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
Β 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdf
Β 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdf
Β 
Glass Big Push Part I.pdf
Glass Big Push  Part I.pdfGlass Big Push  Part I.pdf
Glass Big Push Part I.pdf
Β 

Recently uploaded

Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...lizamodels9
Β 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
Β 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
Β 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
Β 
Call Us πŸ“²8800102216πŸ“ž Call Girls In DLF City Gurgaon
Call Us πŸ“²8800102216πŸ“ž Call Girls In DLF City GurgaonCall Us πŸ“²8800102216πŸ“ž Call Girls In DLF City Gurgaon
Call Us πŸ“²8800102216πŸ“ž Call Girls In DLF City Gurgaoncallgirls2057
Β 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...lizamodels9
Β 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
Β 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
Β 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
Β 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
Β 
Lean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… AbridgedKaiNexus
Β 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
Β 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
Β 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
Β 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
Β 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
Β 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
Β 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
Β 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
Β 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
Β 

Recently uploaded (20)

Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀️8860477959_Russian 100% Genuine Escorts I...
Β 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
Β 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
Β 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
Β 
Call Us πŸ“²8800102216πŸ“ž Call Girls In DLF City Gurgaon
Call Us πŸ“²8800102216πŸ“ž Call Girls In DLF City GurgaonCall Us πŸ“²8800102216πŸ“ž Call Girls In DLF City Gurgaon
Call Us πŸ“²8800102216πŸ“ž Call Girls In DLF City Gurgaon
Β 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❀️8860477959 Escorts...
Β 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
Β 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
Β 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
Β 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Β 
Lean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice β€” One City’s (and Library’s) Lean Story… Abridged
Β 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Β 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Β 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
Β 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
Β 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Β 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
Β 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
Β 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
Β 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
Β 

Comments on Simulations Partners Addendum.pdf

  • 1. Simulations Project 1/27/2024 Brij Consulting, LLC Jean Marshall 1 How Things get BUILT in the World of Glass Systems V3 Overcome Agile Constraint V2 Task Analytics V1 Stakeholder Approach = B See our ADDENDUM: hyD reporting w/ Scrum Performance for Manufacturing Interface… HERE! SOLVED 1
  • 2. Summary of Comments on Simulations Project Page: 1 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:13 PM Glass Systems Branching and Partner Acclimations in Three Portal Arrangements. This is the Last of the Simulations Series.
  • 3. ADDENDUM-1 β€’ Theoretical Production is used for this construction of the Production Portal and so the interim production price as long as it does not exceed the combined Production price before cost, is acceptable. Note the same Union Vector shown on Slide 22. β€’ The primary cost is the inestimable value of the glass mix which varies in all weights, shapes and forms of its primary component. β€’ No one has defeated glass engineering nor will they by re- engineering its basic composition sometimes called its STONE. β€’ This is what makes this replacement method of the atom with its redundancy form the best means of defeating the adversary of the Morning Star. 1/27/2024 Brij Consulting, LLC Jean Marshall 2 Differs by 9 to the theoretical thruput and is easily converted The Glass production is like writing your company a paycheck instead of paying out a considerable investment. Glass production/construction is always BENEFICIAL to all participants. Production Portal Valuation Requirement App. III 115 See slide 22, see Vector Union 1
  • 4. Page: 2 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:14 PM β€œWrite yourself a check,” they say, but there are many stringent conditions to make the reality of Glass Production a viable, valuable and sustainable way of life. It is a Covenant Agreement that is long-lasting for reliable performance.
  • 5. Addendum-2 Scrum Billing 1/27/2024 Brij Consulting, LLC Jean Marshall 3 hYD Production Concepts associated with Glass and its economic circumstance require Morning Star Oversight and Covenant Practices to be achieved. Stringent guidelines need to be observed until practices are well beyond the Learning Curve 1604 APP III App. III 115 .8360 - .82 = .0160 5.3693 - 5.2 = .1693 16.09709 -16.04 = .005709 x2 = .011418 See slide 4 See slide 18 See slide 2 See slide 17 Scrum Billing: See Scrum Performance 1
  • 6. Page: 3 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:14 PM Scrum Billing out of Glass Production is a way to measure the delivery mechanics that put new assets on the books. The Virtual Process builds Virtual Assets that are subscription based. Dealer Licensing and Upgrades are sold.
