CONCEPT
A. Existing Solid Waste Management at Urban Level
• Population of Peshawar City: 1.97 Million (2017
census)
• Annual Growth Rate 3.96 % (Highest in Pakistan)
• Estimated generation of Solid Waste 1000 tons/day
• Collection of Solid Waste by WSSP around 800
tons/day
• Final disposal: Dumping at Bahdur Kalai at a rental
location
Benefits of MSW
• Environment
• Health
• Safety issues
• Land issues
• Flood
Proposed Solution for Sustainable SWM
- Sanitary Land Fill (Estimated Cost Rs. 2.5
billion)
- Construction and development of Compost
Plant (Estimated Cost :Rs 2 billion)
- Waste to Energy project (Cost Rs. 7.4 billion)
Development of Sanitary Land Filling Project
Estimated Cost : 2.5 Billion PKR
Solid Waste Management at Urban Level
Allied Facilities
• Installation of Weigh Bridges linked to video wall
• Development of the Service road for waste unloading vehicles
till sanitary landfill cell
• Development of Buffer Zone across the landfill site
• Requirements
• Distance from Urban area: 30 Km
• Total area of Landfill Facility: 600 Kanal
• Area of Land Fill : 400 Kanal
• Design Capacity : 500 – 1000 tons/day
Contd..
Solid Waste Management at Urban Level
• Essential Components of Sanitary Land filling
Project
• Liner System
• Leachate Collection Facility
• Gas capturing system
• Environmental Monitoring well
• Wheel Washing area
• Benefits
• Air pollution control
• Ground water pollution control due to leachate
treatment
• Reduction in global warming gases emission
• Conversion of landfill into Children Park
Sanitary Landfill Development Cost
S.NO Item Cost in Million PKR
1 Landfill Construction 1100
2 Gas collection system 7
3 Leachate collection system 16
4 Leachate pool 14
5 Storm water 2
6 Ring Road 12
7 Access road and parking 60
8 Admin block 20
9 Workshop building 35
10 Wheel washing area 10
11 Sewerage system 5
12 Water tank 4
13 Landscaping 3
14 Boundry wall 50
15 Ground Water Observation well 3
16 Mechanical works 500
17 Electical works 300
18 Weigh bridge 100
19 Miscellaneous works 284
20 Total 2525
Cont…..
Roughly 20 million tons solid waste is generated with
2.4% growth each year.
Potential of 1000 MW is available through Municipal
Solid Waste.
City wise waste and estimated generation of
electricity is as under:
 Karachi 15,000 ton per day 300 MW
 Lahore 8,000 ton per day 160 MW
 Peshawar 1,000 ton per day 30 MW
 Quetta 300-400 ton per day 10 MW
Project 2: Waste To Energy
Cost : 7.4 Billion PKR (Source: NEPRA)
Solid Waste Management at Urban Level
Solid Waste Management at Urban Level
Peshawar generates 800-1000 ton waste per day
The garbage is dumped at temporary sites
identified by WSSP
The Peshawar City has potential of 30 MW
20-25 Acre land will be required for 30 MW
power plant
Salient Features of NEPRA Upfront Tariff
Incentives
Levelized Tariff US Cents 10.0070/kWh
Project Cost US$ 3.5 million per MW
IRR 16%
Debt: Equity 75:25
Tariff Control Period 25 years
Insurance 1% of EPC
O&M Costs 5% of EPC Cost
Spread over LIBOR 4.5%
Capacity 250 MW (50 MW for each province & Federal Govt.)
Spread over KIBOR
Nil as per State Bank of Pakistan policy. Commercial
Financing after exhausting the aforesaid scheme.
Timeline
Opt for Tariff One years from the date of notification
Construction Period 24 months
Coverage Inflation Risk, Exchange Rate Risk, LIBOR/ KIBOR change, Insurance etc
Private Sector :
Power & Energy Development Corporation
• The PEDC is an authorized consultant of
Hangzhou- Jinjiang Group China. It is a
Chinese company that has authorized PEDC to
contact District Local Authorities of Pakistan
for waste to energy (WTE) project proposal &
implementation.
• 500 tons/day MSW generate 10 MW
Modes of Project Implementation
• Public Private Partnership (PPP) for commercial
