SlideShare a Scribd company logo
Instancing at the
Gate
Part II of Interpolation
Brij
Consulting,
Jean
Marshall
2/17/2021
MDIA Emulation Stage
V2: Building the Instance
Instances
Brij Consulting, Jean Marshall
Schema from
Interpolative
Scope brought
forward with
Design Element
2/13/2021 Brij Consulting, Jean Marshall 2
Instances
Stream
Mu Sic
2/16/2021 Brij Consulting, Jean Marshall
Our Load is not
configured for the
โ€˜engineeringโ€™ of the
wall, but we have
decided to outline to
the Plait Instance in
order to describe its
ascendant properties
3
v1 v2
Angular Load
Work = 1, we donโ€™t
anticipate force but
stress/friction perhapsโ€ฆ
and more than one kind of
load bearing is involved:
Glass load, compression
and bearing. No gโ€™s are
involved. Foil up and Plait
for cascade down.
2/16/2021
Brij Consulting, Jean Marshall
O Map Ark Load
More engineering
definition is required:
the plait part units are
pinned without
gravity, but they must
carry a load value
Our original work is a theoretical starting point
to visualize notional conditions
Internet Instruction for Load Distribution
using gravity load bifurcates a type of
economy. Glass Practice will also bifurcate
but requires load balancing.
Ark Cloud
carries Force
4
Architectural Glass
Views that come out of the Church are important in the
moral comprehension of design for the support of life.
The Church itself has always made an impact on
Architecture and Design. Creation is Godโ€™s Domain.
But the system methodology of wave glass production
is a unique engineering complement to its portents.
The ability to predicate new design on predefined
instances is an exciting prospect of modeling.
2/16/2021 Brij Consulting, Jean Marshall 5
Behind the Wall
Godโ€™s Science
protects us
We need to add Production to Gate
There is no labor conversion or transformation process on the Wall yet to compare to the Ark
Product Metric Standard approach. Yet the data configured on the project appears to adhere well
to the basis of approximating the Data Plan. (404 -399.11 = 5.11 x2 = 1022 map)
2/16/2021 Brij Consulting, Jean Marshall
Time and Motion or Motion Standards have a different methodology in determining whether the
performance characteristics of the mechanics are appropriate. In looking into Materials Science, it is often
important that a Solid Standard is produced in that you donโ€™t want the composition to be subject to slide or
variation. In Financial Engineering we are often trying to produce Conversion to a Plan, and the numbers do
not become firm until the project is reported. It may become important to have code method for difference
in practice standards. We may find the position of the Standard affirms its use.
See Slide 3
HERE
Conversion is @ Gate
Data Here configured
for Process the -399
is considered earn-
back from the churn
rate
Process layers carry the
mechanic application
See Slide 8
6
T&M
v1
Production
Log(Y)
T&M
Plait Internal Selling Price
The Unit Price is
the product of:
Gate Plait Assets โ€“
Equity = Financial
Cost / unit volume
= 35.78
Synergy/T&M
Plait = 8.3834
35.78 x 8.3834 =
300.00
It is necessary to reapply the
wall composition to foil and
plait in order to obtain these
standards SEE NEXT
2/16/2021 Brij Consulting, Jean Marshall 7
From Glass Wave ppt
Appendix III
Appendix I
Plait Wall
The Plait Wall foils to excess time
remaining in the clock but in this
case, it is used as a scalable object to
motivate the cascade. The additional
time built into the Wall covers the
investment. The Wall has more
synergy in it than the Gate.
Brij Consulting, Jean Marshall 2/17/2021
(404 -399.11 = 5.11 x2 = 1022 map)
Gap Transition
From Glass Wave
8
See Slide 6
72,623,576,946 - 72,393,239,544 =230,337,401.73
The motion-ability of the wall cascade
is used as a utility. Points are retained
in a glass application for later use.
T&M
Useful Scale Plait
Slide 3 Slide 7
See Appendix I
Wall Background Loading in Plait Glass
2/17/2021 Brij Consulting, Jean Marshall 9
Data
used for
Gate
The repetitive branching circuit rebuilds
and posts the PT or Pass Thru Gain
The substructure is always