  • 7. Addendum-2A Scrum Performance 1/27/2024 Brij Consulting, LLC Jean Marshall 4 hYD Production Glass: Sustainable, restorable, replicable, Upgradable, predictable, reliable, re-sellable, Employable, deployable, remote and resilient. See slide 18 See slide 2 Scrum and Production Billing: Scrum and Production Performance 1.1 savings years to purchase car Domain = [3.11 - .09] x 2 = 6.202 +Z Related skills: portable, certifiable and long- lasting, advancing in pursuant of certifications. 1
  • 8. Page: 4 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:15 PM Come to the Table, sustainable glass builds wealth in personal portfolios.
  • 9. Best Practice Measures β€’ These Risk Mitigation Practices need to be followed in addition to the Normative Guidelines 1/27/2024 Brij Consulting, LLC Jean Marshall 5 Addendum-3 BIG SIMULATION EVENTS LEAD TO WIDE PARTICIPATION AND LOWER COSTS 1
  • 10. Page: 5 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:15 PM Infrastructure requirements cause multiple simulations events gathering participation from all over the world. These simulations events lower the cost of participation for multi-agency manufacturing and other requirements.
  • 11. Scorecard Gear-Box β€’ There are multiple parts to the Scorecard Gear-Box and all of them are complex β€’ On a Project Basis they are more manageable than on a large company or large production assembly (now) β€’ The theoretical approach to Scorecard should be studied particularly during the Split-Demand period of hybridization. It is a least squares method of deriving a Scrum basis or KPI benefit of operations. 1/27/2024 Brij Consulting, LLC Jean Marshall 6 Portal Arrangements add safety and precision to the Method across the Plan Working with Square Pi Arrangements Funding Economies of Scale Addendum-4 1
  • 12. Page: 6 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:16 PM With the portal arrangement the gear-box methodology was smoother. But Scorecard needs to be streamlined with the overall development.
  • 14. Page: 7 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:16 PM Contents generally deliver a powerful and unique knowledge of the overall portal plan and capability to manage complex glass operations
  • 15. Dividing Content with VRD Portals Ring Composition splits the Requirement Lift X2 =Tan #1 Portals Requirements Demand #1 Short Term (EV) vs. Long Term (PV) Demand = Uses of VRD: (see next) 1. Split Requirement for Price 2. Split Instances of Object Simulation 3. Split Motion of Car/Road Syncopation 4. Split Demand in Multiple Markets 5. Split Product in Ordinal Packaging Β΅If you use the scope as the differential, you retain motion in the remainder as in T&MM that needs to be ended with a secant engineered response i.e., failsafe 1/27/2024 Brij Consulting, LLC Jean Marshall 8 Car/road sync LIFT Manifold V1 Stakeholder Approach 1
  • 16. Page: 8 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:17 PM Split Demand causes branching and bifurcation in glass to examine root associations.
  • 17. Applying VRD across the Board Portals Roles Performance Assimilation Scope/Requirements Split Demand β€’ The primary influence of price is the car & road syncopation of the 5 β€˜car-associated’ portal requirements Prototype Manifold Design Approval 1/27/2024 Brij Consulting, LLC Jean Marshall 9 LIFT and DRIFT STABILIZATION Note that our VRD template was renumbered here to fit a later model (subsequent knowledge) V1 Stakeholder Approach 115 APP III 1
  • 18. Page: 9 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:17 PM The primary influence of price is examined within the 5 car-associated portal requirements. Mitigation of Risk is analyzed in this paper.
  • 19. Other notable VRD facts β€’ Componentization has events that enable distribution to the market. β€’ Packaging becomes the unitive facts between all portal correspondence 1/27/2024 Brij Consulting, LLC Jean Marshall 10 Critical Path This data is moving data and because it is not stationary during the project its focus can change; Project must be parked for this snapshot. VRD STATS 1604 APP III V1 Stakeholder Approach ~ B 1
  • 20. Page: 10 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:17 PM A snapshot of the signature processes for Simulations requires project to be parked. Three portal strength is brought to bear on the componentization requirement.