agreement between Hangzhou Jinjiang group & local
government or its associated company. Following are
the wide range of contractual options of which
anyone could be opted
 Built –OWN- Operate (BOO)  Built–Own-Operate-transfer
(BOOT)
 Built- Transfer(BT)  Built- transfer and Operate(BTO)
 Built –Operate and
transfer(BOT)
 Built-Lease-Transfer(BLT)
 Joint Venture (JV)
Benefits of the WTE projects
• Cleaner environment as a result of elimination of
municipal waste
• Recovery of recyclable material of more than 50%
• Conversion of waste into useful product like power /
energy.
• Gain of carbon credit from international agencies
• Furnace ash collection & reutilization as bricks and
roads paving materials
• Energy self-reliance and savings in much needed
foreign exchange.
• Jobs for local human resource both in permanent and
contractual category.
WASTE To Energy
Solid Waste Management at Urban Level
Project.3
Project Name: Construction and Development of Compost Plant in
Peshawar City
Project Cost: 2 billion PKR (tentative cost)
• Composting is an aerobic biodegradation process used to decompose organic
material
• Around 300 tons of MSW can be processed through composting plant and the
composting is suitable in Pakistan because of the below reason
• High moisture content, high Carbon Nitrogen (C/N) ratio and low value of
volatile content of solid waste
• Cheap process.
• Environment friendly
• 100% natural, no chemical addition
• Improves soil strength - therefore it is called soil conditioner / supplement
• Improves fertility of soil through pure organic matter
• Increases water holding capacity of soil
• Act as natural pesticide
• In ecosystems, it is useful for erosion control, land and stream reclamation,
wetland construction, and as landfill cover.
Compost Plant (Reference Lahore)
Process at Compost Plant
Compost processing is done through aerobic decomposition
using Windrow technology without any addition of chemicals.
Windrow means a long heap of regular shape and cross
section, prepared with the organic material.
The composting process normally takes around 60 days to
complete.
The plant and machinery supplied by MENART of Belgium, has
a capacity to produce around 40,000 MT of compost per
annum.(Lahore Compost)
Process Benefits
Composting process employed not only
controls the emission of Green House Gases
(GHG) to the environment but also turns the
organic material extracted from MSW into a
useful product which eventually go back to the
soil, hence facilitates effective and efficient
management of waste.
Compost Making Operations
Compost making operations include:
1. Sorting of MSW
2. Shredding of compostable material and
mixing
3. Windrows management
4. Compost sieving and bagging
What is Compost?
Compost is a stable, humus like product resulting from
the biological decomposition of organic matter under
controlled conditions.
Controlled biological decomposition process is what
differentiates composting from the natural
decomposition of organic matter.
Organic materials are decomposed regardless of
whether or not we compost them, but regulating and
optimizing conditions ensures a faster and environment
friendly process, thus producing quality end product.
Operations Flow Chart
MSW Sorting +
Screening
Combustible
Material
Organic
Material
Organic
Piling Area
Cow Dung +
Green Waste
Compost
Shed
Composting
(Windrows)
Compost
Sieving
Bagging
Rejected
Material
Rejected
Material
Ware House
Final Conveyor Belt
Windrows Management
Windrows Parameter Check
Analyses of Compost
1. Carbon to Nitrogen Ratio (C:N)
2. Organic matter
3. Moisture
4. Cation Exchange Capacity (CEC)
5. pH
6. Electrical Conductivity (EC)
7. Total Dissolved Solids (TDS)
Windrow Turning
Windrow Turner
Compost Sieving & Bagging