rebuilt in a continuous
replacement process. It can
be changed but generally it
is what is arranged for the
surface of it that is altered.
T&M
Slide 8
Plait and Burden
Test for Drivers
2/16/2021
Brij Consulting, Jean Marshall
10
T&M
T&M
INK-UP
Slide
11
Integral
Lines
Slide
12
App
IV
Wall Plait Markup
T&M
Plait data
Model
1+x
App IV
If we had use of Glass as we envision its use the lines and
integral relationships would be indicated through the layers
and the drivers apparent from the conveyances
Integral Markup
Z1
+33
Time dimensions Motion Processes
59.24
118.4
236+33
.535+.035
=.57
.414+.057
=.471
Drivers and
Other Data
2/17/2021 13
Synergy
Digital Load
When we add the
element to the process
and convey it, we will
have added the Equity
turn characteristic that
will generate ROI.
Then Time and Motion
will pick up the
remainder of the
burden and we can
book our asset into
production
System Burden
Bread for the World
Conveyance
Lifting Burden
V1 Summary
(716,133.42)
(335,667.58)
269,649.92
price
volume
mix
Remainder is
Similar to 1166
labor end metric
Vector Ratio
Analysis
Comparison
before ROI to
Book
1
1
2
2
See Appendix IV
See Slide 8
See 41
Compare
Vector derived from Part I of this paper on
slide 10 of Interpolative Scope from the L data
used in the paper prior to that.
Appendix V
V2 What do Instances Do?
A Wide Area Dimensional
Network would be the first
Digital Portal capability in
Virtual Glass Attribution able to
produce in Instances
2/16/2021 Brij Consulting, Jean Marshall 15
Patterned Elemental Construction
Setting Flags before and after Instances
2/17/2021 Brij Consulting, Jean Marshall 16
The Typical Bottleneck associated with
Asset Delivery is related to Demand Churn
and Revenue Conversion. Time Plait
Instances looking forward and backward
help to speed the process. A salutary
market process is also a cure.
The Digital Portal Process would speed
economic delivery and should relieve
a large part of the plight related to
world demand on resources.
Glass Conveyance and Use of Tools
A Digital Portal would permit
the use of Dimensional
Networking in Glass
Construction for building as
well as:
โ€ข Conveyance is scripted and
motionable
โ€ข Design Attribution
โ€ข Specialty Plaits and
Materials
โ€ข Instance Convection based
on Plan Specifications
2/17/2021 Brij Consulting, Jean Marshall
1 2 3
Optimal solution 1,708,048,913,415.99 1,650,000,000,000.00 58,048,913,415.99
y = -1,349,185,676,613.44000ln(x) + 1,944,504,679,550.33000
Rยฒ = 0.64082
y = -766,951,086,584.02x2 + 2,242,804,346,336.09x + 232,195,653,663.91
Rยฒ = 1.00
-
500,000,000,000.00
1,000,000,000,000.00
1,500,000,000,000.00
2,000,000,000,000.00
2,500,000,000,000.00
OPTIMAL SOLUTION
17
(314,703,413,080,627)
141,886,157,308,799
(456,589,570,389,426)
0.30268
y
m
b
r^2
Series1 Series2 Series3
Predicate Future
Builds and
Requirements
(314,703,413,080,627)
141,886,157,308,799
(456,589,570,389,426)
0.30268
y
m
b
r^2
Wide Area Vector
Series1 Series2 Series3
Elemental
Conveyance
y m b r^2
(314,703,413,080,627) 141,886,157,308,799 (456,589,570,389,426) 0.30268
189,231,099,028,456,000 (44,268,594,503,989,000) 233,499,693,532,445,000 0.26249
(189,545,802,441,537,000) 44,410,480,661,297,800 (233,956,283,102,834,000) 0.04019
Wide Area Plait
(314,703,413,080,627)
156.20 x2 = (312.40)
1,007,692,114.87 1,007,371,592,767.81
0.00100031817663 Mega Conversion
Soft Wares can be
used to plait into
elemental designs
to motivate tools
for glass
construction
Mega plait
Mega conversion
Elemental Array at the Gate
2/17/2021 Brij Consulting, Jean Marshall 19
Wall
Brace
Thread
wall
brace
thread
Sum of plait
vectors
Sum of optimized
vectors
Sum of configured
gains
y = -19,942,393,198,822,700.00000x + 64,272,249,979,767,100.00000
Rยฒ = 0.05102
y = -4,371,031,448,435,990.00000x + 82,058,795,345,359,800.00000
Rยฒ = 0.01309
y = 88,443,012,630.53780x + 110,478,495,997.81400
Rยฒ = 0.02068
y = -105,820,753,767.46800x + 810,493,849,456.06400
Rยฒ = 0.11007
OPTIMIZED ARRAY
Sum of Sum of configured gains
Sum of Sum of optimized vectors
Sum of Sum of plait vectors
Sum of thread
Sum of brace
Sum of wall
