IMPOSITION OF VALUE
ENGINEERING IN PLAIT
GLASS COMPOSITION
V2 Configuring Product Instances
Emulation Stage
MDIA
Dialogue Write
Stream
Mu Sic
4/2/2021 BRIJ CONSULTING, JEAN MARSHALL 2
Arriving at Stream and Digital Write
Capability there are two justification
processes, one for material and the other
for the finished product, both are written
to the glass bin as a complex record as
attributes of an object
Event
IMPLEMENT THE LENS TO
ENGAGE THE PROCESS
a
• Define a Product Pipe
• Arrange Longer Term Events
b
• Consider Probable Outcomes
• Define a Bayesian Structure
c
• Test to Benchmark
• Define the Scope
KANBAN LIST
Setting multiple targets for a
position, set up separate instances
to determine the best means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage bin
g. Move between instances to
create a series of events
During March
of 2021 we
performed
this work
PLOTTING THE EVENTS
4/9/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 4
Hamilton and
Jefferson are
Integral
Convey and
produce Sales
Conversion in
Hamilton
Interpolate
Demand in
Jefferson.
S1 S2
Streams in
Pipe
Notations
in Bin
To Produce Products, Sell
and find new Product
Streams, Assign Parts
Divergent Streams
and Value Events
3
NATURE OF EVENTS SELECTED
In selecting a glass material or product for conveyance it must be determined the nature of the events that need to
take place from each stream via the specified Pipe menu:
Hamilton: Sales Event
1. Select Customers/Vendors as agreed Subscribers
2. Select Specifications for the Product, requiring finishing costs
3. Fold and Compress or use Product Packaging
4. Convey the Object in Packet to Materials Team
5. The specific Demand Product will require an additional series of Engineering Specifications arranged by the
Materials Team
6. Follow up Events Widow
Jefferson: Demand Event
1. Select the Prototype Team for a Meeting Event
2. Select the Rough Specifications for the Product in order to elicit quotations
3. Package and Convey as an unfinished Material for Mark
-up
4. The event will either culminate in a Sale or a Dialogue with Materials Managers
5. Follow up Events Widow
4/9/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 5
This is a Material Pipe
Requests go to Prototyping
Warehouse
PLOTTING BETWEEN INSTANCES
4/9/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 6
How do we keep
the project cost in
line with its value?
Working between
the Material and
Product Finish we
are Plotting these
events and coming
to a good
Bayesian outcome
NATURE OF
EVENTS APPLIES
b
Justification
See
slide9
PRODUCT PIPE
The Product Pipe takes events from
the Two Instances and is the
recipient of dialogue and events
that develop Products in associated
Streams between the Baseline and
the Benchmark where event
completions are recorded. See
Next…
NATURE OF EVENTS SELECTED
In selecting a glass material or product for conveyance it must be determined the nature
of the events that need to take place from each stream via the specified Pipe menu:
Product Assembly Event
1. Select Project Team, They will rough out Production
2. Select Specifications for the Product, Define Assembly
3. Fold and Compress or use Product Packaging
4. Convey the Object in Packet to Test
5. Send to Finishing
Product Finishing Event
1. Select the Finishing Team for a Meeting Event
2. Select the Rough Finishing for the Product in order
to elicit refinements, may require Engineering Fulfillment
3. Package and Convey as a Finished Product
4. The Final Test event will either culminate in a Sale or a Dialogue
5. Follow up Events Widow with Customer
4/9/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 8
This is a Product Pipe
Requests go to Productions
and Assemblers Group
a
PRODUCT JUSTIFICATIONS
Candle Product =
Max Load of 1.349
Tote Product = Min
Load of 1.064
1. 25 months, load 1.064, recover .0413
2. 33 months, load 1.086, recover .0316
3. 70 months, load 1.191, recover .0156
4. 120 months, load 1.349, recover .00966
Compound Interest Table is
traditional method of product
justification used metrically
Note >>
13.164
13.178
Options>>
b
13.178
13.164
26.343
SCOPE AND PLAN ACHIEVEMENT
c
When we branched and conveyed
the Load with added Cost/Benefit
we met the Benchmark Criteria
Scope is clock
related
Scorecard is
Plan Metrics
See next
Our note>>
V2 CONFIGURING FULL PRODUCT INSTANCES
Keys to load, convey, encrypt and dimension products
Reconciled
Because this production keeps streaming it is
important to define and convey the product
according to its correct load and dimensions
and to encrypt it in such a way that it comes
to its productive delivery.
