SlideShare a Scribd company logo
1 of 50
Download to read offline
Brij
Consulting,
LLC
Jean
Marshall
3/31/2024 1
SPO
SPO
Part I: hyD Mark to Market
Part II: Burden LIFT
SEE
NOW
C.H.G.
C. B..
What If?
metrics
Next
Paper
1
Summary of Comments on PowerPoint Presentation
Page: 1
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:46 PM
This paper describes the means to redevelop Scorecard to an on-demand product and as a scalable and portable application. Since we are applying a
mark to market position to our hyD Division and looking for the implications of burden lift to the project earnback requirement, we will likely do some
more KPI and SCRUM METRIC what if testing in our next paper, related to the effects of portal transactions.
Measurements
Management
Re-Configured
SCALABILITY
PORTABILITY
ON DEMAND
Brij
Consulting,
LLC
Jean
Marshall
3/31/2024 2
Scalable
Portable
On Demand
Supply
Chain
Production
Test Simulation
Supply
Chain
Production
Goal: VRD USE CASE SCENARIOS that are PORTAL COMPLIANT
SPO
Reconfiguring
VRD= Variable Rate Demand
1
Page: 2
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:46 PM
The SPO condition is the topographical beginning of reconfiguring KPI and scrum metrics for portal compositional requirements.
Disassemble Design
Brij Consulting, LLC Jean Marshall 3/31/2024 3
The Reconfiguration walk shows a 1:1 relationship
between Purchase Price Valuation and Grid data
(Augmented.) All Glass Data lacks Labor Value-Added.
Two Proofs: 1. Purchase Price Data not inflated
beyond Scorecard and 2. Investment Data within the
All Glass has no labor component, not compiled
USEFUL ALGORITHM
From Scorecard Gearbox
See Slide 4 Economics
We are comparing the Original hyD
Scorecard with the Purchase Price
Valuation here described as
augmented data
1:1
V-A
Limited Earn back
Reconfiguring
1
Page: 3
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:46 PM
Shown branch x 2 and p relationship to plan, the algorithm is compared to the Purchase Price Valuation of hyD shown in our last paper.
Physics and
Econometrics of
Glass Systems
Brij
Consulting,
LLC
Jean
Marshall
3/31/2024 4
See Slide 3 Re-configured Grid is PV Planned Value 30824
30813
11.0 Gate related difference of thruput and clock
Quantum does
not exceed
pushcart theory
Glass is an Ark
based Design
Time and Motion use of Glass forms and mix does not
exceed spintronics speed. But cloud confluency of
the Morning Star far exceeds speed of light
constructed on the universal spectrum
Binary Push or Quantum Pull
LIFT & STREAM
Reconfiguring SPO
LIFT & STREAM
PORTAGE
Burden
1
Page: 4
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:47 PM
Physics and ark relational science discussed; sets apart the first lift and leveraged notations but not the characteristic dimensional building commutations
shown in the ark mode of plait glass. Work is the primary association of Time and Motion physics and econometrics. Ark Science in the context of glass
has LIFT and a glide motivation from green energy and the blue wave. The confluent design will be quite different again.
Brij
Consulting,
LLC
Jean
Marshall
3/31/2024 5
Reconfiguring Scorecard requires:
• Rethinking metric relationships as
regards portal applications
• Rethreading the relationships so that
Scrum and KPI’s work under the SPO
conditions
• Reapplying the On-Demand Concept
3.16
87.7 /8 = 109~
AGG
SPO
See Slide 6 Reconfiguring
Appendix I
1
Page: 5
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:47 PM
P is very important to the Simulations Process and must be metrically aligned. But portals need to be aligned with the Scorecard to find metrics
comparable to the outcomes derived.
Metric Relationship to Portals
Brij
Consulting,
LLC
Jean
Marshall
3/31/2024 6
1,505,552,929-
1,500,105,508
= 5,447,420
V-A, slide 3
Θ+1
= B
SOLVED
The Relationship between the
Scorecard, the Portal and the
Plan is a Star Composition of the
Market position and its
complementary containers.
Demonstrating Ark Sciences
The Funding
Relationship for
hyD’s Equipment
comes from the
Investment Branch
Split Condition to be solved by glass table
Slide 5
Rethinking
Reconfiguring
+6.7
1
Page: 6
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:48 PM
The equipment necessary to build with glass in the case of the hyD division is large frame and will cost an investment by a partner arrangement. A star
pattern is founded in the portal arrangement and the work supplies its integral and functional metric arrangement.
Apply Best Practices
7
3/31/2024
• The Goal in Glass is to apply direct achievement
measures to the process and then correlate the
outcome to improve the process results
• In the Binary System the use of surveys and other
secondary or affiliated resource practices only
indicate the potential to turn the performance to
a more positive ratio, and don’t act as a direct
driver.
• The use of Simulations is the recommended
means to turn conceptual practices into real
performance through a best practice multi-
agency pursuit of the glass engagement. And
also, through an Ark Media approach toward
industry achievement and consensus building.
Brij Consulting, LLC Jean Marshall
Simulations
Drivers
Supply Chain
Metrics
Production
Metrics
Simulations
Drivers
Rethinking
SPO
Reconfiguring
This page contains no comments
Touchpoints
Touchpoints add to the relationship
management until actual quality
threads are at work
Brij
Consulting,
LLC
Jean
Marshall
3/31/2024
8
Rethinking
Use of Low-Level Stars will not impact human performance
Reconfiguring
Quality threads develop
the drivers and plan impact
scenarios
Reconfiguring
1
Page: 8
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:48 PM
Touchpoints are often used in the indirect and often retro-active assembly of vying resources, which do not yet share that common thread of the Ark
Based refinement of enterprise performance.
Review of Ark vs. Binary Metrics
• The Ark Method of Systems
builds dimensionally and is
focused on the asset upgrade
of delivering more complex
products. This is called an
advancing Plan.
• The full scope of the project is
delivered at once with
certified engineering or LIFT-T
• Replication is used as a
packaged method of volume
delivery
3/31/2024 Brij Consulting, LLC Jean Marshall 9
Compiled Value
of Plan is
75,833 Billion
NOT
VRD
FLAT
BASIS
TRIG
EN-
ABLED
Varying
scenarios of the
same binary
relevant range
When looking at costs and
how costs behave, relevant
range is the range of output
or production in which our
assumptions are true
DOCTRINES ARE ASSOCIATIVE
COMPOSITIONAL
Componentization
+/- Risk
Increase
Risk
Spec: .48 * 2 = .96 - .01 = .95 +1 = 1.95
Rethreading
Number Theory
Reconfiguring
Θ+1
Θ+1
Θ
Θ+2
Θ+3
Spec: 5.00045773 x 2 = 10.00091546 Θ+3
Analog to Digital
Δ
Δ
Spec: 74953.05 – 74833 = -879.95
1
Page: 9
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:49 PM
By Assimilation of more properties the full gate scenario becomes available. All Properties can be assimilated once the infrastructure is raised to the full
requirement of the Plan.
Big Frame
• In the Big Frame, large scale association of the
Plan the Ark Transition of the Model within its
architecture enables Hi Yield mechanics.
• The Load Transition is motivated by Scrum and
Map to reach demand levels of the Market of
Investors. The full Theta+3 Transition is
available in the Big Frame
3/31/2024 Brij Consulting, LLC Jean Marshall 10
Analog to Digital
See Slide 11
Gap Comparison to Yield gains Digital Field
Mark to market (MTM) is an accounting method that involves
adjusting the value of an asset to reflect its current market value.
Essentially, it provides a realistic appraisal of an institution or
company bias financial situation based on present market conditions.
Mark to market (MTM)
Digital Field x 2 = 98 metric model signature
155.732
X2 =Θ+3
Reconfiguring
1