Linear (Sum of brace)
Linear (Sum of thread)
Linear (Sum of Sum of optimized vectors)
Linear (Sum of Sum of configured gains)
Mega plait
9974/3=3325x2=665
Gate Optimized Instancing
2/17/2021 Brij Consulting, Jean Marshall 20
1,161
=580.489*2
1 2 3
Optimal solution 1,708,048,913,415.99 1,650,000,000,000.00 58,048,913,415.99
y = -1,349,185,676,613.44000ln(x) + 1,944,504,679,550.33000
Rยฒ = 0.64082
y = -766,951,086,584.02x2 + 2,242,804,346,336.09x + 232,195,653,663.91
Rยฒ = 1.00
-
500,000,000,000.00
1,000,000,000,000.00
1,500,000,000,000.00
2,000,000,000,000.00
2,500,000,000,000.00
OPTIMAL SOLUTION
2/17/2021 Brij Consulting, Jean Marshall 21
Appendix V
512*2=1024 See Slide 6
Conveyance
Covenant Guided Practice in Digital/Ark Model
These Practices are
I Defined Process, II Memory Retained and Recollected, III
Entrustment in accessible parts, IV Plan Comparative, V
Reconcilable, VI Accountable, VII Advancing Knowledge
1. Many of these methods are partially considered in industry
2. We are learning what has not been taught before and it is
documented in its strategic parts
3. We are enabled to reach new conclusions at a higher level of
design
4. These formulations can be tested and applied, with standards
R. O Lord, our God, how wonderful your name in all the earth!
You have made him little less than the angels,
and crowned him with glory and honor.
You have given him rule over the works of your hands,
putting all things under his feet.
Brij Consulting, Jean Marshall 2/16/2021
1. EQUITY is built and maintained
2. The ADVANCING PRACTICE retains the Covenant
Character
3. The Open format does not hide its attribute or
deploy a tendency that does not conform to the well-
known practice of it
4. The Evidence of the operative method is complete
and reconcilable
5. Virtue and its conduct is engaged in the process
Competent Signs of Discovery
22
V3 from Baseline To
Benchmark and Between
Brij Consulting, Jean Marshall
โ€ข We want to deliver more
content on the relationship
of instances to the building
of Benchmark from the
Baselineโ€ฆ next
2/17/2021 23
Timeline of
Discoveriesโ€ฆ
2/16/2021 BRIJ CONSULTING, JEAN MARSHALL 24
These discoveries and recent notes on Wave Glass
point to an energy conveyance theory. The use of a
light-based conveyance for energy could in effect
give us wireless energy, although we are not versed
in the construction, we do recognize that a threaded
"pipe" of light that is plait and conveyed in a ground
state could create an ambient energy when
transmitted with a seeded light- based plait that it
can activate and act upon using server- based
technology
Theory WE can
depict in graphics
is a few scientific
steps away
Appendix I
Reference โ€ข Useful time-oriented distribution for demand scale
8/4/2020 Brij Consulting, LLC 25
5 5
4
8
9
7
8 8
3
1
2
4
10
8
5
6
y = 0.0059x - 251.74
Rยฒ = 0.5743
y = 0.0092x - 395.63
Rยฒ = 0.4994
0
2
4
6
8
10
12
Timeline Ranking and Rating Discoveries
Rating Ranking Linear (Rating) Linear (Ranking)
Reference to Scientific Discovery
We wish to make a note about integral lines:
One line exceeds the other by the clock or timing of it and by a marginal
amount (.0092-.0059=.0033) graphically, and (395-251 = 144)
Pointer makes connective
associations in glass
We are not referring to quantum fields in
this paper, although our earlier work did
Appendix II
Rose Plait Method
The STREAM changes the Landscape
Brij Consulting, Jean Marshall 26
PT
PT= Sales Differences are Pass Thru Gains from yield at Gate Slides 10 & 15
S.E.G.C SEGC: Subject to Engineering Change
Ratios were changed for incorrect labelingโ€ฆ the Asset: Equity is the Synergy element
Appendix III
Wall test on Ark Product Data Mining
2/17/2021
27
Brij
Consulting,
Jean
Marshall
APPENDIX IV Test Extension
VECTOR PLAIT
(716,133.42)
(335,667.58)
269,649.92
price
volume
mix
Other Papers
https://www.slideshare.net/Marshallja/
presentations
2/5/2021 29
Brij Consulting, Jean Marshall
We hope to supply more papers of interest on the
topics related to Virtual Glass, Digital portal
development and Ark Sciences Our Methods changed
Be Aware!

