Arriving at Stream and Digital Write Capability there are two justification processes, one for material and the other for the finished product, both are written to the glass bin as a complex record and as attributes of an object. In V2 we are loading the instances and configuring for encryption. We learn many valued lessons about glass composition. In V3 we will make a product and see how packaging and conveyance are worked into the glass product. The glass material takes on the nature of the attributes which are assigned to it. Here, Value engineering helps to determine how much basis to add to the product cost. Also, how to utilize the Stream Approach to Prosper Instance Planning to Derive a Product in a Digital Portal Pipe with a competent engineering methodology. We are using an emulation of six layer glass to do this.
2. Dialogue Write
Stream
Mu Sic
4/2/2021 BRIJ CONSULTING, JEAN MARSHALL 2
Arriving at Stream and Digital Write
Capability there are two justification
processes, one for material and the other
for the finished product, both are written
to the glass bin as a complex record as
attributes of an object
Event
3. IMPLEMENT THE LENS TO
ENGAGE THE PROCESS
a
• Define a Product Pipe
• Arrange Longer Term Events
b
• Consider Probable Outcomes
• Define a Bayesian Structure
c
• Test to Benchmark
• Define the Scope
KANBAN LIST
Setting multiple targets for a
position, set up separate instances
to determine the best means to:
a. Eliminate an obstacle
b. Convey a package
c. Configure a Mobile Task
d. Increase the number of
Streams available with
inter-branching
e. Build a pipe
f. Create a glass storage bin
g. Move between instances to
create a series of events
During March
of 2021 we
performed
this work
4. PLOTTING THE EVENTS
4/11/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 4
Hamilton and
Jefferson are
Integral
Convey and
produce Sales
Conversion in
Hamilton
Interpolate
Demand in
Jefferson.
S1 S2
Streams in
Pipe
Notations
in Bin
To Produce Products, Sell
and find new Product
Streams, Assign Parts
Divergent Streams
and Value Events
3
5. NATURE OF EVENTS SELECTED
In selecting a glass material or product for conveyance it must be determined the nature of the events that need to
take place from each stream via the specified Pipe menu:
Hamilton: Sales Event
1. Select Customers/Vendors as agreed Subscribers
2. Select Specifications for the Product, requiring finishing costs
3. Fold and Compress or use Product Packaging
4. Convey the Object in Packet to Materials Team
5. The specific Demand Product will require an additional series of Engineering Specifications arranged by the
Materials Team
6. Follow up Events Widow
Jefferson: Demand Event
1. Select the Prototype Team for a Meeting Event
2. Select the Rough Specifications for the Product in order to elicit quotations
3. Package and Convey as an unfinished Material for Mark
-up
4. The event will either culminate in a Sale or a Dialogue with Materials Managers
5. Follow up Events Widow
4/11/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 5
This is a Material Pipe
Requests go to Prototyping
Warehouse
6. PLOTTING BETWEEN INSTANCES
4/11/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 6
How do we keep
the project cost in
line with its value?
Working between
the Material and
Product Finish we
are Plotting these
events and coming
to a good
Bayesian outcome
NATURE OF
EVENTS APPLIES
b
Justification
See
slide 9
7. PRODUCT PIPE
The Product Pipe takes events from
the Two Instances and is the
recipient of dialogue and events
that develop Products in associated
Streams between the Baseline and
the Benchmark where event
completions are recorded. See
Next…
8. NATURE OF EVENTS SELECTED
In selecting a glass material or product for conveyance it must be determined the nature
of the events that need to take place from each stream via the specified Pipe menu:
Product Assembly Event
1. Select Project Team, They will rough out Production
2. Select Specifications for the Product, Define Assembly
3. Fold and Compress or use Product Packaging
4. Convey the Object in Packet to Test
5. Send to Finishing
Product Finishing Event
1. Select the Finishing Team for a Meeting Event
2. Select the Rough Finishing for the Product in order
to elicit refinements, may require Engineering Fulfillment
3. Package and Convey as a Finished Product
4. The Final Test event will either culminate in a Sale or a Dialogue
5. Follow up Events Widow with Customer
4/11/2021 BRIJ CONSULTING, LLC, JEAN MARSHALL 8
This is a Product Pipe
Requests go to Productions
and Assemblers Group
a
9. PRODUCT JUSTIFICATIONS
Candle Product =
Max Load of 1.349
Tote Product = Min
Load of 1.064
1. 25 months, load 1.064, recover .0413
2. 33 months, load 1.086, recover .0316
3. 70 months, load 1.191, recover .0156
4. 120 months, load 1.349, recover .00966
Compound Interest Table is
traditional method of product
justification used metrically
Note >>
13.164
13.178
Options>>
b
13.178
13.164
26.343
10. SCOPE AND PLAN ACHIEVEMENT
c
When we branched and conveyed
the Load with added Cost/Benefit
we met the Benchmark Criteria
Scope is clock
related
Scorecard is
Plan Metrics
See next
Our note>>
11. V2 CONFIGURING FULL PRODUCT INSTANCES
Keys to load, convey, encrypt and dimension products
Reconciled
Because this production keeps streaming it is
important to define and convey the product
according to its correct load and dimensions
and to encrypt it in such a way that it comes
to its productive delivery.