Page: 10
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:49 PM
The Mark to Market Treatment of the Gain Requirement for hyD earnback on this project must come from the Investment of the Big Automakers rather
than their sponsor, Magi and Marcus. This accumulating investment can help to sponsor a startup hosting environment for the requirements of the Big
Frame Requirement needed to prosper the future of Glass conveyances.
ARK Transitions
Brij
Consulting,
LLC
Jean
Marshall
3/31/2024
11
Covalent
Correlation Compositional Commutative Associative MU Assimilated Transmutative Transfigure
Reconfiguring
THREAD DIMENSION ASSEMBLY SYNERGY THETA LIFT-T&MM STAR & GATE CLOUD & STREAM
Rethreading
Spec: 5.00045773 x 2 = 10.00091546
Reapplying
hyD: The difference of
206,285,650 also
appears as part of the
hosting arrangement
and is required as
earnback, available in
large frame format.
x’s
X2 =Θ+3
Ev
1
Page: 11
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:50 PM
Comparing the original hyD division to the branch related Magi and Marcus arrangement it is notable that with the Big Frame Transition the market
transition enables the earnback. Here we can see that the Big Frame produces the Theta requirement and covers that portion of the hyD equipment
necessary to compete as a solid-state engineering developer of the future of the glass plan.
LOB: hyD Mark to Market
• Based on the credit approval of Magi and Marcus, hyD has secured a Mark to
Market arrangement with the Investors in Big Car Makers (Green Motors Group
and GETi Trade.)
• They may host Car Model Development in order to get a good position for a hyD
model in the future.
• At that time, they will review the hyD business model and make a bid.
3/31/2024
Brij Consulting, LLC Jean Marshall 12
Tentative Date: March 7, 2027
Will hyD have their own solid
state glass car by 2038? Slide 13
Suggested Date:
Line of Business:
Valuation of the hyD Division
Start-up Companies for Glass Process
11
See App II
Reapplying
1
Page: 12
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:50 PM
The impact of the involvement of trade and simulations in componentization and modeling will have supra benefits for the hyD organization. We
borrowed the word supra from Japan, The name "supra" is derived from the Latin prefix, meaning "above", "to surpass" or "go beyond".
Part II
When does the burden rate
become profitable?
• We will use our Square Pi
Method to figure this out
3/31/2024 Brij Consulting, LLC Jean Marshall 13
Part II: hyD Burden Lift
V-A = Proof
E
hyD hosting storyboard will be worth a considerable sum
Likely hyD car model
1
3
2
Simulations will drive the value up
For timing see
graph next
Reapplying
1
Page: 13
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:50 PM
We want to see the timing of the model progression and the burden rate lift for the hyD division. We find the graph on the next slide helpful again.
Associative
• Reapplying the metrics
We see that hyD will reach the peaks of progression in this
plan with investment from the Auto Group.
We conclude that the plan is achievable, with benefits
supplied.
3/31/2024 Brij Consulting, LLC Jean Marshall 14
Reapplying
802
400 Appendix I
TIMING
1
Page: 14
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:51 PM
We wanted to verify metrically that there were no other projects leading the latter part of hyD’s path in the plan that might distort the outcome or goal of
it. The 50-year plan has many other projects cycling through it. The realignment of the algorithm was very helpful. And we conclude that the plan is
achievable with co-operative benefits from the Auto Group Investors.
Segment and Frame
• The various parts of the Plan have segments and
frames relevant to the size or scale of the
requirement
• Although it is tempting to write in advance of the
Plan, we must wait for the infrastructure
changes to catch up to the build scenario.
• We had seen this in the early days of Oracle and
other Binary requirements
• Can you build where it is not flat? Can you set a
portal in the sky? A dimensional portal that
builds^, an ark wall^ and even a streamline
warehouse^ has a grounded star design^ within
the model we are learning. But God builds where
no man can build (2Esdras 10:54)
3/31/2024 Brij Consulting, LLC Jean Marshall 15
Reapplying
God may accomplish in ONE MOMENT 50 years of our work,
yet prefers that we learn to set up instances ourselves
We had seen
Hurricane Irma
stopped by praying
to Mary Star of the
Sea, even if the Ark
Science
application is
iconic (Slide 15)
Dialogue in Prayer
Table Model Date
^necessary infrastructure for the glass design
1
Page: 15
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:51 PM
We do believe that glass is helping to delay and terminate storms and that prayer dialogue is a key to interaction with God. The authentic Morning Star
has shown us that portals can be mobile and useful to redirect and dissipate trouble. It is necessary for us to build flat, and the table requirement becomes
very important to the whole process. We are reminded that God has this Ark power and many, many years of experience.
Basilica of the
Annunciation
• Place of the Incarnation of Christ+ and the
appearance of the Archangel
• The Sea of Glass is depicted in a painting
• Original place of the Holy House of Nazareth moved
to Loretto, Italy by angels it is told
• A star design is formed in the ceiling pattern
Brij Consulting, LLC Jean Marshall
16 3/31/2024
March 25th Feast day
Likely Portal
Sea of Glass Painting Catholic Mass is Celebrated
IDOL
1
Page: 16
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:52 PM
We notice that trouble in the Holy Land does not stop the Holy Rite and we celebrate the painting of the Sea of Glass as indicative of the reason why. It is
the Infant Jesus+ that knocked down the idols of Egypt.
Hurricane Irma
Hurricane Irma was the costliest tropical cyclone in the history of the U.S. state of Florida, before being surpassed
by Hurricane Ian in 2022. Irma developed from a tropical wave near the Cape Verde Islands on August 30, 2017. The
storm quickly became a hurricane on August 31 and then a major hurricane shortly thereafter,[nb 1] but would oscillate in
intensity over the next few days. By September 4, Irma resumed strengthening, and became a powerful Category 5
hurricane on the following day. The cyclone then struck Saint Maarten and the British Virgin Islands on September 6 and
later crossed Little Inagua in the Bahamas on September 8. Irma briefly weakened to a Category 4 hurricane, but re-
intensified into a Category 5 hurricane before making landfall in the Sabana-Camagüey Archipelago of Cuba. After falling
to Category 3 status due to land interaction, the storm re-strengthened into a Category 4 hurricane in the Straits of
Florida. Irma struck Florida twice on September 10 – the first as a Category 4 at Cudjoe Key and the second on Marco
Island as a Category 3. The hurricane weakened significantly over Florida, and was reduced to a tropical storm, before
exiting the state into Georgia on September 11.
3/31/2024 Brij Consulting, LLC Jean Marshall 17
WE prayed to
Mary under her
various titles but
especially
during this
storm because
of relatives living
there… JEAN
nearby Ft. Myers, FL
dramatically ended on Marco Island
Basilica, Wash. DC
*Divine Counsel
Therefore, O Mother, [do] hear our prayer.
Star of the Sea, do not let us be shipwrecked in the tempest of war.
Ark of the New Covenant, inspire projects and paths of reconciliation.
Queen of Heaven, restore God’s peace to the world.
Eliminate hatred and the thirst for revenge and teach us forgiveness.
Free us from war, protect our world from the menace of nuclear weapons.
Queen of the Rosary, make us realize our need to pray and to love.
Queen of the Human Family, show people the path of fraternity.