More Related Content

Similar to Instancing at the Gate v2 Building the Instance

Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
Brij Consulting, LLC
ย 
Instancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusInstancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load Prospectus
Brij Consulting, LLC
ย 
Scope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfScope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdf
Brij Consulting, LLC
ย 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
Brij Consulting, LLC
ย 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
Brij Consulting, LLC
ย 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
Brij Consulting, LLC
ย 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
JeanMarshall8
ย 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
Brij Consulting, LLC
ย 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
Brij Consulting, LLC
ย 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
Brij Consulting, LLC
ย 
Remote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfRemote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdf
Brij Consulting, LLC
ย 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdf
Brij Consulting, LLC
ย 
The Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleThe Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production Scale
Brij Consulting, LLC
ย 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdf
Brij Consulting, LLC
ย 
SSE THE REMOTE END.pdf
SSE THE REMOTE END.pdfSSE THE REMOTE END.pdf
SSE THE REMOTE END.pdf
Brij Consulting, LLC
ย 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
Brij Consulting, LLC
ย 
Scope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdfScope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdf
Brij Consulting, LLC
ย 
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdfTime and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Brij Consulting, LLC
ย 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdf
Brij Consulting, LLC
ย 
Glass Big Push Part I.pdf
Glass Big Push  Part I.pdfGlass Big Push  Part I.pdf
Glass Big Push Part I.pdf
Brij Consulting, LLC
ย 

Similar to Instancing at the Gate v2 Building the Instance (20)

Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
ย 
Instancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusInstancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load Prospectus
ย 
Scope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfScope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdf
ย 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
ย 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
ย 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
ย 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
ย 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
ย 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
ย 
Glass Impact.pdf
Glass Impact.pdfGlass Impact.pdf
Glass Impact.pdf
ย 
Remote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdfRemote Build, Phase III V1,V2, V3.pdf
Remote Build, Phase III V1,V2, V3.pdf
ย 
Supply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdfSupply Side Portfolio V4 The Paradigm Poll.pdf
Supply Side Portfolio V4 The Paradigm Poll.pdf
ย 
The Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleThe Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production Scale
ย 
Comments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdfComments on Glass Big Push II & III.pdf
Comments on Glass Big Push II & III.pdf
ย 
SSE THE REMOTE END.pdf
SSE THE REMOTE END.pdfSSE THE REMOTE END.pdf
SSE THE REMOTE END.pdf
ย 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
ย 
Scope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdfScope of Glass Projects Part I Benchmarking.pdf
Scope of Glass Projects Part I Benchmarking.pdf
ย 
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdfTime and Motion Motion in Ark Glass V2 Minding the Thread.pdf
Time and Motion Motion in Ark Glass V2 Minding the Thread.pdf
ย 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdf
ย 
Glass Big Push Part I.pdf
Glass Big Push  Part I.pdfGlass Big Push  Part I.pdf
Glass Big Push Part I.pdf
ย 