Covenant Practices
Prosperity
comes from…
414
695
119
119
Value Engineering
requires the keeping
of records and
documented standards
PRODUCTION CYCLES-DIMENSION
y = -0.36982x + 28,365,218,964.44470
R² = 0.00478
y = 0.00000x + 0.33090
R² = 0.20975
-40,000,000,000
-20,000,000,000
0
20,000,000,000
40,000,000,000
60,000,000,000
80,000,000,000
-15,000,000,000 -10,000,000,000 -5,000,000,000 0 5,000,000,000 10,000,000,000 15,000,000,000
Gate Plait
Object Econo Rate Linear (Object) Linear (Object) Linear (Econo Rate)
5819
-2161
1314
Stochastic Data is
flat. We are missing
the dimensional
aspect of our
project.
Z-Form Requirement
How it
works
Missing .14157
Glass Form + Conversion
The Machine takes the Z-dimensions and sponsors the multiple z’s of the
curved line relationship of an object as defined by the drawing specs.
695
A LOAD FROM VECTOR
ASSEMBLY
We noticed that the Object Time is
higher than the Scorecard Task and
this is a question as to how the system
deals with this. We funded 17.75 and
we are incurring 17.85.
We also see that the Burden rate is
157.0 compared to 156.2.
Since this is related to Z Time, or time
to dimension the product, it is not
costed as it is part of the packaging
process. It adds nothing to the asset
value but is a cost of conveyance.
It’s important to note that the
machine does a better job shaping
the object by taking all the z-
vectors lying in its path and
measuring the exact time dimension
to build the product; the z-sum
242 x2=Critical Path
414
695
ENCRYPTION
We have two levels of encryption
on the Production and Conveyance
of the Finished Products using the
Process Vector and the Lens
Instrument that works within the
layers of the glass.
65 Gate End
We did not
show every
calculation;
many people
work on the
outcome
V3 PACKAGING AND DELIVERY
How is packaging automated into the product and conveyance?
Coming next
Within the making of the actual
product the packaging is already
being worked into it and so we will
need to look into the actual process
to determine how the packaging
has a predetermined path ready
for conveyance.
Production Book
acquires all the
assembly and
process patterns
Intellectual Property
Alms are needed to
deliver the Soul
WHO TEACHES MUST SEE
13 Until I come, devote yourself to the public reading of
Scripture, to exhortation, to teaching. 14 Do not neglect the gift
you have, which was given you by prophecy when the council of
elders laid their hands on you. 15 Practice these things,
immerse yourself in them, so that all may see your progress. 16
Keep a close watch on yourself and on the teaching. Persist in
this, for by so doing you will save both yourself and your
hearers. (1 Tim 4.13-16)
The Soul is like a mirror when fed on Christ+
WHO LEADS MUST KNOW
Historic and Long-
lived Properties
of our National
Heritage require
diligence (Watch)
God Preserves Us
Misuse of
electronic devices,
misapplied science
Abbey Road
ANYONE FROM ANY
BACKGROUND/RELIGION
CAN RECEIVE BENEFITS
Jesus+ said:
When chastisements for sins come
upon the world and your own
country will experience utter
degradation, the only refuge will be
trust in My mercy.
I will protect the cities and homes in
which The Divine Mercy Image is
found; I will protect the persons who
will venerate this Image. The only
refuge will be trust in My Mercy.
