PHASE 1 of Nairobi Metro Fiber
552 Km equivalent distance:
Nairobi to Kampala
8 Months to complete
•First 3 weeks resources are mobilized and training is performed.
•Following 6 weeks, works ramp up
•After the first 9 weeks works take off
•24 weeks after kickoff 500 Km were trenched., duct laid and backfilled.
•300Km fiber blown after 24 weeks
0
100
200
300
400
500
600
Wk07
Wk09
Wk11
Wk13
Wk15
Wk17
Wk19
Wk21
Wk23
Wk25
Wk27
Wk29
Wk31
Opened Trecnh
DuctLaid
Backfilled
Fiber Blown
HUAWEIERICSSON
Combined
0
50
100
150
200
250
0 1 3 6
21
27.64 31.061
37.29940.318
48.60
61.04
73.00
87
106
125.5
138.7
152
161.3
175
182.85
190
198
207.8
218.4 219.39222.70
EricssonPortionBreakdown
Opened Trench Microduct Laid Backfilled Fiber Blown
0
50
100
150
200
250
300
2 7 7 8
14
22
28
38.16942.16845.338
53 59
73
89
109
125
141
148
159
167
187
213
236
247
265.94
274
Huawei PortionBreakdown
Opened Trench HDPE Laid Backfilled Fiber Blowing
02nd September2013
Project at a Glance
Huawei Ericsson
Cluster Length
Effective
Start Date
of P.O.
Issued
Latest Expected
Completion
Date
Effective Number of
sites LLD
Total lead time
Average distance
between sites (Km)
Type of Area
Cluster 4 115 12.11.2012 15.11.2013 35 One year 3,29 Suburban
Cluster 3 76,7 13.11.2012 30.09.13 36 10 monthds 2,13 Suburban
Cluster 1 112 12.11.2012 15.11.2013 120 One year 0,93 CBD
Cluster 1 115 28.12.2012 09.10.2103 54 10 monthds 2,13 Urban low concentration
Cluster 2 134 13.11.2012 No changes 122 10 monthds 1,10 Urban high concentration
Total 552,7 Total 367 Overall average 1,51 Urban medium concentration
Phase 1
Huawei
Ericsson
02nd September2013
• 540 Km of 1.2m deep trench dug by sheer muscle power
• Total earth moved: 254.400m3
• If put in 20ft containers it required 7718 containers
• Enough to fill 02 Panamax-Class Container ships
• At peak Huawei had 1.000 to 1.100 labourers.
• Ericsson had at peak 500 labourers.
Most costs is local labor
02nd September2013
• The project drew all resources available in the country.
• Machinery
• Compressors
• Jackhammers
• Trenchless Machinery
• Fusion Splicers
• To be able to complete on time need to fly in technicians and
machines from South Africa
• Ericsson knocked machines down. Airfreighted and re-assembled
them in country.
• Huawei local subcontractors imported trenchless machinery from
Germany and China to cope
02nd September2013
• Kenya’s top capabilities:
• Huawei 400Km per year
• Ericsson 240Km per year

More Related Content

Similar to Subcontracting resources on metro fiber

6559163.ppt
6559163.ppt6559163.ppt
6559163.ppt
MoHsinKh2
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
Zinfra Group
 
laos-tj-2016
laos-tj-2016laos-tj-2016
laos-tj-2016
Omar Ferro
 
Bunang telecoms profile
Bunang telecoms profileBunang telecoms profile
Bunang telecoms profile
The ViZion Communications Group
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global
Ärk Global
 
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEMADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
iQHub
 
Motaz al saady cv
Motaz al saady cvMotaz al saady cv
Motaz al saady cv
alsaady
 
Project loon
Project loonProject loon
Project loon
C souls Nirmala
 
Loon project
Loon projectLoon project
Loon project
Venkata Sreeram
 
CBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrathCBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrath
Confederation of British Industry
 
TEAM VEER.pptx
TEAM VEER.pptxTEAM VEER.pptx
TEAM VEER.pptx
VishnuPrasad416351
 
AFPIF: The Neutral Case Study
AFPIF: The Neutral Case StudyAFPIF: The Neutral Case Study
AFPIF: The Neutral Case Study
Internet Society
 