More Related Content

What's hot

Paul lengthorn global infrastructure presentation
Paul lengthorn global infrastructure presentationPaul lengthorn global infrastructure presentation
Paul lengthorn global infrastructure presentation
Vikki Jacobs
 
Tirupur Water Supply and Sanitation
Tirupur Water Supply and SanitationTirupur Water Supply and Sanitation
Tirupur Water Supply and Sanitation
Ipsit Dash
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
WRI Ross Center for Sustainable Cities
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
City of San Angelo Texas
 
PAVEMENTS USING RECLAIMED AGGREGATES
PAVEMENTS USING RECLAIMED AGGREGATESPAVEMENTS USING RECLAIMED AGGREGATES
PAVEMENTS USING RECLAIMED AGGREGATES
civej
 
Leather complex
Leather complexLeather complex
Leather complex
Rangeet Mitra
 
Emiko Thompson - Case Studies in Environmental Stewardship
Emiko Thompson - Case Studies in Environmental StewardshipEmiko Thompson - Case Studies in Environmental Stewardship
Emiko Thompson - Case Studies in Environmental Stewardship
Contract Cities
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina
 
Unlock Bengaluru 2017: GIS Analytics and Tools
Unlock Bengaluru 2017: GIS Analytics and ToolsUnlock Bengaluru 2017: GIS Analytics and Tools
Unlock Bengaluru 2017: GIS Analytics and Tools
WRI Ross Center for Sustainable Cities
 
Munciple gis
Munciple gisMunciple gis
Munciple gis
mayank singh sakla
 
Cost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting projectCost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting project
Mohd Hasim Ujang
 

What's hot (11)

Paul lengthorn global infrastructure presentation
Paul lengthorn global infrastructure presentationPaul lengthorn global infrastructure presentation
Paul lengthorn global infrastructure presentation
 
Tirupur Water Supply and Sanitation
Tirupur Water Supply and SanitationTirupur Water Supply and Sanitation
Tirupur Water Supply and Sanitation
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
 
PAVEMENTS USING RECLAIMED AGGREGATES
PAVEMENTS USING RECLAIMED AGGREGATESPAVEMENTS USING RECLAIMED AGGREGATES
PAVEMENTS USING RECLAIMED AGGREGATES
 
Leather complex
Leather complexLeather complex
Leather complex
 
Emiko Thompson - Case Studies in Environmental Stewardship
Emiko Thompson - Case Studies in Environmental StewardshipEmiko Thompson - Case Studies in Environmental Stewardship
Emiko Thompson - Case Studies in Environmental Stewardship
 
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
City of Salina Article-Implementing Excellence at Salina's Municipal Solid Wa...
 
Unlock Bengaluru 2017: GIS Analytics and Tools
Unlock Bengaluru 2017: GIS Analytics and ToolsUnlock Bengaluru 2017: GIS Analytics and Tools
Unlock Bengaluru 2017: GIS Analytics and Tools
 
Munciple gis
Munciple gisMunciple gis
Munciple gis
 
Cost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting projectCost and benefit analysis for kota kinabalu (kk) composting project
Cost and benefit analysis for kota kinabalu (kk) composting project
 

Similar to Swm wssp

Wte
WteWte
Waste to energy india
Waste to energy indiaWaste to energy india
Waste to energy india
Kishlay Kumar
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
SurajRamachandran6
 
The management of sludge in the informal sector, India
The management of sludge in the informal sector, IndiaThe management of sludge in the informal sector, India
The management of sludge in the informal sector, India
zenrain man
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
Manuel Hidalgo
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
Manuel Hidalgo
 
Energy From Waste Options
Energy From Waste OptionsEnergy From Waste Options
Energy From Waste Options
Loay Ghazaleh MBA, BSc Civil Eng.
 
ReWire
ReWireReWire
Novateurs
NovateursNovateurs
Ppt dated 7th recycle &Reuse
Ppt dated 7th recycle &ReusePpt dated 7th recycle &Reuse
Ppt dated 7th recycle &Reuse
Amit Mishra
 
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
NITI Aayog
 
Sustainable solution ehc v 2.0
Sustainable solution ehc v 2.0Sustainable solution ehc v 2.0
Sustainable solution ehc v 2.0
Amal K
 
Solid and liquid waste management in smart cities
Solid and liquid waste management in smart citiesSolid and liquid waste management in smart cities
Solid and liquid waste management in smart cities
Jayanth Rajakumar
 
NE Not just a pretty place: the economic case for a green city
NE Not just a pretty place: the economic case for a green cityNE Not just a pretty place: the economic case for a green city
NE Not just a pretty place: the economic case for a green city
NaturalEngland
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMC
Infotrex Services Pvt. Ltd.
 