  • 21. Portals Reconciliation Brij Consulting, LLC Jean Marshall 1/27/2024 11 SCORECARD RELATIONAL Future Cash Difference SCORECARD RELATIONAL Pass Thru Gain (EOP) Financial Conversion The Architectural Services Market Grows on Labor and Scientifically applied building and tool techniques, virtual machines and glass applications with Ark dimensional basis. Because the Portals secure the investment and Portal Methods mitigate the risk. = B V1 Stakeholder Approach See Growth Slide 14 See Scorecard Slide 22 See Scorecard Slide 22 See Scorecard Slide 22 21969.52 Γ· 21.22 = 35.32+1000 1035.32 ^ See calculations on Slide 7 Bifurcation D-split of 135 .00135 1
  • 22. Page: 11 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:18 PM A phenomenal growth pattern is established in glass which does not rely on the meta world or on binary (slower) response to established building requirements. Ark methods in glass raise up immediate transparent gains. Glass attributes exceeded risk and domain issues but not without deliberated intervention and craftsmanship. It is notable that financial arguments follow the glass with threaded inferences for greater visibility.
  • 23. Leading Questions 1/27/2024 Brij Consulting, LLC Jean Marshall 12 What other lower- level tasks are there beside prototype manifold and car and road syncopation? Tasks Define Lower-Level Tasks Using Best Case Find Portal Value Compile Load and Production Write Forward and Performance St’s. Simulations What Simulation Requirements With Partners are required? Instances, Moments, Markers Recommended Dates Pivots & Lifts Can we suggest a portal valuation equation? Or at least a method? PRODUCTION PORTAL LAYOUT SUPPLY CHAIN PORTAL SIMULATIONS PORTAL Need to check on Strabo and Lens What about Manifold and other Technologies like Thread? DEPTH AND ATTRIBUTION OF PROJECT CONTENT 1 2 3 1 2 3 How do we cope with the Variable Rate Demand of this project? 1 3 2 Portal Valuation Accomplished V1 Stakeholder Approach 3 = B 3.0688 βˆ’ 1.531646975 Γ— 2 = .000550606 See Scorecard Slide 22 ^^Angular proof w/carriage burden See Slide 7 1
  • 24. Page: 12 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:19 PM With one eye focused on the glass plan and the other on the means acquired, the growth in this advancing industry will be phenomenal.
  • 25. hyD Best Case Tasking Brij Consulting, LLC Jean Marshall 1/27/2024 13 Specify Role definition of lower-level tasking Prototype Manifold Car/Road Syncopation Project Dependencies 2 Table Ready Next Prototype Manifold Lens Arrangement Local Access Window Broad Dates Overall and High-Level Tasking Best Case Tasking Data Design Approval 9753 48.5 30,974.68 2-Portal Valuation = 17741.6 Long Term Demand 3 Table Ready 1 Table Ready z V1 Stakeholder Approach Cos(1589.17)=.858691671451 x 2 = 1.71738334-1.77416 = .056776651637098 x2 = .113553303^^ ^^Angular proof w/carriage burden 1
  • 26. Page: 13 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:20 PM It is necessary to specify role definitions of the lower-level tasking and to build up a scrum delivery of the product at its various stages. This of course is primarily an engineering task and not a financial practice. The broad dates help to gain an end-to-end delivery cycle of the whole plan but do not specify the product delivery except in its dependent parts. They want the workable glass model by 2031 and the roadworthy car (distance) by 2034.
  • 27. Variable Demand Project Complexity If ever there was a case of variable rate demand it certainly is the glass project itself and its impact on the hyD division engaging in the manufacturing of the first road-worthy glass car. Up until the date 2037 the scale of the project is concerned with componentization and the scale of the achievement is a price of $400/unit with a cost of $300 for prototyping. It is obvious that once Site Development (SD) and Scientific Assets (SA) begin to be composed the scale changes to distribution of the synthesized or solid state engineered product. Primarily there is more than one portal attributed to this project and also more than one market at work. So it is in this manner that Variable Rate Demand Composition Application must be applied. Notice also the Theta branch is moving from Theta + 1 to Theta +2 to Theta + 3 in our notation. Θ+ Θ+ Another aspect of the problem is to go from a binary method such as industrial coatings to the full ark method such as prototyping. This is part of the learning curve to package and distribute a green & glass product. Project Scope Ξ± rate 30,974,689,621-30,874,553,369.210 = 100,136,351.79= BIFURCATION Hybrid methods produce Bifurcations- Adding dimensions 40.98 Forward Statistical Net LENS MODIFICATIONS View 35.58 1 1 3 40.98 30.00 35.58 1/27/2024 Brij Consulting, LLC Jean Marshall 14 V1 Stakeholder Approach 1
  • 28. Page: 14 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:21 PM Project Complexity and Scope supplies variable demand across lines of increasing development in glass systems infrastructure and architectural services, as well as other industries specific to appliance and cars, conveyances.
