Section 1: Preamble
• 1.1 Scope
• 1.2 Documentation
The present survey programme covers the minimum extent of overall surveys, close-up surveys, thickness
measurements and pressure testing within the cargo length area, cargo holds, ballast tanks, including fore
and aft peak tanks, required by the Code
The arrangements and safety aspects of the survey should be acceptable to the attending surveyor(s)
All documents used in the development of the survey programme should be available on board during
the survey.
Notes on this section
This section defines the scope of the survey programme
Section 2: Arrangement of
cargo holds, tanks and spaces
Notes on this section
This section allows the surveyors to brief himself about the ship’s layout
This section of the survey programme provides information (either in the form of
plans or text) on the arrangement of cargo holds, tanks and spaces that fall within
the scope of the survey
Section 3: List of cargo holds, tanks and
spaces with information on their use, extent of
coatings and corrosion prevention system
Notes on this section
This section gives the details of the use of ship’s spaces and extent of the coating and
any other corrosion prevention system such as anodes or ICCP system
This section of the survey programme gives the information on the use of the holds
and tanks of the ship, the extent of coatings and the corrosion prevention system
provided in the survey planning questionnaire
Section 4: Conditions for survey
Notes on this section
This section provides the pre conditions for the survey. For example for the tank survey, the
condition is that it should have been in a clean state, gas free with proper lighting and
ventilation. Same pre-conditions are documents in this section for other areas of the survey.
This section of the survey programme provides information on the conditions for
survey, e.g. information regarding cargo hold and tank cleaning, gas freeing,
ventilation, lighting, etc.
Section 5: Provisions and
method of access to structures
Notes on this section
This section provides the information such as for close up survey of cargo holds what
arrangements (Scaffoldings etc) will be provided by the shipowners.
This section of the survey programme provides the information on the provisions
and methods of access to structures provided in the survey planning questionnaire
Section 6: List of equipment for
survey
Notes on this section
This section provides the information on the list of equipments that will be arranged by the
shipowner.
This section of the survey programme identifies and list the equipment that will be
made available for carrying out the survey and the required thickness
measurements
Section 7: Survey requirements
• 1.1 Overall Survey
• 1.2 Close up Survey
This section of the survey programme identifies and list the spaces that should undergo an overall survey
for this ship in accordance with ESP Code
This section of the survey programme identifies and list the hull structures that should undergo a
close-up survey for this ship in accordance with ESP code
Notes on this section
This section acts as a quick reference for the areas that will undergo an overall or close up survey. The information
and guidelines on which areas need to undergo overall survey or close up survey is provided in the ESP code
Section 8: Identification of tanks
for tank testing
Notes on this section
This section provides the information on the cargo holds and tanks that need to undergo
pressure testing
This section of the survey programme identifies and lists the cargo holds and tanks
that should undergo tank testing for this ship in accordance with ESP Code
Section 9: Identification of areas and
sections for thickness measurements
Notes on this section
This section provides the exact information of the areas for which thickness measurement
need to be done
This section of the survey programme identifies and lists the areas and sections
where thickness measurements should be taken in accordance with ESP Code
Section 10: Minimum thickness
of hull structures
Notes on this section
This section provides the information about the minimum thickness the hull and other
structure of the ship need to have. This minimum thickness is calculated based upon the
original thickness of the structure minus the allowed wastage. So if the original thickness is
40mm and allowed wastage is 10%, the minimum thickness of this structure needs to be 32mm.
The allowed wastage for various structures is provided in the ESM code.
This section of the survey programme specifies the minimum thickness for hull
structures of the ship that are subject to survey.
Section 11: Thickness
measurement company
Notes on this section
This section provides name of the company that would carry out thickness measurement.
This section of the survey programme identifies the information of the thickness
measurement company.
Section 12: Damage experience
related to the ship
Notes on this section
This section provides the history of the damages of the ship and of all the sister ships. This
gives the indication of areas prone to damages and these areas need to be inspected.
This section of the survey programme, using the tables below, provides details of
the hull damages for at least the last three years in way of the cargo holds, ballast
tanks and void spaces within the cargo length area. These damages are subject to
survey.
Section 13: Areas identified with substantial
corrosion from previous surveys
Notes on this section
This section the areas of concern identified during previous surveys and these areas need to
be inspected.
This section of the survey programme identifies and lists the areas of substantial
corrosion from previous surveys.
Section 14: Critical structural
areas and suspect areas
Notes on this section
This section lists the critical and suspect areas which are identified based upon the experience
and general market research and data.
This section of the survey programme identifies and lists the critical structural areas
and the suspect areas, when such information is available
Section 15: Other relevant
comments and information
Notes on this section
General section for comments and other relevant information.
This section of the survey programme should provide any other comments and
information relevant to the survey.
Appendices
• Appendix 1: List of Plans
• Appendix 2: Survey Planning Questionnaire
• Appendix 3: Other Documentation
The survey planning questionnaire, which has been submitted by the owner, is appended to the
survey programme
This part of the survey programme should identify and list any other documentation that forms part of
the plan