Queen of Peace, obtain peace for our world. Part of the Vatican Prayer
to the Immaculate Heart
I bless this courageous act of "my" Pope who has wished to
entrust the world and all nations to my Immaculate Heart; I
welcome it with love and gratitude; because of it, I promise
to intervene to greatly shorten the hours of the purification
and to render the trial less severe. Mary’s Book, March 25,1984
Rosa Mystica
*Divine Counsel: Consecration to the
Immaculate Heart of Mary is recommended to
the Bishops of the Church for individuals, cities,
countries and especially parish communities.
Also applied to religious or secular organizations.
Marian Dogma up close and applied
1
Page: 17
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:52 PM
We put more details to our experience with Mary Star of the Sea and note that Mary promised to lessen the severity of trials as the tribulation rounds the
bend.
From our last paper we began to mark the
crossover position to the Energy Star and ONE
System of Plait Glass in Ark Design. We were led
into Manifold Development in the starting post
of project assimilation for road handling. Car
Rollout is a Case. Drift Stabilization is a
Compliance Practice, Bernoulli recommended.
Ψ
Ψ
Wheel 1 Wheel 2
F
I
R
S
T
C
A
S
E
GEL is an anacronym that represents GREEN ENERGY LIFT.
First Position
3/31/2024 Brij Consulting, LLC Jean A. Marshall
18
V1 Stakeholder Approach
(2) Car and road syncopation
(1) Manifold prototyping
(1) T3-M4 7/2/2027
(2) T4-M4 10/12/2029
Prototype Manifold
Car/Road Syncopation Perimeter dif.
Appendix I From “Simulation Watch”
1
Page: 18
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:53 PM
The development of the manifold in association both with green energy and the car speed and traction is now a contingency marker on the field of the
project and an associated marker to watch for. The wing stabilization of the car is part of its wave gliding action. This treatment of the secant engineering
road handling requirement is part of its system-based compliance. GEL is an anacronym that represents GREEN ENERGY LIFT.
Brij Consulting, LLC Jean Marshall
3/31/2024 19
Organization Start-ups
assign accountability (and
are Simulation Partners)
Product Media Startups
Glass Product Startups
From“Calendar Cartography”
1
2
3
4
5
6
7
8
9
10
1
2
3 4
5
6
7
8
9
10
7
Pushback on dates available
through agile assimilations
Appendix II
10
Starting Series
11
1
Page: 19
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:54 PM
Organizational Start-ups are assembled around dates in our product mapping to highlight the need for these Partner groups to start early on the Glass
Path. In order to assign accountability organizations are attributed to the start-up path tasking. Project Startups have immediate buy-in to assemble
around the significance of the model. Green-Energy Trading supplies capital. But the earn-back on projects helps to pay investors back for the
unprovided portion.
Scrum Production
A Second Draft of our Scrum Statement
We need to be able to support the addition of
Intellectual Property in order to use this
statement as an increase in the production
associated with the hyD Business Segment/
Partnering arrangement.
This would require LIFT certification of specific
process associated engineering. “We” sent a
request to Magi and Marcus to increase their
property budget to:
3/31/2024 Brij Consulting, LLC Jean Marshall 20
1,505,552,929
The difference of 206,285,650 also appears as part of
the hosting arrangement is not as likely as earnback
in the process on their own scale, but as Magi and
Marcus parent company. However, M&M as Builders
will not pursue large scale auto manufacturing.
PROFORMA
MDIA
Magi & Marcus are likely to
sell hyD to the Automakers
1
Page: 20
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:54 PM
In preparing the Proforma Scrum Production we began to see that the Increase in IP may not be enough to generate earn back on the whole investment
required to bring hyD up to scale as an automaker. Although the memo was sent to increase the equipment budget for hyD we were also not
comfortable with the request. This is an emulation and so we are developing this on the basis of past experiences. Here in this paper we found the means
to accomplish this.
Quiz
What is the first glass car agile date?
Who will finance hyD’s Glass Car Model?
Why should the field plan be level when
making a valuation?
What associative definition enables solid
state engineering?
When is the Glass Table available for
modeling?
3/31/2024 Brij Consulting, LLC Jean Marshall 21
2031 Agile Date
is the “O”model
Big Automakers Commutative
Mathematical
properties in
vector space
Synergy
Modeling enabled
in 2035
A
B
C
D
E
C
E
D
B
The Ark systems
will work with
curves making it
more accurate
1
Page: 21
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:54 PM
Our quiz helps to bring the concepts into focus that accelerate the learning of the glass method.
SIMULATION
S PARTS I
AND II
Scorecard
Arrangements:
1. Field Leveling
2. Drivers and
Gears
3. KPI’s and
Scrum Tasks
4. SPO: Scalable,
Portable and
On-Demand
In our next paper we will look at:
what If? metrics change from portal
demand transactions.
Next
Paper
1
Page: 22
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:56 PM
Contents generally deliver a powerful and unique knowledge of the overall portal plan and capability to manage complex glass operations
Brij Consulting, LLC Jean Marshall
3/31/2024 23
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green Wall and
the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance mined and
delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
7. Simulations: Synergy Modifications: Mitigation in Risk Analysis
8. Simulations: Marking the Contingent Outcome: Marking Pivots and Lifts
9. Simulations: Making a Watch Case Window: Fielding the Position
10. Simulations: Branching with Partners: Partner Branching for Remote Position
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
SIMULATIONS
Papers in Design Series
Part I, II, III
Part I, II
1
Page: 23
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:57 PM
Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to
highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations
reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come. We
continued our Simulations Project with mitigation of Risk in the crossover period through the use of Gap Data.
Brij Consulting, LLC Jean Marshall
3/31/2024 24
Papers in Test Series
1. The Car and Road Test: Simulating Glass Cars and Candle stone Roads
Brij Consulting, LLC | SlideShare
V3 Glass Package
V2 Synergy Modifications
V1 Digital Testing
Strabo
Tying projects back to the Strabo Omega
allows for Simulations Cloud to
orchestrate outcomes
Part I,
From Slide 13
2. Home and Foundation Test: Simulating Glass Instances of Candle
stone and Thread in Componentizations utilizing a legacy form of
Glass
3. Glass Big Push: Legacy Glass gives way to Solid State Engineering,
Instancing and Building with remote synchronization Parts I, and II/III
Of Pillars and Pipes, Portals and Plaits
Part I:
Part II Simulations Marking
1
Page: 24
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:58 PM
We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of
car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for
the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid-
state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the
types of events or changes that impact the Simulation of the Project Performance.
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
3/31/2024
Brij Consulting, LLC Jean Marshall
25
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
1
Page: 25
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:45:01 PM
The Learning Series