  • 29. Full Scope β€’ The full scope of the project is completed with partnering is considered a 50-year project and is accomplished with a payback of 196. Partnering will add an additional simulations scrum set. β€’ Since the project is highly integrated with advanced engineering, details are accomplished with refined dates and scope by the engineers. β€’ Secant Engineering and Glass Construction are the means to more complex and highly scientific virtual products and machines. 1/27/2024 Brij Consulting, LLC Jean Marshall 15 BAC + Asset Conversion .0003082= .00275082 BAC Long Term Demand 75833 = 275.377922 Leveraging STRABO @ Gate πŸ“πŸ“πŸ“πŸ“πŸ“πŸ“. πŸ•πŸ•πŸ•πŸ•πŸ•πŸ•πŸ•πŸ• Γ— 𝟐𝟐 = 𝟏𝟏𝟏𝟏𝟏𝟏. πŸ“πŸ“ Best Case Tasking Data 115 196 APP III APP III X2 = 544 Value-Add +10^3 PROOF of 2-PORTALS SCORECARD V1 Stakeholder Approach There is an upgrade on the Scorecard not part of the Task List, perhaps a last-minute requirement .5582734 x 2 = 1.164 which is a labor metric If a low-level task it should be added in a non-attributed period to avoid date shift Added task increases burden 558.2734- 550.7558 = 7.51 The payback on the Scorecard is lower due to unbillable Asset upgrade WATCH! 3.0688 βˆ’ 1.531646975 Γ— 2 = .000550606 1-PORTAL 550.606-550.868= .262 +Θ 1
  • 30. Page: 15 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:21 PM The full scope of the project is accomplished although not compiled in the full partnering scope of activity. Specific markers milestone accomplishments were indicated by an agile metric application from the compilation of the IF or Impact Factor. The 2 Portal arrangement is found to be compliant with the Project Management Metric associated with Planned Value plus Earned Value or Budget at Completion. You may notice that there could occur impact from an unplanned task on the Scorecard to upgrade assets. This may be a redundancy and could be eliminated as part of pre- constructions.
  • 31. Brij Consulting, LLC Jean Marshall 1/27/2024 16 Simulations make the drill down technique in Power BI helpful in seeing relevant parties to tasking arrangements and their progress markers. The Glass Project creates many multi-agencies related to supply chain efforts It is not difficult to imagine 1000 such Simulations across the world with many different glass associative industries at work. This is what makes the replacement economy so viable. Power BI Empowering media 18L 6L Insight: T3M4 Supply Chain = 1/cosine = Secant of 9.33/3 = 3.11 Perimeter all phases Supply chain is the Area Graph that describes the Process Short Term Demand 121 V1 Stakeholder Approach 1
  • 32. Page: 16 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:22 PM Power BI Media is moving into the idea of empowering projects with the new forms that media may take in the advancing glass age. We have indicated the key agile date for the first functional glass car model (called β€œO”.)
  • 33. Short Term Demand Reconciling in this difficult corner of the manufacturing requirement, we now turn to see if we have adequate lens deliberation for the Strabo requirement coming up. When do the Lens arrive variegated for this requirement? 1/27/2024 Brij Consulting, LLC Jean Marshall 17 This glass concept overcame all scale, mass and hybrid conditions. 135.4 EV = 13.5 Adj Both m and M dates of the first two requirements are within the scope of this All 4 Lens dates should be set up in STRABO for Simulations, but the first lens can precede the start of the project; Also, thread and manifold delivery. Thread and Manifold requirement ROLES Receivable = 8.774 B Assets = 39.749 B 𝒔𝒔𝒔𝒔𝒔𝒔 𝟏𝟏𝟏𝟏𝟏𝟏 Γ— 𝟐𝟐 = 𝟏𝟏. πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’ = 𝟐𝟐 135.4 ^Product Basis ^As shown in Simulations Watch Master Builder Roles V2 Task Analytics 1
  • 34. Page: 17 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:23 PM Short Term Demand made use of data preparation for the use case of the pre-crossover period. All previous compilations have supported the cases of data presented in this emulation.