Alms are needed
APPENDIX Applicable Content for
Production
+1 work
In this paper we do not get all aspects of the
dimensional object covered… we will attempt this
next… but we do show how our past work and our work
here are married together. Notice the Load Diagram
before proceeding
We have added another level of
cryptography to this and for the
finished product
Glass builds on what came before…
recursive. Glass engineers using
redundancy both anticipating what is to
come and decommissioning what is not
necessary, disallowing what is not
appropriate and making a safe
transition to a new method.
We want to scrutinize for duplicates
USING EULER AS A RULER
BRIJ CONSULTING, LLC, JEAN MARSHALL 4/9/2021 20
• P is proper to the distribution of the plot
shown as R^2
• 2 is both the intercept and the mode in the
binary set
• The clock underlies the traverse of time and
distance
• The appropriate scale of 9.85+.027 also has
at its beta the Chi value of 1.28
• Number Theory demonstrates that the time to
traverse the hypotenuse is the square root of
2 in a right triangle, this is the zero-sum rate.
It has no layer of Gain in it.
• Added Notes…A position is not prospered
without gains and not capital without value
added. The up tic of ‘e’ is the curve of 201 x
3 or the transform of 402. When it takes on
the form it becomes Value Added.
y = 2.89ln(x) - 0.2419
R² = 0.6931
y = 0.9877ln(x) + 1.2803
R² = 0.0694
-1
0
1
2
3
4
5
6
E C FRACTION E FACTOR
fact double Log. (fact) Log. (double)
*603 +/- 2 T&M ‘e’
OUR PAPERS
1. The Digital Plait Position
2. Mu Sic in the Advancing Age
3. Engineering Objects
4. Instancing at the Gate
5. Interpolative Scope
6. Functional Glass
7. The Glass Wall
8. The Glass Wave
9. Scrum Costing w/notes (Book It Daniel)
10. Gate Plait Green (Mark It Mark)
11. Scorecard Integration (Map It Ralph)
(Comprehensive of Plait Glass Theory, the V3 or V4 papers have complete content)
Mu Sic defined^^
^^Mu Sic defined to be updated
Appliances Conveyed
https://www.slideshare.net/Marshallja/
presentations

Imposition of Value Engineering in Plait Glass Composition V2 Configuring Product Instances

  • 1.
    IMPOSITION OF VALUE ENGINEERINGIN PLAIT GLASS COMPOSITION V2 Configuring Product Instances Emulation Stage MDIA
  • 2.
    Dialogue Write Stream Mu Sic 4/2/2021BRIJ CONSULTING, JEAN MARSHALL 2 Arriving at Stream and Digital Write Capability there are two justification processes, one for material and the other for the finished product, both are written to the glass bin as a complex record as attributes of an object Event
  • 3.
    IMPLEMENT THE LENSTO ENGAGE THE PROCESS a • Define a Product Pipe • Arrange Longer Term Events b • Consider Probable Outcomes • Define a Bayesian Structure c • Test to Benchmark • Define the Scope KANBAN LIST Setting multiple targets for a position, set up separate instances to determine the best means to: a. Eliminate an obstacle b. Convey a package c. Configure a Mobile Task d. Increase the number of Streams available with inter-branching e. Build a pipe f. Create a glass storage bin g. Move between instances to create a series of events During March of 2021 we performed this work
  • 4.
    PLOTTING THE EVENTS 4/9/2021BRIJ CONSULTING, LLC, JEAN MARSHALL 4 Hamilton and Jefferson are Integral Convey and produce Sales Conversion in Hamilton Interpolate Demand in Jefferson. S1 S2 Streams in Pipe Notations in Bin To Produce Products, Sell and find new Product Streams, Assign Parts Divergent Streams and Value Events 3
  • 5.
    NATURE OF EVENTSSELECTED In selecting a glass material or product for conveyance it must be determined the nature of the events that need to take place from each stream via the specified Pipe menu: Hamilton: Sales Event 1. Select Customers/Vendors as agreed Subscribers 2. Select Specifications for the Product, requiring finishing costs 3. Fold and Compress or use Product Packaging 4. Convey the Object in Packet to Materials Team 5. The specific Demand Product will require an additional series of Engineering Specifications arranged by the Materials Team 6. Follow up Events Widow Jefferson: Demand Event 1. Select the Prototype Team for a Meeting Event 2. Select the Rough Specifications for the Product in order to elicit quotations 3. Package and Convey as an unfinished Material for Mark -up 4. The event will either culminate in a Sale or a Dialogue with Materials Managers 5. Follow up Events Widow 4/9/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 5 This is a Material Pipe Requests go to Prototyping Warehouse
  • 6.