Waste Management 3 YASH.pptx
Waste Management 3 YASH.pptxWaste Management 3 YASH.pptx
Waste Management 3 YASH.pptx
YashSolanki372360
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
KushalSrivastava23
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
Akshat Jain
 
Waste to energy
Waste to energyWaste to energy
Waste to energy
surya k sandeep
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptx
ssuser9b43b32
 

Similar to Swm wssp (20)

Wte
WteWte
Wte
 
Waste to energy india
Waste to energy indiaWaste to energy india
Waste to energy india
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
 
The management of sludge in the informal sector, India
The management of sludge in the informal sector, IndiaThe management of sludge in the informal sector, India
The management of sludge in the informal sector, India
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Presentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-finalPresentation-Symwatech-WED-05.06.16-final
Presentation-Symwatech-WED-05.06.16-final
 
Energy From Waste Options
Energy From Waste OptionsEnergy From Waste Options
Energy From Waste Options
 
ReWire
ReWireReWire
ReWire
 
Novateurs
NovateursNovateurs
Novateurs
 
Ppt dated 7th recycle &Reuse
Ppt dated 7th recycle &ReusePpt dated 7th recycle &Reuse
Ppt dated 7th recycle &Reuse
 
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
Pune’s Trash Solution: A Zero Waste City (by Kunal Kumar, Municipal Commissio...
 
Sustainable solution ehc v 2.0
Sustainable solution ehc v 2.0Sustainable solution ehc v 2.0
Sustainable solution ehc v 2.0
 
Solid and liquid waste management in smart cities
Solid and liquid waste management in smart citiesSolid and liquid waste management in smart cities
Solid and liquid waste management in smart cities
 
NE Not just a pretty place: the economic case for a green city
NE Not just a pretty place: the economic case for a green cityNE Not just a pretty place: the economic case for a green city
NE Not just a pretty place: the economic case for a green city
 
Solid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMCSolid Waste Management Practices & Initiatives of AMC
Solid Waste Management Practices & Initiatives of AMC
 
Waste Management 3 YASH.pptx
Waste Management 3 YASH.pptxWaste Management 3 YASH.pptx
Waste Management 3 YASH.pptx
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
 
Waste Management.pptx
Waste Management.pptxWaste Management.pptx
Waste Management.pptx
 
Waste to energy
Waste to energyWaste to energy
Waste to energy
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptx
 

More from hosting guests

Tourism task force updated tariq sab
Tourism task force updated tariq sabTourism task force updated tariq sab
Tourism task force updated tariq sab
hosting guests
 
Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018
hosting guests
 
Tourism task force final
Tourism task force finalTourism task force final
Tourism task force final
hosting guests
 
Khyber pass economic corridor project p159577 (1)
Khyber pass economic corridor project   p159577 (1)Khyber pass economic corridor project   p159577 (1)
Khyber pass economic corridor project p159577 (1)
hosting guests
 
Frame work on tourism
Frame work on tourismFrame work on tourism
Frame work on tourism
hosting guests
 
Final implement ppt.03.05.2018
Final implement ppt.03.05.2018Final implement ppt.03.05.2018
Final implement ppt.03.05.2018
hosting guests
 
Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)
hosting guests
 
Draft to rs for dmps clean
Draft to rs for dmps   cleanDraft to rs for dmps   clean
Draft to rs for dmps clean
hosting guests
 
Mineral mapping
Mineral mappingMineral mapping
Mineral mapping
hosting guests
 
Project management unit for kite project (1)
Project management unit for kite project (1)Project management unit for kite project (1)
Project management unit for kite project (1)
hosting guests
 
Tourism task force with input of aftab rana
Tourism task force with input of aftab ranaTourism task force with input of aftab rana
Tourism task force with input of aftab rana
hosting guests
 
Performance review benchmarks
Performance review benchmarksPerformance review benchmarks
Performance review benchmarks
hosting guests
 
Note sheet
Note sheetNote sheet
Note sheet
hosting guests
 
Strategic roadmap
Strategic roadmapStrategic roadmap
Strategic roadmap
hosting guests
 
Provision of small machinery
Provision of small machineryProvision of small machinery
Provision of small machinery
hosting guests
 
Small scale youth business
Small scale youth businessSmall scale youth business
Small scale youth business
hosting guests
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)
hosting guests
 
Slf
SlfSlf
Solarized cold storages
Solarized cold storagesSolarized cold storages
Solarized cold storages
hosting guests
 
Stacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourismStacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourism
hosting guests
 

More from hosting guests (20)

Tourism task force updated tariq sab
Tourism task force updated tariq sabTourism task force updated tariq sab
Tourism task force updated tariq sab
 
Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018Kp delegation-of-financial-power-rules-2018
Kp delegation-of-financial-power-rules-2018
 