More Related Content

What's hot (20)

Radar plotting lrg
Radar plotting lrgRadar plotting lrg
Radar plotting lrg
 
Safety in mooring Operations
Safety in mooring OperationsSafety in mooring Operations
Safety in mooring Operations
 
MOORING STATIONS - FOR MARITIME CADETS
MOORING STATIONS -    FOR MARITIME  CADETSMOORING STATIONS -    FOR MARITIME  CADETS
MOORING STATIONS - FOR MARITIME CADETS
 
Surveys of Merchant Ships
Surveys of Merchant Ships Surveys of Merchant Ships
Surveys of Merchant Ships
 
A short note on SOLAS 74
A short note on SOLAS 74A short note on SOLAS 74
A short note on SOLAS 74
 
Decoding SOLAS (Safety of Life at Sea) by SHM Shipcare
Decoding SOLAS (Safety of Life at Sea) by SHM ShipcareDecoding SOLAS (Safety of Life at Sea) by SHM Shipcare
Decoding SOLAS (Safety of Life at Sea) by SHM Shipcare
 
Vessel night navigation lights
Vessel night navigation lightsVessel night navigation lights
Vessel night navigation lights
 
A Short Note on ISPS Code
A Short Note on ISPS CodeA Short Note on ISPS Code
A Short Note on ISPS Code
 
Marpol annexes
Marpol annexesMarpol annexes
Marpol annexes
 
Navigation Rules (Basic)
Navigation Rules (Basic)Navigation Rules (Basic)
Navigation Rules (Basic)
 
Chemical tankers
Chemical tankersChemical tankers
Chemical tankers
 
Imsbc code pocket guide
Imsbc code pocket guideImsbc code pocket guide
Imsbc code pocket guide
 
MlC 2006 General Introduction and Preparation
MlC 2006 General Introduction and PreparationMlC 2006 General Introduction and Preparation
MlC 2006 General Introduction and Preparation
 
ROR review
ROR reviewROR review
ROR review
 
Safety of life at sea understanding your obligations
Safety of life at sea   understanding your obligationsSafety of life at sea   understanding your obligations
Safety of life at sea understanding your obligations
 
Cargo Securing Manual
Cargo Securing ManualCargo Securing Manual
Cargo Securing Manual
 
3 - SOLAS III.pdf
3 - SOLAS III.pdf3 - SOLAS III.pdf
3 - SOLAS III.pdf
 
Ism cbt
Ism cbtIsm cbt
Ism cbt
 
ISM
ISM ISM
ISM
 
Rule 05 look-out
Rule 05     look-outRule 05     look-out
Rule 05 look-out
 

Similar to Survey programme esp (enhanced survey)

GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.pptGEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.pptssuser856cc8
 
Esp booklet for oil tankers tcm155-206361
Esp booklet for oil tankers tcm155-206361Esp booklet for oil tankers tcm155-206361
Esp booklet for oil tankers tcm155-206361KristijanJakimovski1
 
Abs 1975 single point moorings
Abs 1975 single point mooringsAbs 1975 single point moorings
Abs 1975 single point mooringsIgnacio Santana
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specificationCARLOS RUIZ CARDENAS
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTINGAFATous
 
Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Steven Brady
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiiihydrologyproject001
 