Kemrock Case Study
Kemrock Case StudyKemrock Case Study
Kemrock Case Study
Naimish Pathak
 
Irfan Ashraf CV
Irfan Ashraf CVIrfan Ashraf CV
Cost effective site engineering
Cost effective site engineeringCost effective site engineering
Cost effective site engineering
Osvaldo Coelho
 
Kloofzight installation
Kloofzight installationKloofzight installation
Kloofzight installation
Wilf Dickinson
 
2015_ORG_resume
2015_ORG_resume2015_ORG_resume
2015_ORG_resume
Orville R Genoring
 
Resume
ResumeResume
Mr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docxMr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docx
johann van der westhuizen
 
transtech.pptx
transtech.pptxtranstech.pptx
transtech.pptx
pawankumar491710
 

Similar to Subcontracting resources on metro fiber (20)

6559163.ppt
6559163.ppt6559163.ppt
6559163.ppt
 
Zinfra Renewables Capability Statement
Zinfra Renewables Capability StatementZinfra Renewables Capability Statement
Zinfra Renewables Capability Statement
 
laos-tj-2016
laos-tj-2016laos-tj-2016
laos-tj-2016
 
Bunang telecoms profile
Bunang telecoms profileBunang telecoms profile
Bunang telecoms profile
 
Corporate Profile | Ärk Global
Corporate Profile | Ärk Global Corporate Profile | Ärk Global
Corporate Profile | Ärk Global
 
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEMADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
ADVANCED & ENERGY-EFFICIENT MINERAL UPLIFT/ MINERAL VERTICAL TRANSPORT SYSTEM
 
Motaz al saady cv
Motaz al saady cvMotaz al saady cv
Motaz al saady cv
 
Project loon
Project loonProject loon
Project loon
 
Loon project
Loon projectLoon project
Loon project
 
CBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrathCBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrath
 
TEAM VEER.pptx
TEAM VEER.pptxTEAM VEER.pptx
TEAM VEER.pptx
 
AFPIF: The Neutral Case Study
AFPIF: The Neutral Case StudyAFPIF: The Neutral Case Study
AFPIF: The Neutral Case Study
 
Kemrock Case Study
Kemrock Case StudyKemrock Case Study
Kemrock Case Study
 
Irfan Ashraf CV
Irfan Ashraf CVIrfan Ashraf CV
Irfan Ashraf CV
 
Cost effective site engineering
Cost effective site engineeringCost effective site engineering
Cost effective site engineering
 
Kloofzight installation
Kloofzight installationKloofzight installation
Kloofzight installation
 
2015_ORG_resume
2015_ORG_resume2015_ORG_resume
2015_ORG_resume
 
Resume
ResumeResume
Resume
 
Mr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docxMr johann van der westhuizen full cv.docx
Mr johann van der westhuizen full cv.docx
 
transtech.pptx
transtech.pptxtranstech.pptx
transtech.pptx
 

More from Osvaldo Coelho

The electric shower will crash the african grid
The electric shower will crash the african gridThe electric shower will crash the african grid
The electric shower will crash the african grid
Osvaldo Coelho
 
Solar agricultural applications
Solar agricultural applicationsSolar agricultural applications
Solar agricultural applications
Osvaldo Coelho
 
Uberizar os sites da tim brasil
Uberizar os sites da tim brasilUberizar os sites da tim brasil
Uberizar os sites da tim brasil
Osvaldo Coelho
 
Brazil 's oi should work with ott
Brazil 's oi should work with ottBrazil 's oi should work with ott
Brazil 's oi should work with ott
Osvaldo Coelho
 
ABRINT o Futuro dos Pequenos Provedores e 4G
ABRINT o Futuro dos Pequenos Provedores e 4GABRINT o Futuro dos Pequenos Provedores e 4G
ABRINT o Futuro dos Pequenos Provedores e 4G
Osvaldo Coelho
 
Fibre deployment Nairobi CBD
Fibre deployment Nairobi CBDFibre deployment Nairobi CBD
Fibre deployment Nairobi CBD
Osvaldo Coelho
 
We build fiber to destroy Networks
We build fiber to destroy NetworksWe build fiber to destroy Networks
We build fiber to destroy Networks
Osvaldo Coelho
 