  • 35. 1/27/2024 Brij Consulting, LLC Jean Marshall 18 Price associated with Prototyping (Standard) The Prototyping Task is the beginning of the Teams process V2 Task Analytics Prototyping is one of the most significant and labor-intensive new tasks 1
  • 36. Page: 18 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:23 PM Task Analytics provide for various views and considerations of the task deliberations. We call attention to the most significant of starting glass tasks, prototyping, which supplies the basis for all future works.
  • 37. Brij Consulting, LLC Jean Marshall 1/27/2024 19 Branch Partner and Larger Domain Production Supply Chain IF=772 Branch Yi-Assets + Gate SC=121 V2 Task Analytics 1
  • 38. Page: 19 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:23 PM The Crossover period provides Lift for various higher level building practices and dramatic change in the infrastructure considerations of the process. Branch Partnering begins to accentuate the continuous nature of processes.
  • 39. Study of Ark Sciences in Building and Design 1/27/2024 Brij Consulting, LLC Jean Marshall 20 The Supply Chain keeps moving toward the Architectural Services Market Complex Portals deliver multiple instance management to the solution of VRD V2 Task Analytics The Market will double largely due to later projects Portable Assets 1
  • 40. Page: 20 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:24 PM The Market doubles within the solid-state engineering spectrum when projects are capable of being performed remotely. Remote building is an example of ultra-ark Media capability and lens variegation. HyD will likely merge into the Glass Community and find roles such as special conveyances. Portable assets also supply a subscription consideration that is Revenue Producing. Another important feature of glass is the ability to produce in instances, the complex arrangements. As one piece of solid-state engineering with no moving parts.
  • 41. Configuring the Job Match in Portal Relationship Brij Consulting, LLC Jean Marshall 21 We are comparing a generic book stacking problem with job matching across portals. Our remainder in the stack is 135 or like EV. 𝒔𝒔𝒔𝒔𝒔𝒔 𝟏𝟏𝟏𝟏𝟏𝟏 Γ— 𝟐𝟐 = 𝟏𝟏. πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’πŸ’ = 𝟐𝟐 1 2 3 1 2 3 Market Position = B Task, Date & Time Stamp REQUIREMENT: All Portal Tasks The Risk for not achieving domain order is in the Supply Chain, the Split Risk is in the Production 1/27/2024 121 Alternative Method A P P L Y FORMS 121 = B = B 164 2 V3 Overcome Agile Constraint Squaring up 113.553303 – (55.0606 x2)= 3.432103x2 = 6.8||64206 analog to digital conversion~~64.206/8=8.02 x 2 = 16.04||.00575 x 2 = .00115 App. III ^ 1604 115 1
  • 42. Page: 21 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:25 PM The stacking problem and solid model table allowed us to consider the first of many issues related to achieving a proper domain order and table arrangement. Instances within the products themselves can be just as cumbersome.
  • 43. VALUATION PROBLEM (SCORECARD) 1/27/2024 Brij Consulting, LLC Jean Marshall 22 Portals reduce risk and modify outcomes Mitigated V3 Overcome Agile Constraint The blend-over creates scalable economies Mitigated 1
  • 44. Page: 22 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:25 PM The Valuation problem associated with this Binary Scorecard has been settled out by the bifurcation capability of plait glass and its portal arrangements. We have reconciled with the Union Vector in the production and eliminated all variances.
  • 45. Summary: the Last of the Series When the Process begins to take on its continuous nature it can move into cloud confluency. No one can describe how that occurs now but suffice it to say that the building process has become a fluent score. Instances and Moments of what used to be considered dramatic change become part of the flow of a masterful arrangement. Creation is driven by circumspection of pillars and their cloud driven capabilities that become Ark delivered in a STREAM composition. [50+ Years] 1/27/2024 Brij Consulting, LLC Jean Marshall 23 Master Builder Certifications in Glass 1
  • 46. Page: 23 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:25 PM It is quite notable to desire Master Builder Credentials that will keep evolving within the Advancing Plan. The Confluency of the arrangement is more upscale and notable than all previous discussions combined but we are ill-equipped at this point in the learning curve to add any more assembly to the page. We will have to wait to see how such things are arranged.