D1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlineD1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlinejabbar2002pk200
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample MemoChad Colton
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviihydrologyproject001
 
pdfcoffee.com_astm-d5340pdf-pdf-free.pdf
pdfcoffee.com_astm-d5340pdf-pdf-free.pdfpdfcoffee.com_astm-d5340pdf-pdf-free.pdf
pdfcoffee.com_astm-d5340pdf-pdf-free.pdfkomal46592
 
Distribution stg4 mk100_lit rev_tm
Distribution stg4 mk100_lit rev_tmDistribution stg4 mk100_lit rev_tm
Distribution stg4 mk100_lit rev_tmysuranga
 
Cessna Citation Jet Hydraulics Report
Cessna Citation Jet Hydraulics ReportCessna Citation Jet Hydraulics Report
Cessna Citation Jet Hydraulics ReportMichael Etienne
 
API 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfAPI 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfEmmanuelMatutu
 

Similar to Survey programme esp (enhanced survey) (20)

GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.pptGEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV  V.ppt
GEPAM uuuuuuuuuuuuuuuuuuuuuuUNIT IV V.ppt
 
Esp booklet for oil tankers tcm155-206361
Esp booklet for oil tankers tcm155-206361Esp booklet for oil tankers tcm155-206361
Esp booklet for oil tankers tcm155-206361
 
Abs 1975 single point moorings
Abs 1975 single point mooringsAbs 1975 single point moorings
Abs 1975 single point moorings
 
Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTING
 
internship_report
internship_reportinternship_report
internship_report
 
Lh3619271935
Lh3619271935Lh3619271935
Lh3619271935
 
Producción inspeccionada de aeronaves
Producción inspeccionada de aeronavesProducción inspeccionada de aeronaves
Producción inspeccionada de aeronaves
 
Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)Graded Unit Project Fuel Purification Final Report Online Submission (1)
Graded Unit Project Fuel Purification Final Report Online Submission (1)
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartiii
 
D1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadlineD1 mc s & m topic 3 loadline
D1 mc s & m topic 3 loadline
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
Api 575 rev.2
Api 575 rev.2Api 575 rev.2
Api 575 rev.2
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 
pdfcoffee.com_astm-d5340pdf-pdf-free.pdf
pdfcoffee.com_astm-d5340pdf-pdf-free.pdfpdfcoffee.com_astm-d5340pdf-pdf-free.pdf
pdfcoffee.com_astm-d5340pdf-pdf-free.pdf
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
Distribution stg4 mk100_lit rev_tm
Distribution stg4 mk100_lit rev_tmDistribution stg4 mk100_lit rev_tm
Distribution stg4 mk100_lit rev_tm
 
Pipeline repair techniques
Pipeline repair techniquesPipeline repair techniques
Pipeline repair techniques
 
Cessna Citation Jet Hydraulics Report
Cessna Citation Jet Hydraulics ReportCessna Citation Jet Hydraulics Report
Cessna Citation Jet Hydraulics Report
 
API 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdfAPI 653 Exam March 2019-1.pdf
API 653 Exam March 2019-1.pdf
 

Recently uploaded

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Recently uploaded (20)

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

Survey programme esp (enhanced survey)