Tourism task force final
Tourism task force finalTourism task force final
Tourism task force final
 
Khyber pass economic corridor project p159577 (1)
Khyber pass economic corridor project   p159577 (1)Khyber pass economic corridor project   p159577 (1)
Khyber pass economic corridor project p159577 (1)
 
Frame work on tourism
Frame work on tourismFrame work on tourism
Frame work on tourism
 
Final implement ppt.03.05.2018
Final implement ppt.03.05.2018Final implement ppt.03.05.2018
Final implement ppt.03.05.2018
 
Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)Working paper on 1st off road rally (final)
Working paper on 1st off road rally (final)
 
Draft to rs for dmps clean
Draft to rs for dmps   cleanDraft to rs for dmps   clean
Draft to rs for dmps clean
 
Mineral mapping
Mineral mappingMineral mapping
Mineral mapping
 
Project management unit for kite project (1)
Project management unit for kite project (1)Project management unit for kite project (1)
Project management unit for kite project (1)
 
Tourism task force with input of aftab rana
Tourism task force with input of aftab ranaTourism task force with input of aftab rana
Tourism task force with input of aftab rana
 
Performance review benchmarks
Performance review benchmarksPerformance review benchmarks
Performance review benchmarks
 
Note sheet
Note sheetNote sheet
Note sheet
 
Strategic roadmap
Strategic roadmapStrategic roadmap
Strategic roadmap
 
Provision of small machinery
Provision of small machineryProvision of small machinery
Provision of small machinery
 
Small scale youth business
Small scale youth businessSmall scale youth business
Small scale youth business
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)
 
Slf
SlfSlf
Slf
 
Solarized cold storages
Solarized cold storagesSolarized cold storages
Solarized cold storages
 
Stacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourismStacy five years_plan_revised_only_for_tourism
Stacy five years_plan_revised_only_for_tourism
 

Recently uploaded

nurs fpx 4050 assessment 4 final care coordination plan.pdf
nurs fpx 4050 assessment 4 final care coordination plan.pdfnurs fpx 4050 assessment 4 final care coordination plan.pdf
nurs fpx 4050 assessment 4 final care coordination plan.pdf
Carolyn Harker
 
chatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdf
chatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdfchatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdf
chatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdf
marynayjun112024
 
Test bank clinical nursing skills a concept based approach 4e pearson educati...
Test bank clinical nursing skills a concept based approach 4e pearson educati...Test bank clinical nursing skills a concept based approach 4e pearson educati...
Test bank clinical nursing skills a concept based approach 4e pearson educati...
rightmanforbloodline
 
Solution manual for managerial accounting 18th edition by ray garrison eric n...
Solution manual for managerial accounting 18th edition by ray garrison eric n...Solution manual for managerial accounting 18th edition by ray garrison eric n...
Solution manual for managerial accounting 18th edition by ray garrison eric n...
rightmanforbloodline
 
CHAPTER 1 SEMESTER V COMMUNICATION TECHNIQUES FOR CHILDREN.pdf
CHAPTER 1 SEMESTER V  COMMUNICATION TECHNIQUES FOR CHILDREN.pdfCHAPTER 1 SEMESTER V  COMMUNICATION TECHNIQUES FOR CHILDREN.pdf
CHAPTER 1 SEMESTER V COMMUNICATION TECHNIQUES FOR CHILDREN.pdf
Sachin Sharma
 
FACIAL NERVE
FACIAL NERVEFACIAL NERVE
FACIAL NERVE
aditigupta1117
 
Monopoly PCD Pharma Franchise in Tripura
Monopoly PCD Pharma Franchise in TripuraMonopoly PCD Pharma Franchise in Tripura
Monopoly PCD Pharma Franchise in Tripura
SKG Internationals
 
Sectional dentures for microstomia patients.pptx
Sectional dentures for microstomia patients.pptxSectional dentures for microstomia patients.pptx
Sectional dentures for microstomia patients.pptx
SatvikaPrasad
 
India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]
India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]
India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]
Kumar Satyam
 
nursing management of patient with Empyema ppt
nursing management of patient with Empyema pptnursing management of patient with Empyema ppt
nursing management of patient with Empyema ppt
blessyjannu21
 
India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...
India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...
India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...
Kumar Satyam
 
TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...
TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...
TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...
rightmanforbloodline
 