More Related Content

Similar to Comments Scorecard Reconfigured -SPO.pdf

Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfBrij Consulting, LLC
 
The Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleThe Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleBrij Consulting, LLC
 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfBrij Consulting, LLC
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceBrij Consulting, LLC
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfBrij Consulting, LLC
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdfJeanMarshall8
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfJeanMarshall8
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfJeanMarshall8
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
The Glass Wave V3 The Green Works of Thruput
The Glass Wave V3 The Green Works of ThruputThe Glass Wave V3 The Green Works of Thruput
The Glass Wave V3 The Green Works of ThruputBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfBrij Consulting, LLC
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversBrij Consulting, LLC
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfJeanMarshall8
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBrij Consulting, LLC
 
Scope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfScope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfBrij Consulting, LLC
 

Similar to Comments Scorecard Reconfigured -SPO.pdf (20)

Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdf
 
The Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleThe Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production Scale
 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdf
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the Instance
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of Function
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdf
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdf
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdf
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
The Glass Wave V3 The Green Works of Thruput
The Glass Wave V3 The Green Works of ThruputThe Glass Wave V3 The Green Works of Thruput
The Glass Wave V3 The Green Works of Thruput
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and Drivers
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
Building with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdfBuilding with Glass V1 Formalizing the Forward.pdf
Building with Glass V1 Formalizing the Forward.pdf
 
Scope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdfScope of Glass Projects All Parts Combined.pdf
Scope of Glass Projects All Parts Combined.pdf
 

More from Brij Consulting, LLC

Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfBrij Consulting, LLC
 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfBrij Consulting, LLC
 

More from Brij Consulting, LLC (15)

Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdf
 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdf
 
Glass Big Push Part I.pdf
Glass Big Push  Part I.pdfGlass Big Push  Part I.pdf
Glass Big Push Part I.pdf
 