Covenant Practices
Prosperity
comes from…
414
695
119
119
Value Engineering
requires the keeping
of records and
documented standards
12. PRODUCTION CYCLES-DIMENSION
y = -0.36982x + 28,365,218,964.44470
R² = 0.00478
y = 0.00000x + 0.33090
R² = 0.20975
-40,000,000,000
-20,000,000,000
0
20,000,000,000
40,000,000,000
60,000,000,000
80,000,000,000
-15,000,000,000 -10,000,000,000 -5,000,000,000 0 5,000,000,000 10,000,000,000 15,000,000,000
Gate Plait
Object Econo Rate Linear (Object) Linear (Object) Linear (Econo Rate)
5819
-2161
1314
Stochastic Data is
flat. We are missing
the dimensional
aspect of our
project.
Z-Form Requirement
How it
works
Missing .14157
Glass Form + Conversion
The Machine takes the Z-dimensions and sponsors the multiple z’s of the
curved line relationship of an object as defined by the drawing specs.
695
13. A LOAD FROM VECTOR
ASSEMBLY
We noticed that the Object Time is
higher than the Scorecard Task and
this is a question as to how the system
deals with this. We funded 17.75 and
we are incurring 17.85.
We also see that the Burden rate is
157.0 compared to 156.2.
Since this is related to Z Time, or time
to dimension the product, it is not
costed as it is part of the packaging
process. It adds nothing to the asset
value but is a cost of conveyance.
It’s important to note that the
machine does a better job shaping
the object by taking all the z-
vectors lying in its path and
measuring the exact time dimension
to build the product; the z-sum
242 x2=Critical Path
414
695
14. ENCRYPTION
We have two levels of encryption
on the Production and Conveyance
of the Finished Products using the
Process Vector and the Lens
Instrument that works within the
layers of the glass.
65 Gate End
We did not
show every
calculation;
many people
work on the
outcome
Product Load
15. V3 PACKAGING AND DELIVERY
How is packaging automated into the product and conveyance?
Product Specs and Conveyance
Within the making of the actual
product the packaging is already
being worked into it and so we will
need to look into the actual process
to determine how the packaging
has a predetermined path ready
for conveyance.
Production Book
acquires all the
assembly and
process patterns
Intellectual Property
Alms
S2
Prototype Design
Prototype
Designs are
stored in the
Warehouse in
Flat Store-able
Glass Media
Assemble,
Pack,
Compress for
Conveyance
16. SPECIFICATIONS
Pourable Bubble Rolled Formed Other List
Liner, Bottom, Straps
Kanban
Safety Regs
Critical Path
Outer
Dimensions
Zipper, Insert
S2
S2
Tooling
Thread, Stitch
Design
Cart
Assemble,
Pack,
Compress
Measure, Cut, Stitch
Cut, Measure,
Bond, Bind, etc.
BOM
17. THE PIPE, THE STREAM AND THE LOAD
The easiest Method to relate
the Load Delivery Assignment
to the way it passes through
the Gate is to recognize how
much value it can pick up in
the delivery. Our Tote Bag
was only supposed to be
Prototyped for Review and
not Produced. So, it passes
through the Gate once, in its
initial design, with prototype
material and it can be
simulated for review. When
accepted for Production it will
most likely be assigned a
1.086 to add the Form and
Operation Both.