More from Brij Consulting, LLC

Portal Compositions (All Parts Synergy).pdf
Portal Compositions (All Parts Synergy).pdfPortal Compositions (All Parts Synergy).pdf
Portal Compositions (All Parts Synergy).pdf
Brij Consulting, LLC
ย 
Comments on Portal Compositions (All Parts).pdf
Comments on Portal Compositions (All Parts).pdfComments on Portal Compositions (All Parts).pdf
Comments on Portal Compositions (All Parts).pdf
Brij Consulting, LLC
ย 
Portal Compositions Part I Define Problem.pdf
Portal Compositions Part I Define Problem.pdfPortal Compositions Part I Define Problem.pdf
Portal Compositions Part I Define Problem.pdf
Brij Consulting, LLC
ย 
Comments on Portal Compositions Part I.pdf
Comments on Portal Compositions  Part I.pdfComments on Portal Compositions  Part I.pdf
Comments on Portal Compositions Part I.pdf
Brij Consulting, LLC
ย 
Comments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdfComments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdf
Brij Consulting, LLC
ย 
Maker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdfMaker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdf
Brij Consulting, LLC
ย 
Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
Brij Consulting, LLC
ย 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
Brij Consulting, LLC
ย 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
Brij Consulting, LLC
ย 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
Brij Consulting, LLC
ย 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
Brij Consulting, LLC
ย 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
Brij Consulting, LLC
ย 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
Brij Consulting, LLC
ย 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Brij Consulting, LLC
ย 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
Brij Consulting, LLC
ย 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
Brij Consulting, LLC
ย 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
Brij Consulting, LLC
ย 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Brij Consulting, LLC
ย 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
Brij Consulting, LLC
ย 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
Brij Consulting, LLC
ย 

More from Brij Consulting, LLC (20)

Portal Compositions (All Parts Synergy).pdf
Portal Compositions (All Parts Synergy).pdfPortal Compositions (All Parts Synergy).pdf
Portal Compositions (All Parts Synergy).pdf
ย 
Comments on Portal Compositions (All Parts).pdf
Comments on Portal Compositions (All Parts).pdfComments on Portal Compositions (All Parts).pdf
Comments on Portal Compositions (All Parts).pdf
ย 
Portal Compositions Part I Define Problem.pdf
Portal Compositions Part I Define Problem.pdfPortal Compositions Part I Define Problem.pdf
Portal Compositions Part I Define Problem.pdf
ย 
Comments on Portal Compositions Part I.pdf
Comments on Portal Compositions  Part I.pdfComments on Portal Compositions  Part I.pdf
Comments on Portal Compositions Part I.pdf
ย 
Comments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdfComments on Maker Maps-The Next Glass Strategy.pdf
Comments on Maker Maps-The Next Glass Strategy.pdf
ย 
Maker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdfMaker Maps-- the Next Glass Strategy.pdf
Maker Maps-- the Next Glass Strategy.pdf
ย 
Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
ย 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
ย 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
ย 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
ย 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
ย 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
ย 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
ย 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
ย 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
ย 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
ย 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
ย 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
ย 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
ย 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
ย 

Recently uploaded

3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
ย 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
ย 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
ย 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
ย 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
ย 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
ย 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
ย 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
ย 

Recently uploaded (20)

3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
ย 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
ย 
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdfSearch Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
Search Disrupted Googleโ€™s Leaked Documents Rock the SEO World.pdf
ย 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
ย 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
ย 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
ย 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
ย 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
ย 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
ย 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
ย 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
ย 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
ย 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
ย 