Recently uploaded

Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCRsoniya singh
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 

Comments Scorecard Reconfigured -SPO.pdf

  • 1. Brij Consulting, LLC Jean Marshall 3/31/2024 1 SPO SPO Part I: hyD Mark to Market Part II: Burden LIFT SEE NOW C.H.G. C. B.. What If? metrics Next Paper 1
  • 2. Summary of Comments on PowerPoint Presentation Page: 1 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:46 PM This paper describes the means to redevelop Scorecard to an on-demand product and as a scalable and portable application. Since we are applying a mark to market position to our hyD Division and looking for the implications of burden lift to the project earnback requirement, we will likely do some more KPI and SCRUM METRIC what if testing in our next paper, related to the effects of portal transactions.
  • 3. Measurements Management Re-Configured SCALABILITY PORTABILITY ON DEMAND Brij Consulting, LLC Jean Marshall 3/31/2024 2 Scalable Portable On Demand Supply Chain Production Test Simulation Supply Chain Production Goal: VRD USE CASE SCENARIOS that are PORTAL COMPLIANT SPO Reconfiguring VRD= Variable Rate Demand 1
  • 4. Page: 2 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:46 PM The SPO condition is the topographical beginning of reconfiguring KPI and scrum metrics for portal compositional requirements.
  • 5. Disassemble Design Brij Consulting, LLC Jean Marshall 3/31/2024 3 The Reconfiguration walk shows a 1:1 relationship between Purchase Price Valuation and Grid data (Augmented.) All Glass Data lacks Labor Value-Added. Two Proofs: 1. Purchase Price Data not inflated beyond Scorecard and 2. Investment Data within the All Glass has no labor component, not compiled USEFUL ALGORITHM From Scorecard Gearbox See Slide 4 Economics We are comparing the Original hyD Scorecard with the Purchase Price Valuation here described as augmented data 1:1 V-A Limited Earn back Reconfiguring 1
  • 6. Page: 3 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:46 PM Shown branch x 2 and p relationship to plan, the algorithm is compared to the Purchase Price Valuation of hyD shown in our last paper.
  • 7. Physics and Econometrics of Glass Systems Brij Consulting, LLC Jean Marshall 3/31/2024 4 See Slide 3 Re-configured Grid is PV Planned Value 30824 30813 11.0 Gate related difference of thruput and clock Quantum does not exceed pushcart theory Glass is an Ark based Design Time and Motion use of Glass forms and mix does not exceed spintronics speed. But cloud confluency of the Morning Star far exceeds speed of light constructed on the universal spectrum Binary Push or Quantum Pull LIFT & STREAM Reconfiguring SPO LIFT & STREAM PORTAGE Burden 1
  • 8. Page: 4 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:47 PM Physics and ark relational science discussed; sets apart the first lift and leveraged notations but not the characteristic dimensional building commutations shown in the ark mode of plait glass. Work is the primary association of Time and Motion physics and econometrics. Ark Science in the context of glass has LIFT and a glide motivation from green energy and the blue wave. The confluent design will be quite different again.
  • 9. Brij Consulting, LLC Jean Marshall 3/31/2024 5 Reconfiguring Scorecard requires: • Rethinking metric relationships as regards portal applications • Rethreading the relationships so that Scrum and KPI’s work under the SPO conditions • Reapplying the On-Demand Concept 3.16 87.7 /8 = 109~ AGG SPO See Slide 6 Reconfiguring Appendix I 1
  • 10. Page: 5 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:47 PM P is very important to the Simulations Process and must be metrically aligned. But portals need to be aligned with the Scorecard to find metrics comparable to the outcomes derived.
  • 11. Metric Relationship to Portals Brij Consulting, LLC Jean Marshall 3/31/2024 6 1,505,552,929- 1,500,105,508 = 5,447,420 V-A, slide 3 Θ+1 = B SOLVED The Relationship between the Scorecard, the Portal and the Plan is a Star Composition of the Market position and its complementary containers. Demonstrating Ark Sciences The Funding Relationship for hyD’s Equipment comes from the Investment Branch Split Condition to be solved by glass table Slide 5 Rethinking Reconfiguring +6.7 1
  • 12. Page: 6 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:48 PM The equipment necessary to build with glass in the case of the hyD division is large frame and will cost an investment by a partner arrangement. A star pattern is founded in the portal arrangement and the work supplies its integral and functional metric arrangement.
  • 13. Apply Best Practices 7 3/31/2024 • The Goal in Glass is to apply direct achievement measures to the process and then correlate the outcome to improve the process results • In the Binary System the use of surveys and other secondary or affiliated resource practices only indicate the potential to turn the performance to a more positive ratio, and don’t act as a direct driver. • The use of Simulations is the recommended means to turn conceptual practices into real performance through a best practice multi- agency pursuit of the glass engagement. And also, through an Ark Media approach toward industry achievement and consensus building. Brij Consulting, LLC Jean Marshall Simulations Drivers Supply Chain Metrics Production Metrics Simulations Drivers Rethinking SPO Reconfiguring
  • 14. This page contains no comments
  • 15. Touchpoints Touchpoints add to the relationship management until actual quality threads are at work Brij Consulting, LLC Jean Marshall 3/31/2024 8 Rethinking Use of Low-Level Stars will not impact human performance Reconfiguring Quality threads develop the drivers and plan impact scenarios Reconfiguring 1
  • 16. Page: 8 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:48 PM Touchpoints are often used in the indirect and often retro-active assembly of vying resources, which do not yet share that common thread of the Ark Based refinement of enterprise performance.
  • 17. Review of Ark vs. Binary Metrics • The Ark Method of Systems builds dimensionally and is focused on the asset upgrade of delivering more complex products. This is called an advancing Plan. • The full scope of the project is delivered at once with certified engineering or LIFT-T • Replication is used as a packaged method of volume delivery 3/31/2024 Brij Consulting, LLC Jean Marshall 9 Compiled Value of Plan is 75,833 Billion NOT VRD FLAT BASIS TRIG EN- ABLED Varying scenarios of the same binary relevant range When looking at costs and how costs behave, relevant range is the range of output or production in which our assumptions are true DOCTRINES ARE ASSOCIATIVE COMPOSITIONAL Componentization +/- Risk Increase Risk Spec: .48 * 2 = .96 - .01 = .95 +1 = 1.95 Rethreading Number Theory Reconfiguring Θ+1 Θ+1 Θ Θ+2 Θ+3 Spec: 5.00045773 x 2 = 10.00091546 Θ+3 Analog to Digital Δ Δ Spec: 74953.05 – 74833 = -879.95 1