  • 1. Survey Programme Enhanced Survey Programme Prepared by Capt Rajeev Jassal www.myseatime.com Content of
  • 2. Section 1: Preamble • 1.1 Scope • 1.2 Documentation The present survey programme covers the minimum extent of overall surveys, close-up surveys, thickness measurements and pressure testing within the cargo length area, cargo holds, ballast tanks, including fore and aft peak tanks, required by the Code The arrangements and safety aspects of the survey should be acceptable to the attending surveyor(s) All documents used in the development of the survey programme should be available on board during the survey. Notes on this section This section defines the scope of the survey programme
  • 3. Section 2: Arrangement of cargo holds, tanks and spaces Notes on this section This section allows the surveyors to brief himself about the ship’s layout This section of the survey programme provides information (either in the form of plans or text) on the arrangement of cargo holds, tanks and spaces that fall within the scope of the survey
  • 4. Section 3: List of cargo holds, tanks and spaces with information on their use, extent of coatings and corrosion prevention system Notes on this section This section gives the details of the use of ship’s spaces and extent of the coating and any other corrosion prevention system such as anodes or ICCP system This section of the survey programme gives the information on the use of the holds and tanks of the ship, the extent of coatings and the corrosion prevention system provided in the survey planning questionnaire
  • 5. Section 4: Conditions for survey Notes on this section This section provides the pre conditions for the survey. For example for the tank survey, the condition is that it should have been in a clean state, gas free with proper lighting and ventilation. Same pre-conditions are documents in this section for other areas of the survey. This section of the survey programme provides information on the conditions for survey, e.g. information regarding cargo hold and tank cleaning, gas freeing, ventilation, lighting, etc.
  • 6. Section 5: Provisions and method of access to structures Notes on this section This section provides the information such as for close up survey of cargo holds what arrangements (Scaffoldings etc) will be provided by the shipowners. This section of the survey programme provides the information on the provisions and methods of access to structures provided in the survey planning questionnaire
  • 7. Section 6: List of equipment for survey Notes on this section This section provides the information on the list of equipments that will be arranged by the shipowner. This section of the survey programme identifies and list the equipment that will be made available for carrying out the survey and the required thickness measurements
  • 8. Section 7: Survey requirements • 1.1 Overall Survey • 1.2 Close up Survey This section of the survey programme identifies and list the spaces that should undergo an overall survey for this ship in accordance with ESP Code This section of the survey programme identifies and list the hull structures that should undergo a close-up survey for this ship in accordance with ESP code Notes on this section This section acts as a quick reference for the areas that will undergo an overall or close up survey. The information and guidelines on which areas need to undergo overall survey or close up survey is provided in the ESP code
  • 9. Section 8: Identification of tanks for tank testing Notes on this section This section provides the information on the cargo holds and tanks that need to undergo pressure testing This section of the survey programme identifies and lists the cargo holds and tanks that should undergo tank testing for this ship in accordance with ESP Code
  • 10. Section 9: Identification of areas and sections for thickness measurements Notes on this section This section provides the exact information of the areas for which thickness measurement need to be done This section of the survey programme identifies and lists the areas and sections where thickness measurements should be taken in accordance with ESP Code
  • 11. Section 10: Minimum thickness of hull structures Notes on this section This section provides the information about the minimum thickness the hull and other structure of the ship need to have. This minimum thickness is calculated based upon the original thickness of the structure minus the allowed wastage. So if the original thickness is 40mm and allowed wastage is 10%, the minimum thickness of this structure needs to be 32mm. The allowed wastage for various structures is provided in the ESM code. This section of the survey programme specifies the minimum thickness for hull structures of the ship that are subject to survey.
  • 12. Section 11: Thickness measurement company Notes on this section This section provides name of the company that would carry out thickness measurement. This section of the survey programme identifies the information of the thickness measurement company.
  • 13. Section 12: Damage experience related to the ship Notes on this section This section provides the history of the damages of the ship and of all the sister ships. This gives the indication of areas prone to damages and these areas need to be inspected. This section of the survey programme, using the tables below, provides details of the hull damages for at least the last three years in way of the cargo holds, ballast tanks and void spaces within the cargo length area. These damages are subject to survey.
  • 14. Section 13: Areas identified with substantial corrosion from previous surveys Notes on this section This section the areas of concern identified during previous surveys and these areas need to be inspected. This section of the survey programme identifies and lists the areas of substantial corrosion from previous surveys.
  • 15. Section 14: Critical structural areas and suspect areas Notes on this section This section lists the critical and suspect areas which are identified based upon the experience and general market research and data. This section of the survey programme identifies and lists the critical structural areas and the suspect areas, when such information is available
  • 16. Section 15: Other relevant comments and information Notes on this section General section for comments and other relevant information. This section of the survey programme should provide any other comments and information relevant to the survey.
  • 17. Appendices • Appendix 1: List of Plans • Appendix 2: Survey Planning Questionnaire • Appendix 3: Other Documentation The survey planning questionnaire, which has been submitted by the owner, is appended to the survey programme This part of the survey programme should identify and list any other documentation that forms part of the plan