Obama alstom ge siemens
Obama alstom ge siemensObama alstom ge siemens
Obama alstom ge siemens
Osvaldo Coelho
 
Health & safety on a fiber project in Africa ...
Health & safety on a fiber project in Africa                                 ...Health & safety on a fiber project in Africa                                 ...
Health & safety on a fiber project in Africa ...
Osvaldo Coelho
 
Demograhics and the capacity crunch
Demograhics and the capacity crunchDemograhics and the capacity crunch
Demograhics and the capacity crunch
Osvaldo Coelho
 
Communicating fiber project Enterprise town hall meeting
Communicating fiber project Enterprise town hall meetingCommunicating fiber project Enterprise town hall meeting
Communicating fiber project Enterprise town hall meeting
Osvaldo Coelho
 
Comparison of 3 types of mobile infrastructures
Comparison of 3 types of mobile infrastructuresComparison of 3 types of mobile infrastructures
Comparison of 3 types of mobile infrastructures
Osvaldo Coelho
 
OTT and the Customer Dividend
OTT and the Customer DividendOTT and the Customer Dividend
OTT and the Customer Dividend
Osvaldo Coelho
 
Nairobi fiber progress report
Nairobi fiber progress reportNairobi fiber progress report
Nairobi fiber progress report
Osvaldo Coelho
 
Innovation is easy. The hard part is changing
Innovation is easy. The hard part is changingInnovation is easy. The hard part is changing
Innovation is easy. The hard part is changing
Osvaldo Coelho
 
Trenching for fiber built all over the world
Trenching for fiber built all over the worldTrenching for fiber built all over the world
Trenching for fiber built all over the world
Osvaldo Coelho
 
Fiber to the building is for LTE
Fiber to the building is for LTEFiber to the building is for LTE
Fiber to the building is for LTE
Osvaldo Coelho
 
Safaricom fiber construction after 2 months
Safaricom fiber construction after 2 monthsSafaricom fiber construction after 2 months
Safaricom fiber construction after 2 months
Osvaldo Coelho
 
Drive down opex leases and rentals
Drive down opex leases and rentalsDrive down opex leases and rentals
Drive down opex leases and rentals
Osvaldo Coelho
 

More from Osvaldo Coelho (19)

The electric shower will crash the african grid
The electric shower will crash the african gridThe electric shower will crash the african grid
The electric shower will crash the african grid
 
Solar agricultural applications
Solar agricultural applicationsSolar agricultural applications
Solar agricultural applications
 
Uberizar os sites da tim brasil
Uberizar os sites da tim brasilUberizar os sites da tim brasil
Uberizar os sites da tim brasil
 
Brazil 's oi should work with ott
Brazil 's oi should work with ottBrazil 's oi should work with ott
Brazil 's oi should work with ott
 
ABRINT o Futuro dos Pequenos Provedores e 4G
ABRINT o Futuro dos Pequenos Provedores e 4GABRINT o Futuro dos Pequenos Provedores e 4G
ABRINT o Futuro dos Pequenos Provedores e 4G
 
Fibre deployment Nairobi CBD
Fibre deployment Nairobi CBDFibre deployment Nairobi CBD
Fibre deployment Nairobi CBD
 
We build fiber to destroy Networks
We build fiber to destroy NetworksWe build fiber to destroy Networks
We build fiber to destroy Networks
 
Obama alstom ge siemens
Obama alstom ge siemensObama alstom ge siemens
Obama alstom ge siemens
 
Health & safety on a fiber project in Africa ...
Health & safety on a fiber project in Africa                                 ...Health & safety on a fiber project in Africa                                 ...
Health & safety on a fiber project in Africa ...
 