Instancing at the Gate v2 Building the Instance

  • 1. Instancing at the Gate Part II of Interpolation Brij Consulting, Jean Marshall 2/17/2021 MDIA Emulation Stage V2: Building the Instance Instances Brij Consulting, Jean Marshall
  • 2. Schema from Interpolative Scope brought forward with Design Element 2/13/2021 Brij Consulting, Jean Marshall 2 Instances
  • 3. Stream Mu Sic 2/16/2021 Brij Consulting, Jean Marshall Our Load is not configured for the โ€˜engineeringโ€™ of the wall, but we have decided to outline to the Plait Instance in order to describe its ascendant properties 3 v1 v2
  • 4. Angular Load Work = 1, we donโ€™t anticipate force but stress/friction perhapsโ€ฆ and more than one kind of load bearing is involved: Glass load, compression and bearing. No gโ€™s are involved. Foil up and Plait for cascade down. 2/16/2021 Brij Consulting, Jean Marshall O Map Ark Load More engineering definition is required: the plait part units are pinned without gravity, but they must carry a load value Our original work is a theoretical starting point to visualize notional conditions Internet Instruction for Load Distribution using gravity load bifurcates a type of economy. Glass Practice will also bifurcate but requires load balancing. Ark Cloud carries Force 4
  • 5. Architectural Glass Views that come out of the Church are important in the moral comprehension of design for the support of life. The Church itself has always made an impact on Architecture and Design. Creation is Godโ€™s Domain. But the system methodology of wave glass production is a unique engineering complement to its portents. The ability to predicate new design on predefined instances is an exciting prospect of modeling. 2/16/2021 Brij Consulting, Jean Marshall 5 Behind the Wall Godโ€™s Science protects us
  • 6. We need to add Production to Gate There is no labor conversion or transformation process on the Wall yet to compare to the Ark Product Metric Standard approach. Yet the data configured on the project appears to adhere well to the basis of approximating the Data Plan. (404 -399.11 = 5.11 x2 = 1022 map) 2/16/2021 Brij Consulting, Jean Marshall Time and Motion or Motion Standards have a different methodology in determining whether the performance characteristics of the mechanics are appropriate. In looking into Materials Science, it is often important that a Solid Standard is produced in that you donโ€™t want the composition to be subject to slide or variation. In Financial Engineering we are often trying to produce Conversion to a Plan, and the numbers do not become firm until the project is reported. It may become important to have code method for difference in practice standards. We may find the position of the Standard affirms its use. See Slide 3 HERE Conversion is @ Gate Data Here configured for Process the -399 is considered earn- back from the churn rate Process layers carry the mechanic application See Slide 8 6 T&M v1 Production Log(Y) T&M
  • 7. Plait Internal Selling Price The Unit Price is the product of: Gate Plait Assets โ€“ Equity = Financial Cost / unit volume = 35.78 Synergy/T&M Plait = 8.3834 35.78 x 8.3834 = 300.00 It is necessary to reapply the wall composition to foil and plait in order to obtain these standards SEE NEXT 2/16/2021 Brij Consulting, Jean Marshall 7 From Glass Wave ppt Appendix III Appendix I
  • 8. Plait Wall The Plait Wall foils to excess time remaining in the clock but in this case, it is used as a scalable object to motivate the cascade. The additional time built into the Wall covers the investment. The Wall has more synergy in it than the Gate. Brij Consulting, Jean Marshall 2/17/2021 (404 -399.11 = 5.11 x2 = 1022 map) Gap Transition From Glass Wave 8 See Slide 6 72,623,576,946 - 72,393,239,544 =230,337,401.73 The motion-ability of the wall cascade is used as a utility. Points are retained in a glass application for later use. T&M Useful Scale Plait Slide 3 Slide 7 See Appendix I
  • 9. Wall Background Loading in Plait Glass 2/17/2021 Brij Consulting, Jean Marshall 9 Data used for Gate The repetitive branching circuit rebuilds and posts the PT or Pass Thru Gain The substructure is always rebuilt in a continuous replacement process. It can be changed but generally it is what is arranged for the surface of it that is altered. T&M Slide 8