Fit to Fly PCR Covid Testing at our Clinic Near You
Fit to Fly PCR Covid Testing at our Clinic Near YouFit to Fly PCR Covid Testing at our Clinic Near You
Fit to Fly PCR Covid Testing at our Clinic Near You
NX Healthcare
 
English Drug and Alcohol Commissioners June 2024.pptx
English Drug and Alcohol Commissioners June 2024.pptxEnglish Drug and Alcohol Commissioners June 2024.pptx
English Drug and Alcohol Commissioners June 2024.pptx
MatSouthwell1
 
一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理
一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理
一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理
xkute
 
Emotional and Behavioural Problems in Children - Counselling and Family Thera...
Emotional and Behavioural Problems in Children - Counselling and Family Thera...Emotional and Behavioural Problems in Children - Counselling and Family Thera...
Emotional and Behavioural Problems in Children - Counselling and Family Thera...
PsychoTech Services
 
2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...
2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...
2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...
Media Logic
 
Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...
Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...
Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...
DrDevTaneja1
 
3. User Guide Activity Budget Tracking App Steps to apply.pptx
3. User Guide Activity Budget Tracking App Steps to apply.pptx3. User Guide Activity Budget Tracking App Steps to apply.pptx
3. User Guide Activity Budget Tracking App Steps to apply.pptx
habtegirma
 
Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)
Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)
Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)
Aditi Jagtap Pune
 

Recently uploaded (20)

nurs fpx 4050 assessment 4 final care coordination plan.pdf
nurs fpx 4050 assessment 4 final care coordination plan.pdfnurs fpx 4050 assessment 4 final care coordination plan.pdf
nurs fpx 4050 assessment 4 final care coordination plan.pdf
 
chatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdf
chatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdfchatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdf
chatgptfornlp-230314021506-2f03f614.pdf. 21506-2f03f614.pdf
 
Test bank clinical nursing skills a concept based approach 4e pearson educati...
Test bank clinical nursing skills a concept based approach 4e pearson educati...Test bank clinical nursing skills a concept based approach 4e pearson educati...
Test bank clinical nursing skills a concept based approach 4e pearson educati...
 
Solution manual for managerial accounting 18th edition by ray garrison eric n...
Solution manual for managerial accounting 18th edition by ray garrison eric n...Solution manual for managerial accounting 18th edition by ray garrison eric n...
Solution manual for managerial accounting 18th edition by ray garrison eric n...
 
CHAPTER 1 SEMESTER V COMMUNICATION TECHNIQUES FOR CHILDREN.pdf
CHAPTER 1 SEMESTER V  COMMUNICATION TECHNIQUES FOR CHILDREN.pdfCHAPTER 1 SEMESTER V  COMMUNICATION TECHNIQUES FOR CHILDREN.pdf
CHAPTER 1 SEMESTER V COMMUNICATION TECHNIQUES FOR CHILDREN.pdf
 
FACIAL NERVE
FACIAL NERVEFACIAL NERVE
FACIAL NERVE
 
Monopoly PCD Pharma Franchise in Tripura
Monopoly PCD Pharma Franchise in TripuraMonopoly PCD Pharma Franchise in Tripura
Monopoly PCD Pharma Franchise in Tripura
 
Sectional dentures for microstomia patients.pptx
Sectional dentures for microstomia patients.pptxSectional dentures for microstomia patients.pptx
Sectional dentures for microstomia patients.pptx
 
India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]
India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]
India Home Healthcare Market: Driving Forces and Disruptive Trends [2029]
 
nursing management of patient with Empyema ppt
nursing management of patient with Empyema pptnursing management of patient with Empyema ppt
nursing management of patient with Empyema ppt
 
India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...
India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...
India Medical Devices Market: Size, Share, and In-Depth Competitive Analysis ...
 
TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...
TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...
TEST BANK FOR Health Assessment in Nursing 7th Edition by Weber Chapters 1 - ...
 