-5,000,000
0
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
Assembler
Times
Instance1
Instance2
Instance3
1 foil
2 foil integral
3 center
4 group integral
5 group integral2
6 foil integral2
7 time map
8 time map2
9 q rate
10 q dim
11 object motion
12 time map3
13 synergy rate1
14 synergy rate2
1. Prototype Form Instruction
2. Form and Operations
3. Added Form
4. Level of Burden (Engineering)
5. Complete Demand and
Convey
In our next Paper we will
study the making of the
complex Candle and
Lantern Project
Tote Product =
Min Load of 1.064
Next
Time
64+1 Gate End
See
slide 8
18. DIGITAL TO ARK DESIGN
We have begun to look at Digital Portal operations that can
sponsor the making of objects in glass plait design. But
there are other methods of construction that are particularly
noteworthy in Ark Production, which is another Advanced
Method. Ark Production works with the whole, not the parts
and is more powerful in its means and methods. We are
pointing to the True Ark which is evolving the elements and
the object with its design and to its specifications through a
powerful Ark Configurator and compositional Matrix. We
show the Power of Creation in this manner, which the sum of
its parts are much greater than the whole, and beyond the
scope of what our small depictions can array. Our
compositional Ark theory is limited to Remote Building and
configurable design specifications in Plait Glass. The
powerful Ark that we have depicted is working with Crystal
itself in multiple fields of Light and of the spectrum only
God can construct (of the Morning Star.) Thus, God makes
things of their whole and original composition and all at
once in spectacular array.
19. WHO TEACHES MUST SEE
13 Until I come, devote yourself to the public reading of
Scripture, to exhortation, to teaching. 14 Do not neglect the gift
you have, which was given you by prophecy when the council of
elders laid their hands on you. 15 Practice these things,
immerse yourself in them, so that all may see your progress. 16
Keep a close watch on yourself and on the teaching. Persist in
this, for by so doing you will save both yourself and your
hearers. (1 Tim 4.13-16)
The Soul is like a mirror when fed on Christ+
20. WHO LEADS MUST KNOW
Historic and Long-
lived Properties
of our National
Heritage require
diligence (Watch)
God Preserves Us
Misuse of
electronic devices,
misapplied science
Abbey Road
21. ANYONE FROM ANY
BACKGROUND/RELIGION
CAN RECEIVE BENEFITS
Jesus+ said:
When chastisements for sins come
upon the world and your own
country will experience utter
degradation, the only refuge will be
trust in My mercy.
I will protect the cities and homes in
which The Divine Mercy Image is
found; I will protect the persons who
will venerate this Image. The only
refuge will be trust in My Mercy.
Alms are needed
National Shrine Candles - Our Lady of Fatima |
The National Shrine of The Divine Mercy (shrineofdivinemercy.org)
23. APPENDIX Applicable Content for
Production
+1 work
In this paper we do not get all aspects of the
dimensional object covered… we will attempt this
next… but we do show how our past work and our work
here are married together. Notice the Load Diagram
before proceeding is made for the Material Project
We have added another level of
cryptography to this and for the
finished product
Glass builds on what came before…
recursive. Glass engineers using
redundancy both anticipating what is to
come and decommissioning what is not
necessary, disallowing what is not
appropriate and making a safe
transition to a new method.
We want to scrutinize for duplicates against the Product Load
#612
Material Load
24. USING EULER AS A RULER
BRIJ CONSULTING, LLC, JEAN MARSHALL 4/11/2021 24
• P is proper to the distribution of the plot
shown as R^2
• 2 is both the intercept and the mode in the
binary set
• The clock underlies the traverse of time and
distance
• The appropriate scale of 9.85+.027 also has
at its beta the Chi value of 1.28
• Number Theory demonstrates that the time to
traverse the hypotenuse is the square root of
2 in a right triangle, this is the zero-sum rate.
It has no layer of Gain in it.
• Added Notes…A position is not prospered
without gains and not capital without value
added. The up tic of ‘e’ is the curve of 201 x
3 or the transform of 402. When it takes on
the form it becomes Value Added.
y = 2.89ln(x) - 0.2419
R² = 0.6931
y = 0.9877ln(x) + 1.2803
R² = 0.0694
-1
0
1
2
3
4
5
6
E C FRACTION E FACTOR
fact double Log. (fact) Log. (double)
*603 +/- 2 T&M ‘e’
25. OUR PAPERS
1. The Digital Plait Position
2. Mu Sic in the Advancing Age
3. Engineering Objects
4. Instancing at the Gate
5. Interpolative Scope
6. Functional Glass
7. The Glass Wall
8. The Glass Wave
9. Scrum Costing w/notes (Book It Daniel)
10. Gate Plait Green (Mark It Mark)
11. Scorecard Integration (Map It Ralph)
(Comprehensive of Plait Glass Theory, the V3 or V4 papers have complete content)
Mu Sic defined^^
^^Mu Sic defined to be updated
Appliances Conveyed
https://www.slideshare.net/Marshallja/
presentations