  • 10. Plait and Burden Test for Drivers 2/16/2021 Brij Consulting, Jean Marshall 10 T&M T&M INK-UP Slide 11 Integral Lines Slide 12 App IV
  • 11. Wall Plait Markup T&M Plait data Model 1+x App IV
  • 12. If we had use of Glass as we envision its use the lines and integral relationships would be indicated through the layers and the drivers apparent from the conveyances Integral Markup Z1 +33 Time dimensions Motion Processes 59.24 118.4 236+33 .535+.035 =.57 .414+.057 =.471
  • 13. Drivers and Other Data 2/17/2021 13 Synergy Digital Load When we add the element to the process and convey it, we will have added the Equity turn characteristic that will generate ROI. Then Time and Motion will pick up the remainder of the burden and we can book our asset into production System Burden Bread for the World Conveyance Lifting Burden
  • 14. V1 Summary (716,133.42) (335,667.58) 269,649.92 price volume mix Remainder is Similar to 1166 labor end metric Vector Ratio Analysis Comparison before ROI to Book 1 1 2 2 See Appendix IV See Slide 8 See 41 Compare Vector derived from Part I of this paper on slide 10 of Interpolative Scope from the L data used in the paper prior to that. Appendix V
  • 15. V2 What do Instances Do? A Wide Area Dimensional Network would be the first Digital Portal capability in Virtual Glass Attribution able to produce in Instances 2/16/2021 Brij Consulting, Jean Marshall 15 Patterned Elemental Construction
  • 16. Setting Flags before and after Instances 2/17/2021 Brij Consulting, Jean Marshall 16 The Typical Bottleneck associated with Asset Delivery is related to Demand Churn and Revenue Conversion. Time Plait Instances looking forward and backward help to speed the process. A salutary market process is also a cure. The Digital Portal Process would speed economic delivery and should relieve a large part of the plight related to world demand on resources.
  • 17. Glass Conveyance and Use of Tools A Digital Portal would permit the use of Dimensional Networking in Glass Construction for building as well as: โ€ข Conveyance is scripted and motionable โ€ข Design Attribution โ€ข Specialty Plaits and Materials โ€ข Instance Convection based on Plan Specifications 2/17/2021 Brij Consulting, Jean Marshall 1 2 3 Optimal solution 1,708,048,913,415.99 1,650,000,000,000.00 58,048,913,415.99 y = -1,349,185,676,613.44000ln(x) + 1,944,504,679,550.33000 Rยฒ = 0.64082 y = -766,951,086,584.02x2 + 2,242,804,346,336.09x + 232,195,653,663.91 Rยฒ = 1.00 - 500,000,000,000.00 1,000,000,000,000.00 1,500,000,000,000.00 2,000,000,000,000.00 2,500,000,000,000.00 OPTIMAL SOLUTION 17 (314,703,413,080,627) 141,886,157,308,799 (456,589,570,389,426) 0.30268 y m b r^2 Series1 Series2 Series3 Predicate Future Builds and Requirements
  • 18. (314,703,413,080,627) 141,886,157,308,799 (456,589,570,389,426) 0.30268 y m b r^2 Wide Area Vector Series1 Series2 Series3 Elemental Conveyance y m b r^2 (314,703,413,080,627) 141,886,157,308,799 (456,589,570,389,426) 0.30268 189,231,099,028,456,000 (44,268,594,503,989,000) 233,499,693,532,445,000 0.26249 (189,545,802,441,537,000) 44,410,480,661,297,800 (233,956,283,102,834,000) 0.04019 Wide Area Plait (314,703,413,080,627) 156.20 x2 = (312.40) 1,007,692,114.87 1,007,371,592,767.81 0.00100031817663 Mega Conversion Soft Wares can be used to plait into elemental designs to motivate tools for glass construction Mega plait Mega conversion
  • 19. Elemental Array at the Gate 2/17/2021 Brij Consulting, Jean Marshall 19 Wall Brace Thread wall brace thread Sum of plait vectors Sum of optimized vectors Sum of configured gains y = -19,942,393,198,822,700.00000x + 64,272,249,979,767,100.00000 Rยฒ = 0.05102 y = -4,371,031,448,435,990.00000x + 82,058,795,345,359,800.00000 Rยฒ = 0.01309 y = 88,443,012,630.53780x + 110,478,495,997.81400 Rยฒ = 0.02068 y = -105,820,753,767.46800x + 810,493,849,456.06400 Rยฒ = 0.11007 OPTIMIZED ARRAY Sum of Sum of configured gains Sum of Sum of optimized vectors Sum of Sum of plait vectors Sum of thread Sum of brace Sum of wall Linear (Sum of brace) Linear (Sum of thread) Linear (Sum of Sum of optimized vectors) Linear (Sum of Sum of configured gains) Mega plait 9974/3=3325x2=665