Fit to Fly PCR Covid Testing at our Clinic Near You
Fit to Fly PCR Covid Testing at our Clinic Near YouFit to Fly PCR Covid Testing at our Clinic Near You
Fit to Fly PCR Covid Testing at our Clinic Near You
 
English Drug and Alcohol Commissioners June 2024.pptx
English Drug and Alcohol Commissioners June 2024.pptxEnglish Drug and Alcohol Commissioners June 2024.pptx
English Drug and Alcohol Commissioners June 2024.pptx
 
一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理
一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理
一比一原版(UoA毕业证)昆士兰科技大学毕业证如何办理
 
Emotional and Behavioural Problems in Children - Counselling and Family Thera...
Emotional and Behavioural Problems in Children - Counselling and Family Thera...Emotional and Behavioural Problems in Children - Counselling and Family Thera...
Emotional and Behavioural Problems in Children - Counselling and Family Thera...
 
2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...
2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...
2024 Media Preferences of Older Adults: Consumer Survey and Marketing Implica...
 
Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...
Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...
Digital Health in India_Health Informatics Trained Manpower _DrDevTaneja_15.0...
 
3. User Guide Activity Budget Tracking App Steps to apply.pptx
3. User Guide Activity Budget Tracking App Steps to apply.pptx3. User Guide Activity Budget Tracking App Steps to apply.pptx
3. User Guide Activity Budget Tracking App Steps to apply.pptx
 
Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)
Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)
Daughter's of Dr Ranjit Jagtap (Poulami & Aditi)
 