  • 18. Page: 9 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:49 PM By Assimilation of more properties the full gate scenario becomes available. All Properties can be assimilated once the infrastructure is raised to the full requirement of the Plan.
  • 19. Big Frame • In the Big Frame, large scale association of the Plan the Ark Transition of the Model within its architecture enables Hi Yield mechanics. • The Load Transition is motivated by Scrum and Map to reach demand levels of the Market of Investors. The full Theta+3 Transition is available in the Big Frame 3/31/2024 Brij Consulting, LLC Jean Marshall 10 Analog to Digital See Slide 11 Gap Comparison to Yield gains Digital Field Mark to market (MTM) is an accounting method that involves adjusting the value of an asset to reflect its current market value. Essentially, it provides a realistic appraisal of an institution or company bias financial situation based on present market conditions. Mark to market (MTM) Digital Field x 2 = 98 metric model signature 155.732 X2 =Θ+3 Reconfiguring 1
  • 20. Page: 10 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:49 PM The Mark to Market Treatment of the Gain Requirement for hyD earnback on this project must come from the Investment of the Big Automakers rather than their sponsor, Magi and Marcus. This accumulating investment can help to sponsor a startup hosting environment for the requirements of the Big Frame Requirement needed to prosper the future of Glass conveyances.
  • 21. ARK Transitions Brij Consulting, LLC Jean Marshall 3/31/2024 11 Covalent Correlation Compositional Commutative Associative MU Assimilated Transmutative Transfigure Reconfiguring THREAD DIMENSION ASSEMBLY SYNERGY THETA LIFT-T&MM STAR & GATE CLOUD & STREAM Rethreading Spec: 5.00045773 x 2 = 10.00091546 Reapplying hyD: The difference of 206,285,650 also appears as part of the hosting arrangement and is required as earnback, available in large frame format. x’s X2 =Θ+3 Ev 1
  • 22. Page: 11 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:50 PM Comparing the original hyD division to the branch related Magi and Marcus arrangement it is notable that with the Big Frame Transition the market transition enables the earnback. Here we can see that the Big Frame produces the Theta requirement and covers that portion of the hyD equipment necessary to compete as a solid-state engineering developer of the future of the glass plan.
  • 23. LOB: hyD Mark to Market • Based on the credit approval of Magi and Marcus, hyD has secured a Mark to Market arrangement with the Investors in Big Car Makers (Green Motors Group and GETi Trade.) • They may host Car Model Development in order to get a good position for a hyD model in the future. • At that time, they will review the hyD business model and make a bid. 3/31/2024 Brij Consulting, LLC Jean Marshall 12 Tentative Date: March 7, 2027 Will hyD have their own solid state glass car by 2038? Slide 13 Suggested Date: Line of Business: Valuation of the hyD Division Start-up Companies for Glass Process 11 See App II Reapplying 1
  • 24. Page: 12 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:50 PM The impact of the involvement of trade and simulations in componentization and modeling will have supra benefits for the hyD organization. We borrowed the word supra from Japan, The name "supra" is derived from the Latin prefix, meaning "above", "to surpass" or "go beyond".
  • 25. Part II When does the burden rate become profitable? • We will use our Square Pi Method to figure this out 3/31/2024 Brij Consulting, LLC Jean Marshall 13 Part II: hyD Burden Lift V-A = Proof E hyD hosting storyboard will be worth a considerable sum Likely hyD car model 1 3 2 Simulations will drive the value up For timing see graph next Reapplying 1
  • 26. Page: 13 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:50 PM We want to see the timing of the model progression and the burden rate lift for the hyD division. We find the graph on the next slide helpful again.
  • 27. Associative • Reapplying the metrics We see that hyD will reach the peaks of progression in this plan with investment from the Auto Group. We conclude that the plan is achievable, with benefits supplied. 3/31/2024 Brij Consulting, LLC Jean Marshall 14 Reapplying 802 400 Appendix I TIMING 1
  • 28. Page: 14 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:51 PM We wanted to verify metrically that there were no other projects leading the latter part of hyD’s path in the plan that might distort the outcome or goal of it. The 50-year plan has many other projects cycling through it. The realignment of the algorithm was very helpful. And we conclude that the plan is achievable with co-operative benefits from the Auto Group Investors.
  • 29. Segment and Frame • The various parts of the Plan have segments and frames relevant to the size or scale of the requirement • Although it is tempting to write in advance of the Plan, we must wait for the infrastructure changes to catch up to the build scenario. • We had seen this in the early days of Oracle and other Binary requirements • Can you build where it is not flat? Can you set a portal in the sky? A dimensional portal that builds^, an ark wall^ and even a streamline warehouse^ has a grounded star design^ within the model we are learning. But God builds where no man can build (2Esdras 10:54) 3/31/2024 Brij Consulting, LLC Jean Marshall 15 Reapplying God may accomplish in ONE MOMENT 50 years of our work, yet prefers that we learn to set up instances ourselves We had seen Hurricane Irma stopped by praying to Mary Star of the Sea, even if the Ark Science application is iconic (Slide 15) Dialogue in Prayer Table Model Date ^necessary infrastructure for the glass design 1
  • 30. Page: 15 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:51 PM We do believe that glass is helping to delay and terminate storms and that prayer dialogue is a key to interaction with God. The authentic Morning Star has shown us that portals can be mobile and useful to redirect and dissipate trouble. It is necessary for us to build flat, and the table requirement becomes very important to the whole process. We are reminded that God has this Ark power and many, many years of experience.