    PLOTTING BETWEEN INSTANCES 4/9/2021BRIJ CONSULTING, LLC, JEAN MARSHALL 6 How do we keep the project cost in line with its value? Working between the Material and Product Finish we are Plotting these events and coming to a good Bayesian outcome NATURE OF EVENTS APPLIES b Justification See slide9
  • 7.
    PRODUCT PIPE The ProductPipe takes events from the Two Instances and is the recipient of dialogue and events that develop Products in associated Streams between the Baseline and the Benchmark where event completions are recorded. See Next…
  • 8.
    NATURE OF EVENTSSELECTED In selecting a glass material or product for conveyance it must be determined the nature of the events that need to take place from each stream via the specified Pipe menu: Product Assembly Event 1. Select Project Team, They will rough out Production 2. Select Specifications for the Product, Define Assembly 3. Fold and Compress or use Product Packaging 4. Convey the Object in Packet to Test 5. Send to Finishing Product Finishing Event 1. Select the Finishing Team for a Meeting Event 2. Select the Rough Finishing for the Product in order to elicit refinements, may require Engineering Fulfillment 3. Package and Convey as a Finished Product 4. The Final Test event will either culminate in a Sale or a Dialogue 5. Follow up Events Widow with Customer 4/9/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 8 This is a Product Pipe Requests go to Productions and Assemblers Group a
  • 9.
    PRODUCT JUSTIFICATIONS Candle Product= Max Load of 1.349 Tote Product = Min Load of 1.064 1. 25 months, load 1.064, recover .0413 2. 33 months, load 1.086, recover .0316 3. 70 months, load 1.191, recover .0156 4. 120 months, load 1.349, recover .00966 Compound Interest Table is traditional method of product justification used metrically Note >> 13.164 13.178 Options>> b 13.178 13.164 26.343
  • 10.
    SCOPE AND PLANACHIEVEMENT c When we branched and conveyed the Load with added Cost/Benefit we met the Benchmark Criteria Scope is clock related Scorecard is Plan Metrics See next Our note>>
  • 11.
    V2 CONFIGURING FULLPRODUCT INSTANCES Keys to load, convey, encrypt and dimension products Reconciled Because this production keeps streaming it is important to define and convey the product according to its correct load and dimensions and to encrypt it in such a way that it comes to its productive delivery. Covenant Practices Prosperity comes from… 414 695 119 119 Value Engineering requires the keeping of records and documented standards
  • 12.
    PRODUCTION CYCLES-DIMENSION y =-0.36982x + 28,365,218,964.44470 R² = 0.00478 y = 0.00000x + 0.33090 R² = 0.20975 -40,000,000,000 -20,000,000,000 0 20,000,000,000 40,000,000,000 60,000,000,000 80,000,000,000 -15,000,000,000 -10,000,000,000 -5,000,000,000 0 5,000,000,000 10,000,000,000 15,000,000,000 Gate Plait Object Econo Rate Linear (Object) Linear (Object) Linear (Econo Rate) 5819 -2161 1314 Stochastic Data is flat. We are missing the dimensional aspect of our project. Z-Form Requirement How it works Missing .14157 Glass Form + Conversion The Machine takes the Z-dimensions and sponsors the multiple z’s of the curved line relationship of an object as defined by the drawing specs. 695
  • 13.
    A LOAD FROMVECTOR ASSEMBLY We noticed that the Object Time is higher than the Scorecard Task and this is a question as to how the system deals with this. We funded 17.75 and we are incurring 17.85. We also see that the Burden rate is 157.0 compared to 156.2. Since this is related to Z Time, or time to dimension the product, it is not costed as it is part of the packaging process. It adds nothing to the asset value but is a cost of conveyance. It’s important to note that the machine does a better job shaping the object by taking all the z- vectors lying in its path and measuring the exact time dimension to build the product; the z-sum 242 x2=Critical Path 414 695
  • 14.