  • 47. Milestone Dates of Origination These are Supply Chain shifts for the Milestone Dates that built the product cartography. The product dates are likely to shift with re- specification, so we are initiating the project with tentative finish dates for the lens and lead times. Brij Consulting, LLC Jean Marshall 1/27/2024 24 mM Lens Positions Milestone Related m m M M M 10 yrs. ending 8/22/2035 8 yrs. ending 11/26/2051 8 yrs. ending 2/1/2062 4 yrs. ending 6/3/2027 m M M M - 4 Agile years Lens Commitment Dates Appendix I Table <or> SA Associations 1
  • 48. Page: 24 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:26 PM The two time-critical notifications are the lead time arrangements for the lens and the agile dates for the three substantial product models. A shift in these milestone arrangements could cost the project 12 years, so these must be mitigated continuously. Morning Star oversight promises full delivery in spite of human learning curve. For example, if the Green Energy Wall were not compliant in time, the Morning Star would supply it and give people time to acquire necessary skills.
  • 49. 1/27/2024 Brij Consulting, LLC Jean Marshall 25 Appendix II Thread makers use powerful Lens but not variegated 19 1
  • 50. Page: 25 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:26 PM We have raised up once again the requirement for making and testing for car, road and home building arrangements and continue to point back to our earlier work.
  • 51. Full Scope The full scope of the project is completed with partnering is considered a 50-year project and is accomplished with a payback of 196. Partnering will add an additional simulations scrum set. β€’ Since the project is highly integrated with advanced engineering details are accomplished with refined dates and scope by the engineers. β€’ Secant Engineering and Glass Construction are the means to more complex and highly scientific virtual products and machines. 1/27/2024 Brij Consulting, LLC Jean Marshall 26 BAC Long Term Demand PV = 13.8 75833 = 275.377922 Leveraging STRABO @ Gate 550.7558 Γ— 2 = 111.5 Best Case Tasking Data 115 1604 196 196 Appendix III Slide 6 Slide 8 How do Ark Metrics from the Bible Stack up? 75.833 Γ— 2 = 151.67 βˆ’ 150.21 = 1.46 βˆ’ 1.445 = .015 Note 196, 115, 57, 1604 1
  • 52. Page: 26 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:27 PM Here we have added Ark metrics from the Bible to show that these metrics do in fact apply to this project. (Four metrics were used for simplicity.)
  • 53. TIMELINE OF PRODUCT 1/27/2024 Brij Consulting, LLC Jean Marshall 27 βˆ† Ξ± Ο‰ Glass Cars Architectural Builds Remote Development Solid State Engineering Complex Builds Wireless Energy Product Media 3D Ark Media V-A From Cartography Appendix IV Value added is comparable to asset turns increasing equity performance 1
  • 54. Page: 27 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:28 PM We have included the outline of the Product timeline so that the periods of attribution can be seen. The Value Added becomes a continuous STREAM in the epic proportions of the BUILD ECONOMY.
  • 55. β€’ Captive Engineering of the Glass Plan allows for a market free of price uncertainty and a modeled frequency expectation. Without regulation of choice, the adaptation of glass to model various compositional upgrades allows the producer to enjoy a market that exploits positive change. 1/27/2024 Brij Consulting, LLC Jean Marshall 28 Appendix V From earlier work Domain = 31.1 Captive Engineering Proof of Domain 1
  • 56. Page: 28 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:28 PM We have commented on what makes the MARKET different from the material world we have been associated with. The Advancing Age delivers a continuous Plan from the Morning Star and creates a captive engineering capability that is free of various types of uncertainty usual to the conditions experienced in the material world and driven by a political climate. There are no politics involved and only positive change can occur moving forward with the Glass Plan.
  • 57. Ark Certifications include LIFT, LIFE and T&MM Must be Prototype and Production Book Certified 23 1
  • 58. Page: 29 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:28 PM This older diagram of the Supply chain is once again pertinent to the discussion and was recognized early in the process of the learning series.
  • 59. Brij Consulting, LLC Jean Marshall 1/27/2024 30 1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope determination of Glass and STRABO serialization for Agile 2. Glass Impact: Streaming the Engineering of Components, Solid State Assemblage, Table Design Outcomes 3. Cascading in Green: The theories and concepts related to the Green Wall and the starting compositing of green energy and wall migrations. 4. SSE: The Remote End: How Solid-State Engineering is Performance mined and delivered remotely 5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency 6. Simulations in Diminishing Scale: The use of Ring and Lens 7. Simulations: Synergy Modifications: Mitigation in Risk Analysis 8. Simulations: Marking the Contingent Outcome: Marking Pivots and Lifts 9. Simulations: Making a Watch Case Window: Fielding the Position 10. Simulations: Branching with Partners: Partner Branching for Remote Position SSE CASCADE IMPACT SCOPE CLOUD-STAR Brij Consulting, LLC | SlideShare Part I: City Scale Part II: Remote Scale Part III: Confluent Scale SIMULATIONS P a p e rs i n D e s ign Se ri e s Part I, II, III Part I, II 1
  • 60. Page: 30 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:30 PM Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come. We continued our Simulations Project with mitigation of Risk in the crossover period through the use of Gap Data.