Swm wssp

  • 2. A. Existing Solid Waste Management at Urban Level • Population of Peshawar City: 1.97 Million (2017 census) • Annual Growth Rate 3.96 % (Highest in Pakistan) • Estimated generation of Solid Waste 1000 tons/day • Collection of Solid Waste by WSSP around 800 tons/day • Final disposal: Dumping at Bahdur Kalai at a rental location
  • 3. Benefits of MSW • Environment • Health • Safety issues • Land issues • Flood
  • 4. Proposed Solution for Sustainable SWM - Sanitary Land Fill (Estimated Cost Rs. 2.5 billion) - Construction and development of Compost Plant (Estimated Cost :Rs 2 billion) - Waste to Energy project (Cost Rs. 7.4 billion)
  • 5. Development of Sanitary Land Filling Project Estimated Cost : 2.5 Billion PKR Solid Waste Management at Urban Level Allied Facilities • Installation of Weigh Bridges linked to video wall • Development of the Service road for waste unloading vehicles till sanitary landfill cell • Development of Buffer Zone across the landfill site • Requirements • Distance from Urban area: 30 Km • Total area of Landfill Facility: 600 Kanal • Area of Land Fill : 400 Kanal • Design Capacity : 500 – 1000 tons/day Contd..
  • 6. Solid Waste Management at Urban Level • Essential Components of Sanitary Land filling Project • Liner System • Leachate Collection Facility • Gas capturing system • Environmental Monitoring well • Wheel Washing area • Benefits • Air pollution control • Ground water pollution control due to leachate treatment • Reduction in global warming gases emission • Conversion of landfill into Children Park
  • 7. Sanitary Landfill Development Cost S.NO Item Cost in Million PKR 1 Landfill Construction 1100 2 Gas collection system 7 3 Leachate collection system 16 4 Leachate pool 14 5 Storm water 2 6 Ring Road 12 7 Access road and parking 60 8 Admin block 20 9 Workshop building 35 10 Wheel washing area 10 11 Sewerage system 5 12 Water tank 4 13 Landscaping 3 14 Boundry wall 50 15 Ground Water Observation well 3 16 Mechanical works 500 17 Electical works 300 18 Weigh bridge 100 19 Miscellaneous works 284 20 Total 2525
  • 8. Cont….. Roughly 20 million tons solid waste is generated with 2.4% growth each year. Potential of 1000 MW is available through Municipal Solid Waste. City wise waste and estimated generation of electricity is as under:  Karachi 15,000 ton per day 300 MW  Lahore 8,000 ton per day 160 MW  Peshawar 1,000 ton per day 30 MW  Quetta 300-400 ton per day 10 MW Project 2: Waste To Energy Cost : 7.4 Billion PKR (Source: NEPRA) Solid Waste Management at Urban Level
  • 9. Solid Waste Management at Urban Level Peshawar generates 800-1000 ton waste per day The garbage is dumped at temporary sites identified by WSSP The Peshawar City has potential of 30 MW 20-25 Acre land will be required for 30 MW power plant
  • 10. Salient Features of NEPRA Upfront Tariff Incentives Levelized Tariff US Cents 10.0070/kWh Project Cost US$ 3.5 million per MW IRR 16% Debt: Equity 75:25 Tariff Control Period 25 years Insurance 1% of EPC O&M Costs 5% of EPC Cost Spread over LIBOR 4.5% Capacity 250 MW (50 MW for each province & Federal Govt.) Spread over KIBOR Nil as per State Bank of Pakistan policy. Commercial Financing after exhausting the aforesaid scheme. Timeline Opt for Tariff One years from the date of notification Construction Period 24 months Coverage Inflation Risk, Exchange Rate Risk, LIBOR/ KIBOR change, Insurance etc
  • 11. Private Sector : Power & Energy Development Corporation • The PEDC is an authorized consultant of Hangzhou- Jinjiang Group China. It is a Chinese company that has authorized PEDC to contact District Local Authorities of Pakistan for waste to energy (WTE) project proposal & implementation. • 500 tons/day MSW generate 10 MW
  • 12. Modes of Project Implementation • Public Private Partnership (PPP) for commercial agreement between Hangzhou Jinjiang group & local government or its associated company. Following are the wide range of contractual options of which anyone could be opted  Built –OWN- Operate (BOO)  Built–Own-Operate-transfer (BOOT)  Built- Transfer(BT)  Built- transfer and Operate(BTO)  Built –Operate and transfer(BOT)  Built-Lease-Transfer(BLT)  Joint Venture (JV)
  • 13. Benefits of the WTE projects • Cleaner environment as a result of elimination of municipal waste • Recovery of recyclable material of more than 50% • Conversion of waste into useful product like power / energy. • Gain of carbon credit from international agencies • Furnace ash collection & reutilization as bricks and roads paving materials • Energy self-reliance and savings in much needed foreign exchange. • Jobs for local human resource both in permanent and contractual category.
  • 15. Solid Waste Management at Urban Level Project.3 Project Name: Construction and Development of Compost Plant in Peshawar City Project Cost: 2 billion PKR (tentative cost) • Composting is an aerobic biodegradation process used to decompose organic material • Around 300 tons of MSW can be processed through composting plant and the composting is suitable in Pakistan because of the below reason • High moisture content, high Carbon Nitrogen (C/N) ratio and low value of volatile content of solid waste • Cheap process. • Environment friendly • 100% natural, no chemical addition • Improves soil strength - therefore it is called soil conditioner / supplement • Improves fertility of soil through pure organic matter • Increases water holding capacity of soil • Act as natural pesticide • In ecosystems, it is useful for erosion control, land and stream reclamation, wetland construction, and as landfill cover.
  • 17. Process at Compost Plant Compost processing is done through aerobic decomposition using Windrow technology without any addition of chemicals. Windrow means a long heap of regular shape and cross section, prepared with the organic material. The composting process normally takes around 60 days to complete. The plant and machinery supplied by MENART of Belgium, has a capacity to produce around 40,000 MT of compost per annum.(Lahore Compost)
  • 18. Process Benefits Composting process employed not only controls the emission of Green House Gases (GHG) to the environment but also turns the organic material extracted from MSW into a useful product which eventually go back to the soil, hence facilitates effective and efficient management of waste.
  • 19. Compost Making Operations Compost making operations include: 1. Sorting of MSW 2. Shredding of compostable material and mixing 3. Windrows management 4. Compost sieving and bagging
  • 20. What is Compost? Compost is a stable, humus like product resulting from the biological decomposition of organic matter under controlled conditions. Controlled biological decomposition process is what differentiates composting from the natural decomposition of organic matter. Organic materials are decomposed regardless of whether or not we compost them, but regulating and optimizing conditions ensures a faster and environment friendly process, thus producing quality end product. Operations Flow Chart MSW Sorting + Screening Combustible Material Organic Material Organic Piling Area Cow Dung + Green Waste Compost Shed Composting (Windrows) Compost Sieving Bagging Rejected Material Rejected Material Ware House
  • 24. Analyses of Compost 1. Carbon to Nitrogen Ratio (C:N) 2. Organic matter 3. Moisture 4. Cation Exchange Capacity (CEC) 5. pH 6. Electrical Conductivity (EC) 7. Total Dissolved Solids (TDS)
  • 27. Compost Sieving & Bagging

Editor's Notes

  1. Procure proper landfill sites for SWM in line with EPA guidelines Scientifically designed disposal sites to have up to four separate processing areas, Composting yard Recycling area Incinerator Landfill site