Demograhics and the capacity crunch
Demograhics and the capacity crunchDemograhics and the capacity crunch
Demograhics and the capacity crunch
 
Communicating fiber project Enterprise town hall meeting
Communicating fiber project Enterprise town hall meetingCommunicating fiber project Enterprise town hall meeting
Communicating fiber project Enterprise town hall meeting
 
Comparison of 3 types of mobile infrastructures
Comparison of 3 types of mobile infrastructuresComparison of 3 types of mobile infrastructures
Comparison of 3 types of mobile infrastructures
 
OTT and the Customer Dividend
OTT and the Customer DividendOTT and the Customer Dividend
OTT and the Customer Dividend
 
Nairobi fiber progress report
Nairobi fiber progress reportNairobi fiber progress report
Nairobi fiber progress report
 
Innovation is easy. The hard part is changing
Innovation is easy. The hard part is changingInnovation is easy. The hard part is changing
Innovation is easy. The hard part is changing
 
Trenching for fiber built all over the world
Trenching for fiber built all over the worldTrenching for fiber built all over the world
Trenching for fiber built all over the world
 
Fiber to the building is for LTE
Fiber to the building is for LTEFiber to the building is for LTE
Fiber to the building is for LTE
 
Safaricom fiber construction after 2 months
Safaricom fiber construction after 2 monthsSafaricom fiber construction after 2 months
Safaricom fiber construction after 2 months
 
Drive down opex leases and rentals
Drive down opex leases and rentalsDrive down opex leases and rentals
Drive down opex leases and rentals
 

Recently uploaded

2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
PuktoonEngr
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 

Recently uploaded (20)

2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt2. Operations Strategy in a Global Environment.ppt
2. Operations Strategy in a Global Environment.ppt
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 

Subcontracting resources on metro fiber

  • 1. Digital City PHASE 1 of Nairobi Metro Fiber 552 Km equivalent distance: Nairobi to Kampala 8 Months to complete
  • 2. •First 3 weeks resources are mobilized and training is performed. •Following 6 weeks, works ramp up •After the first 9 weeks works take off •24 weeks after kickoff 500 Km were trenched., duct laid and backfilled. •300Km fiber blown after 24 weeks 0 100 200 300 400 500 600 Wk07 Wk09 Wk11 Wk13 Wk15 Wk17 Wk19 Wk21 Wk23 Wk25 Wk27 Wk29 Wk31 Opened Trecnh DuctLaid Backfilled Fiber Blown HUAWEIERICSSON Combined
  • 3. 0 50 100 150 200 250 0 1 3 6 21 27.64 31.061 37.29940.318 48.60 61.04 73.00 87 106 125.5 138.7 152 161.3 175 182.85 190 198 207.8 218.4 219.39222.70 EricssonPortionBreakdown Opened Trench Microduct Laid Backfilled Fiber Blown 0 50 100 150 200 250 300 2 7 7 8 14 22 28 38.16942.16845.338 53 59 73 89 109 125 141 148 159 167 187 213 236 247 265.94 274 Huawei PortionBreakdown Opened Trench HDPE Laid Backfilled Fiber Blowing
  • 4. 02nd September2013 Project at a Glance Huawei Ericsson Cluster Length Effective Start Date of P.O. Issued Latest Expected Completion Date Effective Number of sites LLD Total lead time Average distance between sites (Km) Type of Area Cluster 4 115 12.11.2012 15.11.2013 35 One year 3,29 Suburban Cluster 3 76,7 13.11.2012 30.09.13 36 10 monthds 2,13 Suburban Cluster 1 112 12.11.2012 15.11.2013 120 One year 0,93 CBD Cluster 1 115 28.12.2012 09.10.2103 54 10 monthds 2,13 Urban low concentration Cluster 2 134 13.11.2012 No changes 122 10 monthds 1,10 Urban high concentration Total 552,7 Total 367 Overall average 1,51 Urban medium concentration Phase 1 Huawei Ericsson
  • 5. 02nd September2013 • 540 Km of 1.2m deep trench dug by sheer muscle power • Total earth moved: 254.400m3 • If put in 20ft containers it required 7718 containers • Enough to fill 02 Panamax-Class Container ships • At peak Huawei had 1.000 to 1.100 labourers. • Ericsson had at peak 500 labourers. Most costs is local labor
  • 6. 02nd September2013 • The project drew all resources available in the country. • Machinery • Compressors • Jackhammers • Trenchless Machinery • Fusion Splicers • To be able to complete on time need to fly in technicians and machines from South Africa • Ericsson knocked machines down. Airfreighted and re-assembled them in country. • Huawei local subcontractors imported trenchless machinery from Germany and China to cope
  • 7. 02nd September2013 • Kenya’s top capabilities: • Huawei 400Km per year • Ericsson 240Km per year