  • 61. Brij Consulting, LLC Jean Marshall 1/27/2024 31 P a p e rs i n T e s t Se ri es 1. The Car and Road Test: Simulating Glass Cars and Candle stone Roads Brij Consulting, LLC | SlideShare V3 Glass Package V2 Synergy Modifications V1 Digital Testing Strabo Tying projects back to the Strabo Omega allows for Simulations Cloud to orchestrate outcomes Part I, From Slide 13 2. Home and Foundation Test: Simulating Glass Instances of Candle stone and Thread in Componentizations utilizing a legacy form of Glass 3. Glass Big Push: Legacy Glass gives way to Solid State Engineering, Instancing and Building with remote synchronization Parts I, and II/III Of Pillars and Pipes, Portals and Plaits Part I: Part II Simulations Marking 1
  • 62. Page: 31 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:31 PM We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid- state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the types of events or changes that impact the Simulation of the Project Performance.
  • 63. 1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property reconcilement for Conveyance 2. Crossover Conveyance: Beginning with Remote Signature, threading the advancing fingerprint with a glass path and integral site management, moving into SIMULATIONS in Real Time 3. Converge- The Remote Build: Tasks to consider the process of converging to the Remote Build Site and what considerations are given to producing a remote service or build out of a productive requirement, introducing sandbox theory. Phase I only considers the Kitchen Tech. Phase II is involved in whole home Media and Tech in Glass. Phase III develops the land and its attributes. This is three separate papers. 1/27/2024 Brij Consulting, LLC Jean Marshall 32 1. Studying T&MM: the requirement for certification of mobility for competent conveyances 2. Portal Projects: the evidence, timing and intelligent use of portals 3. Calling it Green: Components of Green Energy, short review: Calling it Green requires new uses of potential and ^studies in wave glass and graphical relationships can raise up a green energy fluency that will lead to energy self-sufficiency 4. Dimensions in Multivariant Fabrications: Determining Forms and Contents of Green Energy and Blue Wave Cascade; relating elements to current science and future requirements 5. Wave and Lens Assimilation: The means to compile and to build in Glass Systems is described. The use of secant math. 6. Math Solutions for Wave and Lens Assimilations: See also Commentary for Math Solutions 7. Supply Side Portfolio: Timing and Model of Glass and Green events to fulfill path… Does the Tan Line help? 8. Partners in T Pluribus Unum: Measuring with Diacritical Marks 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story β€œEru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process 13. Branch- Sound and Image Construction: Characterizing the branch capability of new applications, appliances and mode[ls] of operations 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the β€œcube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) Motion Projects-8 Remote Theory-5 Ark Model-13 Digital-20 Go to https://www.slideshare.net/Marshallja/presentations https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for- wave-and-lens-assimilationpdf Roadmap: #47 & #48 & #49 Dimensional Building in Ark Design Glass Cars and New Product Roadmap Calendar Cartography Building with Glass #50 New Remote Theory Ark Model Motion Projects Building 1
  • 64. Page: 32 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:34 PM The Learning Series
  • 65. Simulations Project 1 2 3 1/27/2024 Brij Consulting, LLC Jean Marshall 33 Branching with Partners BUILDING in the World of Glass Systems 3110/MTh 1- Supply Chain 2. Productions 3. Simulations = B 1
  • 66. Page: 33 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:35 PM A larger view of the Concept Car helps to see how Events attract customers and vendors to the supply chain and how new features are added to glass cars and other products. We mention that the lease cost originally devised has not failed in the larger graphically attained price parameters but only as related to the Model O version.
  • 67. Simulations Project Glass Systems| Brij Consulting, LLC | Jean A. Marshall Branching with Portals 1/27/2024 Brij Consulting, LLC Jean Marshall 34 Stored Notes 1
  • 68. Page: 34 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 1/27/2024 1:30:35 PM We have stored notes here for future reference. Only one partner was discussed in this paper because the discussion is quite detailed.