    ENCRYPTION We have twolevels of encryption on the Production and Conveyance of the Finished Products using the Process Vector and the Lens Instrument that works within the layers of the glass. 65 Gate End We did not show every calculation; many people work on the outcome
  • 15.
    V3 PACKAGING ANDDELIVERY How is packaging automated into the product and conveyance? Coming next Within the making of the actual product the packaging is already being worked into it and so we will need to look into the actual process to determine how the packaging has a predetermined path ready for conveyance. Production Book acquires all the assembly and process patterns Intellectual Property Alms are needed to deliver the Soul
  • 16.
    WHO TEACHES MUSTSEE 13 Until I come, devote yourself to the public reading of Scripture, to exhortation, to teaching. 14 Do not neglect the gift you have, which was given you by prophecy when the council of elders laid their hands on you. 15 Practice these things, immerse yourself in them, so that all may see your progress. 16 Keep a close watch on yourself and on the teaching. Persist in this, for by so doing you will save both yourself and your hearers. (1 Tim 4.13-16) The Soul is like a mirror when fed on Christ+
  • 17.
    WHO LEADS MUSTKNOW Historic and Long- lived Properties of our National Heritage require diligence (Watch) God Preserves Us Misuse of electronic devices, misapplied science Abbey Road
  • 18.
    ANYONE FROM ANY BACKGROUND/RELIGION CANRECEIVE BENEFITS Jesus+ said: When chastisements for sins come upon the world and your own country will experience utter degradation, the only refuge will be trust in My mercy. I will protect the cities and homes in which The Divine Mercy Image is found; I will protect the persons who will venerate this Image. The only refuge will be trust in My Mercy. Alms are needed
  • 19.
    APPENDIX Applicable Contentfor Production +1 work In this paper we do not get all aspects of the dimensional object covered… we will attempt this next… but we do show how our past work and our work here are married together. Notice the Load Diagram before proceeding We have added another level of cryptography to this and for the finished product Glass builds on what came before… recursive. Glass engineers using redundancy both anticipating what is to come and decommissioning what is not necessary, disallowing what is not appropriate and making a safe transition to a new method. We want to scrutinize for duplicates
  • 20.
    USING EULER ASA RULER BRIJ CONSULTING, LLC, JEAN MARSHALL 4/9/2021 20 • P is proper to the distribution of the plot shown as R^2 • 2 is both the intercept and the mode in the binary set • The clock underlies the traverse of time and distance • The appropriate scale of 9.85+.027 also has at its beta the Chi value of 1.28 • Number Theory demonstrates that the time to traverse the hypotenuse is the square root of 2 in a right triangle, this is the zero-sum rate. It has no layer of Gain in it. • Added Notes…A position is not prospered without gains and not capital without value added. The up tic of ‘e’ is the curve of 201 x 3 or the transform of 402. When it takes on the form it becomes Value Added. y = 2.89ln(x) - 0.2419 R² = 0.6931 y = 0.9877ln(x) + 1.2803 R² = 0.0694 -1 0 1 2 3 4 5 6 E C FRACTION E FACTOR fact double Log. (fact) Log. (double) *603 +/- 2 T&M ‘e’
  • 21.
    OUR PAPERS 1. TheDigital Plait Position 2. Mu Sic in the Advancing Age 3. Engineering Objects 4. Instancing at the Gate 5. Interpolative Scope 6. Functional Glass 7. The Glass Wall 8. The Glass Wave 9. Scrum Costing w/notes (Book It Daniel) 10. Gate Plait Green (Mark It Mark) 11. Scorecard Integration (Map It Ralph) (Comprehensive of Plait Glass Theory, the V3 or V4 papers have complete content) Mu Sic defined^^ ^^Mu Sic defined to be updated Appliances Conveyed https://www.slideshare.net/Marshallja/ presentations