  • 20. Gate Optimized Instancing 2/17/2021 Brij Consulting, Jean Marshall 20 1,161 =580.489*2 1 2 3 Optimal solution 1,708,048,913,415.99 1,650,000,000,000.00 58,048,913,415.99 y = -1,349,185,676,613.44000ln(x) + 1,944,504,679,550.33000 Rยฒ = 0.64082 y = -766,951,086,584.02x2 + 2,242,804,346,336.09x + 232,195,653,663.91 Rยฒ = 1.00 - 500,000,000,000.00 1,000,000,000,000.00 1,500,000,000,000.00 2,000,000,000,000.00 2,500,000,000,000.00 OPTIMAL SOLUTION
  • 21. 2/17/2021 Brij Consulting, Jean Marshall 21 Appendix V 512*2=1024 See Slide 6 Conveyance
  • 22. Covenant Guided Practice in Digital/Ark Model These Practices are I Defined Process, II Memory Retained and Recollected, III Entrustment in accessible parts, IV Plan Comparative, V Reconcilable, VI Accountable, VII Advancing Knowledge 1. Many of these methods are partially considered in industry 2. We are learning what has not been taught before and it is documented in its strategic parts 3. We are enabled to reach new conclusions at a higher level of design 4. These formulations can be tested and applied, with standards R. O Lord, our God, how wonderful your name in all the earth! You have made him little less than the angels, and crowned him with glory and honor. You have given him rule over the works of your hands, putting all things under his feet. Brij Consulting, Jean Marshall 2/16/2021 1. EQUITY is built and maintained 2. The ADVANCING PRACTICE retains the Covenant Character 3. The Open format does not hide its attribute or deploy a tendency that does not conform to the well- known practice of it 4. The Evidence of the operative method is complete and reconcilable 5. Virtue and its conduct is engaged in the process Competent Signs of Discovery 22
  • 23. V3 from Baseline To Benchmark and Between Brij Consulting, Jean Marshall โ€ข We want to deliver more content on the relationship of instances to the building of Benchmark from the Baselineโ€ฆ next 2/17/2021 23
  • 24. Timeline of Discoveriesโ€ฆ 2/16/2021 BRIJ CONSULTING, JEAN MARSHALL 24 These discoveries and recent notes on Wave Glass point to an energy conveyance theory. The use of a light-based conveyance for energy could in effect give us wireless energy, although we are not versed in the construction, we do recognize that a threaded "pipe" of light that is plait and conveyed in a ground state could create an ambient energy when transmitted with a seeded light- based plait that it can activate and act upon using server- based technology Theory WE can depict in graphics is a few scientific steps away Appendix I
  • 25. Reference โ€ข Useful time-oriented distribution for demand scale 8/4/2020 Brij Consulting, LLC 25 5 5 4 8 9 7 8 8 3 1 2 4 10 8 5 6 y = 0.0059x - 251.74 Rยฒ = 0.5743 y = 0.0092x - 395.63 Rยฒ = 0.4994 0 2 4 6 8 10 12 Timeline Ranking and Rating Discoveries Rating Ranking Linear (Rating) Linear (Ranking) Reference to Scientific Discovery We wish to make a note about integral lines: One line exceeds the other by the clock or timing of it and by a marginal amount (.0092-.0059=.0033) graphically, and (395-251 = 144) Pointer makes connective associations in glass We are not referring to quantum fields in this paper, although our earlier work did Appendix II Rose Plait Method
  • 26. The STREAM changes the Landscape Brij Consulting, Jean Marshall 26 PT PT= Sales Differences are Pass Thru Gains from yield at Gate Slides 10 & 15 S.E.G.C SEGC: Subject to Engineering Change Ratios were changed for incorrect labelingโ€ฆ the Asset: Equity is the Synergy element Appendix III
  • 27. Wall test on Ark Product Data Mining 2/17/2021 27 Brij Consulting, Jean Marshall APPENDIX IV Test Extension
  • 29. Other Papers https://www.slideshare.net/Marshallja/ presentations 2/5/2021 29 Brij Consulting, Jean Marshall We hope to supply more papers of interest on the topics related to Virtual Glass, Digital portal development and Ark Sciences Our Methods changed Be Aware!