  • 31. Basilica of the Annunciation • Place of the Incarnation of Christ+ and the appearance of the Archangel • The Sea of Glass is depicted in a painting • Original place of the Holy House of Nazareth moved to Loretto, Italy by angels it is told • A star design is formed in the ceiling pattern Brij Consulting, LLC Jean Marshall 16 3/31/2024 March 25th Feast day Likely Portal Sea of Glass Painting Catholic Mass is Celebrated IDOL 1
  • 32. Page: 16 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:52 PM We notice that trouble in the Holy Land does not stop the Holy Rite and we celebrate the painting of the Sea of Glass as indicative of the reason why. It is the Infant Jesus+ that knocked down the idols of Egypt.
  • 33. Hurricane Irma Hurricane Irma was the costliest tropical cyclone in the history of the U.S. state of Florida, before being surpassed by Hurricane Ian in 2022. Irma developed from a tropical wave near the Cape Verde Islands on August 30, 2017. The storm quickly became a hurricane on August 31 and then a major hurricane shortly thereafter,[nb 1] but would oscillate in intensity over the next few days. By September 4, Irma resumed strengthening, and became a powerful Category 5 hurricane on the following day. The cyclone then struck Saint Maarten and the British Virgin Islands on September 6 and later crossed Little Inagua in the Bahamas on September 8. Irma briefly weakened to a Category 4 hurricane, but re- intensified into a Category 5 hurricane before making landfall in the Sabana-Camagüey Archipelago of Cuba. After falling to Category 3 status due to land interaction, the storm re-strengthened into a Category 4 hurricane in the Straits of Florida. Irma struck Florida twice on September 10 – the first as a Category 4 at Cudjoe Key and the second on Marco Island as a Category 3. The hurricane weakened significantly over Florida, and was reduced to a tropical storm, before exiting the state into Georgia on September 11. 3/31/2024 Brij Consulting, LLC Jean Marshall 17 WE prayed to Mary under her various titles but especially during this storm because of relatives living there… JEAN nearby Ft. Myers, FL dramatically ended on Marco Island Basilica, Wash. DC *Divine Counsel Therefore, O Mother, [do] hear our prayer. Star of the Sea, do not let us be shipwrecked in the tempest of war. Ark of the New Covenant, inspire projects and paths of reconciliation. Queen of Heaven, restore God’s peace to the world. Eliminate hatred and the thirst for revenge and teach us forgiveness. Free us from war, protect our world from the menace of nuclear weapons. Queen of the Rosary, make us realize our need to pray and to love. Queen of the Human Family, show people the path of fraternity. Queen of Peace, obtain peace for our world. Part of the Vatican Prayer to the Immaculate Heart I bless this courageous act of "my" Pope who has wished to entrust the world and all nations to my Immaculate Heart; I welcome it with love and gratitude; because of it, I promise to intervene to greatly shorten the hours of the purification and to render the trial less severe. Mary’s Book, March 25,1984 Rosa Mystica *Divine Counsel: Consecration to the Immaculate Heart of Mary is recommended to the Bishops of the Church for individuals, cities, countries and especially parish communities. Also applied to religious or secular organizations. Marian Dogma up close and applied 1
  • 34. Page: 17 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:52 PM We put more details to our experience with Mary Star of the Sea and note that Mary promised to lessen the severity of trials as the tribulation rounds the bend.
  • 35. From our last paper we began to mark the crossover position to the Energy Star and ONE System of Plait Glass in Ark Design. We were led into Manifold Development in the starting post of project assimilation for road handling. Car Rollout is a Case. Drift Stabilization is a Compliance Practice, Bernoulli recommended. Ψ Ψ Wheel 1 Wheel 2 F I R S T C A S E GEL is an anacronym that represents GREEN ENERGY LIFT. First Position 3/31/2024 Brij Consulting, LLC Jean A. Marshall 18 V1 Stakeholder Approach (2) Car and road syncopation (1) Manifold prototyping (1) T3-M4 7/2/2027 (2) T4-M4 10/12/2029 Prototype Manifold Car/Road Syncopation Perimeter dif. Appendix I From “Simulation Watch” 1
  • 36. Page: 18 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:53 PM The development of the manifold in association both with green energy and the car speed and traction is now a contingency marker on the field of the project and an associated marker to watch for. The wing stabilization of the car is part of its wave gliding action. This treatment of the secant engineering road handling requirement is part of its system-based compliance. GEL is an anacronym that represents GREEN ENERGY LIFT.
  • 37. Brij Consulting, LLC Jean Marshall 3/31/2024 19 Organization Start-ups assign accountability (and are Simulation Partners) Product Media Startups Glass Product Startups From“Calendar Cartography” 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 7 Pushback on dates available through agile assimilations Appendix II 10 Starting Series 11 1
  • 38. Page: 19 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:54 PM Organizational Start-ups are assembled around dates in our product mapping to highlight the need for these Partner groups to start early on the Glass Path. In order to assign accountability organizations are attributed to the start-up path tasking. Project Startups have immediate buy-in to assemble around the significance of the model. Green-Energy Trading supplies capital. But the earn-back on projects helps to pay investors back for the unprovided portion.
  • 39. Scrum Production A Second Draft of our Scrum Statement We need to be able to support the addition of Intellectual Property in order to use this statement as an increase in the production associated with the hyD Business Segment/ Partnering arrangement. This would require LIFT certification of specific process associated engineering. “We” sent a request to Magi and Marcus to increase their property budget to: 3/31/2024 Brij Consulting, LLC Jean Marshall 20 1,505,552,929 The difference of 206,285,650 also appears as part of the hosting arrangement is not as likely as earnback in the process on their own scale, but as Magi and Marcus parent company. However, M&M as Builders will not pursue large scale auto manufacturing. PROFORMA MDIA Magi & Marcus are likely to sell hyD to the Automakers 1
  • 40. Page: 20 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:54 PM In preparing the Proforma Scrum Production we began to see that the Increase in IP may not be enough to generate earn back on the whole investment required to bring hyD up to scale as an automaker. Although the memo was sent to increase the equipment budget for hyD we were also not comfortable with the request. This is an emulation and so we are developing this on the basis of past experiences. Here in this paper we found the means to accomplish this.
  • 41. Quiz What is the first glass car agile date? Who will finance hyD’s Glass Car Model? Why should the field plan be level when making a valuation? What associative definition enables solid state engineering? When is the Glass Table available for modeling? 3/31/2024 Brij Consulting, LLC Jean Marshall 21 2031 Agile Date is the “O”model Big Automakers Commutative Mathematical properties in vector space Synergy Modeling enabled in 2035 A B C D E C E D B The Ark systems will work with curves making it more accurate 1
  • 42. Page: 21 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:54 PM Our quiz helps to bring the concepts into focus that accelerate the learning of the glass method.
  • 43. SIMULATION S PARTS I AND II Scorecard Arrangements: 1. Field Leveling 2. Drivers and Gears 3. KPI’s and Scrum Tasks 4. SPO: Scalable, Portable and On-Demand In our next paper we will look at: what If? metrics change from portal demand transactions. Next Paper 1
  • 44. Page: 22 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:56 PM Contents generally deliver a powerful and unique knowledge of the overall portal plan and capability to manage complex glass operations
  • 45. Brij Consulting, LLC Jean Marshall 3/31/2024 23 1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope determination of Glass and STRABO serialization for Agile 2. Glass Impact: Streaming the Engineering of Components, Solid State Assemblage, Table Design Outcomes 3. Cascading in Green: The theories and concepts related to the Green Wall and the starting compositing of green energy and wall migrations. 4. SSE: The Remote End: How Solid-State Engineering is Performance mined and delivered remotely 5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency 6. Simulations in Diminishing Scale: The use of Ring and Lens 7. Simulations: Synergy Modifications: Mitigation in Risk Analysis 8. Simulations: Marking the Contingent Outcome: Marking Pivots and Lifts 9. Simulations: Making a Watch Case Window: Fielding the Position 10. Simulations: Branching with Partners: Partner Branching for Remote Position SSE CASCADE IMPACT SCOPE CLOUD-STAR Brij Consulting, LLC | SlideShare Part I: City Scale Part II: Remote Scale Part III: Confluent Scale SIMULATIONS Papers in Design Series Part I, II, III Part I, II 1
  • 46. Page: 23 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:57 PM Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come. We continued our Simulations Project with mitigation of Risk in the crossover period through the use of Gap Data.
  • 47. Brij Consulting, LLC Jean Marshall 3/31/2024 24 Papers in Test Series 1. The Car and Road Test: Simulating Glass Cars and Candle stone Roads Brij Consulting, LLC | SlideShare V3 Glass Package V2 Synergy Modifications V1 Digital Testing Strabo Tying projects back to the Strabo Omega allows for Simulations Cloud to orchestrate outcomes Part I, From Slide 13 2. Home and Foundation Test: Simulating Glass Instances of Candle stone and Thread in Componentizations utilizing a legacy form of Glass 3. Glass Big Push: Legacy Glass gives way to Solid State Engineering, Instancing and Building with remote synchronization Parts I, and II/III Of Pillars and Pipes, Portals and Plaits Part I: Part II Simulations Marking 1
  • 48. Page: 24 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:44:58 PM We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid- state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the types of events or changes that impact the Simulation of the Project Performance.
  • 49. 1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property reconcilement for Conveyance 2. Crossover Conveyance: Beginning with Remote Signature, threading the advancing fingerprint with a glass path and integral site management, moving into SIMULATIONS in Real Time 3. Converge- The Remote Build: Tasks to consider the process of converging to the Remote Build Site and what considerations are given to producing a remote service or build out of a productive requirement, introducing sandbox theory. Phase I only considers the Kitchen Tech. Phase II is involved in whole home Media and Tech in Glass. Phase III develops the land and its attributes. This is three separate papers. 3/31/2024 Brij Consulting, LLC Jean Marshall 25 1. Studying T&MM: the requirement for certification of mobility for competent conveyances 2. Portal Projects: the evidence, timing and intelligent use of portals 3. Calling it Green: Components of Green Energy, short review: Calling it Green requires new uses of potential and ^studies in wave glass and graphical relationships can raise up a green energy fluency that will lead to energy self-sufficiency 4. Dimensions in Multivariant Fabrications: Determining Forms and Contents of Green Energy and Blue Wave Cascade; relating elements to current science and future requirements 5. Wave and Lens Assimilation: The means to compile and to build in Glass Systems is described. The use of secant math. 6. Math Solutions for Wave and Lens Assimilations: See also Commentary for Math Solutions 7. Supply Side Portfolio: Timing and Model of Glass and Green events to fulfill path… Does the Tan Line help? 8. Partners in T Pluribus Unum: Measuring with Diacritical Marks 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process 13. Branch- Sound and Image Construction: Characterizing the branch capability of new applications, appliances and mode[ls] of operations 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) Motion Projects-8 Remote Theory-5 Ark Model-13 Digital-20 Go to https://www.slideshare.net/Marshallja/presentations https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for- wave-and-lens-assimilationpdf Roadmap: #47 & #48 & #49 Dimensional Building in Ark Design Glass Cars and New Product Roadmap Calendar Cartography Building with Glass #50 New Remote Theory Ark Model Motion Projects Building 1
  • 50. Page: 25 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 3/31/2024 12:45:01 PM The Learning Series